Background1
3. Histrolically Process, Material Handling focussed business
Delivering large scale projects in remote area’s
Full cross border E,C&I turnkey provider
Unique project approach methodology
Major spotlight on Streamlining Project Process’ – get off site
Expanded Energy sector focus business unit with Renewables portfolio
Delivered projects in both Round I and II of the REIPP program
Actively involved in bid submissions for various aspects for renewable projects in
the REIPPP
Experienced design, manufacture and support teams for the renewable projects
4. 8000sqm floor space under roof
20 and 10 ton overhead cranes
Direct loading/offloading onto flatbed
and superlink trucks
5. Capability of eight (8) units/week
Stringent safety and quality procedures
Re-validation of ISO 9001:2008 certificate
6.
7.
8. CONTAINER NO: QCP - Floor Installation
QCP No: Rev. No:
M01 1
Page of Pages
1 1
CBI Electric Details (A) CBI Electric ( Workshop ) Details (B) Client Details (C)
CBI Electric Solutions CBI Electric Solutions ( Workshop )
2022 LENCHEN SOUTH AVENUE 320 West Street
CENTURION Argo Business Park
0046 Boksburg Industrial Site
Tel: 012 741 2090 Tel:
Supplier Order No: Client Project No: Client Contract No:
CBI Electric Project No: Client Order No:
Project Description:
Project Allocation:
Inspection Intention Details
H Hold for witness and/or clearance to proceed V Verify
W Witness S Surveillance by random inspection or documentation check but no work stoppage
R Review
Action
No:
Activity Description
Work Instruction; Procedure
or Drawing No.
Doc Ref no:
Action / Hold Verification Signature and date
A Sign Date B Sign Date C Sign Date
1 Approved Drawings Available
2 Approved Specifications Available
3 All Floor Plates Secure
4 Screws on Floor Flushing
5 All Bolts Fastened and Torqued
6 Washers on all Bolts
7 Locknuts on all Bolts (if Spring Washer is not used)
8
9
10
Compiled By: Patson Marime CBI Electric Approval (A) CBI Electric Approval (B) Client Approval (C)
Sign: Sign: Sign: Sign:
Name: Name: Name: Name:
Date: Date: Date: Date:
9. CONTAINER NO: QCP - Container Equipment Installation
QCP No: Rev. No:
S01 1
Page of Pages
1 1
CBI Electric Details (A) CBI Electric ( Workshop ) Details (B) Client Details (C)
CBI Electric Solutions CBI Electric Solutions ( Workshop )
2022 LENCHEN SOUTH AVENUE 320 West Street
CENTURION Argo Business Park
0046 Boksburg Industrial Site
Tel: 012 741 2090 Tel:
Supplier Order No: Client Project No: Client Contract No:
CBI Electric Project No: Client Order No:
Project Description:
Project Allocation:
Inspection Intention Details
H Hold for witness and/or clearance to proceed V Verify
W Witness S Surveillance by random inspection or documentation check but no work stoppage
R Review
Action No: Activity Description
Work Instruction; Procedure or
Drawing No.
Doc Ref no:
Action / Hold Verification Signature and date
A Sign Date B Sign Date C Sign Date
1 Approved Drawings Available
2 Approved Specifications Available
3 Inverter Panel Installed
4 AC Switch Panel Installed
5 Metering Panel Installed
6 Auxiliary Transformer and Enlosure Installed and Secure
7 LVDB installed
8 Auxiliary and IT Panel Installed
9 Step up Transformer and Enclosure Installed and Secure
10 RMU installed and secure
11 Lights and Light Switches installed
12 Socket Outlets Installed
13 Fan unit and Controller Installed
14 Fire System and Accessories Installed
15 Fire extinguisher
16 Warning signs
17 Welding Socket Installed
18 Doors Installed and Locking properly
19 Panel Walls Erect and Secure
20 Roof Installed and Secure
21 Push bars on door Installed
22
23
Compiled By: Patson Marime CBI Electric Approval (A) CBI Electric Approval (B) Client Approval (C)
Sign: Sign: Sign: Sign:
Name: Name: Name: Name:
Date: Date: Date: Date:
10. Mechanical and structural design Engineers
Low Voltage and Medium Voltage design Engineers
Solid Edge, Autocad and E-plan resources
In-house Electrical PrEng approvals and sign-offs
Core manufacturing team with CBI-electric affliated contractors to extend
capacity
Grid Code Compliance understanding - Solar Inverter and PPC Grid Code
11. 30 x 1250kVA Inverter Stations
LV, MV and Dry-type Transformer Sections
Custom-built skid
Purpose designed wall panels
Busbar electrical integration of equipment
12. 26 x 1250kVA Inverter Stations
LV, MV and Dry-type Transformer Sections
12m Container Design
Optimised ventilation design
Cable electrical integration of equipment