IPSG SUMMARY OF MAJOR RECENT OIL & GAS PROJECTS
IPSG
CLIENTYEARSCOPECLIENTPROJECTS/N
DANIELI
 Fresh Catalyst Loading
for Reformer & 3
Vessels
DANIELI / CR
Fresh Catalyst Loading
for Reformer &
Desulphurization Reactors
1
 Supply of chemical
cleaning skid
ELNGAir coolers bundles & HE
chemical cleaning
2
 Unloading
 Uni-Dense Loading
MIDOR
Reformer Tube Catalyst
Unloading & Loading
Unidense
2
 Mechanical Works
 Basket Removal and
Replacement
 Catalyst Unloading &
Loading
Delta
Fertilizers
Ammonia Converter
Basket Replacement &
Catalyst Loading and
Unloading
3
 District Cooling Piping
Network installation
 District Cooling Flushing
Al Futtaim
Carillion
District Cooling Network
– Pre insulated CS piping
4
IPSG SUMMARY OF MAJOR RECENT OIL & GAS PROJECTS
IPSG
 District Cooling Piping
Network installation
 District Cooling Flushing
Cairo Oil
Refinery –
Smart Village
District Cooling Network
- CS piping
5
 Install supply & return
piping riser network
Chilled Water Cooling CS
Riser Piping
6
 Mechanical Works
 Unloading Under
Nitrogen
 Loading
 Boxing Up
ELNGCatalyst Unloading /
Loading
7
 Supply of Hydrojetting
Units
 Hydrojetting Activities
ELNGHeat Exchanger Hydro-
jetting
8
 Unloading Of Reformer
 Unloading Of Shift
Converter
 Activities Under Inert
Entry
AlexFertCatalyst Unloading9
 Full NDT Inspection
 Hydrojetting Activities
 De-coking activities
 Cutting & Welding
Modification Activities
KHALDA /
APACHE
Heater Decoking /
Modifications / Repair
10
IPSG SUMMARY OF MAJOR RECENT OIL & GAS PROJECTS
IPSG
 Refractory Repair &
Installation
 Burner Installations
“Dahshour”
 Mercury Adsorbent
Vacuum Unloading
 Loading Activities
 Hazardous Material
Disposal
KHALDA /
APACHE
“EOL-Obayed”
Catalyst Unloading /
Loading
11
 Dryers Fresh Loading
Activities
 Review of Vessel Design
 Supervision For
Commissioning
Activities
MELROSE
“AL Mansoura”
Catalyst Loading
&
Supervision Of
Commissioning
12
IPSG SUMMARY OF MAJOR RECENT OIL & GAS PROJECTS
IPSG
 Full NDT inspection
services
KHALDA /
APACHE
“Abu
Gharadeek”
NDT Inspection Services13
 Unloading of Catalyst
 Loading Of catalyst
 Disposal
PETROFAC
“KHALDA EL
SALAM”
Catalyst Loading /
Unloading
14
 Unloading of Catalyst
 Disposal
KHALDA /
APACHE
“EL SALAM”
Mercury Catalyst
Unloading
15
 Unloading of Catalyst
 Disposal
KHALDA /
APACHE
“EL TAREK”
Mercury Catalyst
Unloading
16
 Unloading of Catalyst
 Loading Of catalyst
AMOCCatalyst Loading /
Unloading
17
 Chemical CleaningANRPCHydro-treater Chemical
Cleaning
18
 Design
ANRPCSTP Plant Design &19
IPSG SUMMARY OF MAJOR RECENT OIL & GAS PROJECTS
IPSG
 Supply & Installation
 Commissioning & Start-
up
Supply
 On-Call Basis
Consultancy
SUCORO Plant O&M
Consultancy
20
 Civil Works
 Supply & Install EM
equipment
 Commissioning
PETROBELSTP 200 m3/day21

More Related Content

What's hot

Operational analysis of biogas based cold storage
Operational analysis of biogas based cold storageOperational analysis of biogas based cold storage
Operational analysis of biogas based cold storagePrem Kumar
 
Gas Combustion Turbine System
Gas Combustion Turbine SystemGas Combustion Turbine System
Gas Combustion Turbine SystemPeter Bright
 
Project services offering (november 2016)
Project services offering (november 2016)Project services offering (november 2016)
Project services offering (november 2016)Luis Domínguez
 
Bahamas Project
Bahamas ProjectBahamas Project
Bahamas ProjectTony Bell
 
Case Study of CCV in Marine Application
Case Study of CCV in Marine ApplicationCase Study of CCV in Marine Application
Case Study of CCV in Marine ApplicationAditi Paul
 
GE ADGT Application - Virtual Pipeline
GE ADGT Application - Virtual PipelineGE ADGT Application - Virtual Pipeline
GE ADGT Application - Virtual PipelineGE코리아
 
Best practices at (aditya cement works site) n ew
Best practices at (aditya cement works site) n ewBest practices at (aditya cement works site) n ew
Best practices at (aditya cement works site) n ewPraveen Rathore
 
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...GSE Systems, Inc.
 
Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009Shaun West
 
Summer Training Report
Summer Training ReportSummer Training Report
Summer Training Reportritu sharma
 

What's hot (20)

Operational analysis of biogas based cold storage
Operational analysis of biogas based cold storageOperational analysis of biogas based cold storage
Operational analysis of biogas based cold storage
 
CompleteCNG - Clean Energy Compression’s CompleteCNG includes proven CleanCNG...
CompleteCNG - Clean Energy Compression’s CompleteCNG includes proven CleanCNG...CompleteCNG - Clean Energy Compression’s CompleteCNG includes proven CleanCNG...
CompleteCNG - Clean Energy Compression’s CompleteCNG includes proven CleanCNG...
 
Clean Energy Ccompression Corporate Overview 2016
Clean Energy Ccompression Corporate Overview 2016Clean Energy Ccompression Corporate Overview 2016
Clean Energy Ccompression Corporate Overview 2016
 
Gas Combustion Turbine System
Gas Combustion Turbine SystemGas Combustion Turbine System
Gas Combustion Turbine System
 
Project services offering (november 2016)
Project services offering (november 2016)Project services offering (november 2016)
Project services offering (november 2016)
 
Clean Energy Compression Corporate overview
Clean Energy Compression Corporate overview Clean Energy Compression Corporate overview
Clean Energy Compression Corporate overview
 
IndustrialCNG - Clean Energy Compression’s Bulk Gas Transportation systems
IndustrialCNG - Clean Energy Compression’s Bulk Gas Transportation systemsIndustrialCNG - Clean Energy Compression’s Bulk Gas Transportation systems
IndustrialCNG - Clean Energy Compression’s Bulk Gas Transportation systems
 
OffgridCNG Virtual Pipeline Equipment
OffgridCNG Virtual Pipeline EquipmentOffgridCNG Virtual Pipeline Equipment
OffgridCNG Virtual Pipeline Equipment
 
Bahamas Project
Bahamas ProjectBahamas Project
Bahamas Project
 
The Role of HVAC in Achieving High Performance Goals
The Role of HVAC in Achieving High Performance GoalsThe Role of HVAC in Achieving High Performance Goals
The Role of HVAC in Achieving High Performance Goals
 
Case Study of CCV in Marine Application
Case Study of CCV in Marine ApplicationCase Study of CCV in Marine Application
Case Study of CCV in Marine Application
 
GE ADGT Application - Virtual Pipeline
GE ADGT Application - Virtual PipelineGE ADGT Application - Virtual Pipeline
GE ADGT Application - Virtual Pipeline
 
Hydrogen Gas Turbine
Hydrogen Gas TurbineHydrogen Gas Turbine
Hydrogen Gas Turbine
 
Compact Reliq™
Compact Reliq™Compact Reliq™
Compact Reliq™
 
Best practices at (aditya cement works site) n ew
Best practices at (aditya cement works site) n ewBest practices at (aditya cement works site) n ew
Best practices at (aditya cement works site) n ew
 
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
 
Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009
 
Virtual Pipelines 101: Delivering Cost-Effective Natural Beyond the Pipeline ...
Virtual Pipelines 101: Delivering Cost-Effective Natural Beyond the Pipeline ...Virtual Pipelines 101: Delivering Cost-Effective Natural Beyond the Pipeline ...
Virtual Pipelines 101: Delivering Cost-Effective Natural Beyond the Pipeline ...
 
Summer Training Report
Summer Training ReportSummer Training Report
Summer Training Report
 
Renovation
RenovationRenovation
Renovation
 

Viewers also liked

amGard S40 HYGIENIC SAFETY INTERLOCK
amGard S40 HYGIENIC SAFETY INTERLOCKamGard S40 HYGIENIC SAFETY INTERLOCK
amGard S40 HYGIENIC SAFETY INTERLOCKRichard Barley
 
Desülfüri̇zasyon yöntemleri̇
Desülfüri̇zasyon yöntemleri̇Desülfüri̇zasyon yöntemleri̇
Desülfüri̇zasyon yöntemleri̇Mustafa Oflu
 
Positioning the Company for an Exit - Chapman - Mar 14
Positioning the Company for an Exit - Chapman - Mar 14Positioning the Company for an Exit - Chapman - Mar 14
Positioning the Company for an Exit - Chapman - Mar 14Jim Chapman
 
Cyrus Company Profile
Cyrus Company ProfileCyrus Company Profile
Cyrus Company ProfileSharoon javed
 
Protecting the Seed Investor - Band of Angels-10-16-13
Protecting the Seed Investor - Band of Angels-10-16-13Protecting the Seed Investor - Band of Angels-10-16-13
Protecting the Seed Investor - Band of Angels-10-16-13Jim Chapman
 
5 Schritte zu einem leistungsstarken IT-Team
5 Schritte zu einem leistungsstarken IT-Team 5 Schritte zu einem leistungsstarken IT-Team
5 Schritte zu einem leistungsstarken IT-Team Sofie Hermansen
 
Folio - Northern Rivers Talking Turkey newspaper
Folio - Northern Rivers Talking Turkey newspaperFolio - Northern Rivers Talking Turkey newspaper
Folio - Northern Rivers Talking Turkey newspaperDallas Reeves
 
CITE Presentation-Legal Aspects of Mergers Acquisitions and Reorganizations-M...
CITE Presentation-Legal Aspects of Mergers Acquisitions and Reorganizations-M...CITE Presentation-Legal Aspects of Mergers Acquisitions and Reorganizations-M...
CITE Presentation-Legal Aspects of Mergers Acquisitions and Reorganizations-M...Jim Chapman
 
Social media wheat
Social media wheatSocial media wheat
Social media wheatSamWheat
 
Folio-TheCourier,Narrabri
Folio-TheCourier,NarrabriFolio-TheCourier,Narrabri
Folio-TheCourier,NarrabriDallas Reeves
 
Jardineria Sant Vicenç
Jardineria Sant VicençJardineria Sant Vicenç
Jardineria Sant VicençSerru Garnova
 
Mi contexto de vida
Mi contexto de vidaMi contexto de vida
Mi contexto de vidavivianatepud
 
US China Legal Exchange - 12-9-13
US China Legal Exchange - 12-9-13US China Legal Exchange - 12-9-13
US China Legal Exchange - 12-9-13Jim Chapman
 

Viewers also liked (20)

amGard S40 HYGIENIC SAFETY INTERLOCK
amGard S40 HYGIENIC SAFETY INTERLOCKamGard S40 HYGIENIC SAFETY INTERLOCK
amGard S40 HYGIENIC SAFETY INTERLOCK
 
Desülfüri̇zasyon yöntemleri̇
Desülfüri̇zasyon yöntemleri̇Desülfüri̇zasyon yöntemleri̇
Desülfüri̇zasyon yöntemleri̇
 
Positioning the Company for an Exit - Chapman - Mar 14
Positioning the Company for an Exit - Chapman - Mar 14Positioning the Company for an Exit - Chapman - Mar 14
Positioning the Company for an Exit - Chapman - Mar 14
 
The Audience
The AudienceThe Audience
The Audience
 
Slogans
SlogansSlogans
Slogans
 
Cyrus Company Profile
Cyrus Company ProfileCyrus Company Profile
Cyrus Company Profile
 
Protecting the Seed Investor - Band of Angels-10-16-13
Protecting the Seed Investor - Band of Angels-10-16-13Protecting the Seed Investor - Band of Angels-10-16-13
Protecting the Seed Investor - Band of Angels-10-16-13
 
5 Schritte zu einem leistungsstarken IT-Team
5 Schritte zu einem leistungsstarken IT-Team 5 Schritte zu einem leistungsstarken IT-Team
5 Schritte zu einem leistungsstarken IT-Team
 
entireAnnotatedBibliography
entireAnnotatedBibliographyentireAnnotatedBibliography
entireAnnotatedBibliography
 
Folio - Northern Rivers Talking Turkey newspaper
Folio - Northern Rivers Talking Turkey newspaperFolio - Northern Rivers Talking Turkey newspaper
Folio - Northern Rivers Talking Turkey newspaper
 
Math Unit
Math UnitMath Unit
Math Unit
 
Automacity
AutomacityAutomacity
Automacity
 
CITE Presentation-Legal Aspects of Mergers Acquisitions and Reorganizations-M...
CITE Presentation-Legal Aspects of Mergers Acquisitions and Reorganizations-M...CITE Presentation-Legal Aspects of Mergers Acquisitions and Reorganizations-M...
CITE Presentation-Legal Aspects of Mergers Acquisitions and Reorganizations-M...
 
BDRLsenGFreport
BDRLsenGFreportBDRLsenGFreport
BDRLsenGFreport
 
Programa de les Fires d'Inca 2016 - Agenda d'activitats
Programa de les Fires d'Inca 2016 - Agenda d'activitats Programa de les Fires d'Inca 2016 - Agenda d'activitats
Programa de les Fires d'Inca 2016 - Agenda d'activitats
 
Social media wheat
Social media wheatSocial media wheat
Social media wheat
 
Folio-TheCourier,Narrabri
Folio-TheCourier,NarrabriFolio-TheCourier,Narrabri
Folio-TheCourier,Narrabri
 
Jardineria Sant Vicenç
Jardineria Sant VicençJardineria Sant Vicenç
Jardineria Sant Vicenç
 
Mi contexto de vida
Mi contexto de vidaMi contexto de vida
Mi contexto de vida
 
US China Legal Exchange - 12-9-13
US China Legal Exchange - 12-9-13US China Legal Exchange - 12-9-13
US China Legal Exchange - 12-9-13
 

Similar to REFERENCE 2015

Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Kamran Saeed
 
LNG Processing Overview for natural gas.pdf
LNG Processing Overview for natural gas.pdfLNG Processing Overview for natural gas.pdf
LNG Processing Overview for natural gas.pdfYusri881
 
The Gas Recovery Systems - Sphere Decontamination Presentation
The Gas Recovery Systems - Sphere Decontamination PresentationThe Gas Recovery Systems - Sphere Decontamination Presentation
The Gas Recovery Systems - Sphere Decontamination PresentationGulfCoastConsulting
 
ExLon VacTech Solutions
ExLon VacTech SolutionsExLon VacTech Solutions
ExLon VacTech SolutionsAamer Pathan
 
Ener-tec, Inc. - Water/oil presentation
Ener-tec, Inc. - Water/oil presentationEner-tec, Inc. - Water/oil presentation
Ener-tec, Inc. - Water/oil presentationJonathan Shroyer
 
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)Unit 1 Coal based Power plants of Power Plant Engg (ME6701)
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)PALANIVEL SUBBIAH
 
Immersion Cooling Cryptocurrency Tank Designs
Immersion Cooling Cryptocurrency Tank DesignsImmersion Cooling Cryptocurrency Tank Designs
Immersion Cooling Cryptocurrency Tank DesignsAlaxandria von Hell
 
Chiller Plant-EN - Catalogue
Chiller Plant-EN - CatalogueChiller Plant-EN - Catalogue
Chiller Plant-EN - CatalogueTomas Eriksson
 
Stakeholder weekly report-20th May 2023.pptx
Stakeholder weekly report-20th May 2023.pptxStakeholder weekly report-20th May 2023.pptx
Stakeholder weekly report-20th May 2023.pptxbalajikollu3
 
Aspen Final Presentation Master
Aspen Final Presentation MasterAspen Final Presentation Master
Aspen Final Presentation MasterMichael Fedorenko
 

Similar to REFERENCE 2015 (20)

Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech
 
Unit1 COALBASEDPOWER PLANTS
Unit1 COALBASEDPOWER PLANTSUnit1 COALBASEDPOWER PLANTS
Unit1 COALBASEDPOWER PLANTS
 
LNG Processing Overview for natural gas.pdf
LNG Processing Overview for natural gas.pdfLNG Processing Overview for natural gas.pdf
LNG Processing Overview for natural gas.pdf
 
Lec 01 rac
Lec 01 racLec 01 rac
Lec 01 rac
 
The Gas Recovery Systems - Sphere Decontamination Presentation
The Gas Recovery Systems - Sphere Decontamination PresentationThe Gas Recovery Systems - Sphere Decontamination Presentation
The Gas Recovery Systems - Sphere Decontamination Presentation
 
Choi.ppt
Choi.pptChoi.ppt
Choi.ppt
 
QATAR GAS
QATAR GASQATAR GAS
QATAR GAS
 
ExLon VacTech Solutions
ExLon VacTech SolutionsExLon VacTech Solutions
ExLon VacTech Solutions
 
Akhilesh ongc report
Akhilesh ongc reportAkhilesh ongc report
Akhilesh ongc report
 
Ener-tec, Inc. - Water/oil presentation
Ener-tec, Inc. - Water/oil presentationEner-tec, Inc. - Water/oil presentation
Ener-tec, Inc. - Water/oil presentation
 
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)Unit 1 Coal based Power plants of Power Plant Engg (ME6701)
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Immersion Cooling Cryptocurrency Tank Designs
Immersion Cooling Cryptocurrency Tank DesignsImmersion Cooling Cryptocurrency Tank Designs
Immersion Cooling Cryptocurrency Tank Designs
 
Chiller Plant-EN - Catalogue
Chiller Plant-EN - CatalogueChiller Plant-EN - Catalogue
Chiller Plant-EN - Catalogue
 
Chiller Plant-EN - Catalogue
Chiller Plant-EN - CatalogueChiller Plant-EN - Catalogue
Chiller Plant-EN - Catalogue
 
fpd-100-ea4(1)
fpd-100-ea4(1)fpd-100-ea4(1)
fpd-100-ea4(1)
 
Stakeholder weekly report-20th May 2023.pptx
Stakeholder weekly report-20th May 2023.pptxStakeholder weekly report-20th May 2023.pptx
Stakeholder weekly report-20th May 2023.pptx
 
Mechanical engineer-cdr
Mechanical engineer-cdrMechanical engineer-cdr
Mechanical engineer-cdr
 
CESC-TGS REPORT
CESC-TGS REPORTCESC-TGS REPORT
CESC-TGS REPORT
 
Aspen Final Presentation Master
Aspen Final Presentation MasterAspen Final Presentation Master
Aspen Final Presentation Master
 

REFERENCE 2015

  • 1. IPSG SUMMARY OF MAJOR RECENT OIL & GAS PROJECTS IPSG CLIENTYEARSCOPECLIENTPROJECTS/N DANIELI  Fresh Catalyst Loading for Reformer & 3 Vessels DANIELI / CR Fresh Catalyst Loading for Reformer & Desulphurization Reactors 1  Supply of chemical cleaning skid ELNGAir coolers bundles & HE chemical cleaning 2  Unloading  Uni-Dense Loading MIDOR Reformer Tube Catalyst Unloading & Loading Unidense 2  Mechanical Works  Basket Removal and Replacement  Catalyst Unloading & Loading Delta Fertilizers Ammonia Converter Basket Replacement & Catalyst Loading and Unloading 3  District Cooling Piping Network installation  District Cooling Flushing Al Futtaim Carillion District Cooling Network – Pre insulated CS piping 4
  • 2. IPSG SUMMARY OF MAJOR RECENT OIL & GAS PROJECTS IPSG  District Cooling Piping Network installation  District Cooling Flushing Cairo Oil Refinery – Smart Village District Cooling Network - CS piping 5  Install supply & return piping riser network Chilled Water Cooling CS Riser Piping 6  Mechanical Works  Unloading Under Nitrogen  Loading  Boxing Up ELNGCatalyst Unloading / Loading 7  Supply of Hydrojetting Units  Hydrojetting Activities ELNGHeat Exchanger Hydro- jetting 8  Unloading Of Reformer  Unloading Of Shift Converter  Activities Under Inert Entry AlexFertCatalyst Unloading9  Full NDT Inspection  Hydrojetting Activities  De-coking activities  Cutting & Welding Modification Activities KHALDA / APACHE Heater Decoking / Modifications / Repair 10
  • 3. IPSG SUMMARY OF MAJOR RECENT OIL & GAS PROJECTS IPSG  Refractory Repair & Installation  Burner Installations “Dahshour”  Mercury Adsorbent Vacuum Unloading  Loading Activities  Hazardous Material Disposal KHALDA / APACHE “EOL-Obayed” Catalyst Unloading / Loading 11  Dryers Fresh Loading Activities  Review of Vessel Design  Supervision For Commissioning Activities MELROSE “AL Mansoura” Catalyst Loading & Supervision Of Commissioning 12
  • 4. IPSG SUMMARY OF MAJOR RECENT OIL & GAS PROJECTS IPSG  Full NDT inspection services KHALDA / APACHE “Abu Gharadeek” NDT Inspection Services13  Unloading of Catalyst  Loading Of catalyst  Disposal PETROFAC “KHALDA EL SALAM” Catalyst Loading / Unloading 14  Unloading of Catalyst  Disposal KHALDA / APACHE “EL SALAM” Mercury Catalyst Unloading 15  Unloading of Catalyst  Disposal KHALDA / APACHE “EL TAREK” Mercury Catalyst Unloading 16  Unloading of Catalyst  Loading Of catalyst AMOCCatalyst Loading / Unloading 17  Chemical CleaningANRPCHydro-treater Chemical Cleaning 18  Design ANRPCSTP Plant Design &19
  • 5. IPSG SUMMARY OF MAJOR RECENT OIL & GAS PROJECTS IPSG  Supply & Installation  Commissioning & Start- up Supply  On-Call Basis Consultancy SUCORO Plant O&M Consultancy 20  Civil Works  Supply & Install EM equipment  Commissioning PETROBELSTP 200 m3/day21