Practice Problems: Supplement 10 (S10), Work Measurement
Problem 1:
Carolyn Barrett, a marketing surveyor, takes an average of 10 minutes to complete a
particular questionnaire. Carolyn’s performance rating (pace) is 110% and there is an
allowance of 15%.
What is the Normal time for completing this questionnaire?
What is the Standard time for completing this questionnaire?
Problem 2:
Tom Leonard, of Leonard, Spitz, and Wareham, takes 3 hours and 25 minutes to write
an end of month report. Tom is rated at 95% (work pace is 95%) and the office has a
personal time allowance of 8%. There is no delay time or fatigue time.
What is the Normal time for writing an end of month report?
What is the Standard time for writing an end of month report?
Problem 3:
The two steps in preparing chocolate candy bars are molding and packaging. Personal
fatigue and delay allowances are set at 15%. The molding machine operator is rated at
110% and the packer is rated at 80%. Observed times per batch are given below.

Observed Time in Minutes
Task

1

2

3

4

Molding

26

30

29

31

Packing

45

50

35

30

Determine the Normal and standard times for both tasks.

1
Problem 4:
A work-study sample of a manufacturing activity conducted over a 40-hour period
shows that a worker with an 85% rating produced 12 parts. The worker’s idle time
was 10% and the allowance factor was 12%
Find the Normal and Standard time for this activity.
Problem 5:
Jim and Bob recently time-studied a janitorial task. From a sample of 75 observations,
they computed an average cycle time of 15 minutes with a standard deviation of 2
minutes. Was their sample large enough that one can be 99% confident that the
standard time is within 5% of the true value?
Problem 6:
Consider the following task broken down into 5 MTM elements:

TMUs

Code in MTM Books

Reach to tool box

14.2

R12D

Grasp a tool

3.5

BG1

Separate tool by pressing

10.6

AP2

Turn tool

3.5

T45S

Move and focus eyes

13.4

M12B

What is the total time for the task?

2
ANSWERS
Problem 1:
Normal time = (total time)(%working on this task)(rating)/(number of units produced)
= (10)(1.00)(1.10)/1 = 11 minutes
Standard time =

Total Normal time
11
11
=
=
= 12.9 minutes
1-Allowance factor 1 − 0.15 .85

Problem 2:
Normal time = (total time)(%working on this task)(rating)/(number of units produced)
= (205 minutes)(1.00)(0.95)/1 = 194.75 minutes
Standard time =

Total Normal time 194.75 194.75
=
=
= 211.68 minutes
1-Allowance factor 1 − 0.08
.92

Problem 3:

Observed Times in Minutes
Task

1

2

3

4

Molding

26

30

29

31

Packing

45

50

35

30

For Molding:
Average for the actual Molding cycle = 29 minutes per batch
Normal time = (total time)(% working)(rating)/(number of units produced)
= (29)(1.00)(1.10) /1 = 31.9 minutes per batch
Standard time = (Normal time)/(1-Allowance)
= 31.90 /(1 − 0.15) = 37.5 minutes per batch

For Packing:
Average actual Packing time = 40 minutes
3
Normal time = (total time)(%working)(rating)/(number of units produced)
= (40)(1.00)(.80) = 32 minutes per batch
Standard time = (Normal time)/(1-Allowance)
= (32)/(1 − 0.15) = 37.6 minutes
Problem 4:
Average actual time = 40 hours
Normal time = (total time)(%working)(rating)/(number of units produced)
= (40hrs)(0.90)(0.85)/(12) = 2.55 hours per part
Standard time = (Normal time)/(1-Allowance)
= 2.55 / 0.88 = 2.90 hours per part
Problem 5:
To find the number of samples required:
2

 zσ 
n=
÷ where h is the accuracy desired and z is the confidence level
h−x 
2

2

 2.575* 2   5.15 
n=
÷ =
÷ = 47.15 or 48 samples
 0.05*15   .75 
Therefore, the sample size of 75 is sufficient.

4
Problem 6:

TMUs
Reach to tool box

Code in MTM Books

14.2

R12D

3.5

BG1

10.6

AP2

3.5

T45S

Move and focus eyes

13.4

M12B

TOTAL

45.2

Grasp a tool
Separate tool by pressing
Turn tool

Remember: 1 TMU = .0006 minutes.
Translating to minutes: 45.2 TMUs * .0006 = .027 minutes
Translating to seconds: .027 minutes * 60 = 1.627 seconds

5
Problem 6:

TMUs
Reach to tool box

Code in MTM Books

14.2

R12D

3.5

BG1

10.6

AP2

3.5

T45S

Move and focus eyes

13.4

M12B

TOTAL

45.2

Grasp a tool
Separate tool by pressing
Turn tool

Remember: 1 TMU = .0006 minutes.
Translating to minutes: 45.2 TMUs * .0006 = .027 minutes
Translating to seconds: .027 minutes * 60 = 1.627 seconds

5

More Related Content

What's hot

Product1 [4] capacity planning
Product1 [4]   capacity planningProduct1 [4]   capacity planning
Product1 [4] capacity planningnickoleaaronlinog
 
Continuous improvement and tqm [short version]
Continuous improvement and tqm [short version]Continuous improvement and tqm [short version]
Continuous improvement and tqm [short version]JonRobinsonConsultancy
 
Work study method and time study-final - copy
Work study method and time study-final - copyWork study method and time study-final - copy
Work study method and time study-final - copyHareesh M
 
3 work measurement ppt
3 work measurement ppt3 work measurement ppt
3 work measurement pptLizzette Danan
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancingMANJUNATH N
 
heizer jay operations management Ch14pp
 heizer jay operations management Ch14pp heizer jay operations management Ch14pp
heizer jay operations management Ch14ppTaliya Hemanth
 
Toyota production system-JIT-Lean Operation
Toyota production system-JIT-Lean OperationToyota production system-JIT-Lean Operation
Toyota production system-JIT-Lean OperationShahbaz Jaffri
 
heizer jay operations management Mod dpp
heizer jay operations management Mod dppheizer jay operations management Mod dpp
heizer jay operations management Mod dppTaliya Hemanth
 
Assembly line balancing using Rank positional weight (RPW)
Assembly line balancing using Rank positional weight (RPW)Assembly line balancing using Rank positional weight (RPW)
Assembly line balancing using Rank positional weight (RPW)shady anwer
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSJulian Kalac P.Eng
 

What's hot (20)

Line balancing
Line balancingLine balancing
Line balancing
 
Ch12pp
Ch12ppCh12pp
Ch12pp
 
Ch04pp
Ch04ppCh04pp
Ch04pp
 
Product1 [4] capacity planning
Product1 [4]   capacity planningProduct1 [4]   capacity planning
Product1 [4] capacity planning
 
Queueing theory
Queueing theoryQueueing theory
Queueing theory
 
2. cost of quality
2. cost of quality2. cost of quality
2. cost of quality
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
 
Line balancing and heuristics
Line balancing and heuristicsLine balancing and heuristics
Line balancing and heuristics
 
Continuous improvement and tqm [short version]
Continuous improvement and tqm [short version]Continuous improvement and tqm [short version]
Continuous improvement and tqm [short version]
 
Time study part 2
Time study part 2Time study part 2
Time study part 2
 
Work study method and time study-final - copy
Work study method and time study-final - copyWork study method and time study-final - copy
Work study method and time study-final - copy
 
3 work measurement ppt
3 work measurement ppt3 work measurement ppt
3 work measurement ppt
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
heizer jay operations management Ch14pp
 heizer jay operations management Ch14pp heizer jay operations management Ch14pp
heizer jay operations management Ch14pp
 
Toyota production system-JIT-Lean Operation
Toyota production system-JIT-Lean OperationToyota production system-JIT-Lean Operation
Toyota production system-JIT-Lean Operation
 
heizer jay operations management Mod dpp
heizer jay operations management Mod dppheizer jay operations management Mod dpp
heizer jay operations management Mod dpp
 
Assembly line balancing using Rank positional weight (RPW)
Assembly line balancing using Rank positional weight (RPW)Assembly line balancing using Rank positional weight (RPW)
Assembly line balancing using Rank positional weight (RPW)
 
Design of Work Systems
Design of Work SystemsDesign of Work Systems
Design of Work Systems
 
Work measurement (1)
Work measurement (1)Work measurement (1)
Work measurement (1)
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 

Viewers also liked

Viewers also liked (19)

Heizer 05
Heizer 05Heizer 05
Heizer 05
 
heizer jay operations managementSupp07pp
 heizer jay operations managementSupp07pp heizer jay operations managementSupp07pp
heizer jay operations managementSupp07pp
 
253413062 heizer-om11-irm-ch07 s
253413062 heizer-om11-irm-ch07 s253413062 heizer-om11-irm-ch07 s
253413062 heizer-om11-irm-ch07 s
 
241233316 solution-manual-of-chapter-8-om
241233316 solution-manual-of-chapter-8-om241233316 solution-manual-of-chapter-8-om
241233316 solution-manual-of-chapter-8-om
 
heizer jay operations management Ch11pp
heizer jay operations management Ch11ppheizer jay operations management Ch11pp
heizer jay operations management Ch11pp
 
Ch10pp
Ch10ppCh10pp
Ch10pp
 
Ch13pp
Ch13ppCh13pp
Ch13pp
 
Ch17pp
Ch17ppCh17pp
Ch17pp
 
Ch16pp
Ch16ppCh16pp
Ch16pp
 
heizer jay operations management Ch17pp
 heizer jay operations management Ch17pp heizer jay operations management Ch17pp
heizer jay operations management Ch17pp
 
Ch11pp
Ch11ppCh11pp
Ch11pp
 
heizer jay operations management Mod app
 heizer jay operations management Mod app heizer jay operations management Mod app
heizer jay operations management Mod app
 
Sociology of work
Sociology of work   Sociology of work
Sociology of work
 
Mod fpp
Mod fppMod fpp
Mod fpp
 
heizer jay operations management Ch08pp
heizer jay operations management Ch08ppheizer jay operations management Ch08pp
heizer jay operations management Ch08pp
 
Ch09pp
Ch09ppCh09pp
Ch09pp
 
Heizer 10
Heizer 10Heizer 10
Heizer 10
 
Scientific knowledge in Vedas
Scientific knowledge in VedasScientific knowledge in Vedas
Scientific knowledge in Vedas
 
Dmt assignment
Dmt assignmentDmt assignment
Dmt assignment
 

Similar to heizer jay operations management Supp10pp

Production & Operation Management Chapter15[1]
Production & Operation Management Chapter15[1]Production & Operation Management Chapter15[1]
Production & Operation Management Chapter15[1]Hariharan Ponnusamy
 
Work measurement ppt @ bec doms
Work measurement ppt @ bec domsWork measurement ppt @ bec doms
Work measurement ppt @ bec domsBabasab Patil
 
Litttle knowledge of lean concept helps
Litttle knowledge of lean  concept helpsLitttle knowledge of lean  concept helps
Litttle knowledge of lean concept helpsSF Lau
 
02_Ch(2)_Work Systems and How They Work.pptx
02_Ch(2)_Work Systems and How They Work.pptx02_Ch(2)_Work Systems and How They Work.pptx
02_Ch(2)_Work Systems and How They Work.pptxAhmed Sobhi
 
ACC 300 Assignment 7
ACC 300 Assignment 7ACC 300 Assignment 7
ACC 300 Assignment 7AdalineForbs
 
Constraint Management, operations management.ppt
Constraint Management, operations management.pptConstraint Management, operations management.ppt
Constraint Management, operations management.pptPratyushKumar908783
 
Quality Management.ppt
Quality Management.pptQuality Management.ppt
Quality Management.pptddelucy
 
2.1 Understand problem solving concept
2.1 Understand problem solving concept2.1 Understand problem solving concept
2.1 Understand problem solving conceptFrankie Jones
 
Lean Smpl 1
Lean Smpl 1Lean Smpl 1
Lean Smpl 1jsgerges
 
Managerial and Technical skills of supervisors
Managerial and Technical skills of supervisorsManagerial and Technical skills of supervisors
Managerial and Technical skills of supervisorsNabila Naik
 
Mba 505 business_processes_operations_productivity_strategy_tutorial1s
Mba 505 business_processes_operations_productivity_strategy_tutorial1sMba 505 business_processes_operations_productivity_strategy_tutorial1s
Mba 505 business_processes_operations_productivity_strategy_tutorial1sChainon
 
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturingLEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturingssuser72b8e8
 

Similar to heizer jay operations management Supp10pp (20)

Mpc sequencing
Mpc   sequencingMpc   sequencing
Mpc sequencing
 
Heizer ch10 s
Heizer ch10 sHeizer ch10 s
Heizer ch10 s
 
Production & Operation Management Chapter15[1]
Production & Operation Management Chapter15[1]Production & Operation Management Chapter15[1]
Production & Operation Management Chapter15[1]
 
Work measurement ppt @ bec doms
Work measurement ppt @ bec domsWork measurement ppt @ bec doms
Work measurement ppt @ bec doms
 
Litttle knowledge of lean concept helps
Litttle knowledge of lean  concept helpsLitttle knowledge of lean  concept helps
Litttle knowledge of lean concept helps
 
02_Ch(2)_Work Systems and How They Work.pptx
02_Ch(2)_Work Systems and How They Work.pptx02_Ch(2)_Work Systems and How They Work.pptx
02_Ch(2)_Work Systems and How They Work.pptx
 
Line balancing
Line balancing Line balancing
Line balancing
 
ACC 300 Assignment 7
ACC 300 Assignment 7ACC 300 Assignment 7
ACC 300 Assignment 7
 
katalooselam100813
katalooselam100813katalooselam100813
katalooselam100813
 
Constraint Management, operations management.ppt
Constraint Management, operations management.pptConstraint Management, operations management.ppt
Constraint Management, operations management.ppt
 
Quality Management.ppt
Quality Management.pptQuality Management.ppt
Quality Management.ppt
 
Kaizen.ppt
Kaizen.pptKaizen.ppt
Kaizen.ppt
 
2.1 Understand problem solving concept
2.1 Understand problem solving concept2.1 Understand problem solving concept
2.1 Understand problem solving concept
 
7. cqia (kaizen, 5 s, tpm)
7. cqia (kaizen, 5 s, tpm)7. cqia (kaizen, 5 s, tpm)
7. cqia (kaizen, 5 s, tpm)
 
OEE
OEEOEE
OEE
 
Lean Smpl 1
Lean Smpl 1Lean Smpl 1
Lean Smpl 1
 
Managerial and Technical skills of supervisors
Managerial and Technical skills of supervisorsManagerial and Technical skills of supervisors
Managerial and Technical skills of supervisors
 
Mba 505 business_processes_operations_productivity_strategy_tutorial1s
Mba 505 business_processes_operations_productivity_strategy_tutorial1sMba 505 business_processes_operations_productivity_strategy_tutorial1s
Mba 505 business_processes_operations_productivity_strategy_tutorial1s
 
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturingLEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
 
Artisan RCA1
Artisan RCA1Artisan RCA1
Artisan RCA1
 

More from Taliya Hemanth

Dark matter ~ Introduction
Dark matter ~ Introduction Dark matter ~ Introduction
Dark matter ~ Introduction Taliya Hemanth
 
cutting forces(static) simulation on lathe
cutting forces(static) simulation on lathecutting forces(static) simulation on lathe
cutting forces(static) simulation on latheTaliya Hemanth
 
pnuematic valve symbols
pnuematic valve symbolspnuematic valve symbols
pnuematic valve symbolsTaliya Hemanth
 
G and m_programming_for_mills_manual
G and m_programming_for_mills_manualG and m_programming_for_mills_manual
G and m_programming_for_mills_manualTaliya Hemanth
 
Ukraines conflict and_resolution
Ukraines conflict and_resolutionUkraines conflict and_resolution
Ukraines conflict and_resolutionTaliya Hemanth
 
heizer jay operations management Ch07pp
heizer jay operations management Ch07ppheizer jay operations management Ch07pp
heizer jay operations management Ch07ppTaliya Hemanth
 

More from Taliya Hemanth (10)

Dark matter ~ Introduction
Dark matter ~ Introduction Dark matter ~ Introduction
Dark matter ~ Introduction
 
cutting forces(static) simulation on lathe
cutting forces(static) simulation on lathecutting forces(static) simulation on lathe
cutting forces(static) simulation on lathe
 
Clean room technology
Clean room technologyClean room technology
Clean room technology
 
pnuematic valve symbols
pnuematic valve symbolspnuematic valve symbols
pnuematic valve symbols
 
Cnc milling
Cnc millingCnc milling
Cnc milling
 
G and m_programming_for_mills_manual
G and m_programming_for_mills_manualG and m_programming_for_mills_manual
G and m_programming_for_mills_manual
 
Ukraines conflict and_resolution
Ukraines conflict and_resolutionUkraines conflict and_resolution
Ukraines conflict and_resolution
 
heizer jay operations management Ch07pp
heizer jay operations management Ch07ppheizer jay operations management Ch07pp
heizer jay operations management Ch07pp
 
Ch06pp
Ch06ppCh06pp
Ch06pp
 
Ch05pp
Ch05ppCh05pp
Ch05pp
 

Recently uploaded

CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 

Recently uploaded (20)

CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 

heizer jay operations management Supp10pp

  • 1. Practice Problems: Supplement 10 (S10), Work Measurement Problem 1: Carolyn Barrett, a marketing surveyor, takes an average of 10 minutes to complete a particular questionnaire. Carolyn’s performance rating (pace) is 110% and there is an allowance of 15%. What is the Normal time for completing this questionnaire? What is the Standard time for completing this questionnaire? Problem 2: Tom Leonard, of Leonard, Spitz, and Wareham, takes 3 hours and 25 minutes to write an end of month report. Tom is rated at 95% (work pace is 95%) and the office has a personal time allowance of 8%. There is no delay time or fatigue time. What is the Normal time for writing an end of month report? What is the Standard time for writing an end of month report? Problem 3: The two steps in preparing chocolate candy bars are molding and packaging. Personal fatigue and delay allowances are set at 15%. The molding machine operator is rated at 110% and the packer is rated at 80%. Observed times per batch are given below. Observed Time in Minutes Task 1 2 3 4 Molding 26 30 29 31 Packing 45 50 35 30 Determine the Normal and standard times for both tasks. 1
  • 2. Problem 4: A work-study sample of a manufacturing activity conducted over a 40-hour period shows that a worker with an 85% rating produced 12 parts. The worker’s idle time was 10% and the allowance factor was 12% Find the Normal and Standard time for this activity. Problem 5: Jim and Bob recently time-studied a janitorial task. From a sample of 75 observations, they computed an average cycle time of 15 minutes with a standard deviation of 2 minutes. Was their sample large enough that one can be 99% confident that the standard time is within 5% of the true value? Problem 6: Consider the following task broken down into 5 MTM elements: TMUs Code in MTM Books Reach to tool box 14.2 R12D Grasp a tool 3.5 BG1 Separate tool by pressing 10.6 AP2 Turn tool 3.5 T45S Move and focus eyes 13.4 M12B What is the total time for the task? 2
  • 3. ANSWERS Problem 1: Normal time = (total time)(%working on this task)(rating)/(number of units produced) = (10)(1.00)(1.10)/1 = 11 minutes Standard time = Total Normal time 11 11 = = = 12.9 minutes 1-Allowance factor 1 − 0.15 .85 Problem 2: Normal time = (total time)(%working on this task)(rating)/(number of units produced) = (205 minutes)(1.00)(0.95)/1 = 194.75 minutes Standard time = Total Normal time 194.75 194.75 = = = 211.68 minutes 1-Allowance factor 1 − 0.08 .92 Problem 3: Observed Times in Minutes Task 1 2 3 4 Molding 26 30 29 31 Packing 45 50 35 30 For Molding: Average for the actual Molding cycle = 29 minutes per batch Normal time = (total time)(% working)(rating)/(number of units produced) = (29)(1.00)(1.10) /1 = 31.9 minutes per batch Standard time = (Normal time)/(1-Allowance) = 31.90 /(1 − 0.15) = 37.5 minutes per batch For Packing: Average actual Packing time = 40 minutes 3
  • 4. Normal time = (total time)(%working)(rating)/(number of units produced) = (40)(1.00)(.80) = 32 minutes per batch Standard time = (Normal time)/(1-Allowance) = (32)/(1 − 0.15) = 37.6 minutes Problem 4: Average actual time = 40 hours Normal time = (total time)(%working)(rating)/(number of units produced) = (40hrs)(0.90)(0.85)/(12) = 2.55 hours per part Standard time = (Normal time)/(1-Allowance) = 2.55 / 0.88 = 2.90 hours per part Problem 5: To find the number of samples required: 2  zσ  n= ÷ where h is the accuracy desired and z is the confidence level h−x  2 2  2.575* 2   5.15  n= ÷ = ÷ = 47.15 or 48 samples  0.05*15   .75  Therefore, the sample size of 75 is sufficient. 4
  • 5. Problem 6: TMUs Reach to tool box Code in MTM Books 14.2 R12D 3.5 BG1 10.6 AP2 3.5 T45S Move and focus eyes 13.4 M12B TOTAL 45.2 Grasp a tool Separate tool by pressing Turn tool Remember: 1 TMU = .0006 minutes. Translating to minutes: 45.2 TMUs * .0006 = .027 minutes Translating to seconds: .027 minutes * 60 = 1.627 seconds 5
  • 6. Problem 6: TMUs Reach to tool box Code in MTM Books 14.2 R12D 3.5 BG1 10.6 AP2 3.5 T45S Move and focus eyes 13.4 M12B TOTAL 45.2 Grasp a tool Separate tool by pressing Turn tool Remember: 1 TMU = .0006 minutes. Translating to minutes: 45.2 TMUs * .0006 = .027 minutes Translating to seconds: .027 minutes * 60 = 1.627 seconds 5