Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
ACC 300 Assignment 7
1. Buy here:
http://homework.plus/acc-300-assignment-7/
1. Problem 7-1
An analyst has timed a metal-cutting operation for 50 cycles. The average time per cycle was
10.7 minutes, and the standard deviation was 1.20 minutes for a worker with a performance
rating of 138 percent. Assume an allowance of 19 percent of job time. Find the standard time
for this operation. (Do not round intermediate calculations. Round your final answer to 2
decimal places.)
2. Problem 7-4
Given these observed times (in minutes) for four elements of a job, determine the observed time
(OT) for each element. Note : The second element only occurs every other cycle. (Round your
answers to 2 decimal places.)
CYCLE
Element 1 2 3 4 5 6
1 4.1 4.0 5.0 4.1 4.1 4.1
2. 2 - 1.5 - 2.0 - 1.4
3 3.2 3.2 3.9 3.2 3.3 3.3
4 2.7 3.7 2.7 2.8 2.8 2.8
3. Problem 7-5
Given these observed times (in minutes) for five elements of a job, determine the observed time
(OT) for each element. Note: Some of the elements occur only periodically. (Round your
answers to 2 decimal places.)
CYCLE
3. Elemen
t
1 2 3 4 5 6
1 2.1 2.0 2.6 2.1 2.1 -
2 - 1.6 - 1.0 - 1.2
3 3.4 3.5 3.3 3.8 3.4 3.3
4 4.0 - - 4.5 - -
5 1.4 1.4 2.1 1.5 1.5 1.4
4. Problem 7-6
Using the following data, develop an allowance percentage for a job element that requires the
worker to lift a weight of 40 pounds while (1) standing in a slightly awkward position, (2) in light
4. that is well below recommended standards, and (3) with intermittent loud noises occurring. The
monotony for this element is high. Include a personal allowance of 5 percent and a basic fatigue
allowance of 4 percent of job time. (Leave no cells blank - be certain to enter "0" wherever
required. Omit the "%" sign in your response.)
Percent Percent
A. Constant allowances: 4. Bad light:
1. Personal allowance 5 a. Slightly below
recommended
0
2. Basic fatigue allowances 4 b. Well below 2
B. Variable allowances: c. Very inadequate 5
5. 1. Standing allowance 2 5. Atmospheric conditions
2. Abnormal position allowance: (heat and
humidity)—variable
0-10
a. Slightly awkward 0 6. Close attention:
b. Awkward (bending) 2 a. Fairly fine work 0
c. Very awkward (lying,
stretching)
7 b. Fine or exacting 2
3. Use of force or muscular
energy
c. Very fine or very exacting 5
(lifting, pulling, or pushing): 7. Noise level:
6. Weight lifted (in pounds): a. Continuous 0
5 0 b. Intermittent—loud 2
10 1 c. Intermittent—very loud 5
15 2 d. High-pitched—loud 5
20 3 8. Mental strain:
25 4 a. Fairly complex process 1
30 5 b. Complex or wide span of
attention
4
7. 35 7 c. Very complex 8
40 9 9. Monotony:
45 11 a. Low 0
50 13 b. Medium 1
60 17 c. High 4
70 22 10.Tediousness:
a.Rather tedious 0
b. Tedious 2
8. c. Very tedious 5
5. Problem 7-10
The data in the table below represent time study observations for a woodworking operation.
(Hint: See Solved Problems section.)
OBSERVATIONS (minutes per cycle)
Performanc
e
Elemen
t
Rating 1 2 3 4 5 6
1 110% 1.20 1.17 1.16 1.22 1.24 1.15
2 115 0.83 0.87 0.78 0.82 0.85 1.32*
9. 3 105 0.58 0.53 0.52 0.59 0.60 0.54
*Unusual delay, disregard time.
1. a. Based on the observations, determine the standard time for the operation,
assuming an allowance of 15 percent of job time. (Round your intermediate
calculations and final answers to 3 decimal places.)
Element Standard time
6. Problem 7-11
How many observations should a time study analyst plan for in an operation that has a standard
deviation of 1.7 minutes per piece if the goal is to estimate the mean time per piece to
within .2 minute with a confidence of 95.5 percent? (Do not round intermediate calculations.
Round up your final answer to the next whole number.)