CERC ( DSM)2022
CERC(AS)2022
NTPC R&R Colony,
Darlipali
NTPC Bhadla
NTPC Rojmal
NTPC Koldam NTPC Kayamkulam
NTPC Kudgi
CERC Regulations Issued in CY 2022
Notified Regulations to be operational in CY-22
• Deviation Settlement Mechanism and Related Matters (DSM) Regulations,2022
Replaces (Deviation Settlement Mechanism)Regulation 2014
• Ancillary Services (AS) Regulations,2022
Replaces (Ancillary Services )Regulation 2015
• Connectivity and General Network Access to the Inter State Transmission System (GNA) Regulation 2022
Replaces (Connectivity and open Access)Regulation 2009
Draft Regulations
• Indian Electricity Grid Code (IEGC) Regulations 2022
Would Replaces (IEGC)Regulation 2010
Deviation Settlement Mechanism –Need for Revision
 Existing mechanism incentivises the entities for strategic deviation from the schedule .
 Entities used to make some profits by deliberate deviations by over-injection and by Under-injection as
deviation rate depends upon the frequency of the grid
To limit deviations by entities , following additional provisions brought in with subsequent amendments of DSM
Regulations (05 no's of Amendments)
 Deviation rate Capped at 303.04 p/unit for Generator
 Additional Deviation penalty
 Deviation Volume Limit penalty
 Sign change violation penalty
Concerns for Grid Stability
Undesirable Deviations are still there in the Grid, so for controlling the same DSM Regulation 2022 ,which
mandates for zero deviation from entities
CERC ( DSM ) Regulation 2022
• CERC notified Regulation on “Deviation Settlement Mechanism and Related Matters” on 14.03.2022.
Commencement of Regulation 05/12/2022
• OBJECTIVE -
 For a secure and stable operation of the grid, every grid connected regional entity shall adhere
to its schedule and shall not deviate from its schedule.
 Any deviation shall be managed by the Load Despatch Centre as per the Ancillary Services
Regulations
• SCOPE-
Applicable to all the Grid connected regional entities and other entities engaged in interstate
sale and purchase of Electricity
CERC ( DSM ) Regulation 2022
• Deviation –( General Seller )
Deviation(MWh) = AG – SG
% Deviation= 100 *(AG – SG)/SG
SG = (ISGS+URS+DAM+RTM
+SCED+RRAS+AGC)
• Normal Deviation Rate ( Penalty per unit of deviation) —
Maximum of Wt. average DAM or RTM or AS of that time block
Time block 1 ( DAM,RTM,AS : Rs 4, 3, 3.8 ) ---- Normal Deviation Rate Rs 4 per Unit
Time block 2 ( DAM,RTM,AS : Rs 4, 6 ,3 ) ---- Normal Deviation Rate Rs 6 per Unit
.
.
Time block 96 ( DAM,RTM,AS : Rs 4, 2 , 4 ) ---- Normal Deviation Rate Rs 4 per Unit
CERC ( DSM ) Regulation 2022
• Deviation Charges ( General Seller )--
OVER-INJECTION
Beyond 2%
Up to 2%
UNDER-INJECTION
Up to 2%
2% to 10 %
No penalty, generators will get Reference
charge rate(ECR)
Penalty @10% of Deviation Rate to be paid
by generator to Pool Account
Reference Charge rate(ECR) to be paid
back to Pool account by generator
@ 120 % Normal Deviation rate to be
paid in Pool account
>10 %
@ 150 %Normal Deviation rate to be
paid in Pool account
Impact on generators for any deviation will depends upon the Deviation Rate(Market rate of the block ) as well as
ECR of the stations
CERC ( DSM ) Regulation 2022
• Case Study I (Low ECR station operating in off peak period ) -ECR ( INR 2.OO ),Max of(DAM,RTM)- (INR 2.00)
OVER-INJECTION
Beyond 2%
Up to 2%
UNDER-INJECTION
Up to 2%
2% to 10 %
@10% of Deviation
Rate
@ 120 %Deviation
rate
Generator will get
ECR @( INR2.00 )
per unit
Impact on NTPC
Loss of ECR @( INR2.00)
+Penalty( 0.2)=@ 2.20 per
unit
ECR@ (2.00) to be
returned back to pool
account
Penalty(2.40)- ECR Saving
(2.00)= Net loss@ 0.40 per unit
>10 % @ 150 %Deviation
rate
Penalty(3)- ECR Saving (2.00)=
Net loss@ 3.00 per unit
No loss , No
gain
No loss , No
gain
CERC ( DSM ) Regulation 2022
• Case Study II –( Low ECR station operating in normal period ) - ECR ( INR 2.OO ),Max of(DAM,RTM)-( INR 4.00)
OVER-INJECTION
Beyond 2%
Up to 2%
UNDER-INJECTION
Up to 2%
2% to 10 %
@10% of Deviation
Rate
@ 120 %Deviation
rate
Generator will get
ECR @( INR2.00 )
per unit
Impact on NTPC
Loss of ECR @( INR2.00)
+Penalty( 0.4)=@ 2.40 per
unit
ECR@ (2.00) to be
returned back to pool
account
Penalty(4.80)- ECR Saving
(2.00)= Net loss@ 2.80 per unit
>10 % @ 150 %Deviation
rate
Penalty(6)- ECR Saving (2.00)=
Net loss@ 4.00 per unit
No loss , No
gain
No loss , No
gain
CERC ( DSM ) Regulation 2022
• Case Study III –( Low ECR station operating in peak period ) - ECR ( INR 2.OO ),Max of(DAM,RTM)-( INR 8.00)
OVER-INJECTION
Beyond 2%
Up to 2%
UNDER-INJECTION
Up to 2%
2% to 10 %
@10% of Deviation
Rate
@ 120 %Deviation
rate
Generator will get
ECR @( INR2.00 )
per unit
Impact on NTPC
Loss of ECR @( INR2.00)
+Penalty( 0.8)=@ 2.80 per
unit
ECR@ (2.00) to be
returned back to pool
account
Penalty(9.60)- ECR Saving
(2.00)= Net loss@7.60per unit
>10 % @ 150 %Deviation
rate
Penalty(12)- ECR Saving (2.00)=
Net loss@ 10.00 per unit
No loss , No
gain
No loss , No
gain
CERC ( DSM ) Regulation 2022
• Case Study IV (Medium ECR station in off peak ) -- ECR ( INR 4.OO ), Max of(DAM,RTM) as ( INR 2.00)
OVER-INJECTION
Beyond 2%
Up to 2%
UNDER-INJECTION
Up to 2%
2% to 10 %
@10% of Deviation
Rate
@ 120 %Deviation
rate
Generator will get
ECR @( INR4.00 )
per unit
Impact on NTPC
Loss of ECR @( INR4.00)
+Penalty( 0.2)=@ 4.20 per
unit
ECR@ (4.00) to be
returned back to pool
account
Penalty(2.40)- ECR Saving
(4.00)= Net loss@ -1.60 per unit
>10 % @ 150 %Deviation
rate
Penalty(3)- ECR Saving (4.00)=
Net loss@ -1.00 per unit
No loss , No
gain
No loss , No
gain
CERC ( DSM ) Regulation 2022
• Case Study V (Medium ECR station in normal period) --ECR ( INR 4.OO ), Max of(DAM,RTM) as ( INR 4.00)
OVER-INJECTION
Beyond 2%
Up to 2%
UNDER-INJECTION
Up to 2%
2% to 10 %
@10% of Deviation
Rate
@ 120 %Deviation
rate
Generator will get
ECR @( INR4.00 )
per unit
Impact on NTPC
Loss of ECR @( INR4.00)
+Penalty( 0.4)=@ 4.40 per
unit
ECR@ (4.00) to be
returned back to pool
account
Penalty(4.80)- ECR Saving
(4.00)= Net loss@ 0.80 per unit
>10 % @ 150 %Deviation
rate
Penalty(6)- ECR Saving (4.00)=
Net loss@ 2.00 per unit
No loss , No
gain
No loss , No
gain
CERC ( DSM ) Regulation 2022
• Case Study VI (High ECR station at normal period ) -- ECR ( INR 6.OO ), Max of(DAM,RTM) as ( INR
4.00)
OVER-INJECTION
Beyond 2%
Up to 2%
UNDER-INJECTION
Up to 2%
2% to 10 %
@10% of Deviation
Rate
@ 120 %Deviation
rate
Generator will get
ECR @( INR6.00 )
per unit
Impact on NTPC
Loss of ECR @( INR6.00)
+Penalty( 0.4)=@ 6.40 per
unit
ECR@ (6.00) to be
returned back to pool
account
Penalty(4.80)- ECR Saving
(6.00)= Net loss @ - 1.20 per
unit
>10 % @ 150 %Deviation
rate
Penalty(6)- ECR Saving (6.00)=
Net loss@ 0.00 per unit
No loss , No
gain
No loss , No
gain
Implications- Thermal Stations
Over
injection
Under
injection
Low ECR High ECR
+2%
-2%
Little opportunity for stations with +MC
Only Loss
> +2%
< -2%
Some opportunity, when
DSM price is less than ECR
Little opportunity, DSM price
would be more than ECR
most of the time
CERC ( DSM ) Regulation 2022
 Deviation charges for infirm Power shall be zero.( No payment would be received for
infirm power – all Coal cost required to be capitalised – FC would be increased by 7-8
paise) .
 Start-up power before COD shall be payable at Deviation Rate.
 Power for running the Auxiliary equipment’s during shut down shall be payable at
Deviation Rate .
Other Provisions of DSM Regulation 2022
Ancillary Services Regulation
Primary Reserve
Ancillary Services
(PRAS)
•Mandated in Grid Code
•3rd Party testing. 1% RoE
reduction if failed during
ramp assessment.
Secondary Reserve
Ancillary Services
(SRAS)
•AGC - Real time command
to Genco.
•Started in 2019; Suo Motto
Order by CERC
•Added to final SG; Mark-up
payment @50 paise/unit for
5 min energy
Tertiary Reserve
Ancillary Services
(TRAS)
•AS regulations 2015
•Administered by RLDC
based on given conditions
in AS regulations 2015
•RRAS Up @ 50 paise/unit,
RRAS down @ 25% of ECR.
Ancillary
Services
Regulation
2022
Market orientation
Current AGC and RRAS AS mechanisms to be replaced by SRAS and TRAS,
SRAS would be Performance based and TRAS would be bid based.
Existing Provisions
Ancillary Regulation 2022
Secondary Reserve AS (SRAS)
• Mark-Up payment linked to Performance
• Accounting: 15 min Energy added to final Schedule; 5 min Energy used for providing the markup
incentive.
• Performance (75-95 %) - 40 paise/unit
Tertiary Reserve AS (TRAS)
• Procured through bidding in DAM and RTM and deployed on Real-time
• TRAS UP - MCP for quantum deployed; Commitment money if not deployed @10 % of MCP, < 20
p/unit.
• TRAS Down - Generator will refund @ Pay bid for the quantum deployed
• Emergency deployment of TRAS by NLDC –TRAS Up @ 110 % of ECR, TRAS Down with
return of @ 90% of ECR (10% of ECR is left with Generator)
SRAS Incentive
Performance
(%)
Incentive
(P/kWh)
>95 50
75-95 40
60-75 30
50-60 20
20-50 10
<20 0
Tuning of CMC Control loops required in all stations for AGC performance.
CERC ( DSM ) Regulation 2022
• ACCOUNTING --
Every Thursday , RLDC shall provide the data for deviation of previous week(Monday to
Sunday) to RPC .
RPC prepare and issue the statement of charges to all regional entities by ensuing
Tuesday.
Regional entities to pay the due amount within 07 days otherwise LPS@0.04%per-day
ALL MONEY THAT WILL COME FROM DSM WILL BE POOLED TO “DEVIATION AND ANCILLARY POOL
ACCOUNT”
“DEVIATION AND ANCILLARY POOL
ACCOUNT”
Deviation
amount + AS
down
AS UP
Payments to Generators
for over-injection. Payment
to buyers for unde-
rinjection
Thank You

More Related Content

What's hot

Indian Electricity Grid Code
Indian Electricity Grid CodeIndian Electricity Grid Code
Indian Electricity Grid Code
Power System Operation
 
Types of insulator
Types of insulatorTypes of insulator
Types of insulator
adeelshafiq
 

What's hot (20)

Availability based tariff
Availability based tariffAvailability based tariff
Availability based tariff
 
BREAKDOWN IN LIQUIDS_NDS
BREAKDOWN IN LIQUIDS_NDSBREAKDOWN IN LIQUIDS_NDS
BREAKDOWN IN LIQUIDS_NDS
 
Indian Electricity Grid Code
Indian Electricity Grid CodeIndian Electricity Grid Code
Indian Electricity Grid Code
 
tariff and its types
tariff and its typestariff and its types
tariff and its types
 
Atc calculation methods by shridhar kulkarni
Atc calculation methods by shridhar kulkarniAtc calculation methods by shridhar kulkarni
Atc calculation methods by shridhar kulkarni
 
TDU -Unit 04 ELECTRIC HEATING AND WELDING
TDU -Unit  04 ELECTRIC HEATING AND WELDINGTDU -Unit  04 ELECTRIC HEATING AND WELDING
TDU -Unit 04 ELECTRIC HEATING AND WELDING
 
An Active Input Current Waveshaping with Zero Switching Losses for Three-Phas...
An Active Input Current Waveshaping with Zero Switching Losses for Three-Phas...An Active Input Current Waveshaping with Zero Switching Losses for Three-Phas...
An Active Input Current Waveshaping with Zero Switching Losses for Three-Phas...
 
Generator rotor earth fault protection
Generator rotor earth fault protectionGenerator rotor earth fault protection
Generator rotor earth fault protection
 
Switchyard design overview
Switchyard design overviewSwitchyard design overview
Switchyard design overview
 
molten carbonate fuel cell
molten carbonate fuel cellmolten carbonate fuel cell
molten carbonate fuel cell
 
Flywheel Energy Storage System
Flywheel Energy Storage SystemFlywheel Energy Storage System
Flywheel Energy Storage System
 
DFIG ppt.pptx
DFIG ppt.pptxDFIG ppt.pptx
DFIG ppt.pptx
 
Wind Power Generation Schemes
Wind Power Generation SchemesWind Power Generation Schemes
Wind Power Generation Schemes
 
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNADay-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
 
Types of insulator
Types of insulatorTypes of insulator
Types of insulator
 
Energy economics ppt
Energy economics pptEnergy economics ppt
Energy economics ppt
 
Fuel cells - types, working, construction, fabrication and application
Fuel cells - types, working, construction, fabrication and applicationFuel cells - types, working, construction, fabrication and application
Fuel cells - types, working, construction, fabrication and application
 
Availability Based Tariff and UI charges
Availability Based Tariff and UI chargesAvailability Based Tariff and UI charges
Availability Based Tariff and UI charges
 
PSOC.pptx
PSOC.pptxPSOC.pptx
PSOC.pptx
 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
 

Similar to CERC Regulation 2022.pptx

Optimisation process guide
Optimisation process guideOptimisation process guide
Optimisation process guide
killerkitties
 
Applied motion products stm datasheet
Applied motion products stm datasheetApplied motion products stm datasheet
Applied motion products stm datasheet
Electromate
 

Similar to CERC Regulation 2022.pptx (20)

Executive Summary of “Forecasting, Scheduling, Deviation settlement and relat...
Executive Summary of “Forecasting, Scheduling, Deviation settlement and relat...Executive Summary of “Forecasting, Scheduling, Deviation settlement and relat...
Executive Summary of “Forecasting, Scheduling, Deviation settlement and relat...
 
Life Cycle Cost Analysis Case of Study
Life Cycle Cost Analysis Case of StudyLife Cycle Cost Analysis Case of Study
Life Cycle Cost Analysis Case of Study
 
ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)
 
Brochure FMI - Productos comerciales para espacio
Brochure FMI - Productos comerciales para espacioBrochure FMI - Productos comerciales para espacio
Brochure FMI - Productos comerciales para espacio
 
Improved Transient Compensation using PI-SRF Control Scheme Based UHVDC for O...
Improved Transient Compensation using PI-SRF Control Scheme Based UHVDC for O...Improved Transient Compensation using PI-SRF Control Scheme Based UHVDC for O...
Improved Transient Compensation using PI-SRF Control Scheme Based UHVDC for O...
 
Technical minimum schedule for ppt f
Technical minimum schedule for  ppt fTechnical minimum schedule for  ppt f
Technical minimum schedule for ppt f
 
intelligent braking system report
intelligent braking system reportintelligent braking system report
intelligent braking system report
 
final yr project
final yr projectfinal yr project
final yr project
 
IRJET- Direct Torque Control of Induction Motor
IRJET-  	  Direct Torque Control of Induction MotorIRJET-  	  Direct Torque Control of Induction Motor
IRJET- Direct Torque Control of Induction Motor
 
Optimisation process guide
Optimisation process guideOptimisation process guide
Optimisation process guide
 
Kathreins system
Kathreins systemKathreins system
Kathreins system
 
Tamil nadu central and state plants
Tamil nadu central and state plantsTamil nadu central and state plants
Tamil nadu central and state plants
 
Session.pptx
Session.pptxSession.pptx
Session.pptx
 
Intelligent mcc Siemens
Intelligent mcc Siemens Intelligent mcc Siemens
Intelligent mcc Siemens
 
Intelligent mcc
Intelligent mccIntelligent mcc
Intelligent mcc
 
IRJET- Simultaneous Microgrid Voltage and Current Harmonics Compensation usin...
IRJET- Simultaneous Microgrid Voltage and Current Harmonics Compensation usin...IRJET- Simultaneous Microgrid Voltage and Current Harmonics Compensation usin...
IRJET- Simultaneous Microgrid Voltage and Current Harmonics Compensation usin...
 
Applied motion products stm datasheet
Applied motion products stm datasheetApplied motion products stm datasheet
Applied motion products stm datasheet
 
E cwith scada
E cwith scadaE cwith scada
E cwith scada
 
TCL SMARTStart
TCL SMARTStartTCL SMARTStart
TCL SMARTStart
 
Grid Event Analysis In Indian Power System
Grid Event Analysis In Indian Power SystemGrid Event Analysis In Indian Power System
Grid Event Analysis In Indian Power System
 

Recently uploaded

Program Kickoff- Cohort......_4 (1).pptx
Program Kickoff- Cohort......_4 (1).pptxProgram Kickoff- Cohort......_4 (1).pptx
Program Kickoff- Cohort......_4 (1).pptx
ScottMeyers35
 
Program Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptxProgram Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptx
ScottMeyers35
 
Securing the Future | Public Good App House
Securing the Future | Public Good App HouseSecuring the Future | Public Good App House
Securing the Future | Public Good App House
TechSoup
 

Recently uploaded (20)

Topical Guide for RID 3830 Public Image Training Series.ppsx
Topical Guide for RID 3830 Public Image Training Series.ppsxTopical Guide for RID 3830 Public Image Training Series.ppsx
Topical Guide for RID 3830 Public Image Training Series.ppsx
 
WhenWomenTakeControl.pdf Yale Historical Review
WhenWomenTakeControl.pdf Yale Historical ReviewWhenWomenTakeControl.pdf Yale Historical Review
WhenWomenTakeControl.pdf Yale Historical Review
 
Everything you need to know about your Parish or Town council website & .gov....
Everything you need to know about your Parish or Town council website & .gov....Everything you need to know about your Parish or Town council website & .gov....
Everything you need to know about your Parish or Town council website & .gov....
 
Program Kickoff- Cohort......_4 (1).pptx
Program Kickoff- Cohort......_4 (1).pptxProgram Kickoff- Cohort......_4 (1).pptx
Program Kickoff- Cohort......_4 (1).pptx
 
Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...
Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...
Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...
 
2024: The FAR - Federal Acquisition Regulations, Part 33
2024: The FAR - Federal Acquisition Regulations, Part 332024: The FAR - Federal Acquisition Regulations, Part 33
2024: The FAR - Federal Acquisition Regulations, Part 33
 
bee engaged with youth - World Bee Day 2024
bee engaged with youth - World Bee Day 2024bee engaged with youth - World Bee Day 2024
bee engaged with youth - World Bee Day 2024
 
Help set up SERUDS Orphanage virtual classroom
Help set up SERUDS Orphanage virtual classroomHelp set up SERUDS Orphanage virtual classroom
Help set up SERUDS Orphanage virtual classroom
 
Electric Vehicle infrastructure planning in Rural Planning Organizations
Electric Vehicle infrastructure planning in Rural Planning OrganizationsElectric Vehicle infrastructure planning in Rural Planning Organizations
Electric Vehicle infrastructure planning in Rural Planning Organizations
 
Ian Bremmer's message for those graduating in toxic times.pdf
Ian Bremmer's message for those graduating in toxic times.pdfIan Bremmer's message for those graduating in toxic times.pdf
Ian Bremmer's message for those graduating in toxic times.pdf
 
EDI Executive Education MasterClass- 15thMay 2024 (updated).pdf
EDI Executive Education MasterClass- 15thMay 2024 (updated).pdfEDI Executive Education MasterClass- 15thMay 2024 (updated).pdf
EDI Executive Education MasterClass- 15thMay 2024 (updated).pdf
 
“Bee engaged with Youth”. World Bee Day 2024; May. 20th.
“Bee engaged with Youth”. World Bee Day 2024; May. 20th.“Bee engaged with Youth”. World Bee Day 2024; May. 20th.
“Bee engaged with Youth”. World Bee Day 2024; May. 20th.
 
OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...
OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...
OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...
 
Program Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptxProgram Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptx
 
Medieval Iraq Demographic Factors Yale Historical Review
Medieval Iraq Demographic Factors Yale Historical ReviewMedieval Iraq Demographic Factors Yale Historical Review
Medieval Iraq Demographic Factors Yale Historical Review
 
Characterizing wildlife trafficking and associated crime.
Characterizing wildlife trafficking and associated crime.Characterizing wildlife trafficking and associated crime.
Characterizing wildlife trafficking and associated crime.
 
Tennessee DOT- TEVI Plan coordination & EV
Tennessee DOT- TEVI Plan coordination & EVTennessee DOT- TEVI Plan coordination & EV
Tennessee DOT- TEVI Plan coordination & EV
 
Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438
 
Securing the Future | Public Good App House
Securing the Future | Public Good App HouseSecuring the Future | Public Good App House
Securing the Future | Public Good App House
 
The Outlook for the Budget and the Economy
The Outlook for the Budget and the EconomyThe Outlook for the Budget and the Economy
The Outlook for the Budget and the Economy
 

CERC Regulation 2022.pptx

  • 1. /ntpc1 /ntpclt d1 /ntpclimite d /Company/nt pc /ntpclimited Follow us on: CERC ( DSM)2022 CERC(AS)2022 NTPC R&R Colony, Darlipali NTPC Bhadla NTPC Rojmal NTPC Koldam NTPC Kayamkulam NTPC Kudgi
  • 2. CERC Regulations Issued in CY 2022 Notified Regulations to be operational in CY-22 • Deviation Settlement Mechanism and Related Matters (DSM) Regulations,2022 Replaces (Deviation Settlement Mechanism)Regulation 2014 • Ancillary Services (AS) Regulations,2022 Replaces (Ancillary Services )Regulation 2015 • Connectivity and General Network Access to the Inter State Transmission System (GNA) Regulation 2022 Replaces (Connectivity and open Access)Regulation 2009 Draft Regulations • Indian Electricity Grid Code (IEGC) Regulations 2022 Would Replaces (IEGC)Regulation 2010
  • 3. Deviation Settlement Mechanism –Need for Revision  Existing mechanism incentivises the entities for strategic deviation from the schedule .  Entities used to make some profits by deliberate deviations by over-injection and by Under-injection as deviation rate depends upon the frequency of the grid To limit deviations by entities , following additional provisions brought in with subsequent amendments of DSM Regulations (05 no's of Amendments)  Deviation rate Capped at 303.04 p/unit for Generator  Additional Deviation penalty  Deviation Volume Limit penalty  Sign change violation penalty Concerns for Grid Stability Undesirable Deviations are still there in the Grid, so for controlling the same DSM Regulation 2022 ,which mandates for zero deviation from entities
  • 4. CERC ( DSM ) Regulation 2022 • CERC notified Regulation on “Deviation Settlement Mechanism and Related Matters” on 14.03.2022. Commencement of Regulation 05/12/2022 • OBJECTIVE -  For a secure and stable operation of the grid, every grid connected regional entity shall adhere to its schedule and shall not deviate from its schedule.  Any deviation shall be managed by the Load Despatch Centre as per the Ancillary Services Regulations • SCOPE- Applicable to all the Grid connected regional entities and other entities engaged in interstate sale and purchase of Electricity
  • 5. CERC ( DSM ) Regulation 2022 • Deviation –( General Seller ) Deviation(MWh) = AG – SG % Deviation= 100 *(AG – SG)/SG SG = (ISGS+URS+DAM+RTM +SCED+RRAS+AGC) • Normal Deviation Rate ( Penalty per unit of deviation) — Maximum of Wt. average DAM or RTM or AS of that time block Time block 1 ( DAM,RTM,AS : Rs 4, 3, 3.8 ) ---- Normal Deviation Rate Rs 4 per Unit Time block 2 ( DAM,RTM,AS : Rs 4, 6 ,3 ) ---- Normal Deviation Rate Rs 6 per Unit . . Time block 96 ( DAM,RTM,AS : Rs 4, 2 , 4 ) ---- Normal Deviation Rate Rs 4 per Unit
  • 6. CERC ( DSM ) Regulation 2022 • Deviation Charges ( General Seller )-- OVER-INJECTION Beyond 2% Up to 2% UNDER-INJECTION Up to 2% 2% to 10 % No penalty, generators will get Reference charge rate(ECR) Penalty @10% of Deviation Rate to be paid by generator to Pool Account Reference Charge rate(ECR) to be paid back to Pool account by generator @ 120 % Normal Deviation rate to be paid in Pool account >10 % @ 150 %Normal Deviation rate to be paid in Pool account Impact on generators for any deviation will depends upon the Deviation Rate(Market rate of the block ) as well as ECR of the stations
  • 7. CERC ( DSM ) Regulation 2022 • Case Study I (Low ECR station operating in off peak period ) -ECR ( INR 2.OO ),Max of(DAM,RTM)- (INR 2.00) OVER-INJECTION Beyond 2% Up to 2% UNDER-INJECTION Up to 2% 2% to 10 % @10% of Deviation Rate @ 120 %Deviation rate Generator will get ECR @( INR2.00 ) per unit Impact on NTPC Loss of ECR @( INR2.00) +Penalty( 0.2)=@ 2.20 per unit ECR@ (2.00) to be returned back to pool account Penalty(2.40)- ECR Saving (2.00)= Net loss@ 0.40 per unit >10 % @ 150 %Deviation rate Penalty(3)- ECR Saving (2.00)= Net loss@ 3.00 per unit No loss , No gain No loss , No gain
  • 8. CERC ( DSM ) Regulation 2022 • Case Study II –( Low ECR station operating in normal period ) - ECR ( INR 2.OO ),Max of(DAM,RTM)-( INR 4.00) OVER-INJECTION Beyond 2% Up to 2% UNDER-INJECTION Up to 2% 2% to 10 % @10% of Deviation Rate @ 120 %Deviation rate Generator will get ECR @( INR2.00 ) per unit Impact on NTPC Loss of ECR @( INR2.00) +Penalty( 0.4)=@ 2.40 per unit ECR@ (2.00) to be returned back to pool account Penalty(4.80)- ECR Saving (2.00)= Net loss@ 2.80 per unit >10 % @ 150 %Deviation rate Penalty(6)- ECR Saving (2.00)= Net loss@ 4.00 per unit No loss , No gain No loss , No gain
  • 9. CERC ( DSM ) Regulation 2022 • Case Study III –( Low ECR station operating in peak period ) - ECR ( INR 2.OO ),Max of(DAM,RTM)-( INR 8.00) OVER-INJECTION Beyond 2% Up to 2% UNDER-INJECTION Up to 2% 2% to 10 % @10% of Deviation Rate @ 120 %Deviation rate Generator will get ECR @( INR2.00 ) per unit Impact on NTPC Loss of ECR @( INR2.00) +Penalty( 0.8)=@ 2.80 per unit ECR@ (2.00) to be returned back to pool account Penalty(9.60)- ECR Saving (2.00)= Net loss@7.60per unit >10 % @ 150 %Deviation rate Penalty(12)- ECR Saving (2.00)= Net loss@ 10.00 per unit No loss , No gain No loss , No gain
  • 10. CERC ( DSM ) Regulation 2022 • Case Study IV (Medium ECR station in off peak ) -- ECR ( INR 4.OO ), Max of(DAM,RTM) as ( INR 2.00) OVER-INJECTION Beyond 2% Up to 2% UNDER-INJECTION Up to 2% 2% to 10 % @10% of Deviation Rate @ 120 %Deviation rate Generator will get ECR @( INR4.00 ) per unit Impact on NTPC Loss of ECR @( INR4.00) +Penalty( 0.2)=@ 4.20 per unit ECR@ (4.00) to be returned back to pool account Penalty(2.40)- ECR Saving (4.00)= Net loss@ -1.60 per unit >10 % @ 150 %Deviation rate Penalty(3)- ECR Saving (4.00)= Net loss@ -1.00 per unit No loss , No gain No loss , No gain
  • 11. CERC ( DSM ) Regulation 2022 • Case Study V (Medium ECR station in normal period) --ECR ( INR 4.OO ), Max of(DAM,RTM) as ( INR 4.00) OVER-INJECTION Beyond 2% Up to 2% UNDER-INJECTION Up to 2% 2% to 10 % @10% of Deviation Rate @ 120 %Deviation rate Generator will get ECR @( INR4.00 ) per unit Impact on NTPC Loss of ECR @( INR4.00) +Penalty( 0.4)=@ 4.40 per unit ECR@ (4.00) to be returned back to pool account Penalty(4.80)- ECR Saving (4.00)= Net loss@ 0.80 per unit >10 % @ 150 %Deviation rate Penalty(6)- ECR Saving (4.00)= Net loss@ 2.00 per unit No loss , No gain No loss , No gain
  • 12. CERC ( DSM ) Regulation 2022 • Case Study VI (High ECR station at normal period ) -- ECR ( INR 6.OO ), Max of(DAM,RTM) as ( INR 4.00) OVER-INJECTION Beyond 2% Up to 2% UNDER-INJECTION Up to 2% 2% to 10 % @10% of Deviation Rate @ 120 %Deviation rate Generator will get ECR @( INR6.00 ) per unit Impact on NTPC Loss of ECR @( INR6.00) +Penalty( 0.4)=@ 6.40 per unit ECR@ (6.00) to be returned back to pool account Penalty(4.80)- ECR Saving (6.00)= Net loss @ - 1.20 per unit >10 % @ 150 %Deviation rate Penalty(6)- ECR Saving (6.00)= Net loss@ 0.00 per unit No loss , No gain No loss , No gain
  • 13. Implications- Thermal Stations Over injection Under injection Low ECR High ECR +2% -2% Little opportunity for stations with +MC Only Loss > +2% < -2% Some opportunity, when DSM price is less than ECR Little opportunity, DSM price would be more than ECR most of the time
  • 14. CERC ( DSM ) Regulation 2022  Deviation charges for infirm Power shall be zero.( No payment would be received for infirm power – all Coal cost required to be capitalised – FC would be increased by 7-8 paise) .  Start-up power before COD shall be payable at Deviation Rate.  Power for running the Auxiliary equipment’s during shut down shall be payable at Deviation Rate . Other Provisions of DSM Regulation 2022
  • 15. Ancillary Services Regulation Primary Reserve Ancillary Services (PRAS) •Mandated in Grid Code •3rd Party testing. 1% RoE reduction if failed during ramp assessment. Secondary Reserve Ancillary Services (SRAS) •AGC - Real time command to Genco. •Started in 2019; Suo Motto Order by CERC •Added to final SG; Mark-up payment @50 paise/unit for 5 min energy Tertiary Reserve Ancillary Services (TRAS) •AS regulations 2015 •Administered by RLDC based on given conditions in AS regulations 2015 •RRAS Up @ 50 paise/unit, RRAS down @ 25% of ECR. Ancillary Services Regulation 2022 Market orientation Current AGC and RRAS AS mechanisms to be replaced by SRAS and TRAS, SRAS would be Performance based and TRAS would be bid based. Existing Provisions
  • 16. Ancillary Regulation 2022 Secondary Reserve AS (SRAS) • Mark-Up payment linked to Performance • Accounting: 15 min Energy added to final Schedule; 5 min Energy used for providing the markup incentive. • Performance (75-95 %) - 40 paise/unit Tertiary Reserve AS (TRAS) • Procured through bidding in DAM and RTM and deployed on Real-time • TRAS UP - MCP for quantum deployed; Commitment money if not deployed @10 % of MCP, < 20 p/unit. • TRAS Down - Generator will refund @ Pay bid for the quantum deployed • Emergency deployment of TRAS by NLDC –TRAS Up @ 110 % of ECR, TRAS Down with return of @ 90% of ECR (10% of ECR is left with Generator) SRAS Incentive Performance (%) Incentive (P/kWh) >95 50 75-95 40 60-75 30 50-60 20 20-50 10 <20 0 Tuning of CMC Control loops required in all stations for AGC performance.
  • 17. CERC ( DSM ) Regulation 2022 • ACCOUNTING -- Every Thursday , RLDC shall provide the data for deviation of previous week(Monday to Sunday) to RPC . RPC prepare and issue the statement of charges to all regional entities by ensuing Tuesday. Regional entities to pay the due amount within 07 days otherwise LPS@0.04%per-day ALL MONEY THAT WILL COME FROM DSM WILL BE POOLED TO “DEVIATION AND ANCILLARY POOL ACCOUNT” “DEVIATION AND ANCILLARY POOL ACCOUNT” Deviation amount + AS down AS UP Payments to Generators for over-injection. Payment to buyers for unde- rinjection