SAFETY REVIEW
1. SHE organization chart not submitted.
2. Sr SHE Electrical Engineer, Traffic Engineer, Labour Welfare Officer & Barricading Manager not
deployed.
3. Monthly Audit Rating score (MARS) commenced on 26.07.2022.
4. 96 hours training started at underground station for JKIL staff.
5. External Quarterly audit commenced on 21.07.2022.
6. ISO certification process not started for underground works.
7. Project Management Safety walk down carried out.
8. Without submission of Method statement fencing works are carried out at cut & cover and UG.
9. Inadequate Occupational Health & Welfare facilities-Absence of Ambulance van on site and tie up of
the nearest hospital. Also insufficient/inadequate first aid boxes on site offices.
AREA OF CONCERN
NCR Summary
THIS WEEK UP TO DATE (TOTAL)
Issued Closed Open Closed
00 00 01 02
Tree Cutting and Plantation/Transplantation Status MML 7A, CA-48
Metro
Line
Total
Scope
Trees
to be
retained
Trees
to be
Cut
Trees to be
Transplant
Compensatory
Plantation
Remarks
Line-7A
(MCGM,
K/East
Ward)
203 64 20/55 51/84 50/110
 Letter fwd. by MMRDA to MCGM on 24th July 2020. Site
visit by JTO was held on 20th Aug 2020 and ASG (Zone III,
K/East Ward) visited on 27.11.2020 .
 Revised Proposal along with Tree Marking in Plan and
other required documents forwarded by GC to MMRDA
after review vide GC’s letter no.
SCGC59/L9/MMRDA/ENV/2267 dtd.21.12.2020 for
necessary approval from concerned tree Authority.
 MMRDA has submitted all required documents to
concerned tree authority vide letter No. MMRDA/
MPIU/ML-7A/Tree Permissions/ 2021/36 Dtd.
14.01.2021 to accord approval.
 Tree permission granted vide MCGM Letter No.
DYSG/TA/Z-III/ 15/P Dtd. 11.04.2022
Total 203 64 20 51/84 50
 Effort is being taken to save the trees by minimizing
tree cutting/transplantation
 Out of 55 Nos. trees Permitted to cut, 06 Nos. Trees
will be saved.
 Out of 84 Nos. trees Permitted to transplant, 07 Nos.
Trees will be saved.
 50 Nos. tree sapling planted @ Aarey Forest Land
Parcel on 4th/5th June 2022
Sr. No. Station
GAD
Issued/Not
Issued
Issued Date Further Action
1
Airport
Colony
Issued
updated
03-03-22
• GC issued CRS comments for structural framing drgs JKIL/DDC-S to submit updated drgs for
final approval.
• DDC – A to update & resubmit Detail Design Drgs for Entry Exit structures by 26-07-2022.
2 CSMIA
Issued
updated
13-07-22
• JKIL/DDC – A submitted updated drawings on 13-07-2022. GC submitted to GC Systems for
comments.
• Reference meeting on 18-07-2022, MIAL provided detailed loads for OSD structure.
JKIL/DDC-S to provide structural framing drgs for CSMIA station by 29-07-2022.
• Reference to PRM dated 13-07-2022, JKIL/DDC informed MEP design in progress. Design &
details of vent shafts as requested by MIAL.
• MIAL have requested the secant pile drawings for further coordination with OSD works, JKIL
to provide.
• JKIL to submit Activity wise project schedule.
• MMRDA to send interchange data by Mail to GC..
STATUS OF STRUCTURAL DESIGN- ELEVATED VIADUCT
Sr No DESCRIPTION TOTAL SCOPE
DESIGN SUBMITTED
BY JKIL
DESIGN APPROVED BY GC
DESIGN REJECTED BY
GC
PENDING WITH
GC AS ON DATE
REMARKS
1 PILE 88 88 88 0 0 All GFC’s are approved.
2
PILECAP and
PIER
22 22 22 0 0 All GFC’s are approved.
3 PIER CAP 22 19 19 0 0
Design of Pier Cap Design for 3 Pier locations is
awaited.
4 Airport Colony Station
Pile– 96 96 96 0 0 All GFC’s are approved.
Pile cap - 25 21 12 0 09
Grid 7 to 12 CRD approved.
Grid 1 to 6, being progressively reviewed.
Pier/Portal Pier -
25
21 12 0 09
Grid 7 to 12 CRD approved.
Grid 1 to 6, being progressively reviewed.
5 Elastomeric Bearing 176 158 158 0 0
GFC for U-Girder are approved.
Design for Bearing under I-Girder is awaited.
6 Bearing Pedestal 176 0 0 0 0 Design for Bearing Pedestals is awaited.
7 Seismic Arrestor 88 88 88 0 0
GFC for U-Girder are approved.
Design for Seismic Arrestor at I-Girder is
awaited.
STATUS OF STRUCTURAL DESIGN OF UG SECTION
Sr NO DESCRIPTION
TOTAL SCOPE
DESIGN
SUBMITTED BY
JKIL
DESIGN APPROVED
BY GC
DESIGN
REJECTED BY GC
PENDING WITH GC
AS ON DATE REMARKS
1
SECANT PILE-
LAUNCHING SHAFT
and UG Station
RCC Pile - 426
PCC Pile - 426
RCC Pile -426
PCC Pile -426
426
426
0
0
0
0
All GFCs of Secant Piles are approved for Zone-A, B, C,
C1, D and D1 including Nallah side.
2
SECANT PILE-
RETRIVEAL SHAFT
& Ramp
RCC Pile - 300
PCC Pile -300
RCC Pile -300
PCC Pile -300
300
300
0
0
0
0
All GFCs of Secant Piles are approved for UG Ramp and
TBM Retrieval Shaft.
3 Waler and Anchor
UG Station
RETRIVEAL SHAFT
UG Station
RETRIVEAL SHAFT
Commented (STR-
6201 dt. 03.02.2022
0 0 Revised design of Anchor and Waler is awaited.
4 Elevated RAMP 165 m 165 m 165 m 0 0 GFCs of Elevated Ramp are approved.
5
CUT & COVER
TUNNEL
U-Section 145 m
Box Section 80 m
145 m
80 m
Commented (STR-
6442 dt. 28.02.2022
0 0
Revised design received. Under GC review. Two nos
MCGM water pipelines are encountered, to be diverted.
6
NATM
TUNNEL
Cross Over 155 m
Cross Passage 7 no
P D of Cross
Passage
Commented (STR-
6280 dt. 11.02.2022
0 0
GC issued comments. Revised submission awaited.
JKIL to submit Design of Cross-Over.
7
BORED
TUNNEL
2000 m 2000 m 2000 m 0 0
Conditional approval issued to GFC. JKIL to submit
revised design for change in track alignment.
8
CSMIA
STATION
250 m x 23 m x 30 m 0 0 0 0
JKIL to submit Preliminary design of the permanent
structures (like Base slab, wall, columns etc.)
9 Pedestrian subway 4m x2.5 m 0 0 0 0
JKIL to finalise and submit the layout and construction
methodology based on site survey.

More Related Content

Similar to Design Status.pptx

23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)hepemod733
 
PMDP Presentation Sep-22_Final dt 27.10.2022.pptx
PMDP Presentation Sep-22_Final  dt 27.10.2022.pptxPMDP Presentation Sep-22_Final  dt 27.10.2022.pptx
PMDP Presentation Sep-22_Final dt 27.10.2022.pptxssuserea04ef1
 
ACCF- PCM19- MM Brief to Client- 26.10.21_At.pptx
ACCF- PCM19- MM Brief to Client- 26.10.21_At.pptxACCF- PCM19- MM Brief to Client- 26.10.21_At.pptx
ACCF- PCM19- MM Brief to Client- 26.10.21_At.pptxRamKumar957449
 
500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction report500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction reportSumit Singh
 
RCREEE-enerMENA_pgesco profile-rcree
RCREEE-enerMENA_pgesco profile-rcreeRCREEE-enerMENA_pgesco profile-rcree
RCREEE-enerMENA_pgesco profile-rcreeRCREEE
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptxTalebAlfihan
 
Improvement and Asphalting of State Highway and Major District Road of Koppal...
Improvement and Asphalting of State Highway and Major District Road of Koppal...Improvement and Asphalting of State Highway and Major District Road of Koppal...
Improvement and Asphalting of State Highway and Major District Road of Koppal...IRJET Journal
 

Similar to Design Status.pptx (20)

FQUP PPT.pptx
FQUP PPT.pptxFQUP PPT.pptx
FQUP PPT.pptx
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
PMDP Presentation Sep-22_Final dt 27.10.2022.pptx
PMDP Presentation Sep-22_Final  dt 27.10.2022.pptxPMDP Presentation Sep-22_Final  dt 27.10.2022.pptx
PMDP Presentation Sep-22_Final dt 27.10.2022.pptx
 
RESUME 2015
RESUME 2015RESUME 2015
RESUME 2015
 
RESUME 2015
RESUME 2015RESUME 2015
RESUME 2015
 
Quotation 50 kva_std_ongrid
Quotation 50 kva_std_ongridQuotation 50 kva_std_ongrid
Quotation 50 kva_std_ongrid
 
ACCF- PCM19- MM Brief to Client- 26.10.21_At.pptx
ACCF- PCM19- MM Brief to Client- 26.10.21_At.pptxACCF- PCM19- MM Brief to Client- 26.10.21_At.pptx
ACCF- PCM19- MM Brief to Client- 26.10.21_At.pptx
 
organized.pdf
organized.pdforganized.pdf
organized.pdf
 
500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction report500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction report
 
Exalta Quotation 10 kw_ongrid_rajkot_std
Exalta Quotation 10 kw_ongrid_rajkot_stdExalta Quotation 10 kw_ongrid_rajkot_std
Exalta Quotation 10 kw_ongrid_rajkot_std
 
Quotation 10 kw_std_offgrid_nareshji
Quotation 10 kw_std_offgrid_nareshjiQuotation 10 kw_std_offgrid_nareshji
Quotation 10 kw_std_offgrid_nareshji
 
PIPING DESIGNER
PIPING DESIGNERPIPING DESIGNER
PIPING DESIGNER
 
CV-JKGHOSH_04 Jun 2016
CV-JKGHOSH_04 Jun 2016CV-JKGHOSH_04 Jun 2016
CV-JKGHOSH_04 Jun 2016
 
3.4.2 Isolator .pdf
3.4.2 Isolator .pdf3.4.2 Isolator .pdf
3.4.2 Isolator .pdf
 
RCREEE-enerMENA_pgesco profile-rcree
RCREEE-enerMENA_pgesco profile-rcreeRCREEE-enerMENA_pgesco profile-rcree
RCREEE-enerMENA_pgesco profile-rcree
 
Risk Issue.pdf
Risk Issue.pdfRisk Issue.pdf
Risk Issue.pdf
 
Training PPT
Training PPTTraining PPT
Training PPT
 
COBRA PRESENTATION
COBRA  PRESENTATIONCOBRA  PRESENTATION
COBRA PRESENTATION
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptx
 
Improvement and Asphalting of State Highway and Major District Road of Koppal...
Improvement and Asphalting of State Highway and Major District Road of Koppal...Improvement and Asphalting of State Highway and Major District Road of Koppal...
Improvement and Asphalting of State Highway and Major District Road of Koppal...
 

Recently uploaded

UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelDrAjayKumarYadav4
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxhublikarsn
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxNANDHAKUMARA10
 
Compressing and Sparsifying LLM in GenAI Applications
Compressing and Sparsifying LLM in GenAI ApplicationsCompressing and Sparsifying LLM in GenAI Applications
Compressing and Sparsifying LLM in GenAI ApplicationsMFatihSIRA
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdfKamal Acharya
 
Danikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdfDanikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdfthietkevietthinh
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Fundamentals of Internet of Things (IoT) Part-2
Fundamentals of Internet of Things (IoT) Part-2Fundamentals of Internet of Things (IoT) Part-2
Fundamentals of Internet of Things (IoT) Part-2ChandrakantDivate1
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptjigup7320
 
Databricks Generative AI Fundamentals .pdf
Databricks Generative AI Fundamentals  .pdfDatabricks Generative AI Fundamentals  .pdf
Databricks Generative AI Fundamentals .pdfVinayVadlagattu
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdfAlexander Litvinenko
 
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...ssuserdfc773
 

Recently uploaded (20)

UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Compressing and Sparsifying LLM in GenAI Applications
Compressing and Sparsifying LLM in GenAI ApplicationsCompressing and Sparsifying LLM in GenAI Applications
Compressing and Sparsifying LLM in GenAI Applications
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
Danikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdfDanikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdf
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Fundamentals of Internet of Things (IoT) Part-2
Fundamentals of Internet of Things (IoT) Part-2Fundamentals of Internet of Things (IoT) Part-2
Fundamentals of Internet of Things (IoT) Part-2
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) ppt
 
Databricks Generative AI Fundamentals .pdf
Databricks Generative AI Fundamentals  .pdfDatabricks Generative AI Fundamentals  .pdf
Databricks Generative AI Fundamentals .pdf
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
 

Design Status.pptx

  • 1. SAFETY REVIEW 1. SHE organization chart not submitted. 2. Sr SHE Electrical Engineer, Traffic Engineer, Labour Welfare Officer & Barricading Manager not deployed. 3. Monthly Audit Rating score (MARS) commenced on 26.07.2022. 4. 96 hours training started at underground station for JKIL staff. 5. External Quarterly audit commenced on 21.07.2022. 6. ISO certification process not started for underground works. 7. Project Management Safety walk down carried out. 8. Without submission of Method statement fencing works are carried out at cut & cover and UG. 9. Inadequate Occupational Health & Welfare facilities-Absence of Ambulance van on site and tie up of the nearest hospital. Also insufficient/inadequate first aid boxes on site offices. AREA OF CONCERN NCR Summary THIS WEEK UP TO DATE (TOTAL) Issued Closed Open Closed 00 00 01 02
  • 2. Tree Cutting and Plantation/Transplantation Status MML 7A, CA-48 Metro Line Total Scope Trees to be retained Trees to be Cut Trees to be Transplant Compensatory Plantation Remarks Line-7A (MCGM, K/East Ward) 203 64 20/55 51/84 50/110  Letter fwd. by MMRDA to MCGM on 24th July 2020. Site visit by JTO was held on 20th Aug 2020 and ASG (Zone III, K/East Ward) visited on 27.11.2020 .  Revised Proposal along with Tree Marking in Plan and other required documents forwarded by GC to MMRDA after review vide GC’s letter no. SCGC59/L9/MMRDA/ENV/2267 dtd.21.12.2020 for necessary approval from concerned tree Authority.  MMRDA has submitted all required documents to concerned tree authority vide letter No. MMRDA/ MPIU/ML-7A/Tree Permissions/ 2021/36 Dtd. 14.01.2021 to accord approval.  Tree permission granted vide MCGM Letter No. DYSG/TA/Z-III/ 15/P Dtd. 11.04.2022 Total 203 64 20 51/84 50  Effort is being taken to save the trees by minimizing tree cutting/transplantation  Out of 55 Nos. trees Permitted to cut, 06 Nos. Trees will be saved.  Out of 84 Nos. trees Permitted to transplant, 07 Nos. Trees will be saved.  50 Nos. tree sapling planted @ Aarey Forest Land Parcel on 4th/5th June 2022
  • 3. Sr. No. Station GAD Issued/Not Issued Issued Date Further Action 1 Airport Colony Issued updated 03-03-22 • GC issued CRS comments for structural framing drgs JKIL/DDC-S to submit updated drgs for final approval. • DDC – A to update & resubmit Detail Design Drgs for Entry Exit structures by 26-07-2022. 2 CSMIA Issued updated 13-07-22 • JKIL/DDC – A submitted updated drawings on 13-07-2022. GC submitted to GC Systems for comments. • Reference meeting on 18-07-2022, MIAL provided detailed loads for OSD structure. JKIL/DDC-S to provide structural framing drgs for CSMIA station by 29-07-2022. • Reference to PRM dated 13-07-2022, JKIL/DDC informed MEP design in progress. Design & details of vent shafts as requested by MIAL. • MIAL have requested the secant pile drawings for further coordination with OSD works, JKIL to provide. • JKIL to submit Activity wise project schedule. • MMRDA to send interchange data by Mail to GC..
  • 4. STATUS OF STRUCTURAL DESIGN- ELEVATED VIADUCT Sr No DESCRIPTION TOTAL SCOPE DESIGN SUBMITTED BY JKIL DESIGN APPROVED BY GC DESIGN REJECTED BY GC PENDING WITH GC AS ON DATE REMARKS 1 PILE 88 88 88 0 0 All GFC’s are approved. 2 PILECAP and PIER 22 22 22 0 0 All GFC’s are approved. 3 PIER CAP 22 19 19 0 0 Design of Pier Cap Design for 3 Pier locations is awaited. 4 Airport Colony Station Pile– 96 96 96 0 0 All GFC’s are approved. Pile cap - 25 21 12 0 09 Grid 7 to 12 CRD approved. Grid 1 to 6, being progressively reviewed. Pier/Portal Pier - 25 21 12 0 09 Grid 7 to 12 CRD approved. Grid 1 to 6, being progressively reviewed. 5 Elastomeric Bearing 176 158 158 0 0 GFC for U-Girder are approved. Design for Bearing under I-Girder is awaited. 6 Bearing Pedestal 176 0 0 0 0 Design for Bearing Pedestals is awaited. 7 Seismic Arrestor 88 88 88 0 0 GFC for U-Girder are approved. Design for Seismic Arrestor at I-Girder is awaited.
  • 5. STATUS OF STRUCTURAL DESIGN OF UG SECTION Sr NO DESCRIPTION TOTAL SCOPE DESIGN SUBMITTED BY JKIL DESIGN APPROVED BY GC DESIGN REJECTED BY GC PENDING WITH GC AS ON DATE REMARKS 1 SECANT PILE- LAUNCHING SHAFT and UG Station RCC Pile - 426 PCC Pile - 426 RCC Pile -426 PCC Pile -426 426 426 0 0 0 0 All GFCs of Secant Piles are approved for Zone-A, B, C, C1, D and D1 including Nallah side. 2 SECANT PILE- RETRIVEAL SHAFT & Ramp RCC Pile - 300 PCC Pile -300 RCC Pile -300 PCC Pile -300 300 300 0 0 0 0 All GFCs of Secant Piles are approved for UG Ramp and TBM Retrieval Shaft. 3 Waler and Anchor UG Station RETRIVEAL SHAFT UG Station RETRIVEAL SHAFT Commented (STR- 6201 dt. 03.02.2022 0 0 Revised design of Anchor and Waler is awaited. 4 Elevated RAMP 165 m 165 m 165 m 0 0 GFCs of Elevated Ramp are approved. 5 CUT & COVER TUNNEL U-Section 145 m Box Section 80 m 145 m 80 m Commented (STR- 6442 dt. 28.02.2022 0 0 Revised design received. Under GC review. Two nos MCGM water pipelines are encountered, to be diverted. 6 NATM TUNNEL Cross Over 155 m Cross Passage 7 no P D of Cross Passage Commented (STR- 6280 dt. 11.02.2022 0 0 GC issued comments. Revised submission awaited. JKIL to submit Design of Cross-Over. 7 BORED TUNNEL 2000 m 2000 m 2000 m 0 0 Conditional approval issued to GFC. JKIL to submit revised design for change in track alignment. 8 CSMIA STATION 250 m x 23 m x 30 m 0 0 0 0 JKIL to submit Preliminary design of the permanent structures (like Base slab, wall, columns etc.) 9 Pedestrian subway 4m x2.5 m 0 0 0 0 JKIL to finalise and submit the layout and construction methodology based on site survey.