This 15-page document provides a comprehensive proposal for a 10KW off-grid solar photovoltaic system. The system would include 40 250-watt solar panels, 1 inverter, mounting structures, electrical accessories, and optional monitoring equipment. Installation is estimated to take 1-8 weeks upon receipt of payment. The total cost is estimated at 7.5 lakhs plus additional costs for taxes and an upgraded inverter capacity. A 25-year warranty is provided for the solar panels and shorter warranties for other components.