SlideShare a Scribd company logo
1 of 16
INDUSTRIAL TRAINING
REPORT
COMPANY NAME : DELHI METRO RAIL CORPORATION LIMITED.
DURATION : 18, May 2016 to 21, June 2016
NAME : DEEPAK KUMAR
ROLL NUMBER : 1301011044
DEPARTMENT OF CIVIL ENGINEERING
DIT UNIVERSITY
Project Name-Design and construction of tunnel &
underground metro stations from Janakpuri West to
Botanical Garden(CC-32) and (CC-34)
Client DMRC
Location Delhi
Contract Type Design and construction basis.
Contractor HCC-Samsung JV (Share 50 : 50) and HCC is leader
Completion period 46 months (18 Feb. 2013 ~ 01 Dec. 2016)
Contract Value 865.98 Cr. (A = 812.04, B = 41.18, C = 12.76)
Scope of work Design and construction of
 Twin tunnel between ch. 830.912 and 4591.63 by shield TBM. (4.363
KM Each)
 0.113 km and 0.158KM long Crossovers on either side of Janakpuri
station by C/C Method.
 U/G Stations at Janakpuri West, Dabri Mor and Dashrathpuri
including architectural finishing of stations.
 Interchange facilities between old and new Metro station
at Janakpuri.
SITE LOCATION
SITE MAP
1. Site map of CC32
2. SITE MAP OF CC33
SAFETY INDUCTION
In safety induction safety engineer told us about the use of safety equipment and PPE (Personal
Protective Equipment) at construction site.
PPE(Personal Protective Equipment)
 Safety Helmet
 Safety shoes
 Safety Gloves
 Safety Jacket
 Safety Glasses
Bottom Up construction Method(JANAKPURI
STATION)
Bottom up construction involves
 Excavation & Soil
Stabilization
 Construction of Base
slab, Concourse slab
& Roof slab
Construction of Columns
and Retaining wall.
 Waterproofing of
structure
 Filling Operations
TUNNEL OVERVIEW
KEY POINTS ABOUT TUNNEL:-
 Tunnels are constructed with the help of TBM (tunnel Boring Machine)
 The type of tunnel is “twin tunnel”.
 Inner diameter of tunnel is 5.8m
 Outer diameter is 6.5m
 There are 6 segment key in one ring of thickness 275mm and length 1.4m
 A cross passage is provided after every 200 rings for emergency exit.
 The lowermost of the tunnel is 20m below the ground surface.
TBM (Tunnel Boring Machine)
A tunnel Boring machine also known as “mole“, is a machine used to excavate tunnels with a circular cross section through
a variety of soil and rock strata. They can bore through anything from hard rock to sand. Tunnel diameter can range from a
meter (done with micro-TBM) to 19.25 meter to date.
Tunnel boring machine are used as an alternative to drilling and blasting methods in rock and conventional “hand mining “in
soil. TBM have the advantages of limiting the disturbance to the surrounding ground and produced a smooth tunnel wall.
The major disadvantage is the upfront cost. TBMs are expensive to construct, and can be difficult to transport. However, as
modern tunnels become longer, the cost of tunnel boring machines versus drill and blast is actually less.
WATER PROOFING
Chemicals used for Waterproofing
-For Priming Purpose
Master Seal M2525(Provided In two component A & B)
-Waterproofing Layer
Master Seal M800(Provided In two component A & B)
Master Seal M2525-Master Emaco 2525 is a solvent free, high-performance,
versatile epoxy binder that can be used to produce a range of epoxy resin based
mortars.
Several application stages:
 Surface preparation
 Pre-Application condition
 Preparation for Primer coat
 Spraying of MasterSeal M 800 membrane
 Surface Test
BACKFILLING
 The backfill material used shall be suitable earth / fine sand
complying with the required specification.
 Compaction of soil layer is done using rammer, plate compactor
and manual compaction will be done. Special care is taken
during the the compaction such that utilities are not damaged
during the compaction.
 Dumping, spreading and compaction of soil are done in layer of
@ 200 mm compacted thicknesses until the desired compaction
level is achieved.
 The soil is compacted till 95% compaction is achieved for each
layer and testing requirement shall be as per criteria specified.
BLOCK
WORKS
Dimension of Block– 400*200*200
Mortar-Cement sand mortar with ratio 1:4
Block Strength- 7.5 N/mm2
MIX –M15
Thickness of the bond-10mm
Joint Type-Basic English Bond(1 block thick)
BLOCK WORK IN
FRONT OF
RETAINING WALL
CONCOURSE
SLAB
ROOF SLAB
INITIAL LAYER OF BLOCK
WORK
RETAINING WALL
METHOD FOR CONCRETING
 Placing of concrete
 Compaction of concrete
 Curing of concrete
Various methods involves in concrete work
REBARING
Mostly HILTI chemical are used for rebaring
 Steps involved:-
 Drilling in the existing structure as per drawing
 Cleaning of holes by ELE blower
 Filling of chemical in well cleaned holes
 Then inserting bars slowly inside the holes
Rebaring is the method of insertion of steel bars when:-
•There is change in design or there is some extension of present structure.
•When steel rod as per has been not installed and to install the same rebaring is used.
QUALITY ASSURANCE & QUALITY CONTROL
 TESTS ON CEMENT
 TESTS ON AGGREGATES
 WATER ABSORPTION
 TESTS ON CONCRETE
CONCLUSION
It was a wonderful learning experience at Delhi Metro Rail Corporation Ltd.
for 5 weeks at CC32(UG-3) and CC34(UG-5). I gained a lot of insight
regarding several aspect of site. I was given exposure in almost all the
departments at the site. The friendly welcome from all the employees is
appreciating, sharing their experience and
giving their peace of wisdom which they have gained in long journey of work.
I am very much thankful for the wonderful accommodation facility from
DMRC. I hope this experience will surely help me in my future and also in
shaping my career.
THANKYOU

More Related Content

What's hot

Cc road summer training ppt @akshay kumar
Cc road summer training ppt @akshay kumarCc road summer training ppt @akshay kumar
Cc road summer training ppt @akshay kumarAkshay kumar
 
Vertical milling machine
Vertical milling machineVertical milling machine
Vertical milling machinelinxiaomo
 
Multi story building construction anshul
Multi story building construction anshulMulti story building construction anshul
Multi story building construction anshulAnshul Shakya
 
Svp field training report final
Svp field training report finalSvp field training report final
Svp field training report finalShubham Parab
 
Continuously reinforced concrete pavement seminar report by chandramohan lodha
Continuously reinforced concrete pavement seminar report by chandramohan lodhaContinuously reinforced concrete pavement seminar report by chandramohan lodha
Continuously reinforced concrete pavement seminar report by chandramohan lodhaChandra Mohan Lodha
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential buildingShariful Haque Robin
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveyingAnchit Agrawal
 
Summer training ppt on cc road construction
Summer training ppt on cc road constructionSummer training ppt on cc road construction
Summer training ppt on cc road constructionVijaypal Bagariya
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)Anil Gupta
 
Design of special pavements as per IRC SP 20
Design of special pavements as per IRC SP 20Design of special pavements as per IRC SP 20
Design of special pavements as per IRC SP 20GOVERNMENT POLYTECHNIC
 
Experimental behaviour and analysis of stress in rigid pavement
Experimental behaviour and analysis of stress in rigid pavementExperimental behaviour and analysis of stress in rigid pavement
Experimental behaviour and analysis of stress in rigid pavementVivek Loyola
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)Sukhdarshan Singh
 
Field visit report 2019
Field visit report 2019Field visit report 2019
Field visit report 2019Nirob Ahmed
 
Construction of Road
Construction of RoadConstruction of Road
Construction of RoadAman Shakya
 
Design of rigit pavement
Design of rigit pavementDesign of rigit pavement
Design of rigit pavementTAHIR HUSEN
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concreteMylene Delmoro
 

What's hot (20)

Training PPT
Training PPTTraining PPT
Training PPT
 
Cc road summer training ppt @akshay kumar
Cc road summer training ppt @akshay kumarCc road summer training ppt @akshay kumar
Cc road summer training ppt @akshay kumar
 
Vertical milling machine
Vertical milling machineVertical milling machine
Vertical milling machine
 
Multi story building construction anshul
Multi story building construction anshulMulti story building construction anshul
Multi story building construction anshul
 
Svp field training report final
Svp field training report finalSvp field training report final
Svp field training report final
 
Continuously reinforced concrete pavement seminar report by chandramohan lodha
Continuously reinforced concrete pavement seminar report by chandramohan lodhaContinuously reinforced concrete pavement seminar report by chandramohan lodha
Continuously reinforced concrete pavement seminar report by chandramohan lodha
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential building
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveying
 
Summer training ppt on cc road construction
Summer training ppt on cc road constructionSummer training ppt on cc road construction
Summer training ppt on cc road construction
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
 
Design of special pavements as per IRC SP 20
Design of special pavements as per IRC SP 20Design of special pavements as per IRC SP 20
Design of special pavements as per IRC SP 20
 
Experimental behaviour and analysis of stress in rigid pavement
Experimental behaviour and analysis of stress in rigid pavementExperimental behaviour and analysis of stress in rigid pavement
Experimental behaviour and analysis of stress in rigid pavement
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)
 
Field visit report 2019
Field visit report 2019Field visit report 2019
Field visit report 2019
 
Construction of Road
Construction of RoadConstruction of Road
Construction of Road
 
4
44
4
 
Jitendra road ppt
Jitendra road pptJitendra road ppt
Jitendra road ppt
 
Design of rigit pavement
Design of rigit pavementDesign of rigit pavement
Design of rigit pavement
 
Design of a rigid pavement (jpcp & crcp)
Design of a rigid pavement (jpcp & crcp)Design of a rigid pavement (jpcp & crcp)
Design of a rigid pavement (jpcp & crcp)
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concrete
 

Similar to Dmrctrainingpresentation 161115165907

Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationShuBham RaNa
 
Building materials, Basic civil engineering ,unit-1
Building materials, Basic civil engineering ,unit-1Building materials, Basic civil engineering ,unit-1
Building materials, Basic civil engineering ,unit-1Parimal Jha
 
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCDELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCAl Hakam Khan
 
Dmrc ppt final
Dmrc ppt finalDmrc ppt final
Dmrc ppt finalMd Shadab
 
Industrial Training Report1
Industrial Training Report1Industrial Training Report1
Industrial Training Report1Er Naveen Kumar
 
Technical textiles in Central Public Works Department
Technical textiles in Central Public Works DepartmentTechnical textiles in Central Public Works Department
Technical textiles in Central Public Works DepartmentDr K M SONI
 
Chhabra Thermal Power plant ppt by Cm lodha
Chhabra Thermal Power plant ppt by Cm lodhaChhabra Thermal Power plant ppt by Cm lodha
Chhabra Thermal Power plant ppt by Cm lodhaChandra Mohan Lodha
 
DMRC CC 66 training ppt
DMRC CC 66 training pptDMRC CC 66 training ppt
DMRC CC 66 training pptVikas Kumar
 
DMRC SUMMER INTERNSHIP REPORT
DMRC SUMMER INTERNSHIP REPORT DMRC SUMMER INTERNSHIP REPORT
DMRC SUMMER INTERNSHIP REPORT Deepak Kumar
 
Micro-Tunnelling: Productivity improvement for Asset and Apparatus Owners.
Micro-Tunnelling: Productivity improvement for Asset and Apparatus Owners.Micro-Tunnelling: Productivity improvement for Asset and Apparatus Owners.
Micro-Tunnelling: Productivity improvement for Asset and Apparatus Owners.Carlo Gabriele Borri MACostE AMICE
 
New materials and technologies used in some buildings in Mumbai
New materials and technologies used in some buildings in MumbaiNew materials and technologies used in some buildings in Mumbai
New materials and technologies used in some buildings in MumbaiDr K M SONI
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technologyAlexASquare1
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technologyAlexASquare1
 

Similar to Dmrctrainingpresentation 161115165907 (20)

Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
 
Building materials, Basic civil engineering ,unit-1
Building materials, Basic civil engineering ,unit-1Building materials, Basic civil engineering ,unit-1
Building materials, Basic civil engineering ,unit-1
 
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCDELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
 
Dmrc ppt final
Dmrc ppt finalDmrc ppt final
Dmrc ppt final
 
Eurasia tunnel1
Eurasia tunnel1Eurasia tunnel1
Eurasia tunnel1
 
Summer training report
Summer training reportSummer training report
Summer training report
 
Industrial Training Report1
Industrial Training Report1Industrial Training Report1
Industrial Training Report1
 
Technical textiles in Central Public Works Department
Technical textiles in Central Public Works DepartmentTechnical textiles in Central Public Works Department
Technical textiles in Central Public Works Department
 
Trench less Technology
Trench less Technology Trench less Technology
Trench less Technology
 
07 soil-grout threadbar
07 soil-grout threadbar07 soil-grout threadbar
07 soil-grout threadbar
 
training1 (1).pptx
training1 (1).pptxtraining1 (1).pptx
training1 (1).pptx
 
Chhabra Thermal Power plant ppt by Cm lodha
Chhabra Thermal Power plant ppt by Cm lodhaChhabra Thermal Power plant ppt by Cm lodha
Chhabra Thermal Power plant ppt by Cm lodha
 
DMRC CC 66 training ppt
DMRC CC 66 training pptDMRC CC 66 training ppt
DMRC CC 66 training ppt
 
DMRC SUMMER INTERNSHIP REPORT
DMRC SUMMER INTERNSHIP REPORT DMRC SUMMER INTERNSHIP REPORT
DMRC SUMMER INTERNSHIP REPORT
 
Micro-Tunnelling: Productivity improvement for Asset and Apparatus Owners.
Micro-Tunnelling: Productivity improvement for Asset and Apparatus Owners.Micro-Tunnelling: Productivity improvement for Asset and Apparatus Owners.
Micro-Tunnelling: Productivity improvement for Asset and Apparatus Owners.
 
New materials and technologies used in some buildings in Mumbai
New materials and technologies used in some buildings in MumbaiNew materials and technologies used in some buildings in Mumbai
New materials and technologies used in some buildings in Mumbai
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
optimec-1111
optimec-1111optimec-1111
optimec-1111
 
Saurabhk601
Saurabhk601Saurabhk601
Saurabhk601
 

Recently uploaded

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 

Recently uploaded (20)

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 

Dmrctrainingpresentation 161115165907

  • 1. INDUSTRIAL TRAINING REPORT COMPANY NAME : DELHI METRO RAIL CORPORATION LIMITED. DURATION : 18, May 2016 to 21, June 2016 NAME : DEEPAK KUMAR ROLL NUMBER : 1301011044 DEPARTMENT OF CIVIL ENGINEERING DIT UNIVERSITY
  • 2. Project Name-Design and construction of tunnel & underground metro stations from Janakpuri West to Botanical Garden(CC-32) and (CC-34) Client DMRC Location Delhi Contract Type Design and construction basis. Contractor HCC-Samsung JV (Share 50 : 50) and HCC is leader Completion period 46 months (18 Feb. 2013 ~ 01 Dec. 2016) Contract Value 865.98 Cr. (A = 812.04, B = 41.18, C = 12.76) Scope of work Design and construction of  Twin tunnel between ch. 830.912 and 4591.63 by shield TBM. (4.363 KM Each)  0.113 km and 0.158KM long Crossovers on either side of Janakpuri station by C/C Method.  U/G Stations at Janakpuri West, Dabri Mor and Dashrathpuri including architectural finishing of stations.  Interchange facilities between old and new Metro station at Janakpuri.
  • 4. SITE MAP 1. Site map of CC32 2. SITE MAP OF CC33
  • 5. SAFETY INDUCTION In safety induction safety engineer told us about the use of safety equipment and PPE (Personal Protective Equipment) at construction site. PPE(Personal Protective Equipment)  Safety Helmet  Safety shoes  Safety Gloves  Safety Jacket  Safety Glasses
  • 6. Bottom Up construction Method(JANAKPURI STATION) Bottom up construction involves  Excavation & Soil Stabilization  Construction of Base slab, Concourse slab & Roof slab Construction of Columns and Retaining wall.  Waterproofing of structure  Filling Operations
  • 7. TUNNEL OVERVIEW KEY POINTS ABOUT TUNNEL:-  Tunnels are constructed with the help of TBM (tunnel Boring Machine)  The type of tunnel is “twin tunnel”.  Inner diameter of tunnel is 5.8m  Outer diameter is 6.5m  There are 6 segment key in one ring of thickness 275mm and length 1.4m  A cross passage is provided after every 200 rings for emergency exit.  The lowermost of the tunnel is 20m below the ground surface.
  • 8. TBM (Tunnel Boring Machine) A tunnel Boring machine also known as “mole“, is a machine used to excavate tunnels with a circular cross section through a variety of soil and rock strata. They can bore through anything from hard rock to sand. Tunnel diameter can range from a meter (done with micro-TBM) to 19.25 meter to date. Tunnel boring machine are used as an alternative to drilling and blasting methods in rock and conventional “hand mining “in soil. TBM have the advantages of limiting the disturbance to the surrounding ground and produced a smooth tunnel wall. The major disadvantage is the upfront cost. TBMs are expensive to construct, and can be difficult to transport. However, as modern tunnels become longer, the cost of tunnel boring machines versus drill and blast is actually less.
  • 9. WATER PROOFING Chemicals used for Waterproofing -For Priming Purpose Master Seal M2525(Provided In two component A & B) -Waterproofing Layer Master Seal M800(Provided In two component A & B) Master Seal M2525-Master Emaco 2525 is a solvent free, high-performance, versatile epoxy binder that can be used to produce a range of epoxy resin based mortars. Several application stages:  Surface preparation  Pre-Application condition  Preparation for Primer coat  Spraying of MasterSeal M 800 membrane  Surface Test
  • 10. BACKFILLING  The backfill material used shall be suitable earth / fine sand complying with the required specification.  Compaction of soil layer is done using rammer, plate compactor and manual compaction will be done. Special care is taken during the the compaction such that utilities are not damaged during the compaction.  Dumping, spreading and compaction of soil are done in layer of @ 200 mm compacted thicknesses until the desired compaction level is achieved.  The soil is compacted till 95% compaction is achieved for each layer and testing requirement shall be as per criteria specified.
  • 11. BLOCK WORKS Dimension of Block– 400*200*200 Mortar-Cement sand mortar with ratio 1:4 Block Strength- 7.5 N/mm2 MIX –M15 Thickness of the bond-10mm Joint Type-Basic English Bond(1 block thick) BLOCK WORK IN FRONT OF RETAINING WALL CONCOURSE SLAB ROOF SLAB INITIAL LAYER OF BLOCK WORK RETAINING WALL
  • 12. METHOD FOR CONCRETING  Placing of concrete  Compaction of concrete  Curing of concrete Various methods involves in concrete work
  • 13. REBARING Mostly HILTI chemical are used for rebaring  Steps involved:-  Drilling in the existing structure as per drawing  Cleaning of holes by ELE blower  Filling of chemical in well cleaned holes  Then inserting bars slowly inside the holes Rebaring is the method of insertion of steel bars when:- •There is change in design or there is some extension of present structure. •When steel rod as per has been not installed and to install the same rebaring is used.
  • 14. QUALITY ASSURANCE & QUALITY CONTROL  TESTS ON CEMENT  TESTS ON AGGREGATES  WATER ABSORPTION  TESTS ON CONCRETE
  • 15. CONCLUSION It was a wonderful learning experience at Delhi Metro Rail Corporation Ltd. for 5 weeks at CC32(UG-3) and CC34(UG-5). I gained a lot of insight regarding several aspect of site. I was given exposure in almost all the departments at the site. The friendly welcome from all the employees is appreciating, sharing their experience and giving their peace of wisdom which they have gained in long journey of work. I am very much thankful for the wonderful accommodation facility from DMRC. I hope this experience will surely help me in my future and also in shaping my career.