Overview of OECD CEFIM Programme
CEFIM country partners: Colombia, Egypt,
India, Indonesia, Philippines, South Africa,
Thailand and Viet Nam
OECD programme funded by Australia, Canada,
Denmark, Egypt and Germany
Aim: to help accelerate clean energy finance and
investment by strengthening domestic enabling
conditions
Scope: renewable electricity, energy efficiency in
buildings and industry decarbonisation
Activities:
The CEFIM programme, Roadmap process and
timelines
MARCH 2022
Project Steering
Committee (PSC)
& Technical
Working Groups
(TWG)
Workshops and
consultations in
the Philippines
with public
sector, private
sector and
international
organisations
Roadmap
revision process
by DOE, industry
experts and
OECD
Roadmap
publication and
launch event
Implementation
of support
activities
MAY-NOV 2022 JUN-DEC 2023 MARCH 2024 H2 2024
Workshops and
consultations in
the Philippines
with public
sector, private
sector and
international
organisations
Roadmap
revision process
by DOE, industry
experts and
OECD
Scope of the Clean Energy Finance and Investment
Roadmap of the Philippines (“the Roadmap”)
1. Offshore wind 2. Energy Efficiency in public buildings
In close collaboration with the Department of Energy (DOE) of the Philippines, offshore
wind and energy efficiency in public buildings were selected as priority areas for this
Roadmap.
50% RE
in the power generation
mix by 2040
+10x RE
investments needed vs.
today’s annual average
178 GW
technical offshore
wind potential
+60 GW
Wind energy service
contracts awarded
24% economy
wide energy savings
by 2040
2% annual
reductions in energy
consumption in
buildings
+36x investments
needed vs. today’s
average
LGUs as principal
target adopters to kick-
start an energy
efficiency market
5
1.
Target setting
for
development
plans
Maritime spatial plans
Power development plans
Transmission development plans
2.
Zone
allocation for
OSW go-to
areas
Data driven process,
including biodiversity,
socio-economic and
broader infrastructure
planning
3.
One-stop-shop
approach
Integrates the OSW go-to areas
Adapted to OSW needs & timelines
Clear rules and digital tools
4.
Grid
networks
and
transmission
planning
Proactive grid planning
Streamlined project
selection process
Clarified asset boundary
classifications
5.
Port
expansion
and
upgrades
Multi-port strategy
Investment certainty
Future utilization rates
Key recommendations to unlock finance and investments
for offshore wind in the Philippines (part 1/2)
6
Key recommendations to unlock finance and investments
for offshore wind in the Philippines (part 2/2)
6.
Auction
design to
improve
competition
outcomes
Frontloaded schedule
Revenue stabilisation
Realistic timelines
Inflation indexed tariffs
Clear and predictable regulations
Enhanced PPA credibility
Diversity of capital
7.
Offshore
wind
finance
8.
Capacity
building
Improve
competitiveness,
learning curves, advance
supply chain buildout
It’s a
marathon and
not a sprint.
7
1.
Harmonised
implementation
plans
Clear timelines and
pathways between
national agencies,
local government,
central government
3.
Regulatory
reforms
Procurement rules for
energy efficiency projects
exceeding one calendar
year, as well as bundled
contracts
Key recommendations to unlock finance and investments for
energy efficiency in public buildings in the Philippines (part 1/2)
2.
Public budget
allocation for
LGUs
Assessing the budget
allocation of LGUs and the
needed resources against the
time-bound targets under
NEECP 2023-2050
8
4.
Data collection
and
transparency
Improve the trust in the
business model by addressing
perceived risks through data
analytics on savings,
performance, payback period
5.
Improved
access to
finance
Diversified funding through
project aggregation to facilitate
private sector engagement,
especially equity finance
6.
Capacity
building for
local impact
Public awareness campaigns
Sharing of best practices
Training and development
Key recommendations to unlock finance and investments for
energy efficiency in public buildings in the Philippines (part 2/2)
9
Please visit our webpage:
www.oecd.org/cefim/
For more information, please contact:
Ariola.Mbistrova@oecd.org
Geraldine.ANG@oecd.org
10
11
Investments in new renewable energy projects in the Philippines 2010 – 2022 (includes
BESS)
Actions to mobilise finance & investments for offshore wind
and energy efficiency in public buildings in the Philippines
Recommendations common to both offshore wind and energy efficiency in public buildings:
▪ Long-term vision, enhanced cross-government collaboration and integrated planning
▪ Capacity building across all the supply chain to maximise local content and benefit to the local communities
Offshore wind priority areas:
▪ Planning and permitting: one-stop-shop
approach
▪ Onshore support facilities: grid networks,
port infrastructure, other transportation
infrastructure
▪ Auction design and offshore wind
regulatory framework
▪ Implications of government policies on the
cost of finance
Energy efficiency in public buildings
priority areas:
▪ Budgetary constraints of LGUs, public
procurement and public accounting rules
▪ Access to finance for LGUs
▪ Data collection and transparency
▪ Project aggregation to establish an
investment pipeline
13
Country
Number of
auctions
(& auctioned
projects)
Auctioned
projects reaching
FID
(% of
capacity)
Capacity
weighted
average
prices
(€2020/
MWh)
Funding mechanism
(CfD, FIT, tax credit)
Tenor
(years)
Inflation
indexed
Grid
connection
responsibility
Site
developm
ent
Seabed
lease auction
Devex
support
Penalties for non-
compliance
Technology
specific
China 7
(21)
9
(36.8%)
103.1 Administrative FIT/competitive
FIT
n/a No Guaranteed access n/a n/a n/a Permit loss w/o construction >2 years Yes
United Kingdom 4
(9)
8
(99.9%)
66.5 Two-sided CfD 15 Yes Project Bidder Yes, separate
auction prior CfD
No Non-delivery: Banned for 2 years Partial
(different
technology pots)
Germany 3
(13)
9
(54.2%)
15.1 One-sided CfD 20 No TSO
(socialised)
Governme
nt
No Yes Financial €0.1–0.2/MW Yes
Netherlands 8
(8)
7
(83.2%)
26.8 One-sided CfD 15 No TSO
(socialised)
Governme
nt
Yes, part of
auction criteria
Yes Non-delivery: €10m Late: €3.5m/mo Yes
Denmark 8
(8)
5
(83.8%)
89.4 Two-sided CfD 20 No Project
(as of 2021)
Bidder No No Non-delivery/Late: =€m0.15/MW + less
supported production
Yes
Chinese
Taipei
2
(14)
6
(38.2%)
90.8 Administrative FIT/competitive
FIT
20 No TSO
(socialised)
Governme
nt
No No No Yes
United States 9
(13)
1
(9.4%)
75.5 Fixed OREC /
fixed-priced PPA
20 Yes Project Bidder Yes, prior federal
seabed auctions
No No Yes
France 5
(8)
4
(42.0%)
133.7 FIT / two-sided CfD 20 Yes (for 60%
of the tariff)
TSO
(socialised)
Bidder No No CfD shorted by the number of days
delayed
Yes
Philippines (based on
current GEAP)
na na na Fixed price PPA 20 No Project
(to be further clarified)
Bidder No No Delay >1 year: 20% performance bond;
Delay<1 year: 0.1%/day to a max of
10% of project cost
Partial (different
technology bands)
Overview of main fixed-bottom offshore wind auction design in
established offshore wind markets (as of December 2021)
14
Overview of main floating offshore wind regulatory design in
established offshore wind markets (as of December 2021)
Main regulatory design
elements
France
United
Kingdom
Norway Spain Ireland Italy Portugal Greece
Floating wind
target
Yes
750 MW (3x250 MW) by
2030 and 1500 MW
(extensions)
Yes
5000 MW by 2030
Yes
1500 MW
Yes
1000 - 3000 MW
Partially
5000 MW of mostly bottom
fixed offshore wind by
2030, with strong potential
afterwards
Partially
3500 MW of offshore
wind without breakdown
Yes
2000 MW
Yes
2000 MW
Areas for
floating
available in
Maritime Spatial
Plan
Yes
Specific locations to be
determined after
stakeholder consultation
Yes Yes Yes Yes, but work is ongoing
The Offshore Renewable
Energy Development Plan
II identified areas for
upcoming auction
No,
but work is ongoing
Yes No,
but work is ongoing
Consult
stakeholders
Yes Yes Yes Yes Yes
Under
consideration
Yes
Under
consideration
One-stop shop
authority
Partially Yes
Under
consideration
Under
consideration
Under
consideration
No No No
Technology
specific auctions
Yes Partially Yes
Under
consideration
Under
consideration
Under
consideration
Under
consideration
Under
consideration
Rounds frequency,
volumes, and
evaluation criteria
Yes Yes Yes
Under
consideration
Under
consideration
Under
consideration
Under
consideration
Under
consideration
Support for supply
chain, ports, and
mass production
Partially
Recovery plan budget
for greener ports
Yes
Under
consideration
Partially
Recovery plan budget
for R&I
Under
consideration
No
Under
consideration
No
Grid connection roles and
responsibilities
Yes Yes Yes Yes Yes
Under
consideration
Under
consideration
Under
consideration

More Related Content

Similar to Clean Energy Finance and Investment Roadmap OECD.pdf

10 may presentation_by_ahmed_abdel_latif
10 may presentation_by_ahmed_abdel_latif10 may presentation_by_ahmed_abdel_latif
10 may presentation_by_ahmed_abdel_latif
Julien Grollier
 
Port of SD Fact Sheets
Port of SD Fact SheetsPort of SD Fact Sheets
Port of SD Fact Sheets
Crowdbrite
 
Turkey: Proposed Carbon Registry
Turkey: Proposed Carbon Registry Turkey: Proposed Carbon Registry
Turkey: Proposed Carbon Registry
nooone
 
20160229_GEF-6_RE-EE_Project
20160229_GEF-6_RE-EE_Project20160229_GEF-6_RE-EE_Project
20160229_GEF-6_RE-EE_Project
Danny Nekitel
 

Similar to Clean Energy Finance and Investment Roadmap OECD.pdf (20)

Vietnam _Green Growth
Vietnam _Green GrowthVietnam _Green Growth
Vietnam _Green Growth
 
10 may presentation_by_ahmed_abdel_latif
10 may presentation_by_ahmed_abdel_latif10 may presentation_by_ahmed_abdel_latif
10 may presentation_by_ahmed_abdel_latif
 
4 sarah nightingale decc offshore wind seminar 18 19 march 2014
4 sarah nightingale decc offshore wind seminar 18 19  march 20144 sarah nightingale decc offshore wind seminar 18 19  march 2014
4 sarah nightingale decc offshore wind seminar 18 19 march 2014
 
B2 - Djibouti Geothermal Energy Strategy and Action Plan from 2018 to 2021
B2 - Djibouti Geothermal Energy  Strategy and Action Plan from 2018 to 2021 B2 - Djibouti Geothermal Energy  Strategy and Action Plan from 2018 to 2021
B2 - Djibouti Geothermal Energy Strategy and Action Plan from 2018 to 2021
 
Port of SD Fact Sheets
Port of SD Fact SheetsPort of SD Fact Sheets
Port of SD Fact Sheets
 
Turkey: Proposed Carbon Registry
Turkey: Proposed Carbon Registry Turkey: Proposed Carbon Registry
Turkey: Proposed Carbon Registry
 
offshore.pptx
offshore.pptxoffshore.pptx
offshore.pptx
 
20160229_GEF-6_RE-EE_Project
20160229_GEF-6_RE-EE_Project20160229_GEF-6_RE-EE_Project
20160229_GEF-6_RE-EE_Project
 
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 29 ...
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 29 ...Horizon 2020 Green Deal: Information and Consortia Building Event Series, 29 ...
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 29 ...
 
19th CTCN Advisory Board Meeting: Director's presentation, Rose Mwebaza
19th CTCN Advisory Board Meeting: Director's presentation, Rose Mwebaza19th CTCN Advisory Board Meeting: Director's presentation, Rose Mwebaza
19th CTCN Advisory Board Meeting: Director's presentation, Rose Mwebaza
 
Eurogia2020, GET YOUR BEST IDEAS FUNDED
Eurogia2020, GET YOUR BEST IDEAS FUNDEDEurogia2020, GET YOUR BEST IDEAS FUNDED
Eurogia2020, GET YOUR BEST IDEAS FUNDED
 
Industrial Energy Transformational Fund Phase 2 Spring 2022 - Competition Bri...
Industrial Energy Transformational Fund Phase 2 Spring 2022 - Competition Bri...Industrial Energy Transformational Fund Phase 2 Spring 2022 - Competition Bri...
Industrial Energy Transformational Fund Phase 2 Spring 2022 - Competition Bri...
 
Flexibility needs at system level and how RD&I projects are leveraging these ...
Flexibility needs at system level and how RD&I projects are leveraging these ...Flexibility needs at system level and how RD&I projects are leveraging these ...
Flexibility needs at system level and how RD&I projects are leveraging these ...
 
CEFIM Roadmap Overview - offshore wind and green hydrogen under the Clean Ene...
CEFIM Roadmap Overview - offshore wind and green hydrogen under the Clean Ene...CEFIM Roadmap Overview - offshore wind and green hydrogen under the Clean Ene...
CEFIM Roadmap Overview - offshore wind and green hydrogen under the Clean Ene...
 
Challenges and best practices in financing to accelerate industry decarbonisa...
Challenges and best practices in financing to accelerate industry decarbonisa...Challenges and best practices in financing to accelerate industry decarbonisa...
Challenges and best practices in financing to accelerate industry decarbonisa...
 
Does the permitting process in France need a further overhaul?
Does the permitting process in France need a further overhaul?Does the permitting process in France need a further overhaul?
Does the permitting process in France need a further overhaul?
 
Cut Carbon Symposium: Decarbonising UK Freight
Cut Carbon Symposium: Decarbonising UK FreightCut Carbon Symposium: Decarbonising UK Freight
Cut Carbon Symposium: Decarbonising UK Freight
 
Philippine Energy Plan: Towards a Sustainable and Clean Energy Future - Felix...
Philippine Energy Plan: Towards a Sustainable and Clean Energy Future - Felix...Philippine Energy Plan: Towards a Sustainable and Clean Energy Future - Felix...
Philippine Energy Plan: Towards a Sustainable and Clean Energy Future - Felix...
 
Public to Private Partnership in water sector
Public to Private Partnership in water sectorPublic to Private Partnership in water sector
Public to Private Partnership in water sector
 
Andrew Tipping - Green Growth Diagnostics for Africa
Andrew Tipping - Green Growth Diagnostics for AfricaAndrew Tipping - Green Growth Diagnostics for Africa
Andrew Tipping - Green Growth Diagnostics for Africa
 

More from OECD Environment

More from OECD Environment (20)

OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...
OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...
OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...
 
Detlef Van Vuuren- Integrated modelling for interrelated crises.pdf
Detlef Van Vuuren- Integrated modelling for interrelated crises.pdfDetlef Van Vuuren- Integrated modelling for interrelated crises.pdf
Detlef Van Vuuren- Integrated modelling for interrelated crises.pdf
 
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdf
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdfThomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdf
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdf
 
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...
 
Astrid Bos - Identifying trade offs & searching for synergies.pdf
Astrid Bos - Identifying trade offs & searching for synergies.pdfAstrid Bos - Identifying trade offs & searching for synergies.pdf
Astrid Bos - Identifying trade offs & searching for synergies.pdf
 
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...
 
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...
 
Laurent Drouet - Physical and Economic Risks of Climate Change.pdf
Laurent Drouet - Physical and Economic Risks of Climate Change.pdfLaurent Drouet - Physical and Economic Risks of Climate Change.pdf
Laurent Drouet - Physical and Economic Risks of Climate Change.pdf
 
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...
 
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...
 
GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdf
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...
 

Recently uploaded

Removal of Fe in well water using surface flow constructed wetland system wit...
Removal of Fe in well water using surface flow constructed wetland system wit...Removal of Fe in well water using surface flow constructed wetland system wit...
Removal of Fe in well water using surface flow constructed wetland system wit...
Open Access Research Paper
 

Recently uploaded (20)

Green Innovation in Transforming Sustainable Fashion Design
Green Innovation in Transforming Sustainable Fashion DesignGreen Innovation in Transforming Sustainable Fashion Design
Green Innovation in Transforming Sustainable Fashion Design
 
PRESENTATION 1 - GLOBAL SUSTAINABILITY CHALLENGES.pptx
PRESENTATION 1 - GLOBAL SUSTAINABILITY CHALLENGES.pptxPRESENTATION 1 - GLOBAL SUSTAINABILITY CHALLENGES.pptx
PRESENTATION 1 - GLOBAL SUSTAINABILITY CHALLENGES.pptx
 
Removal of Fe in well water using surface flow constructed wetland system wit...
Removal of Fe in well water using surface flow constructed wetland system wit...Removal of Fe in well water using surface flow constructed wetland system wit...
Removal of Fe in well water using surface flow constructed wetland system wit...
 
Introducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnershipsIntroducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnerships
 
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
 
Role of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRole of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease Management
 
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
 
Rising temperatures also mean that more plant pests are appearing earlier and...
Rising temperatures also mean that more plant pests are appearing earlier and...Rising temperatures also mean that more plant pests are appearing earlier and...
Rising temperatures also mean that more plant pests are appearing earlier and...
 
Production, dispersal, sedimentation and taphonomy of spores/pollen
Production, dispersal, sedimentation and taphonomy of spores/pollenProduction, dispersal, sedimentation and taphonomy of spores/pollen
Production, dispersal, sedimentation and taphonomy of spores/pollen
 
NO1 Pakistan Black magic/kala jadu,manpasand shadi in lahore,karachi rawalpin...
NO1 Pakistan Black magic/kala jadu,manpasand shadi in lahore,karachi rawalpin...NO1 Pakistan Black magic/kala jadu,manpasand shadi in lahore,karachi rawalpin...
NO1 Pakistan Black magic/kala jadu,manpasand shadi in lahore,karachi rawalpin...
 
Role of nanotechnology in management of stored grain pests of cereals and pulses
Role of nanotechnology in management of stored grain pests of cereals and pulsesRole of nanotechnology in management of stored grain pests of cereals and pulses
Role of nanotechnology in management of stored grain pests of cereals and pulses
 
Heavy metals with their causes and effect.ppt
Heavy metals with their causes and effect.pptHeavy metals with their causes and effect.ppt
Heavy metals with their causes and effect.ppt
 
Fuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionFuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An Introduction
 
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
 
Peat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG LonderangPeat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG Londerang
 
A Wide Range of Eco System Services with Mangroves
A Wide Range of Eco System Services with MangrovesA Wide Range of Eco System Services with Mangroves
A Wide Range of Eco System Services with Mangroves
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
CAUSES,EFFECTS,CONTROL OF DEFORESTATION.pptx
CAUSES,EFFECTS,CONTROL OF DEFORESTATION.pptxCAUSES,EFFECTS,CONTROL OF DEFORESTATION.pptx
CAUSES,EFFECTS,CONTROL OF DEFORESTATION.pptx
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...
 
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
 

Clean Energy Finance and Investment Roadmap OECD.pdf

  • 1. 1 The Philippines Clean Energy Finance and Investment Roadmap Roadmap Launch Event and Workshops on Energy Efficiency in Public Buildings and Offshore Wind 6-7 March 2024
  • 2. 2 Overview of OECD CEFIM Programme CEFIM country partners: Colombia, Egypt, India, Indonesia, Philippines, South Africa, Thailand and Viet Nam OECD programme funded by Australia, Canada, Denmark, Egypt and Germany Aim: to help accelerate clean energy finance and investment by strengthening domestic enabling conditions Scope: renewable electricity, energy efficiency in buildings and industry decarbonisation Activities:
  • 3. The CEFIM programme, Roadmap process and timelines MARCH 2022 Project Steering Committee (PSC) & Technical Working Groups (TWG) Workshops and consultations in the Philippines with public sector, private sector and international organisations Roadmap revision process by DOE, industry experts and OECD Roadmap publication and launch event Implementation of support activities MAY-NOV 2022 JUN-DEC 2023 MARCH 2024 H2 2024 Workshops and consultations in the Philippines with public sector, private sector and international organisations Roadmap revision process by DOE, industry experts and OECD
  • 4. Scope of the Clean Energy Finance and Investment Roadmap of the Philippines (“the Roadmap”) 1. Offshore wind 2. Energy Efficiency in public buildings In close collaboration with the Department of Energy (DOE) of the Philippines, offshore wind and energy efficiency in public buildings were selected as priority areas for this Roadmap. 50% RE in the power generation mix by 2040 +10x RE investments needed vs. today’s annual average 178 GW technical offshore wind potential +60 GW Wind energy service contracts awarded 24% economy wide energy savings by 2040 2% annual reductions in energy consumption in buildings +36x investments needed vs. today’s average LGUs as principal target adopters to kick- start an energy efficiency market
  • 5. 5 1. Target setting for development plans Maritime spatial plans Power development plans Transmission development plans 2. Zone allocation for OSW go-to areas Data driven process, including biodiversity, socio-economic and broader infrastructure planning 3. One-stop-shop approach Integrates the OSW go-to areas Adapted to OSW needs & timelines Clear rules and digital tools 4. Grid networks and transmission planning Proactive grid planning Streamlined project selection process Clarified asset boundary classifications 5. Port expansion and upgrades Multi-port strategy Investment certainty Future utilization rates Key recommendations to unlock finance and investments for offshore wind in the Philippines (part 1/2)
  • 6. 6 Key recommendations to unlock finance and investments for offshore wind in the Philippines (part 2/2) 6. Auction design to improve competition outcomes Frontloaded schedule Revenue stabilisation Realistic timelines Inflation indexed tariffs Clear and predictable regulations Enhanced PPA credibility Diversity of capital 7. Offshore wind finance 8. Capacity building Improve competitiveness, learning curves, advance supply chain buildout It’s a marathon and not a sprint.
  • 7. 7 1. Harmonised implementation plans Clear timelines and pathways between national agencies, local government, central government 3. Regulatory reforms Procurement rules for energy efficiency projects exceeding one calendar year, as well as bundled contracts Key recommendations to unlock finance and investments for energy efficiency in public buildings in the Philippines (part 1/2) 2. Public budget allocation for LGUs Assessing the budget allocation of LGUs and the needed resources against the time-bound targets under NEECP 2023-2050
  • 8. 8 4. Data collection and transparency Improve the trust in the business model by addressing perceived risks through data analytics on savings, performance, payback period 5. Improved access to finance Diversified funding through project aggregation to facilitate private sector engagement, especially equity finance 6. Capacity building for local impact Public awareness campaigns Sharing of best practices Training and development Key recommendations to unlock finance and investments for energy efficiency in public buildings in the Philippines (part 2/2)
  • 9. 9 Please visit our webpage: www.oecd.org/cefim/ For more information, please contact: Ariola.Mbistrova@oecd.org Geraldine.ANG@oecd.org
  • 10. 10
  • 11. 11 Investments in new renewable energy projects in the Philippines 2010 – 2022 (includes BESS)
  • 12. Actions to mobilise finance & investments for offshore wind and energy efficiency in public buildings in the Philippines Recommendations common to both offshore wind and energy efficiency in public buildings: ▪ Long-term vision, enhanced cross-government collaboration and integrated planning ▪ Capacity building across all the supply chain to maximise local content and benefit to the local communities Offshore wind priority areas: ▪ Planning and permitting: one-stop-shop approach ▪ Onshore support facilities: grid networks, port infrastructure, other transportation infrastructure ▪ Auction design and offshore wind regulatory framework ▪ Implications of government policies on the cost of finance Energy efficiency in public buildings priority areas: ▪ Budgetary constraints of LGUs, public procurement and public accounting rules ▪ Access to finance for LGUs ▪ Data collection and transparency ▪ Project aggregation to establish an investment pipeline
  • 13. 13 Country Number of auctions (& auctioned projects) Auctioned projects reaching FID (% of capacity) Capacity weighted average prices (€2020/ MWh) Funding mechanism (CfD, FIT, tax credit) Tenor (years) Inflation indexed Grid connection responsibility Site developm ent Seabed lease auction Devex support Penalties for non- compliance Technology specific China 7 (21) 9 (36.8%) 103.1 Administrative FIT/competitive FIT n/a No Guaranteed access n/a n/a n/a Permit loss w/o construction >2 years Yes United Kingdom 4 (9) 8 (99.9%) 66.5 Two-sided CfD 15 Yes Project Bidder Yes, separate auction prior CfD No Non-delivery: Banned for 2 years Partial (different technology pots) Germany 3 (13) 9 (54.2%) 15.1 One-sided CfD 20 No TSO (socialised) Governme nt No Yes Financial €0.1–0.2/MW Yes Netherlands 8 (8) 7 (83.2%) 26.8 One-sided CfD 15 No TSO (socialised) Governme nt Yes, part of auction criteria Yes Non-delivery: €10m Late: €3.5m/mo Yes Denmark 8 (8) 5 (83.8%) 89.4 Two-sided CfD 20 No Project (as of 2021) Bidder No No Non-delivery/Late: =€m0.15/MW + less supported production Yes Chinese Taipei 2 (14) 6 (38.2%) 90.8 Administrative FIT/competitive FIT 20 No TSO (socialised) Governme nt No No No Yes United States 9 (13) 1 (9.4%) 75.5 Fixed OREC / fixed-priced PPA 20 Yes Project Bidder Yes, prior federal seabed auctions No No Yes France 5 (8) 4 (42.0%) 133.7 FIT / two-sided CfD 20 Yes (for 60% of the tariff) TSO (socialised) Bidder No No CfD shorted by the number of days delayed Yes Philippines (based on current GEAP) na na na Fixed price PPA 20 No Project (to be further clarified) Bidder No No Delay >1 year: 20% performance bond; Delay<1 year: 0.1%/day to a max of 10% of project cost Partial (different technology bands) Overview of main fixed-bottom offshore wind auction design in established offshore wind markets (as of December 2021)
  • 14. 14 Overview of main floating offshore wind regulatory design in established offshore wind markets (as of December 2021) Main regulatory design elements France United Kingdom Norway Spain Ireland Italy Portugal Greece Floating wind target Yes 750 MW (3x250 MW) by 2030 and 1500 MW (extensions) Yes 5000 MW by 2030 Yes 1500 MW Yes 1000 - 3000 MW Partially 5000 MW of mostly bottom fixed offshore wind by 2030, with strong potential afterwards Partially 3500 MW of offshore wind without breakdown Yes 2000 MW Yes 2000 MW Areas for floating available in Maritime Spatial Plan Yes Specific locations to be determined after stakeholder consultation Yes Yes Yes Yes, but work is ongoing The Offshore Renewable Energy Development Plan II identified areas for upcoming auction No, but work is ongoing Yes No, but work is ongoing Consult stakeholders Yes Yes Yes Yes Yes Under consideration Yes Under consideration One-stop shop authority Partially Yes Under consideration Under consideration Under consideration No No No Technology specific auctions Yes Partially Yes Under consideration Under consideration Under consideration Under consideration Under consideration Rounds frequency, volumes, and evaluation criteria Yes Yes Yes Under consideration Under consideration Under consideration Under consideration Under consideration Support for supply chain, ports, and mass production Partially Recovery plan budget for greener ports Yes Under consideration Partially Recovery plan budget for R&I Under consideration No Under consideration No Grid connection roles and responsibilities Yes Yes Yes Yes Yes Under consideration Under consideration Under consideration