This document summarizes a success story of Yokogawa's control and monitoring systems implementation at Eraring Power Station in Australia. The key points are:
The City Utilities of Springfield
Springfield, Missouri, USA
Control system replacement
1) Yokogawa implemented an integrated control and monitoring system at Eraring Power Station, Australia's largest power plant, to ensure continued reliability.
2) Their solution minimized plant outage time through extensive testing on a simulator prior to commissioning.
3) The renovated units now operate more stably and flexibly, allowing the plant to respond faster to electricity market demands.
The document provides information about an in-plant training conducted by two students at BHEL Electronics Division (EDN) in Bangalore. It summarizes BHEL EDN's profile, products, manufacturing processes and facilities. Key areas covered in the training included automation and control systems, semiconductor manufacturing, photovoltaic systems, traction drives, gas turbine controls, and surface mount technology. The students gained exposure in various electronics engineering fields and thanked BHEL EDN for the well-planned training program.
This document provides information about Nuclear Power Corporation of India (NPCIL) and Bharat Heavy Electricals Limited (BHEL). It discusses NPCIL's objectives of undertaking nuclear power projects across various sites in India. It then introduces BHEL as a state-owned power equipment manufacturer and discusses its portfolio, manufacturing facilities, product profile, and divisions like electronics and automation & control systems. The document also summarizes the seminar topics around various power plants, automation systems, traction systems, solar photovoltaics, and BHEL-EDN's infrastructure.
Irfan Rasheed is an Electrical Technician with 6 years of experience working for Engro Fertilizers Limited in Daharki, Pakistan. He has experience conducting preventative and corrective maintenance on generators, motors, switchgear, transformers, protection relays, batteries, UPS systems, and other electrical equipment. He is responsible for maintenance scheduling in SAP, completing PMs and CMs, record keeping, and planning projects and tasks. Some of his achievements include installing an intelligent load management scheme.
IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...IRJET Journal
The document describes a proposed inductive power transfer system using a digital controller based matrix converter. The system aims to provide single-stage AC to high frequency power conversion at the transmitting end without bulky storage elements. At the receiving end, a rectifier can provide 12 power levels for different applications. A simplified digital circuit controller is implemented using logic circuits to provide soft switching of the matrix converter. The system allows for resonance frequency tracking for higher frequency power transfer with low delay. The self-tuning controller makes the system suitable for dynamic inductive charging of electric vehicles.
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...IRJET Journal
This document describes the design and analysis of the electrical distribution system for a typical large-scale chemical industry plant using ETAP software. The existing 11kV distribution network is analyzed and found to be insufficient for current load demands. A new optimized distribution network is proposed, including three 11kV/415V distribution transformers, duplicate and sectionalized main buses, motor control centers, and backup diesel generators. Load flow analysis is performed on the proposed network under normal and abnormal conditions. The results show improvements in voltage profile, losses, and power factor compared to the existing network.
The document describes Hitec QPS, a continuous power and uninterrupted power supply system with modular design. Key features include highest power ratings in the industry, exceptional power density, optimized availability, and best end-to-end efficiency. The system provides reliable, resilient power to data centers through its proven technology, flexibility, and high reliability. It offers customers significant benefits like industry-best total cost of ownership and optimized efficiency.
The document provides information about an in-plant training conducted by two students at BHEL Electronics Division (EDN) in Bangalore. It summarizes BHEL EDN's profile, products, manufacturing processes and facilities. Key areas covered in the training included automation and control systems, semiconductor manufacturing, photovoltaic systems, traction drives, gas turbine controls, and surface mount technology. The students gained exposure in various electronics engineering fields and thanked BHEL EDN for the well-planned training program.
This document provides information about Nuclear Power Corporation of India (NPCIL) and Bharat Heavy Electricals Limited (BHEL). It discusses NPCIL's objectives of undertaking nuclear power projects across various sites in India. It then introduces BHEL as a state-owned power equipment manufacturer and discusses its portfolio, manufacturing facilities, product profile, and divisions like electronics and automation & control systems. The document also summarizes the seminar topics around various power plants, automation systems, traction systems, solar photovoltaics, and BHEL-EDN's infrastructure.
Irfan Rasheed is an Electrical Technician with 6 years of experience working for Engro Fertilizers Limited in Daharki, Pakistan. He has experience conducting preventative and corrective maintenance on generators, motors, switchgear, transformers, protection relays, batteries, UPS systems, and other electrical equipment. He is responsible for maintenance scheduling in SAP, completing PMs and CMs, record keeping, and planning projects and tasks. Some of his achievements include installing an intelligent load management scheme.
IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...IRJET Journal
The document describes a proposed inductive power transfer system using a digital controller based matrix converter. The system aims to provide single-stage AC to high frequency power conversion at the transmitting end without bulky storage elements. At the receiving end, a rectifier can provide 12 power levels for different applications. A simplified digital circuit controller is implemented using logic circuits to provide soft switching of the matrix converter. The system allows for resonance frequency tracking for higher frequency power transfer with low delay. The self-tuning controller makes the system suitable for dynamic inductive charging of electric vehicles.
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...IRJET Journal
This document describes the design and analysis of the electrical distribution system for a typical large-scale chemical industry plant using ETAP software. The existing 11kV distribution network is analyzed and found to be insufficient for current load demands. A new optimized distribution network is proposed, including three 11kV/415V distribution transformers, duplicate and sectionalized main buses, motor control centers, and backup diesel generators. Load flow analysis is performed on the proposed network under normal and abnormal conditions. The results show improvements in voltage profile, losses, and power factor compared to the existing network.
The document describes Hitec QPS, a continuous power and uninterrupted power supply system with modular design. Key features include highest power ratings in the industry, exceptional power density, optimized availability, and best end-to-end efficiency. The system provides reliable, resilient power to data centers through its proven technology, flexibility, and high reliability. It offers customers significant benefits like industry-best total cost of ownership and optimized efficiency.
Test platform for electronic control units of high-performance safety-critica...IJECEIAES
In this paper we are mostly concerned with the problem of testing electronic control units of synchronized electric power actuators. This task is particularly complex for safety critical applications, where it is crucial that the control system properly reacts in response to the faults that are hard to reproduce and verify. A cost-effective flexible and reconfigurable test platform is proposed, discussing its architecture and implementation. The proposed system facilitates the phase of definition and development of the electronic control unit, allowing the interfacing towards both hydraulic and electromechanical actuators, and having a high flexibility as regards the I/O signals. Some results, obtained during the laboratory test activity, are also presented.
Speed Synchronization of Multiple Bldcmotors In Textile &Paper Mills Using Mi...IJERA Editor
Multiple motor setup has vast application in industries. The application can be in textile mills, paper mills and robotics. In these all application the synchronization is must between the motors to perform certain task. Speed synchronization is very essential in these all operation to avoid damage to the product. The synchronization is done by using microcontroller chip which controls the master slave whose speed is followed by the other motors which all have to be synchronized.
This report aims to familiarize the reader with basic but important information about
two specific types of controllers – DC drives and AC drives. The first part provides
descriptions of the general working principles of variable speed drive (VSD)
technology. It discusses their main advantages and disadvantages between AC and
DC drive solutions. The second part explains some problems that could possibly be
encountered when employing AC or DC drive systems and offers practical
recommendations about how to approach these problems.
Dr Adrian West, Optima’s technical director, has spent more than 30 years working
with, programming and troubleshooting drive systems. This report is based on his
extensive practical knowledge and experience. It is, therefore, a very accurate and independent source of information.
The merits of integrating renewables with smarter grid carilecRick Case, PMP, P.E.
This presentation was given at the recent Carilec Renewable Energy (RE) Conference held in the beautiful country of St. Kitts under the theme "RE Ready, Are we REady? We looked at the Jamaican Context and experience with integration RE following the aggressive approach from the government to lower energy prices and diversify our energy supply mix.
We examined various SMART Grid solutions to the problems experienced by JPS and in general how Electric Grids can cope with high penetration of RE.
Narendra Charola has over 9 years of experience as an Electrical Manager at Reliance Industries Limited in Jamnagar, India. He leads a group of electrical engineers responsible for the smooth running of the crude complex, which includes two identical 325,000 barrels per day crude oil processing trains. His responsibilities include maintenance of the electrical systems and protection relays, planning and execution of maintenance activities, and ensuring plant reliability. He has experience in commissioning new projects, shutdown planning, and safety management. Narendra holds a Bachelor's degree in Electrical Engineering and has received training in areas such as process safety management, power systems, and electrical equipment.
The merits of integrating renewables with smarter grid carimetRick Case, PMP, P.E.
A critical look at the response a grid will need with increasing penetration levels of Variable Renewable Resouces (VRRs) on a grid and the SMART solutions required to maintain grid stability.
This document provides an overview of a feasibility study conducted by NISCOM Inc. on introducing energy efficient technologies and management systems to data centers in Indonesia to reduce energy consumption and greenhouse gas emissions. The study assessed technologies like high voltage direct current power supplies, energy efficient cooling systems, intelligent monitoring software. It was estimated these measures could reduce emissions by 3,400 tons of CO2 per year at a sample data center. The document also outlines plans to provide guidance to Indonesian partners on monitoring and verifying emission reductions from implementing the proposed technologies.
Caminhão para mineração subterranea cat ad6085283081
The document provides specifications for the Caterpillar AD60 Underground Articulated Truck. Some key points:
- It has a Cat C27 engine producing 579/600 kW of power and a gross machine weight of 110,000 kg.
- Components like the engine, transmission, and electronics are integrated for optimal performance.
- Features include a reliable transmission, robust braking system, comfortable operator cab, and durable truck bodies.
- Service and maintenance were priorities in the design with improved access points and diagnostic systems.
Nidec asi electric power solutions for pipeline applicationsNidec Corporation
Nidec ASI provides electric power solutions for pumps and compressors used in oil and gas pipelines. They have over 40 years of experience designing customized solutions that meet clients' needs in terms of power quality, network connection flexibility, maintenance costs, machine durability, and capital expenditures. Nidec ASI works closely with end users, engineers, and OEMs to develop optimal global solutions for pipeline operations. Their solutions include soft starters, variable frequency drives, and fully integrated packages for applications up to 30 MW. Nidec takes an integrated engineering approach considering mechanical, electrical, and site factors to optimize performance, reliability, and costs.
Power Line Fault Detection and Rectification using RobotIRJET Journal
The document describes the development of a mobile robot that can inspect power transmission lines for defects. The robot uses 6 motors, an arm, and 4 wheels to move along overhead power lines. It also includes a glue gun mount on the arm to help repair a common problem of failing compression line splices. The robot is controlled via Bluetooth from an Android mobile device and uses sensors to inspect the lines and identify any issues.
A simple way of looking at grid modernization and managing the modern grid through the interaction and integration of technology, applications and systems. An approach to kick of your Smart Grid Road Map through the Maturity Model approach.
Energy Management and the Evolution of Intelligent Motor Control and Drives @...ARC Advisory Group
Intelligent motor control and drives have evolved from providing safe and flexible motor control to acting as smart energy managers. They perform critical protective, diagnostic, and troubleshooting functions to improve productivity and minimize downtime, especially in applications where even short periods of downtime can be costly. The document discusses a survey of electrical power system end users that found most operate systems 11-30 years old. While many exceed equipment suppliers' stated obsolescence dates, practices for justifying upgrades focus on lost production, failure costs, and failure frequency. Condition assessments before upgrades help prevent future downtime.
SPEED SYNCHRONIZATION OF MASTER –SLAVE D.C. MOTORS USING MICROCONTROLLER, FOR...Editor IJMTER
In textile industry many processes require speed synchronization of more than one motors involved in the process. Rolling of cloth should be synchronized with the speed of weaving spindle to avoid damage and motor speed synchronization is vital in conveyor belt driven by multiple motors. Abrupt load variations may cause hunting or oscillatory behavior in d. c. machines. This behavior can be detrimental to the process. The digitally controlled d. c. machines can have much aggravated phenomenon owing to poor sampling period selection. Traditionally processes are synchronized through mechanical transmission system consisting of a line shaft gears, pullers etc. Among the available software mechanisms master-slave synchronization is a widely used technique. Multi-motor applications have become very attractive field in industrial applications replacing in traditional mechanical coupling. Many textile applications involved synchronized speed motors. For example wrapping of clothes should be synchronized with the speed of weaving spindle to avoid damage and Similarly in some cases the speed of long conveyor belt driven by multiple motors is need to be constant. In such types of applications master slave technique is used as a software mechanism to synchronize the speed of different motors to avoid damage.
Renewable energy and grid integration energy transitionNarinporn Malasri
Energy Regulatory Commission Thailand : Energy-Related Policies and Activities
Renewable energy and grid integration and energy transition in Thailand. IMPACT of Renewable Connection such as FULL GRID CONNECTION CAPACITIES, REVERSE POWER FLOWS, VOLTAGE CONTROL IN DISTRIBUTION GRID
PROTECTION COORDINATION IN DISTRIBUTION GRID.
EPRI Activities for Energy Efficiency in Data Centers & Telecom Central Offic...Burton Lee
The document discusses EPRI's activities to improve energy efficiency in data centers and telecom central offices. It notes that while data centers and central offices share similarities like installing large amounts of IT equipment, they differ in aspects like operating voltages and equipment certifications. The document outlines EPRI's testing of more efficient power supplies and demonstration of air flow management software that saved 23% of energy in a data center. It also shows a comparison of 208 VAC and 380 VDC systems.
The document describes a smart battery management system that monitors and controls the charging of battery cells. It uses a microcontroller, voltage and current sensors, a relay, and an LCD display. The system can measure battery parameters during charging and discharging, protect battery cells, and display information digitally. It aims to increase battery life, efficiency, and safety by controlling the relay to disconnect charging when cells are full. When a cell discharges, charging is restarted. This smart battery management helps improve electric vehicle batteries and prolongs their usable life.
Scenarios for Specifying an Uninterruptible Power Supply for Industrial Appli...Classic Controls, Inc.
For a number of years, some industries have used UPSs as a matter of course in applications requiring
uninterrupted process control. These include power-generation facilities, both fossil and nuclear, and petrochemical
plants and refineries.
Recently, other types of industrial companies (pulp and paper mills, steel mills, pharmaceutical manufacturing and
cogeneration facilities) have created a need for UPSs by incorporating DCSs into their plants to control their
processes. Additional control equipment, such as supervisory control and data acquisition (SCADA) systems,
energy management systems (EMSs), boiler-control and microprocessor-based instrumentation, give power
protection an even more important role in industry.
In all these systems, the power flow of electrical energy takes place through Electrical Substations. An Electrical Substation is an assemblage of electrical components including busbars, switchgear, power transformers, auxiliaries, etc. Basically an electrical substation consists of a number of incoming circuits and outgoing circuits connected to common busbar system. Busbars are conducting bars to which a number of incoming or outgoing circuits are connected. Each circuit has certain electrical components such as circuit-breakers, isolators, earthing switches, current transformers, voltage transformers, etc. These components are connected in a definite sequence such that a circuit can be switched off/on during normal operation by manual/remote command and also automatically during abnormal conditions such as short-circuits. A substation receives electrical power from generating station via incoming transmission lines and delivers electrical power via the outgoing transmission lines. Substations
Presentation from the EPRI-Sandia Symposium on Secure and Resilient Microgrids: IEEE 1547 and Microgrids, presented by Tom Key, EPRI, Baltimore, MD, August 29-31, 2016.
This document summarizes an input/output upgrade project for the demineralized water treatment plant at the Vindhyachal Thermal Power Station in India. The National Thermal Power Corporation sought to upgrade the aging and obsolete input/output cards from L&T to minimize downtime. Schneider Electric replaced over 1000 input/outputs with Quantum input/output cards and modified the SCADA system addresses accordingly. The upgrade provided improved reliability, support, and a single point of contact while ensuring minimal disruption to plant operations during the transition.
Yokogawa provided a CENTUM CS 3000 process control system to control the batch processes and emergency shutdown system for Aldwich Enviro-Management's waste oil to diesel plant in Malaysia. The plant processes waste oil through filtration, dehydration, cracking, distillation and other steps to produce diesel, naphtha and fuel oil. The CENTUM CS 3000 system integrates process control and safety shutdown. It has helped ensure safe and reliable operations since the plant was completed in 2005.
Test platform for electronic control units of high-performance safety-critica...IJECEIAES
In this paper we are mostly concerned with the problem of testing electronic control units of synchronized electric power actuators. This task is particularly complex for safety critical applications, where it is crucial that the control system properly reacts in response to the faults that are hard to reproduce and verify. A cost-effective flexible and reconfigurable test platform is proposed, discussing its architecture and implementation. The proposed system facilitates the phase of definition and development of the electronic control unit, allowing the interfacing towards both hydraulic and electromechanical actuators, and having a high flexibility as regards the I/O signals. Some results, obtained during the laboratory test activity, are also presented.
Speed Synchronization of Multiple Bldcmotors In Textile &Paper Mills Using Mi...IJERA Editor
Multiple motor setup has vast application in industries. The application can be in textile mills, paper mills and robotics. In these all application the synchronization is must between the motors to perform certain task. Speed synchronization is very essential in these all operation to avoid damage to the product. The synchronization is done by using microcontroller chip which controls the master slave whose speed is followed by the other motors which all have to be synchronized.
This report aims to familiarize the reader with basic but important information about
two specific types of controllers – DC drives and AC drives. The first part provides
descriptions of the general working principles of variable speed drive (VSD)
technology. It discusses their main advantages and disadvantages between AC and
DC drive solutions. The second part explains some problems that could possibly be
encountered when employing AC or DC drive systems and offers practical
recommendations about how to approach these problems.
Dr Adrian West, Optima’s technical director, has spent more than 30 years working
with, programming and troubleshooting drive systems. This report is based on his
extensive practical knowledge and experience. It is, therefore, a very accurate and independent source of information.
The merits of integrating renewables with smarter grid carilecRick Case, PMP, P.E.
This presentation was given at the recent Carilec Renewable Energy (RE) Conference held in the beautiful country of St. Kitts under the theme "RE Ready, Are we REady? We looked at the Jamaican Context and experience with integration RE following the aggressive approach from the government to lower energy prices and diversify our energy supply mix.
We examined various SMART Grid solutions to the problems experienced by JPS and in general how Electric Grids can cope with high penetration of RE.
Narendra Charola has over 9 years of experience as an Electrical Manager at Reliance Industries Limited in Jamnagar, India. He leads a group of electrical engineers responsible for the smooth running of the crude complex, which includes two identical 325,000 barrels per day crude oil processing trains. His responsibilities include maintenance of the electrical systems and protection relays, planning and execution of maintenance activities, and ensuring plant reliability. He has experience in commissioning new projects, shutdown planning, and safety management. Narendra holds a Bachelor's degree in Electrical Engineering and has received training in areas such as process safety management, power systems, and electrical equipment.
The merits of integrating renewables with smarter grid carimetRick Case, PMP, P.E.
A critical look at the response a grid will need with increasing penetration levels of Variable Renewable Resouces (VRRs) on a grid and the SMART solutions required to maintain grid stability.
This document provides an overview of a feasibility study conducted by NISCOM Inc. on introducing energy efficient technologies and management systems to data centers in Indonesia to reduce energy consumption and greenhouse gas emissions. The study assessed technologies like high voltage direct current power supplies, energy efficient cooling systems, intelligent monitoring software. It was estimated these measures could reduce emissions by 3,400 tons of CO2 per year at a sample data center. The document also outlines plans to provide guidance to Indonesian partners on monitoring and verifying emission reductions from implementing the proposed technologies.
Caminhão para mineração subterranea cat ad6085283081
The document provides specifications for the Caterpillar AD60 Underground Articulated Truck. Some key points:
- It has a Cat C27 engine producing 579/600 kW of power and a gross machine weight of 110,000 kg.
- Components like the engine, transmission, and electronics are integrated for optimal performance.
- Features include a reliable transmission, robust braking system, comfortable operator cab, and durable truck bodies.
- Service and maintenance were priorities in the design with improved access points and diagnostic systems.
Nidec asi electric power solutions for pipeline applicationsNidec Corporation
Nidec ASI provides electric power solutions for pumps and compressors used in oil and gas pipelines. They have over 40 years of experience designing customized solutions that meet clients' needs in terms of power quality, network connection flexibility, maintenance costs, machine durability, and capital expenditures. Nidec ASI works closely with end users, engineers, and OEMs to develop optimal global solutions for pipeline operations. Their solutions include soft starters, variable frequency drives, and fully integrated packages for applications up to 30 MW. Nidec takes an integrated engineering approach considering mechanical, electrical, and site factors to optimize performance, reliability, and costs.
Power Line Fault Detection and Rectification using RobotIRJET Journal
The document describes the development of a mobile robot that can inspect power transmission lines for defects. The robot uses 6 motors, an arm, and 4 wheels to move along overhead power lines. It also includes a glue gun mount on the arm to help repair a common problem of failing compression line splices. The robot is controlled via Bluetooth from an Android mobile device and uses sensors to inspect the lines and identify any issues.
A simple way of looking at grid modernization and managing the modern grid through the interaction and integration of technology, applications and systems. An approach to kick of your Smart Grid Road Map through the Maturity Model approach.
Energy Management and the Evolution of Intelligent Motor Control and Drives @...ARC Advisory Group
Intelligent motor control and drives have evolved from providing safe and flexible motor control to acting as smart energy managers. They perform critical protective, diagnostic, and troubleshooting functions to improve productivity and minimize downtime, especially in applications where even short periods of downtime can be costly. The document discusses a survey of electrical power system end users that found most operate systems 11-30 years old. While many exceed equipment suppliers' stated obsolescence dates, practices for justifying upgrades focus on lost production, failure costs, and failure frequency. Condition assessments before upgrades help prevent future downtime.
SPEED SYNCHRONIZATION OF MASTER –SLAVE D.C. MOTORS USING MICROCONTROLLER, FOR...Editor IJMTER
In textile industry many processes require speed synchronization of more than one motors involved in the process. Rolling of cloth should be synchronized with the speed of weaving spindle to avoid damage and motor speed synchronization is vital in conveyor belt driven by multiple motors. Abrupt load variations may cause hunting or oscillatory behavior in d. c. machines. This behavior can be detrimental to the process. The digitally controlled d. c. machines can have much aggravated phenomenon owing to poor sampling period selection. Traditionally processes are synchronized through mechanical transmission system consisting of a line shaft gears, pullers etc. Among the available software mechanisms master-slave synchronization is a widely used technique. Multi-motor applications have become very attractive field in industrial applications replacing in traditional mechanical coupling. Many textile applications involved synchronized speed motors. For example wrapping of clothes should be synchronized with the speed of weaving spindle to avoid damage and Similarly in some cases the speed of long conveyor belt driven by multiple motors is need to be constant. In such types of applications master slave technique is used as a software mechanism to synchronize the speed of different motors to avoid damage.
Renewable energy and grid integration energy transitionNarinporn Malasri
Energy Regulatory Commission Thailand : Energy-Related Policies and Activities
Renewable energy and grid integration and energy transition in Thailand. IMPACT of Renewable Connection such as FULL GRID CONNECTION CAPACITIES, REVERSE POWER FLOWS, VOLTAGE CONTROL IN DISTRIBUTION GRID
PROTECTION COORDINATION IN DISTRIBUTION GRID.
EPRI Activities for Energy Efficiency in Data Centers & Telecom Central Offic...Burton Lee
The document discusses EPRI's activities to improve energy efficiency in data centers and telecom central offices. It notes that while data centers and central offices share similarities like installing large amounts of IT equipment, they differ in aspects like operating voltages and equipment certifications. The document outlines EPRI's testing of more efficient power supplies and demonstration of air flow management software that saved 23% of energy in a data center. It also shows a comparison of 208 VAC and 380 VDC systems.
The document describes a smart battery management system that monitors and controls the charging of battery cells. It uses a microcontroller, voltage and current sensors, a relay, and an LCD display. The system can measure battery parameters during charging and discharging, protect battery cells, and display information digitally. It aims to increase battery life, efficiency, and safety by controlling the relay to disconnect charging when cells are full. When a cell discharges, charging is restarted. This smart battery management helps improve electric vehicle batteries and prolongs their usable life.
Scenarios for Specifying an Uninterruptible Power Supply for Industrial Appli...Classic Controls, Inc.
For a number of years, some industries have used UPSs as a matter of course in applications requiring
uninterrupted process control. These include power-generation facilities, both fossil and nuclear, and petrochemical
plants and refineries.
Recently, other types of industrial companies (pulp and paper mills, steel mills, pharmaceutical manufacturing and
cogeneration facilities) have created a need for UPSs by incorporating DCSs into their plants to control their
processes. Additional control equipment, such as supervisory control and data acquisition (SCADA) systems,
energy management systems (EMSs), boiler-control and microprocessor-based instrumentation, give power
protection an even more important role in industry.
In all these systems, the power flow of electrical energy takes place through Electrical Substations. An Electrical Substation is an assemblage of electrical components including busbars, switchgear, power transformers, auxiliaries, etc. Basically an electrical substation consists of a number of incoming circuits and outgoing circuits connected to common busbar system. Busbars are conducting bars to which a number of incoming or outgoing circuits are connected. Each circuit has certain electrical components such as circuit-breakers, isolators, earthing switches, current transformers, voltage transformers, etc. These components are connected in a definite sequence such that a circuit can be switched off/on during normal operation by manual/remote command and also automatically during abnormal conditions such as short-circuits. A substation receives electrical power from generating station via incoming transmission lines and delivers electrical power via the outgoing transmission lines. Substations
Presentation from the EPRI-Sandia Symposium on Secure and Resilient Microgrids: IEEE 1547 and Microgrids, presented by Tom Key, EPRI, Baltimore, MD, August 29-31, 2016.
This document summarizes an input/output upgrade project for the demineralized water treatment plant at the Vindhyachal Thermal Power Station in India. The National Thermal Power Corporation sought to upgrade the aging and obsolete input/output cards from L&T to minimize downtime. Schneider Electric replaced over 1000 input/outputs with Quantum input/output cards and modified the SCADA system addresses accordingly. The upgrade provided improved reliability, support, and a single point of contact while ensuring minimal disruption to plant operations during the transition.
Yokogawa provided a CENTUM CS 3000 process control system to control the batch processes and emergency shutdown system for Aldwich Enviro-Management's waste oil to diesel plant in Malaysia. The plant processes waste oil through filtration, dehydration, cracking, distillation and other steps to produce diesel, naphtha and fuel oil. The CENTUM CS 3000 system integrates process control and safety shutdown. It has helped ensure safe and reliable operations since the plant was completed in 2005.
The technology and thermal efficiencies of the coal-fired
cycle have improved dramatically, and the basic idea
of converting the stored energy of coal into electricity
accounts for more than 40% of the world’s power.
The Marafiq Independent Water and Power Plant (IWPP) in Saudi Arabia is a large project addressing the kingdom's increasing needs for electricity and water by producing over 2,740 megawatts of power and 800,000 cubic meters per day of desalinated water. A consortium of international companies including GE, Hyundai, and SIDEM is constructing the IWPP under an EPC contract. GE's scope includes gas and steam turbines, generators, and a control system. The advanced Mark VIe control system provides benefits like reduced complexity, costs, and commissioning time by integrating control of all plant equipment on a single platform.
Power plant intelligent maintenance advisory systemIIT Kanpur
This document proposes a Power Plant Intelligent Maintenance System to analyze sensor data from power plants to predict equipment failures and recommend preventative maintenance. It will ingest structured data like temperature readings from sensors as well as weather data through APIs. The data will be stored in Google Cloud and analyzed with Apache Hadoop. This will help reduce power plant breakdowns and save costs from forced shutdowns. The estimated budget is $5.47 million per year per plant.
Power Distribution Feeder Automation - Application Story 2012Jiunn-Jer Sun
Feeder automation systems in Taiwan monitor and control power distribution networks. Korenix's fiber Ethernet switches and redundant ring technology were used to implement the fiber network connecting feeder terminal units along the distribution system. This enabled failure detection, identification, recovery, and reporting to minimize error handling time and ensure continuous network service when failures occurred on the fiber links.
Upgradeable Fully Featured Power and Energy Meter - PDFElectro Industries
All rights reserved. No part of this publication may be reproduced or transmitted in
any form or by any means, electronic or mechanical, including photocopying, recording,
or information storage or retrieval systems or any future forms of duplication,
for any purpose other than the purchaser's use, without the expressed written
permission of Electro Industries/GaugeTech.
The Bakun Hydropower Project in Sarawak, Malaysia is the most efficient power station in the world. IMPSA was contracted to supply electromechanical equipment, including four 350 MW Francis turbine generating units, main power transformers, control and protection systems, and other ancillary equipment. The project involves constructing a 205m high concrete dam and powerhouse with eight generating units totaling 2,800 MW of installed capacity. The high efficiency of 94% is achieved through IMPSA's efficient Francis turbine design and integrated automation and control systems.
Intrinsic Energy is a company that specializes in substation automation and industrial networking solutions with over 15 years of experience in the electrical supply industry. They provide design, procurement, installation, and commissioning services for SCADA systems for independent power producers to ensure compliance with grid requirements. They have experience with various wind, solar, and hydro projects in South Africa. Their services include designing and configuring SCADA panels and gateways, writing test procedures, overseeing installations, establishing communications with remote control centers, and more. They have worked with customers such as Eskom, power developers, and engineering companies on projects such as the Klipheuwel wind farm, Noblesfontein wind farm, Jasper solar
Yokogawa provided its CENTUM CS 3000 distributed control system and ProSafe-RS safety instrumented system for the South Hook LNG Terminal in the UK, the largest LNG terminal in Europe. The terminal plays a major role in supplying natural gas to the UK and strengthening the strategic partnership between Qatar and the UK. Yokogawa's solutions help ensure plant safety and reliability through integrated automation and safety systems, effective data management with Exaquantum, and training operators using a simulator to handle abnormal situations safely. The customer is satisfied with Yokogawa's highly reliable systems contributing to the terminal's continuous 24/7/365 operations and supply of up to 20% of UK gas demand.
PES Wind Magazine - The development of a MV power converter for FC wind turbi...Ingeteam Wind Energy
Having cost-optimal power converters is a must in order to survive in the competitive wind market following the costs reduction rate.
To continue improving the performance of the wind turbines, while maintaining or even increasing the reliability, having a deep knowledge of the technology is crucial for the power converter developments.
Based on the long experience in the wind industry and the deep knowledge about core components composing a power converter, Ingeteam applies a design procedure that allows optimizing the power converter solution, developing power converter products up to 15MW for offshore environments.
L-3 MAPPS has secured several new contracts and projects:
1) L-3 MAPPS signed a contract with Ontario Power Generation to provide replacement computers for the Darlington Nuclear Generating Station.
2) L-3 MAPPS secured a contract from Korea Hydro & Nuclear Power to supply the full scope simulator for the Wolsong Unit 1 nuclear plant in South Korea.
3) L-3 MAPPS signed a contract with Slovenia's Nuklearna elektrarna Krško to upgrade the full scope simulator for the Krško Nuclear Power Plant as part of a safety upgrade program.
4) L-3 MAPPS obtained an order from Pacific Gas & Electric Company to carry
Yokogawa in the Petrochemical Industry | VigilantPlantYokogawa
Brochure about Yokogawa's presence in the Petrochemical industry. Yokogawa's VigilantPlant solutions deliver visibility, predictability and agility for your petrochemical business.
Improved Governor Response at the Dinorwig Power PlantGreg Yohe
The Dinorwig Power Station in Wales underwent an upgrade to its governor control system to address obsolescence issues. American Governor Company was selected to develop new digital governor software integrated into the main unit PLC. Extensive testing was performed using a hardware-in-the-loop simulator to model the plant's response. This ensured the governor software met Dinorwig's unique performance requirements for supporting the UK power grid, such as responding rapidly to frequency deviations. The new system was commissioned using the simulator and factory acceptance testing to minimize risks to the critical plant.
Data Center Optimization with Avocent MergePoint Infrastructure Explorer (AMIE)42U Data Center Solutions
In this presentation 42U and Avocent show how the Avocent AMIE infrastructure software solution can help you optimize your data center.
To view the recorded webinar, which includes a live demo of the software, visit http://www.42u.com/webinars/Avocent-AMIE-Webinar/playback.htm
Summary: Avocent MergePoint Infrastructure Explorer (AMIE) software presents a fresh alternative to familiar tools such as spreadsheets and VISIO diagrams. With real-time visibility, users can model, plan for, and schedule changes to their data center. Coupled with asset management and capacity planning, AMIE takes the guesswork out of data center projects.
IRJET- Automatic Load Balancing and Phase Balancing by PLC and ScadaIRJET Journal
This document describes an automatic load balancing and phase balancing system using a programmable logic controller (PLC) and supervisory control and data acquisition (SCADA). The proposed system aims to automatically shed non-essential loads in the event of a generator tripping to balance power consumption and generation. A PLC is used for data logging, control operations, and communication between individual systems. A human-machine interface (HMI) is also developed to allow engineers to monitor the process and modify load priority settings. The system is intended to help industries maintain normal plant operations when relying on multiple power sources.
White paper - Ingeteam's new-generation power converters for 6-8 MW wind tur...Ingeteam Wind Energy
The document discusses Ingeteam's new generation power converters for doubly fed induction generator (DFIG) wind turbines with power ratings of 6-8 MW. The converters apply advanced semiconductor technologies, cooling strategies, hardware and software validation techniques to overcome constraints of the DFIG topology and allow power increases. This enables wind turbine manufacturers to develop more powerful and cost-effective turbines, helping reduce the levelized cost of energy for wind power.
University of Kentucky Solar Car Team Fluke Connect Student Contest Presentationflukecontests
Live testing performance parameters on a solar car. Project entry for the Fluke Connect Student Contest by University of Kentucky Solar Car Team. For more info, or to vote, go to https://www.facebook.com/fluke.corporation/
The document summarizes a power augmentation system customer case from AXUS. It describes how the customer uses battery systems to store power at night when rates are low and provide startup power to large machines in the morning to reduce energy costs and grid spikes. The customer initially considered a RISC system but opted for Axiomtek's Intel Atom ICO300 system instead for its PC compatibility and ability to communicate via LAN or cellular network to monitor performance. The ICO300 provided a fanless, DIN rail mounted solution with wide temperature and power input support suited for the customer's stationary power storage application.
Moore provides industrial automation and optimization solutions for FPSOs and subsea control systems. They offer an Integrated Control and Safeguarding System to automate, integrate and optimize core FPSO functionality while ensuring safety. They also provide solutions like power management systems, predictive maintenance, and telemetry. Moore has extensive experience delivering projects for FPSOs and facilities around the world.
Similar to Yokogawa's Vigilant Plant | Success Stories | Power industry (20)
Senstation pH/ORP Measurement Solution - A scalable, integrated system that i...Yokogawa
SENSTATION from Yokogawa is a new concept that combines the company’s SENCOM smart sensors with the SMART data logger and SMARTDAC+ modular data-acquisition system to provide a scalable integrated pH measurement solution
Yokogawa’s new TDLS8000 houses all of the industry’s leading features in one robust device.
The platform design is for in situ measurements which negate the need for sample extraction and conditioning.
The non-contacting sensor allows for a variety of process types including corrosive, abrasive and condensing.
The first generation platform has been proven in many others for the measurements of O2, CO, CH4, NH3, H2O and many more NIR absorbing gases.
This second generation platform has improved reliability and ease of installation and maintenance while still meeting or exceeding designed application demands.
Secured Remote Solutions for Critical Plant AssetsYokogawa
Process industries face continuous competition in enhancing productivity and efficiency, improving plant asset availability, avoiding unplanned outages, and managing plant safety. These industry users also face a wide range of operational challenges in cybersecurity as a pervasive threat to safety and availability. Most companies take a relatively simplistic plant-by-plant approach in implementing operating system security patches and anti-virus pattern file updates. As a result, security levels tend to vary at each plant.
Hydrogen is not corrosive, but it can cause problems for pressure transmitters through Hydrogen Permeation. Learn how Yokogawa can improve the permeation resistance of your pressure transmitter with this application guide.
CENTUM VP is Yokogawa’s latest integrated production control system, also known as a distributed control system (DCS). Nearly 40 years of knowledge and experience with DCSs has gone into its development.
Yokogawa’s Vigilant Plant solutions deliver visibility, predictability and agility for your chemical business.
Being a producer in the chemical industry has
become more and more challenging over the years.
Customer needs for products, pricing, and delivery
are more demanding and material requirements
are complex and ever-changing. Additionally,
health, safety, security, and environment (HSSE)
compliance has always been a primary requirement
for doing business.
Over the years, Yokogawa has worked with many
chemical companies to provide technology
solutions that meet these challenges. We stand
ready to partner with you to take on whatever
challenges you face and help you achieve your aims
safely and profitably.
Whitepaper: The Next Evolution of Yokogawa CENTUMYokogawa
In 2014 Yokogawa is adding significant new capabilities to CENTUM VP. Now the New CENTUM VP becomes the platform for delivering four new innovations; Hyper-intuitive
Operation, Total Automation Management, Intelligent Plant Conductor, and Sustainable Plant Operation. Each innovation addresses pain points felt by today’s plant owner-operators as they strive for greater operational
integrity. Yokogawa has emphasized its objective to especially leverage two enabling technologies in this development program; field digital technology and dynamic process simulation.
Yokogawa has delivered high quality products to the Analytical Industrial automation for more than 65 years. Now Yokogawa combines its proven expertise in pH and ORP technology with innovative digital communication to produce the SENCOM range of smart sensing solutions.
The SENCOM platform initially consists of:
> pH and ORP sensors enabling improved maintenance management and diagnostics, including laboratory calibration possibilities before returning it to the field.
> Dedicated SENCOM SPS24 management software utilizes historical measurements, calibrations and diagnostic data from the sensor to predict maintenance, calibration frequency and estimate the sensors lifetime.
> The SENCOM module will give it powerful digital signal processing capabilities required to work together with the new SENCOM sensors.
The SMARTDAC+ series is a simple and flexible data acquisition control system designed for ease of use in a variety of ways to provide an ideal operating experience for the user.
Energy management solutions. A Framework for your Energy Management SystemYokogawa
ISO50001 International Standard, a Framework for your Energy Management System. Energy security, energy cost and climate change are global concerns. As a first step to cope with these challenges, top management need to measure energy metrics effectively and look for formal processes to execute energy management policies.
Drive your Energy Management Effectively and Sustainably. With EP-Analytics you can transfer data into useful information for operator, engineer and management for decision making and assist to find the cause of energy wastes by drilldown function. EP-Analytics uses Production Supervisor of Yokogawa standard dashboard.
Whitepaper | Network Security - How to defend your Plant against the threats ...Yokogawa
Yokogawa offers a range of cyber-security solutions for control systems, including network security assessment, network and firewall design, PC/server and network device hardening, antivirus and patch management, backup and recovery systems, and network management systems. By seamlessly integrating these solutions with its proven control system solutions, Yokogawa is also aiming to meet its customers' needs for control system security management. Read more about Yokogawa’s approach to cyber security in this whitepaper.
Interview with the President | Annual Rapport 2014 YokogawaYokogawa
Yokogawa Electric Corporation saw increases in orders, net sales, and operating income in fiscal year 2013 compared to the previous year, driven mainly by strong performance in their industrial automation and control business outside of Japan. For fiscal year 2014, they forecast further increases in orders, net sales, operating income, and net income. However, the president acknowledges they must transform their business model to keep up with changes in the market and generate real growth beyond benefits from currency exchange rates. Going forward, their strategies will focus on accelerating growth through expanding solutions services and strengthening their product portfolio, as well as improving profitability by reducing costs in Japan and globally optimizing operations.
Company profile: Yokogawa Marex (industrial software)Yokogawa
Tom Stroud, editor Island Business Magazine, goes behind the scenes at “the masters of reinvention” - a software company - MAREX - with record results, owned by Yokogawa and operating independently in Cowes, United Kingdom. Articles offers a nice company profile of Yokogawa Marex. (source: Island Business - July 2014)
Naast de bekende papierrecorders blijft Yokogawa innoveren op het gebied van papierloze recorders. Met trots introduceren wij u hierbij een aantrekkelijke actie voor de GX & GP SMARTDAC + lijn.
U ontvangt 25% korting bij inlevering van uw oude recorder!
Voor meer informatie: http://www.yokogawa.com/nl/smartdac/actie.htm
As plants often have sensors from multiple vendors that rely on more than one communications standard, versatile software tools are required for device configuration, adjustment, and management. FieldMate, a PC-based software package that supports all major industry-standard communications protocols (such as HART, FOUNDATION™ fieldbus, PROFIBUS® and BRAIN), is ideal for such requirements.
Centum VP - Evolution of Yokogawa System Solutions (2014)Yokogawa
Yokogawa’s system platforms combined with proven execution experience provide the highest quality and innovative solutions for secure and optimized process automation and management. Yokogawa’s global customer centric focus together with strong local support reduces users’ business risks and provides the lowest total cost of ownership. With a long history of progressive compatibility, Yokogawa is your dependable automation partner.
The document describes a tour of Yokogawa Electric Corporation's Europe headquarters located in Amersfoort, Netherlands. The headquarters features plenty of meeting space, an open office layout, and photographs of various work areas within the building.
Already the 7th European Users Conference will take place, this year in Berlin, Germany, from 2-4 July. In this 3 day event attendees can meet their peers, learn from expert speakers, network with Yokogawa management and see live demonstrations.
3 Simple Steps To Buy Verified Payoneer Account In 2024SEOSMMEARTH
Buy Verified Payoneer Account: Quick and Secure Way to Receive Payments
Buy Verified Payoneer Account With 100% secure documents, [ USA, UK, CA ]. Are you looking for a reliable and safe way to receive payments online? Then you need buy verified Payoneer account ! Payoneer is a global payment platform that allows businesses and individuals to send and receive money in over 200 countries.
If You Want To More Information just Contact Now:
Skype: SEOSMMEARTH
Telegram: @seosmmearth
Gmail: seosmmearth@gmail.com
Building Your Employer Brand with Social MediaLuanWise
Presented at The Global HR Summit, 6th June 2024
In this keynote, Luan Wise will provide invaluable insights to elevate your employer brand on social media platforms including LinkedIn, Facebook, Instagram, X (formerly Twitter) and TikTok. You'll learn how compelling content can authentically showcase your company culture, values, and employee experiences to support your talent acquisition and retention objectives. Additionally, you'll understand the power of employee advocacy to amplify reach and engagement – helping to position your organization as an employer of choice in today's competitive talent landscape.
buy old yahoo accounts buy yahoo accountsSusan Laney
As a business owner, I understand the importance of having a strong online presence and leveraging various digital platforms to reach and engage with your target audience. One often overlooked yet highly valuable asset in this regard is the humble Yahoo account. While many may perceive Yahoo as a relic of the past, the truth is that these accounts still hold immense potential for businesses of all sizes.
Industrial Tech SW: Category Renewal and CreationChristian Dahlen
Every industrial revolution has created a new set of categories and a new set of players.
Multiple new technologies have emerged, but Samsara and C3.ai are only two companies which have gone public so far.
Manufacturing startups constitute the largest pipeline share of unicorns and IPO candidates in the SF Bay Area, and software startups dominate in Germany.
LA HUG - Video Testimonials with Chynna Morgan - June 2024Lital Barkan
Have you ever heard that user-generated content or video testimonials can take your brand to the next level? We will explore how you can effectively use video testimonials to leverage and boost your sales, content strategy, and increase your CRM data.🤯
We will dig deeper into:
1. How to capture video testimonials that convert from your audience 🎥
2. How to leverage your testimonials to boost your sales 💲
3. How you can capture more CRM data to understand your audience better through video testimonials. 📊
B2B payments are rapidly changing. Find out the 5 key questions you need to be asking yourself to be sure you are mastering B2B payments today. Learn more at www.BlueSnap.com.
Understanding User Needs and Satisfying ThemAggregage
https://www.productmanagementtoday.com/frs/26903918/understanding-user-needs-and-satisfying-them
We know we want to create products which our customers find to be valuable. Whether we label it as customer-centric or product-led depends on how long we've been doing product management. There are three challenges we face when doing this. The obvious challenge is figuring out what our users need; the non-obvious challenges are in creating a shared understanding of those needs and in sensing if what we're doing is meeting those needs.
In this webinar, we won't focus on the research methods for discovering user-needs. We will focus on synthesis of the needs we discover, communication and alignment tools, and how we operationalize addressing those needs.
Industry expert Scott Sehlhorst will:
• Introduce a taxonomy for user goals with real world examples
• Present the Onion Diagram, a tool for contextualizing task-level goals
• Illustrate how customer journey maps capture activity-level and task-level goals
• Demonstrate the best approach to selection and prioritization of user-goals to address
• Highlight the crucial benchmarks, observable changes, in ensuring fulfillment of customer needs
Structural Design Process: Step-by-Step Guide for BuildingsChandresh Chudasama
The structural design process is explained: Follow our step-by-step guide to understand building design intricacies and ensure structural integrity. Learn how to build wonderful buildings with the help of our detailed information. Learn how to create structures with durability and reliability and also gain insights on ways of managing structures.
Discover timeless style with the 2022 Vintage Roman Numerals Men's Ring. Crafted from premium stainless steel, this 6mm wide ring embodies elegance and durability. Perfect as a gift, it seamlessly blends classic Roman numeral detailing with modern sophistication, making it an ideal accessory for any occasion.
https://rb.gy/usj1a2
Top mailing list providers in the USA.pptxJeremyPeirce1
Discover the top mailing list providers in the USA, offering targeted lists, segmentation, and analytics to optimize your marketing campaigns and drive engagement.
Yokogawa's Vigilant Plant | Success Stories | Power industry
1. VigilantPlant
Success Story
Collection
& AFRICA B.S.C.(c)
Trademarks
All brand or product names of Yokogawa Electric Corporation in this bulletin are trademarks or registered trademarks of Yokogawa
ElectricCorporation. All other company brand or product names in this bulletin are trademarks or registered trademarks of their
respective holders.
2010
05
305
00A01A53-01E
2. Vigilan
tPlant Su
ccess Stories
This is a showcase of success stories from our customers worldwide.
Many leading companies are using Yokogawa products to manage their
plants and processes.
3. Power
Contents
VigilantPlant Success Stories
01
Eraring Energy
29
Australian Gas Light Company
03
The City Utilities of Springfield
31
Greater Toronto Airports Authority
05
Pha Lai 2 Thermal Power Joint Stock Company
33
District Cooling System and Power Plant Co., Ltd.
07
The 4th Thermal Power Plant
35
Kraftszer Kft
11
Macquarie Generation
37
PetroChina Company Limited
13
Tachibanawan Thermal Power Station
39
Energy Brix Australia Corporation
15
Itoigawa Power Plant
41
PNOC-EDC
17
Tuas Power Station
43
Australian National University
19
Korea South East Power Co., Ltd.
45
NEP SOLAR Pty Ltd.
21
Bahia de Bizkaia Electricidad, Bahia de Bizkaia Gas
47
A.T. Biopower Co., Ltd.
23
SC Electrocentrale Bucuresti SA
49
Japan Wind Development Co., Ltd.
25
EGCO Cogeneration Co., Ltd.
51
Lakeside EFW
27
Samutprakarn Cogeneration Co., Ltd.
Making critical plant information fully visible is just
the beginning of the vigilant cycle.
The clear path to operational excellence
Envision a plant where people are watchful and attentive while your business responds to change quickly and efficiently.
Now picture an operation that delivers non-stop production while confidently expanding your capabilities into the future.
Imagine no further. This is the vision and promise behind VigilantPlant, the clear path to operational excellence.
Seeing clearly gives you the knowledge necessary to anticipate the changes required in your process.
Knowing in advance brings you the speed and flexibility to optimize your plant in real time.
And by acting with agility,
you are able to adapt to the ups and downs of your business environment.
VigilantPlant excels at bringing out the best in your plant and your people - keeping them fully aware,
well informed, and ready to face the next challenge.
4. 1
Australia
Power
Highly Integrated Control and Monitoring Systems
Solution for Australia’s Largest Power Station
Plant Information
Plant Information
Plant name:
Plant name: Eraring Power Station
Location:
Location:
Project type: New South Wales, Australia
Project type: Plant revamping
Plant type:
Plant type: Coal-fired power plant
Output:
Output:
Order date: 4 x 660MW
Order date: 2003
Completion:
Completion: August 2004-2005
Eraring Energy
Yokogawa met these requirements for integrated device management across the HART protocol with a combination of its CENTUM CS 3000
DCS and its Plant Resource Manager (PRM) software. The new system integrates all field information into a single database on a PRM server
and allows real-time, remote maintenance of many hundreds of devices, including around 500 EJA transmitters, via the DCS networks and
HART I/O modules. The open architecture of PRM will also allow the diagnostics of smart Fisher valve positioners via the Yokogawa DCS just
by loading diagnostic plug-in software onto the PRM server. This integrated maintenance solution helped Eraring’s maintenance crew streamline
plant maintenance work.
Minimum plant outage
Another challenge was the tight commissioning schedule. The first outage was planned 15 months after the initial order. To minimize the time
taken for the control system replacement, Yokogawa proposed a unique solution making full use of the capabilities of the Yokogawa DCS and
simulator.
The CENTUM has a unique engineering test function that enables an application functional test on a general-purpose PC without any real
controller hardware. Yokogawa affiliate TechComm Simulation developed the high-fidelity simulation system based on the detailed plant
documentation supplied by the customer. Combining these capabilities, Yokogawa engineers were able to very extensively test the new control
system on the simulator prior to DCS commissioning, thereby minimizing the final tuning work once the unit returned to service.
Eraring plant operators were well trained in the new control system utilizing the simulator. This avoided mistakes that could have occurred if they
had not been familiar with the new system, ensuring a smooth plant commissioning process.
The Results
Background
Eraring Power Station, located just north of Sydney, is one of the largest power stations in Australia, comprising four 660MW coal-fired units.
The power station has operated reliably since 1981. To ensure continued reliability for the next few decades, Eraring Energy, the owner
of the power plant, decided to replace the original hard-wired control equipment with a modern integrated control and monitoring system
(ICMS). Significant project drivers were the requirements to maintain plant reliability and to gain operational improvements in order to ensure
the competitiveness in the deregulated Australian power market. The re-instrumentation work started in early 2003 under the leadership of
Yokogawa Australia, which teamed up with TechComm Simulation, a wholly owned Yokogawa subsidiary.
The Challenges and the Solutions
The customer required an integrated system to control the operation of the boilers, turbines, generators and other balance of plant equipment.
Yokogawa proposed an integrated solution comprised of a distributed control system (DCS), plant information management system, field device
management system, full-replica training simulator and field instruments together with strong local support.
System maintainability
Another important issue to be considered was system maintainability. From the late 1990’s (before the control system replacement), the
customer had progressively upgraded its analog field instruments selecting Yokogawa DPharp EJA transmitters as well as other vendor’s
devices. A further requirement was to upgrade the original paper-based field device management system to a Windows-based, user-friendly tool
which integrates various data from multivender HART and analogue devices into a single database. The customer wanted system compatibility
with the DCS and used the opportunity of the plant revamping to achieve tight integration of the field device management system into the DCS.
Faster commissioning
The four units at Eraring are being retrofitted progressively, with
the first changeover in August 2004 and the second unit being
completed at the beginning of 2005. The customer was very
pleased that Yokogawa has completed return to service of the first
unit ahead of schedule, with the second unit approximately two
weeks early and similar results expected for the third and fourth
units.
Efficient operation ensuring high reliability
The renovated units give very stable, and at the same time more
flexible operation than before. After the revamping, the customer
now makes everyday load changes at a rate faster than with the
previous control system. This can provide financial benefits in the
competitive Australian electricity market.
Efficient maintenance
Integrated device management enables predictive maintenance, reducing routine maintenance work. Jeff Hogan, Power Station Technicians
Supervisor of Eraring Energy said, “The upgrading of field instrument is still in progress but PRM has provided access from our workshop to all
smart instruments on site. When a plant problem occurs we are able to verify the validity of reading and configuration settings of the associated
instrument within a couple of minutes. A great diagnostic tool which enhances the Yokogawa CS3000 System.”
Operational improvements ensuring plant reliability
System Details
The Eraring plant has four large units with a total system input/output (I/O) count of more than 40,000 as well as 25,000 interfaces to other plant
auxiliary systems. Yokogawa’s CENTUM CS 3000 R3 DCS supported this large application in a single architecture while ensuring reliable plant
operation with its”pair&spare” non-stop controller technology.
Distributed control system, Burner management system:
Plant information management system:
Integrated plant resource management system:
Simulator:
Field devices:
Project includes:
To satisfy the need for further operational improvement, a Yokogawa Exaquantum plant information management system was used for longterm data storage, data and alarm logging, and performance calculation. The users can monitor the graphical data for both current and historical
plant information in an Exaquantum window at their own PCs using the Eraring wide area network. This makes it easier for operators and plant
managers to keep informed and to make decisions for future plant operation.
The customer also desired to improve plant operation in the aspects of human resources and operating environment. Yokogawa’s high fidelity,
full-replica simulator enabled custom-made operator training that fully replicated the characteristics of the Eraring Power Station. This allowed
the operators to be familiar with all aspects of plant operation using the new control system before running the real plant.
The original analog-based control room was replaced with a new control room which is based on the latest ergonomic design, securing
operator’s higher performance.
2
CENTUM CS3000 R3
Exaquantum
Plant Resource Manager (PRM)
TechComm full-replica training simulator
EJA series electronic pressure transmitters, GD series gas density meters
Full functional requirements design, control system software development, factory
acceptance, installation, commissioning & tuning
5. 3
USA
Power
James River Power Plant Replaces Legacy
Control System
Plant Information
Plant name:
Location:
Project type:
Plant type:
Output:
James River Power Plant
Springfield, MO, USA
Control system revamping
Coal and gas fired power plant
253 MW (2 x 22 MW, 1 x 44 MW,
1 x 60 MW and 1 x 105 MW)
Order date: March 2006
Completion: April 2007
The City Utilities of Springfield
Scope
“We decided to handle all the new-system installation in-house,” said Stodden. “That way our personnel would be very familiar with everything
involved. We were delighted with how smoothly the entire procedure went, and we completed installation in only six weeks. We had virtually no
problems with the CS 3000 hardware or software. Our biggest obstacle was moving the electrical interlocks required to combine the two control
rooms into one. If the Yokogawa system had not worked so well, we would never have made our startup dates.”
“Originally,” he continued, “Units 1 and 2 were housed in one control room, while Units 3, 4 and 5 were housed in a separate control room. As
part of this project, we combined these into one. The new system has worked so well, that we now utilize one control operator to run both Units
1 and 2, where before each unit had a dedicated control operator assigned to each unit.”
“Units 3, 4 and 5 use a ‘hybrid’ configuration. These units are equipped with an older control system platform, utilizing Hand-Auto Stations for
operator interface. This control system, while dated, is still supported. Therefore, as a step toward uniformity among the units, we utilize the
Yokogawa Operator Console Platform to communicate with the older control system hardware already in place. The operators see the same
style of operator screens as Units 1 and 2, without realizing that it is utilizing a completely different control system. Annunciators and selected
other functions work directly from the CS 3000 control; control loops are displayed on the CS 3000 screens but are processing existing control
loops through an interface.”
When asked about acceptance by operators of the new electronic system, Stodden illustrated by quoting one of the men who initially said he
thought the “…new system was the worst decision we had ever made.” But within two months after startup, the same operator asked ‘When are
we going to do the other three units?’ Suffice it to say that by now our operators are very comfortable and pleased.”
Background
In 1957, the City Utilities of Springfield, MO, commissioned a pneumatic distributed control system for its James River Power Plant. At that time,
the plant was considered very advanced because it utilized a centralized control room for operations, instead of a series of separate control
stations located throughout the facility.
“Through the years since,” explained Maintenance Manager Steve Stodden, “we had attempted to keep the existing systemfunctional, but
maintaining a 50-year-old system has proven difficult. Several years ago we started discussions with all plantpersonnel involved about upgrading
the old control system to improve the safety of the plant and to take advantage of modern digital technology. The result is that we now operate
our five generating units with varying stages of a new CS 3000 control system from Yokogawa.”
The CS 3000 system has provided the ability for automatic control sequences not previously practical. For example, shutting down a coal feeder
used to require many control manipulations to maintain safe operation of the boiler. The entire sequence is now automatic. “We just hit a key
and sit back to watch everything progress through the control sequence,” said Stodden with a satisfied smile.
Notes on James River Power Plant
The plant, which celebrated its 50th anniversary in 2007, consists of five coalfired boilers equipped with steam turbines and two natural-gas-fired
turbines. The plant initially was designed to utilize natural gas as its primary fuel, with coal as a winter backup fuel. This switched during the late
1970’s driven by the Power Plant and Industrial Fuel Use Act of 1978. The station now utilizes less than 1% natural gas for fuel for the steam
boilers.
Ultra low-NOX burners and overfire air(OFA) were introduced
later to greatly reduce nitrogen oxide emissions in
preparation for EPA standards that went into effect in 2009.
All units of the James River Power Station remain capable
of burning either 100% coal or 100% natural gas in order to
produce electricity.
Evaluating the Choices
“Our evaluation of competing vendors was based on consideration of a combination of factors
with the awareness that the new system will probably be in place for decades until the current
facility is retired,” said Stodden. “We had to be confident of the vendor’s support during this
extended future time period.”
The plant currently supplies slightly more than half of the
electricity generated by City Utilities. Forced outages at
the plant have averaged slightly more than 1%, which is
approximately one-fifth of the national average.
With the vendor selected, system details were then examined. The initial bid was based on 4-20
mA protocol but replaced by FOUNDATION fieldbus (FF) as advantages of FF emerged. The
plant has five generating units with a total capacity of 253 MW (two 22 MW, one 44 MW, one 60
MW, and one 105 MW).
4
CENTUM CS 3000
System Configuration
System Details
System:
Total I/O:
System configuration:
Other:
Scope:
CENTUM CS 3000
Approximately 1,400
9 x HIS, 1 x EWS, 1 x SIOS, 1 x GSGW
PRM (Plant Resource Manager), FF, Bailey INFI90 interface
System, project management, design, configuration engineering, commissioning services
6. 5
Vietnam
Power
Yokogawa CENTUM CS 3000 Ensures a Stable
Supply of Power to Vietnam’s National Grid
Pha Lai 2 Thermal Power Joint Stock Company
Plant Information
The Challenges and the Solutions
Plant name:
Location:
Project type:
Plant type:
Output:
Order date:
Completion:
1. Steady power supply and safe operation
Power demand from the national grid is high, and the Pha Lai 2 power station covers
a significant percentage of that. It needs to provide a very steady supply of power 24
hours a day, 7 days a week, all through the year. Yokogawa’s highly reliable CENTUM
CS 3000 DCS makes this possible.
Pha Lai 2 Power Station
Hai Duong, Vietnam
New
Coal (anthracite) fired power plant
2x 300 MW
1999
2002
In addition, Yokogawa transmitters installed in the power island area are contributing to
the high overall reliability of this power station.
The CENTUM CS 3000 provides integrated
control of the power station’s steam turbine
control system, water treatment PLC,
wastewater treatment PLC, ash handling
PLC, burner management system, and coal
handling system, enabling the data from
these systems to be monitored in real time on
graphic displays. This gives plant operators
all the information they need to take quick
and effective action whenever needed, thus
ensuring the safe operation of the plant and
the stable supply of power to the national grid
at all times.
Executive Summary
With a power generating capacity of 600 MW, Pha Lai 2 is the largest coal-fired plant in Vietnam. As part of a master plan by the Vietnam
Ministry of Industry to meet rapidly rising demand for power by doubling the country’s generating capacity, the power station was constructed
at a cost of $540 million by Electric of Vietnam (EVN). Located approximately 65 km northeast of Hanoi, Pha Lai 2 and the adjacent Pha Lai
1 power station (a Russian-built facility with eight 220 t/h coal-fired boilers and four 110 MW turbines) are owned and operated by a wholly
owned EVN subsidiary, Pha Lai Thermo Power Joint Stock Company. (PPC). It is estimated that the two power stations supply approximately
80% of Hanoi’s power. In accordance with the Ministry of Industry’s master plan, no more than 20% of their power is allotted to private power
companies, and the remainder goes to EVN.
In 2002, Yokogawa successfully designed, installed,
and commissioned a CENTUM CS 3000 distributed
control system (DCS) for the Pha Lai 2 power station,
and it has operated to date without any significant
problems. Along with the Yokogawa DCS, a full
replica plant simulator was installed to provide plant
operator training. The DCS and all related systems are
maintained by Yokogawa Vietnam under the terms of
an annual maintenance contract.
6
Unit 1 overview graphic display
Steam turbine unit 1
2. Environmentally optimized operation
Coal-fired power plants produce significantly more greenhouse gasses than
plants that rely on natural gas and other fuels. Thanks to the fine-tuned boiler
combustion control configured in the CENTUM CS 3000 system and the use of an
oxygen monitoring system that can precisely track the oxigen concentration in the
flue gas, it has been possible to optimize the combustion process under varying
load conditions and keep CO2 emissions at this plant well within regulatory
guidelines. In addition, a Yokogawa solution has made it possible to monitor and
strictly control the CO, NOx, and SOx values in the flue gas and the pH value
of the water from the plant’s cooling towers. In these ways, the Pha Lai 2 power
station is maintaining a sustainable operation.
Unit 1 air and flue gas overview graphic display
3. High fidelity power plant training simulator
For effective operation and engineering staff training, the training simulator uses
the test features of the CENTUM CS 3000 to simulate the power plant. The
operator training interface accurately replicates the plant control console and
graphical interface.
Central control room
Station staff training on the simulator
Customer Satisfaction
Plant Details
Systems Delivered
Nguyen Khac Son, PPC’s Chief Executive Officer, said, “We are very happy to be using the Yokogawa CENTUM CS 3000 process control
system. We are now operating nonstop without any major problems, using Yokogawa’s system and field transmitters. We are operating near
capacity almost every day and are sending this power to the national grid. Continuous operation is a very important point.” He continued, “The
CENTUM CS 3000 is the brain of this power station and the field transmitters are important sensors for monitoring all power plant equipment
and processes. We have a good relationship with Yokogawa Vietnam and look to working with them in the future.”
Type of boiler: Down-shot coal-fired
Boiler: 922 t/h, Mitsui Babcock Energy Ltd., UK (Doosan Babcock)
Steam turbine: General Electric, USA
Steam temperature: 541°C
Steam pressure: 17.0 MPa
Gross unit output: 600 MW (300 MW x 2 units)
Distributed control system for boiler control, burner management,
balance-of-plant control, etc: CENTUM CS 3000
Human-machine interfaces: 10 screens per unit
Field control stations: 15 controllers per unit
Total hardwired I/O: 16,400
Field devices: Yokogawa transmitters
7. 7
Mongolia
Power
Modernization of Large Thermal Power Plant
Maintains a Key Lifeline for the People of Mongolia
The 4th Thermal Power Plant
Plant Information
The Solutions
Plant name:
Location:
Project type:
Plant type:
Output:
First of all, information had to be gathered that would provide a starting point for
the automation design. This was followed by conversion to a direct firing boiler
combustion system in which pulverized coal is directly loaded into the boilers and the
replacement of the old mill burner control systems with a Yokogawa DCS.
Thermal Power Plant No. 4 (TES4)
Ulaanbaatar, Mongolia
Modernization
Coal-fired power plant
580 MW (1 x 80 MW and 5 x 100 MW)
8 x 420 t/h
Order date: 1996 (Phase one), 2002 (Phase two)
Completion: 2001 (Phase one), 2007 (Phase two)
Executive Summary
In Mongolia, temperatures fall as low as -40℃ in mid-winter. The heat and electricity generated by Thermal Power Plant No. 4 (TES4) in the
capital city of Ulaanbaatar is an important lifeline for the people living there. This is the largest coal fired power plant in Mongolia and it generates
70% of the electricity for Mongolia’s central energy system and 65% of the heat energy used by the Ulaanbaatar district heating system.
TES4 was built many years ago and has been severely affected by the scarcity of spare parts for its legacy systems. Plant shutdowns were a
frequent occurrence due to equipment malfunctions and accidents, disrupting the supply of heat and power. In addition, the plant caused severe
air pollution due to inefficient control of coal combustion. Efforts to correct these problems were also hampered by the loss of many of the plant’s
original blueprints and other design related documents.
To solve these problems, the Mongolian government decided to execute a plant revamping project in two phases using an official development
assistance (ODA) loan. Phase one for boilers one to four started in 1998 and was completed in 2001. Phase two for boilers five to eight started
in 2001 and was completed in 2007. For this project, Yokogawa delivered control systems and field instrumentation for all eight boilers.
TES4 in winter
TES4, lifeline for Mongolia
Automation of boilers, burners, and balance of plant facilities and changeover
to a new boiler combustion system
To meet the customer’s requirements for changing the old indirect combustion
system to a direct combustion system, a Yokogawa project team of Russian, English,
Mongolian, and Japanese speakers conducted a detailed investigation of the original
boiler combustion control system and coordinated its activities with a new burner
vendor. They had to crawl around every nook and cranny of this plant to create a
piping & instrument diagram (P&ID) and a cabling drawing that accurately described
the plant configuration. This was dirty and challenging work and it took many days to
complete. Finally they succeeded in bringing together the documentation needed to
design the automation for the plant’s boilers, burners, and balance of plant facilities
and change to a direct firing boiler combustion system.
Original boiler control panel
Replacement of conventional analog control system with state-of-the-art digital
control system
With the completion of both phases of this project, the control of all eight boilers has
been integrated with a Yokogawa CENTUM CS 3000 DCS. The operator stations
were changed over from conventional analog panels to a modern graphical user
interface, and this has improved the efficiency and safety of plant operations. In
addition, a Yokogawa Exaquantum Plant Information Management System was
installed to enable remote monitoring of all boiler operations from the administration
building, which contributes to correct and prompt plant operation management. As
for the system architecture, a redundant remote optical network was used for the I/O
system to reduce the cabling cost and improve safety and reliability.
Power plant simulator improves skills and eases transition to screen-based
operations
Together with a state-of-art DCS, a power plant simulator was provided that operators
can use to upgrade their skills. This made possible a smooth transition from the
conventional analog control panels to an all-new graphical user interface.
Old plant drawing
New central control room
The Challenges
design in detail. As a result, no one completely understood the actual workings of the plant.
The original combustion system used indirect firing, with pulverized coal being transferred from a storage silo whenever the boiler was started
up. With the exception of feed water control, all the boilers and mill burners were manually controlled by operators. There were many equipment
problems and a high risk of explosions, and combustion was extremely low.
However, the Mongolian government had an urgent need to rehabilitate this large plant and thereby secure this major lifeline for its people. The
customer’s specific requirements were as follows:
1. Full automation of the boilers, burners, and balance of plant facilities
2. Change from an analog control system to a modern digital control system
3. Use of a power plant simulator to train operators and achieve a smooth transition to screen-based operations.
In addition, there were just a few of the original blueprints dating back to when the plant was built in the 1980s, and none showed the boiler
8
8. 9
Mongolia
Power
10
The 4th Thermal Power Plant
Results
Customer Satisfaction
Reduction of boiler trips and accidents
One by one, the eight boilers were changed over to the new control system and resumed operation, starting at the end of 1998. Reliability and
safety have both been dramatically improved as a result of a steady decline in the number of boiler trips and accidents. With production up and
oil consumption down, it has been possible to significantly reduce energy imports from Russia.
More than a year after phase one was fully completed, one of the four boilers
caused a trip. Yokogawa dispatched engineers immediately and made every
effort to solve the problem. The investigation found that the boiler trip was caused
by a malfunction in one of the conventional components left over the old plant
control system. Even though a Yokogawa product was not at fault, the company’s
engineers provided the TES4 engineers the support they needed to get the plant
safely operating again.
Reduction of CO2 emissions through improved combustion efficiency
With the reduction of boiler trips and plant accidents, boiler combustion efficiency has been dramatically improved. In addition to ensuring a
stable supply of heat and electricity to the city of Ulaanbaatar, this has made it possible to generate more electricity from the same amount of
coal. The amount of oil consumed for plant restarts has also been decreased, further reducing CO2 emissions.
276
87% reduction
From 1997 to 2007
250
222
16
13.9
12
205
10.3
200
8
102
4.8 4.8
82
3.9
2.8
1.9
Number of hot start
g/kWh
2005
2004
2001
2000
Year
1999
0
1997
2006
37
2005
2003
2002
2001
2000
1999
1998
1997
50
2004
47
4.0
4
64
2007
63
4.8
1.7
2007
69
2003
100
0
7.3
2006
127
2002
150
88% reduction
From 1997 to 2007
1998
300
Kilo ton
Technical transfer to TES4
The Yokogawa project team worked together with TES4’s engineers from start to finish of this project, providing them the opportunity to improve
their skills in such areas as engineering design and commissioning. A number of the boiler control systems were successfully replaced by the
TES4 engineers. This transfer of power plant engineering expertise was one of the main aims of this ODA project, and this ensures that the skills
and know-how are in place to sustain operations at this plant.
Heavy oil consumption (Kilo ton)
kg/Gcal
Fuel consumption per electricity generation (g/kWh)
Fuel consumption per heat generation (g/kWh)
Year
Mr. Tseveen, Executive Director of TES4, says, “Seeing is believing. Whatever
beautiful things sales people say, I will not believe until I see them at work. When
we experienced the plant trip, I learned what makes Yokogawa different from
others. I admire their sincerity and devotion toward customers.”
Mr. Tseveen
Executive Director of TES4
9. 11
Australia
Power
Liddell Power Station revamped
successfully Macquarie Generation
Macquarie Generation
Plant Information
Plant Information
Plant name:
Plant name: Liddell Power Station
Location:
Location:
Project type: New South Wales, Australia
Project type: Plant revamping
Plant type:
Plant type: Coal-fired power plant
Output:
Output:
Order date: 4 x 500MW
Order date: 2000
Completion:
Completion: 2004
Executive Summary
System Details
Macquarie Generation’s Liddell Power Station is located near Muswellbrook, NSW, approximately 200km north of Sydney in the Hunter Valley. It
comprises four coal-fired boiler steam turbine generator sets, each unit of 500MW capacity.
System:
CENTUM CS 3000
Total I/O:
approximately 30,000
System Configuration: 12x HIS, 20x Screens, 2x EWS
Other:
Exaquantum Information Management system
Scope:
System, project management, design, configuration engineering, installation, commissioning services
The project consisted of the replacement of all existing process controls and monitoring and protection systems on each unit as well as the
common station plant equipment. In addition, a substantial part of the field devices were replaced or new loops installed. Complete design and
installation services were also included in the scope, and were provided by Yokogawa Australia in conjunction with alliance partner DownerRML. An Exaquantum Process Information Management System was installed to handle the normal data history, comprising 20,000 tags per
unit plus an additional 20,000 tags for the system common components, making a total of 100,000 tags for the complete system.
The first unit controls were implemented in the new control system in 2002, followed by the common station plant controls. Thereafter, each
subsequent unit will be installed progressively, culminating in final completion in 2004.
The entire project is being conducted under an alliance contract, with the alliance partners comprising Macquarie Generation, Yokogawa
Australia, and Downer-RML as the installation contractor. The alliance arrangement includes the concept of a target price which is the estimated
cost price for completing the work, and which is agreed to by all partners after the completion of the up-front engineering specification.
Payment is made by Macquarie to the alliance partners on the basis of how close the final cost is to the target price, and whether a set of Key
Performance Indicators are met or exceeded.
The CENTUM CS 3000 distributed control system controls all aspects of the project, including all associated plant units. Yokogawa’s Sydney
and Melbourne offices joined forces on the pursuit of the project with the engineering being performed by the Sydney office.
12
10. 13
Japan
Power
Control Solutions for Environmental Control
Facilities Tachibanawan Thermal Power Station, Japan
14
Tachibanawan Thermal Power Station
Plant Information
Plant name:
Location:
Project type:
Plant type:
Output:
Order date:
Completion:
Tachibanawan Thermal Power Station
Tokushima, Japan
New
Flue gas desulfurization
2 x 1,050 MW
1997
2000
Executive Summary
The Challenges and the Solutions
One of Japan’s largest coal-fired power plants, with advanced environmental protection measures
Integrated operation of large environmental control facilities
The environmental control facilities at this plant consist of FGD, electric precipitator, coal handling, ash handling, and waste water treatment
systems. This large application with more than 30,000 data items is monitored and controlled by Yokogawa’s CENTUM CS integrated control
system. With a remote I/O architecture that minimizes cabling, highly reliable dual-redundant fiber-optic cables, and communication links with
plant auxiliary sub-systems, the CENTUM system achieves highly-reliable, single-architecture monitoring of all facilities.
- Supplies electricity to a wide area in western Japan (Kansai, Chugoku, Shikoku, and Kyushu)
- Has the largest coal-fired generation units in Japan, each with an output of 1,050 MW
- Protects environment by removing NOx/SOx emissions and ash dust, and recycling fly ash
- Integrated control and monitoring of the environmental facilities, supported by Yokogawa’s highly-reliable CENTUM system and state-of-art
large displays
Background
The Tachibanawan Thermal Power Station is owned by Electric Power Development Co., Ltd. and is located in Anan City, Tokushima Prefecture.
With two 1,050 MW generating units, it is one of the largest coal-fired power plants in Japan.
The station entered commercial operation in 2000 and supplies electricity to a wide area in western Japan through four power utilities that serve
the Kansai, Chugoku, Shikoku, and Kyushu regions.
The plant is well known not only for its stable electricity supply but also its environmental protection measures. The plant layout was optimized
to keep the site size to a minimum, and colors were selected that matched the scenic surroundings of the Seto Inland Sea area. Part of the
fly ash from the combustion process is recycled to make cement. To prevent air pollution, state-of-art environmental control facilities such as
Flue Gas Desulfurization (FGD) systems were installed, removing NOx, SOx and ash dust. In 2004 this plant received ISO14001 certification,
demonstrating that its environmental protection measures meet international standards.
Mouse operation and large displays
For safety and efficiency, plant operators can perform input with a mouse and monitor operations on two 100-inch displays. Yokogawa has
optimized the operation of these large displays through the development of individual screens, frames, and alarm functions. For example,
in an emergency, a guidance message pops up on a screen and easy-to-understand video/audio prompts enable operators to quickly verify
associated systems and instruments. This customized operator interface helps to ensure that the plant operates smoothly and safely.
Calculation system for environmental management system
For the effective management of the FGD and waste water treatment facilities, a calculation system was embedded in the CENTUM control
system. The system also includes an operation management function that reduces operating costs and extends equipment life, a forecast
calculation function, and a reporting function. This supports highly-reliable and efficient management of the environmental control facilities.
Since entering commercial operation in 2000, the environmental control facilities at the Tachibanawan Thermal Power Station have been
managed effectively by the CENTUM control system, achieving a stable electricity supply with minimal impact on the environment.
System Details
Output: 2 x 1,050 MW
Control system for environmental control facilities: CENTUM CS
11. 15
Japan
Power
Flexible Control Solution for IPP Generation
Facility with CFB Boiler
Itoigawa Power Plant
Plant Information
The Challenges and the Results
Plant name:
Location:
Project type:
Plant type:
Output:
Order date:
Completion:
Flexible response to shifts in electricity demand
To adjust to shifts in electricity demand, the customer runs
the Itoigawa Power Plant in swing mode. During the daytime
hours of high electricity demand, the plant is run at up to
100% of its capacity, with output being adjusted flexibly
in response to commands from a central load dispatching
center. At night the plant is operated at just 40% of its
capacity.
Itoigawa Power Plant
Niigata, Japan
New
Circulating fluidized bed boiler
149 MW
1999
2000
Automatic shutdown/startup capability
Yokogawa fully implemented the operation logic for its highlyreliable CENTUM CS control system to match frequent
load changes and provide a high degree of flexibility in the
system’s operation.
Daily operation example in swing mode
The CENTUM control system also supports automatic
shutdown/startup to keep to a minimum the manual checks
performed by operators. They are only required to check
the master control sequence for stopping and starting the
plant facilities, which ensures a safe, smooth shutdown and
startup.
Executive Summary
Flexible operation of circulating fluidized bed (CFB) facility by independent power producer (IPP)
- 149 MW coal-fired power plant operated by IPP
- First use of circulating fluidized bed (CFB) boiler by IPP in Japan
- Fly ash recycled at adjacent cement plant
- Daily operation in swing mode and shutdown/startup responding to shifts in electricity demand
- Controlled by Yokogawa’s CENTUM system
16
Since commencing commercial operation in July 2001,
the Itoigawa power plant has been operating reliably and
efficiently under its Yokogawa CENTUM control system while
employing CFB technology to generate environmentally
friendly electricity.
Control room
Background
The Itoigawa Power Plant was constructed adjacent to a cement plant in Itoigawa City, Niigata Prefecture, and is operated by an IPP that
supplies electricity to Tohoku Electric Power, one of Japan’s major power companies. The use of a 149 MW coal-fired CFB boiler in this power
plant is a first for an IPP in Japan, and this effectively reduces NOx emissions. This power plant also recycles at an adjacent cement plant the fly
ash that is the byproduct of coal combustion.
Plant automatic sequence monitoring
System Details
System:
Total I/O:
System configuration:
Scope:
CENTUM CS
Aprox. 1,500
4 x HIS, 1 x EWS, 4 x FCD
System, project management, design, configuration engineering, commissioning services
12. 17
Singapore
Power
18
Safe and Efficient Power Plant Operation
Tuas Power Station
Plant Information
Plant name:
Location:
Project type:
Plant type:
Output:
Order date:
Completion:
A full-scope, high-fidelity training simulator supplied by Yokogawa enabled a simulator training in all aspects of operating complex plant systems
and has made a significant contribution in raising the skill levels of the highly motivated Tuas Power Station workforce.
Tuas Power Station
Tuas, Singapore
New
Gas and oil fired power plant
1,200 MW (2 x 600 MW)
July 1995
March 1999
Replica simulator showcase
Executive Summary
Yokogawa also designed the Tuas Power Station’s central control room (CCR), which has won praise from users for its good operating
environment. Our CCR design methodology emphasizes the importance of sound ergonomic design in reducing operator errors and facilitating
the smooth running and control of processes.
The Tuas Power Station and its associated facilities are located on reclaimed land along the western shore of Singapore. The station occupies
an area of approximately 75 hectares and is being built in two stages.
Stage I of Tuas Power Station is comprised of two 600 MW oil-fired steam-generating sets. The power station entered commercial operation in
March 1999 when the first of these units was fully commissioned.
As part of its work in stage I of this project, Yokogawa supplied the CENTUM CS integrated production control system (DCS) for the plant’s
very large power generation units. Yokogawa Electric Asia Pte. Ltd., Singapore produced the control system in Singapore and carried out all
engineering work.
In addition to supplying Instrumentation & Control (I&C) equipment, Yokogawa handled system design/engineering, configuration, project
management, commissioning services and maintenance.
The Tuas Power Station successfully entered commercial operation on schedule and the plant owner has attributed this in part to Yokogawa’s
good performance in delivering both products and services.
The development of Stage II comprised of four-block combined cycle power plants was completed in September 2005, which brought the Station
to its licensed capacity of 2,670 MW.
Central control room designed by Yokogawa
System Details
System:
CENTUM CS
Total I/O:
43,410 (DIO: 37,300, AIO: 5,840)
System configuration: 51 x FCS, 3 x EWS, 29 x operation monitors, 4 x alarm monitors, 2 x CCTV, 3 x sequence-of-events manager/visual
annunciator systems, 2 x on-line performance monitoring systems, 3 x historian systems
13. 19
Korea
Power
800 MW Supercritical Coal-fired Power Plant Achieves Smooth and
Rapid Plant Commissioning Using a Full-replica Plant Simulator
Plant Information
Plant name: Yonghung Thermal Power Plant
(Units 1 & 2)
Location:
Yonghung, Korea
Project type: New
Plant type: Coal-fired power plant
Output:
2 x 800 MW (supercritical)
Order date: 2001
Completion: 2004
20
Korea South East Power Co., Ltd.
The Challenges and the Results
To ensure that the commissioning process for its new plant went smoothly, KOSEP turned to Yokogawa and its TechComm
Simulation subsidiary for a full-replica training simulator solution.
The purpose of this full-replica training simulator was twofold:
- To conduct a thorough, off-line test and validation of the DCS configuration prior to the control system’s actual loading and commissioning at
the plant.
- To aid in the initial/refresher training of plant operators, which was conducted in parallel with the plant commissioning.
To achieve these objectives, the simulator was required to fully stimulate DCS functions and emulate turbine, generator, and electrical control
functions. Yokogawa’s full-replica simulator met the customer’s requirements with high accuracy (> 99% steady state; >95% dynamic state),
calculation of models at less than 250msec per cycle, and the ability to perform performance tests and a wide variety of simulations including
startups, shutdowns, and load changes under normal, abnormal, and emergency operating conditions.
Thorough Off-line Control Validation
Executive Summary
Faster, smoother plant commissioning
The customer has successfully brought online a greenfield 800 MW supercritical power plant using a Yokogawa full-replica plant simulator to
ensure a fast and smooth plant commissioning process.
The full-replica plant simulator was used for:
- Control system validation prior to DCS commissioning
- Operator training
Background
In Korea, steadily growing demand for electricity together with limited indigenous energy resources and a heightened environmental awareness
have required additional power generation facilities with improved efficiency and environmental performance. Korea South East Power Co., Ltd.
(KOSEP), a wholly owned subsidiary of the government-owned Korean Electric Power Company, constructed two new 800 MW supercritical
coal-fired units in Yonghung, Korea to generate highly efficient, environmentally friendly electricity.
The simulator was delivered on-schedule to the site in September 2002, twelve months before the boiler was to be fired up for the first time. In
collaboration with the DCS manufacturer and Yokogawa, the customer proceeded to test and validate the DCS configuration on the simulator,
conducting an I/O checkout, drive checks, sequence checks, control module checks/tuning, alarm/trip setting, and DCS response checks as well
as tests in which malfunctions and other abnormal situations were simulated. This enabled thorough validation of the control configuration prior
to DCS installation at the site, thereby minimizing the final tuning work. A significant number of potential plant trips and incidents where there was
potential for damage to the plant were identified and resolved before the initial plant startup, ensuring a safe and smooth plant commissioning
process.
Custom-made Operator training
The thorough control system validation on the simulator also provided a
suitable training environment for plant operators. The simulator aided in
the initial training for plant operators and refresher training for experienced
operators under a wide variety of normal, abnormal, and emergency
operating conditions. In parallel with DCS commissioning, KOSEP plant
operators were well trained under the new control environment, reproducing
custom-made flexible operating scenarios on the simulator. This avoided
mistakes that could have occurred if the operator had not been familiar with
the new system, thereby ensuring safe and smooth plant operation.
The simulator also has the flexibility and expandability to accommodate
future improvements in plant performance. The simulator continues to be
an effective tool for the customer to optimize operational procedures and the
plant logic/system.
Plant Details
Owner:
Output:
Plant efficiency:
Operation mode:
Fuel:
Boiler type:
Turbine:
Generator:
Simulator system:
Central control room
Korea South East Power Co., Ltd. (KOSEP)
2 x 800 MW
43.5%
Base load & cycle operation
Bituminous coal
Supercritical pressure, once through, single reheat
Tandem compound, HP, IP, and LP turbine, single stage reheat, condensing type
Cylindrical rotor, hydrogen and water cooled, three-phase synchronous generator
Yokogawa full-replica plant simulator (main computer + instructor system + DCS)
Power plant simulator
14. 21
Spain
Power
Combined Cycle Power Plant with Regasification Facility
Realizes Stable Power Supply
22
Bahia de Bizkaia Electricidad
Bahia de Bizkaia Gas
Plant Information
The Challenges and Results
Plant name:
Location:
Project type:
Plant type:
Output:
Order date:
Completion:
1. High availability (BBE and BBG)
Both facilities aim to have high availability. The field-proven CENTUM CS 3000 distributed control system (DCS) ensures this by enabling the
control and monitoring of the entire BBE power station. The BBG regasification facility is designed to operate 24 hours a day, 365 days a year
without having to be shut down for maintenance. Yokogawa’s highly reliable CENTUM CS 3000 DCS offers a high degree of redundancy that
contributes to the entire plant’s high availability.
BBE & BBG Plants
Bilbao, Spain
New
Combined cycle power plant
800 MW
2001
2003
2. Unified operation of multivender control systems (BBE)
At the BBE power station, General Electric Company gas and steam turbines have been installed and are controlled by the company’s own
turbine control system. The electrical equipment of the power station is controlled by another vender’s system. With its Unified Operator Interface
(UOI), Yokogawa’s CENTUM CS 3000 enables the seamless operation of each of these control systems. With the UOI solution, all of the actions
required for the operation, management, and maintenance of turbines, the heat recovery steam generator (HRSG), and the balance of plant
and electrical controls can be carried out from a single operator interface. The UOI also eliminates the requirement for operators to master the
operation of multiple systems.
3. Flexible operation and reduced start-up time (BBE)
The BBE power station is capable of working both at base load and at partial loads, which provides flexibility in the plant operation. In addition,
to reduce the start-up time, 100-percent-flow by-passes were designed to start the gas turbine and the HRSG individually without starting up
the steam turbine. The Yokogawa DCS for which the Spanish engineering company Siemsa Notre S.A. (SIEMSA) fully implemented the above
operation logic has steadfastly supported the safe plant operation and smooth startup.
Background of the Project
Customer Satisfaction
In Spain, the demand for electricity and imported natural gas has been rapidly increasing, a trend that is anticipated to continue for years to
come. To augment the country’s energy supply, several new LNG regasfication plants as well as combined cycle gas turbine plants have been
constructed in Spain.
The SIEMSA engineer commented, “We appreciate CENTUM CS 3000’s operationality and system reliability. With the UOI solution, the DCS
controls use the same HMI system as the turbine and electrical control system, and there is no need for a dedicated communication gateway
and separate screens. This significantly reduces the engineering time and costs.”
About the Bahia de Bizkaia Plant - BBE and BBG
To achieve a stable supply of gas and electricity for the country, the Spanish government decided to build the Bahia de Bizkaia Plant. Located in
Bilbao, this plant consists of Bahia de Bizkaia Electricidad (BBE), an 800 MW gas fired combined cycle power station, and Bahia de Bizkaia Gas
(BBG), a regasification facility with regasificators having a total capacity of 2.7 billion cubic meters.
The Bahia de Bizkaia Plant was one of the most significant power projects to be carried out in this region. The project was led and financed by
Ente Vasco de la Energia, Repsol-YPF, British Petroleum, and Iberdrole S.A., with the total investment of approximately 600 million euros.
System Details
System: CENTUM CS 3000/UOI (BBE)
CENTUM CS 3000 (BBG)
System configuration: 4 x operator stations
(BBE)
1 x engineering workstation
2 x UOI (Cimplicity) servers
4 x field control stations
2,600 inputs/outputs
1,800 communication Signals
System configuration: 1 x engineering stations
(BBG)
6 x operator stations
4 x control stations
1,500 inputs/outputs
2,500 communication signals
1 x OPC Server
15. 23
24
Romania
Power
CENTUM CS 3000 R3/UOI Improves Reliability and Efficiency
by Integrating Systems Controls at Bucuresti Vest Power Plant
SC Electrocentrale Bucuresti SA
Plant Information
The Solutions
Plant name: Bucuresti Vest Combined Cycle Heat
and Power Plant (CCHP)
Location:
Bucharest, Romania
Project type: Modernization
Plant type: Coal-fired
Output:
186 MW (electrical), 197 MW (thermal)
Order date: May 2005
Completion: March 2009
1. Single Operator Interface
The CENTUM CS 3000/UOI provides a single operator interface for the
operation, management, and maintenance of the plant’s turbines, HRSG,
balance of plant (BOP) facilities, and electrical systems.Yokogawa’s unified
operator interface (UOI) makes this possible. It was developed by Yokogawa to
provide a common control platform for the CENTUM DCS and the GE Mark VI
gas turbine control system. All data from the GE Mark VI turbine control system,
Siemens Simatic steam turbine control system, and other plant systems can be
accessed from the CENTUM CS 3000/UOI. No gateway is required.
The București Vest CCHP is operated and monitored from four operator stations
that are located in the central control room and provide access to more than 90
process graphics. Each of these stations has four monitors that can display four
separate graphics. In addition, there are four 50” operator displays.
Unified Operator Interface (UOI)
Unified Operator Interface (UOI)
Interface
f
Data/Message from
Turbine Project
UOI
UOI
Data/Message from
HRSG/BOP Project
UOI
UOI
UOI viewers
(CIMPLICITY)
UOI
Ethernet
tion
Configuration
PC
UOI Server(s)
(CIMPLICITY
Server)
CIMPLICITY
T
Servers
Unit Data Highway for Mark VI
ata
f
for
k
Mark VI
n
(for Gas Turbine)
Turbine)
CENTUM CS
3000 Builder PC
Control Bus (Vnet IP)
Siemens S7
(for Steam Turbine)
f
e
(for
Turbine)
ProSafe RS
SCS(s)
(for safety)
CENTUM CS
3000 FCS(s)
(for HRSG)
CENTUM CS
3000 FCS(s)
(for BOP)
HRSG/BOP and SaffetyConttro
HRSG/BOP and Safety Controll
HRSG/BOP andSafety Con rol
HRSG/BOP and Sa ety Control
Safety
by Yokogawa
by Yokogawa
by Yokogawa
by Yokogawa
TurrbineConttro by
Turbine Controllby
Tu bine Con rol by
Turbine Control by
Generra EllectricCompany
GenerallElectric Company
Gene al Eectric Company
General Electric Company
(Electrical plant overview)
(Condensate system)
(Gas turbine startup)
(Steam turbine by-pass control)
The turbine graphics and other system graphics are shown right. With these
graphics at the CENTUM CS 3000/UOI stations, operators can monitor and
control all the plant’s different systems with the same look and feel.
About the Project
The Bucurresti Vest Combined Cycle Heat and Power Plant (CCHP) is located in the Romanian capital of Bucharest and supplies both electricity
and heat to this city. Sited next to two existing 125 MW plants, it was built to meet Romania’s rising demand for electric power.
The owner of the plant is SC Electrocentrale București SA (ELCEN), a major energy supplier in Romania that accounts for approximately 20% of
the nation’s power generation capacity. ELCEN’s thermal power plants generate over 2 gigawatts (GW) of electricity, of which 1 GW is supplied
directly to the city of Bucharest.
The Bucuresti Vest CCHP consists of a GE 9E gas turbine that generates up to 135 MW, a heat recovery steam generator (HRSG)
manufactured by Austrian Energy and Environment, and a SKODA steam turbine that generates up to 60 MW.
The main contractor for this plant construction project was the Combined Cycle Division of VA Tech Hydro AG (integrated into the Andritz Group
in 2006). VA Tech Hydro’s scope of supply included the complete electrical systems and instrumentation and control, all auxiliary plant units such
as gas supply, and all structural engineering. Yokogawa provided the CENTUM CS 3000/UOI distributed control system (DCS), ProSafe-RS
Safety Instrumented System, and the Exaquantum Plant Information Management System, as well as engineering, installation, commissioning,
and operator training services.
2. Automatic Plant Start-up and Shutdown
For the new CCHP, Yokogawa configured block sequences for automatic plant
start-up and shutdown. The heating plant units that supply up to 190 MW of
thermal energy to Bucharest’s district heating network were also automated to
ensure a high degree of flexibility in responding to fluctuations in demand.
The power plant can be operated in an accentuated electrical mode or in an
accentuated thermal mode that requires the calculation of complex mathematical
equations. This computation can be handled by the DCS field control station
(FCS) and does not need to be outsourced via OPC or other means.
3. Advanced Alarm Management
Alarm management at this power plant is done with Yokogawa’s Consolidated
Alarm List software. This manages both DCS and turbine controller alarms
as well as alarms from subsidiary controllers and safety systems, using the
sequence of events (SOE) signals to timestamp these events with millisecond
accuracy.
The project was executed in a professional manner. The construction period was kept short – less than 30 months net – to facilitate a rapid
return on investment.
Yokogawa’s state-of-the–art plant control system contributes significantly to high degree of plant automation and plant reliability.
Customer Satisfaction
System Details
VA Tech Hydro chose Yokogawa’s automation system for this project because of the demonstrated capabilities of the CENTUM CS 3000
control system in power plant applications and its compliance with the relevant VGB guidelines. An additional factor leading to this decision was
this system’s use of redundant Profibus cards in keeping with the Profibus decentralized periphery (DP) concept and its support of IEC60870
communication profiles.
Control systems:
CENTUM CS 3000/UOI, ProSafe-RS
Number of I/O points: 6,900 (1,300 hard wired, 3,600 via Profibus, 2,000 via other bus protocols)
System configuration: 4 UOI viewers, 2 engineering stations, 2 UOI servers, 1 Exaquantum server, 1 SOE server,
1 IEC server, 4 50” plasma screens, 8 FCS, 1 safety control station (SCS)
The design and structure of the CENTUM CS 3000 DCS for this new power plant met this customer’s high expectations in terms of availability
and operational reliability.
At the operator desk in front of the HMI operator station, the merits of Yokogawa’s UOI solution become obvious:
- It's easy to navigate through the power plant control and turbine control processes as both are represented in a similar manner and run on the
same visualization platform. The process graphics that were prepared for this project are excellent overall, with well structured and detailed
process overview and operator displays.
- The Consolidated Alarm List software helps operators quickly identify cause and effect relationships in power plant and turbine control.
16. 25
Thailand
Power
Fully Automated Power Plant Supplies Steady
Flow of Electricity to Thai National Grid
EGCO Cogeneration Co., Ltd.
The Challenges and the Solutions
Plant Information
Plant name:
Location:
Project type:
Plant type:
Output:
Cogeneration plant
Rayong, Thailand
New
Combined cycle cogeneration
140 MW (2x 40 MW electrical and
1 x 60 MW electrical)
Order date: 2000
Completion: 2002
Executive Summary
The Electricity Generating Public Company Limited (EGCO) was the first independent power producer (IPP) to be established in Thailand as
the result of an initiative by that country’s government to allow broader private sector investment in the power sector. EGCO was incorporated
on May 12, 1992 by the Electricity Generating Authority of Thailand (EGAT), and over the next three years it became a public company and
was listed on the Stock Exchange of Thailand (SET). Operating as a holding company, it invests in power generation and supply and provides
comprehensive operation, maintenance, engineering, and construction services to the power industry and other industries in Thailand as well as
other countries. Furthermore, the company searches for good growth opportunities that are related to its core energy business.
EGCO Cogeneration Co., Ltd, an EGCO Group company,
operates a combined cycle power generation plant at
the Rayong Industrial Park. The plant uses natural gas
from PTT to power gas turbines that generate electricity.
Heat recovery steam generators (HRSG) use waste heat
from the turbines to produce steam for a steam turbine
that generates additional electricity. Sixty percent of the
generated electricity goes to the national grid (EGAT)
and the remaining 40% is utilized by companies at the
Rayong Industrial Park.
To control these processes at the EGCO Cogen power
plant, Yokogawa Thailand installed a CENTUM CS 3000
process control system in 2002. This facility has operated
without any major system failures since then.
26
1. Highly efficient operation
The national grid operated by EGAT needs a steady supply of electricity at
all times, and the same is true for the Rayong Industrial Park. The CENTUM
CS 3000 plays a core role by controlling and enabling the monitoring of all
processes at the EGCO Cogen plant.
The gas and steam turbine control systems as well as the PLCs controlling
the water treatment and chemical injection facilities are all integrated with
the CS 3000 system through a Modbus interface. The CS 3000 system has
access to both horizontally and vertically integrated data from throughout the
plant, allowing EGCO Cogen to calculate the efficiency of each gas and steam
turbine as well as each of the HRSGs in real time.
Operators have constant access to plant performance data and a daily
report showing the hourly base performance figures can be printed out. The
performance data is utilized to plan maintenance and improve control strategy.
Currently, the plant’s overall efficiency is about 60%.
2. Steady and safe operation
Based on monthly requests from EGAT, EGCO Cogen supplies a steady flow
of electricity to the national grid. EGCO Cogen also supplies load of 40 MW
to the Rayong Industrial Park. To meet these requirements under a variety of
circumstances, the CS 3000 system has the following control functions:
2-1) Automatic start-up and shutdown sequences
2-2) Automatic load sharing and plant optimization
2-3) Load shedding control
2-4) Voltage and power factor control
2-5) Island operation when disconnected from the national grid
2-6) Plant performance monitoring
Plant performance screen
Each operator workstation has function keys that allow quick access to a target process from the plant overview graphic display. With certain
sequences, clear and easy-to-understand operation procedures are displayed. Operators thus have all the information needed to take quick and
timely action whenever needed, making this a very safe plant.
Monthly electricity demand
Main process overview
Central control room
Plant Details
Customer Satisfaction
Gas turbine: 2 x 40 MW, GE
HRSG: 2, Alstom
Steam turbine: 60 MW, Alstom
According to the Plant Manager, “The system allows operators to clearly see the
plant’s status and know what is going on. With this information, our operators
can take quick action whenever there is a problem with a gas or steam turbine
or with an HRSG. When there is a problem with the transmission lines or some
other part of the national grid, the plant is immediately put into island mode and
provides electricity only to its local customers. We are very pleased with the
performance of Yokogawa’s CENTUM CS 3000 at our power plant.”
System Details
Distributed control system: CENTUM CS 3000
Total I/O: 1,500
Field devices: Yokogawa pH meters, conductivity meters
HRSG graphic display
EGCO Cogen operators
17. 27
Thailand
Power
Replacement of Legacy System with CENTUM CS 3000
Ensures Steady Supply of Electricity to Thai National Grid
Samutprakarn Cogeneration Co., Ltd.
Plant Information
The Challenges and the Solutions
Plant name:
Location:
Project type:
Plant type:
Output:
Order date:
Completion:
1. Steady power supply
With 90% of this plant’s generated power going to the Thai National
Grid, which is owned and operated by the Electricity Generating
Authority of Thailand (EGAT), it is vital for the production control
system to be highly reliable. EGAT sends a power demand pattern
every month (see the right figure) to the power station and it must
generate electricity accordingly. With an availability that exceeds
99.99999%, Yokogawa’s CENTUM CS 3000 system has been key to
meeting this requirement.
Samutprakarn Cogeneration Plant
Samutprakarn, Thailand
Control system revamping
Gas fired cogeneration power plant
126 MW
2005
2007
2. Operational data visualization for safe operation
The Yokogawa CENTUM CS 3000 controls and monitors the plant’s
HRSG units and its balance of plant (BOP) facilities. Other vendors’
systems such as the gas turbine and steam turbine control systems
are all integrated through Modbus interfaces with the CENTUM CS
3000 system, so almost all plant data can be viewed at the CENTUM
CS 3000 human machine interface (HMI) stations. Operators can
clearly see in real time the status of the compressors and all other
equipment throughout the plant, and thus have the information they
need to take quick and effective action when necessary. This data
is also used to facilitate equipment diagnosis so that engineers can
schedule maintenance at the most appropriate time and ensure safe
operation.
Executive Summary
A 126 MW gas fired cogeneration power plant built by Thailand’s Samutprakarn Cogeneration Co., Ltd. began generating electricity on August
23, 1999. Ninety MW of its output is supplied to the Thai National Grid, with the remainder going to local companies. The plant operates 24
hours a day, seven days a week, and is shut down for 35 days once a year for maintenance. A major overhaul is done every six years. For
improved efficiency, this power plant was designed to have more than one thermodynamic cycle, and uses both gas and steam turbines. Two
GE gas turbines burn fuel to produce heat energy and generate electricity, and the waste heat is used to produce steam that passes through an
Alstom steam turbine to generate additional electricity.
The gas fuel for this plant comes from a PTT gas separation plant,
which receives gas via an undersea pipeline from wells in the Gulf of
Thailand. The plant’s boilers utilize heat recovery steam generators
(HRSG) with a capacity of 80 t/h (max.120 t/h) and a maximum
allowable steam pressure of 65 bar. The steam temperature is 500
degrees Celsius.
28
3. Sustainable power generation
The replacement of this plant’s legacy control system has enhanced
performance in a number of ways. This includes steady improvement
in the heat rate (BTU/kWh), as the graph in the lower left shows.
Signals from a variety of analyzers are also monitored by the
CENTUM system to control emissions. The continuous measurement
of CO and O2 concentrations allows operators at this power plant to
fine tune the air-fuel ratio and thereby boost combustion efficiency
and reduce NOx emissions.
Power generation overview
The decision by Samutprakarn Cogeneration to upgrade this plant’s
legacy distributed control system was made because it was proving
difficult to procure spare parts from the system vendor. Yokogawa
Thailand successfully installed the CENTUM CS 3000 system on
schedule and on budget.
Central control room
Customer Satisfaction
Kitpoat Srasomsub, Maintenance Manager, had the following to say about the plant’s new
control system: “We have been very happy with Yokogawa’s CENTUM CS 3000 since
introducing it in 2007. The system is very reliable and there have been no major problems with
it. We have the important mission of providing a steady supply of electricity to both the EGAT
national grid and local companies 24 hours a day, seven days a week, throughout the year. We
are always striving to improve efficiency and reduce emissions through the visualization of all
plant data.”
Mr. Srasomsub
18. 29
Australia
Power
Unified Operator Interface Enables Remote Operation
AGL Hallett & Somerton Power Stations, Australia
Plant Information
Plant name: AGL Hallett and Somerton Power Stations
Location:
South Australia (Hallett) and Victoria
(Somerton), Australia
Project type: New
Plant type: Gas turbine
Output:
200 MW (Hallett)
150 MW (4 x 37 MW) (Somerton)
Order date: 2001
Completion: 2002
Australian Gas Light Company
The Challenge
To respond to these pressing needs, AGL required the following:
• Remote control and operation
The 12 gas turbines in the Hallett plant and the 4 gas turbines in the Somerton plant needed to be remotely controlled from an existing control
center in Melbourne.
• Fast-track construction
Each plant construction project was placed on a fast-track three-month completion schedule so that they could be operational by the summer
of 2002. All system equipment had to be delivered and installed within this timeframe.
• Flexible operation
The turbine control system had to have the capability to flexibly meet the intermittent power needs of a peaking power station.
Executive Summary
The Australian Gas Light Company (AGL) was established by private interests in New South Wales in 1837 to light the streets of Sydney with
coal gas. Today, AGL is Australia’s leading energy provider. AGL’s wholesale and retail marketing businesses sell natural gas, electricity, and
associated products and services.
Electricity consumption is growing rapidly in southern Australia. In response to growing summer demand in South Australia, AGL built a power
station in 2001 in Hallett, South Australia, and completed construction of another power station the following year in Somerton, Victoria. Both are
peak power plants that help reduce the likelihood of power blackouts and keep electricity prices stable during periods of peak demand.
Remote control and operation
CENTUM CS 3000/UOI
The Solution
System Details
In these projects for AGL, Yokogawa Australia cooperated closely with the Group’s Singapore factory to develop and deliver a fully engineered
control system on specification and on schedule.
System:
CENTUM CS 3000/UOI
Scope: (Hallett)
Interface to GE SPEEDTRONIC Mark V turbine controllers
Balance of plant (BOP) control
Interface to ALSTOM SCADA
Interface to electricity market network for load dispatch
For its Hallett and Somerton plants, AGL selected Yokogawa’s CENTUM CS 3000 together with its Unified Operator Interface (UOI). The system
platform in the UOI is the GE Fanuc CIMPLICITY Human Machine Interface (HMI) system, which fully integrates the controllers for the turbine
and balance of plant (BOP) auxiliaries and uses the same screens/formats in both the turbine and BOP HMI displays. The CIMPLICITY HMI
used in the UOI is a SCADA based design that fully supports AGL’s requirement for remote operation capability.
For the Hallett plant, AGL also introduced an automatic turbine optimizer. This embedded system automatically schedules and selects turbines
to flexibly meet peaking market demands.
30
Scope: (Somerton) Interface to Triconex turbine controllers
Balance of plant (BOP) control
Interface to electricity market network for load (NEMMCO) dispatch
19. 31
Canada
Power
Toronto Airport Cogen Plant Focuses on
Reliability
Plant Information
Plant name: Cogeneration plant at Pearson
International Airport
Location:
Toronto, ON, Canada
Project type: Control system revamping
Plant type: Gas fired cogeneration plant
Output:
117 MW (2 x 42 MW electrical,
1 x 33 MW thermal)
Order date: 2004
Completion: 2005
32
Greater Toronto Airports Authority
The Plant
The airport is owned by the GTAA1, which hired outside firms to help design, build, and operate the plant. The airport, by meeting the twin
requirements of a coincident demand for electricity and thermal power along with access to fuel (natural gas), was an ideal candidate for a
Cogeneration system. In early 2001, GTAA had constructed a Central Utility Plant for the airport; it replaced a legacy plant torn down as various
airport facilities were being added. The plant supplied steam for heating and chilled water for cooling the airport terminals.This new plant can
supply steam needs but also allows the optional operation of the plant’s steam boilers in standby mode while using steam from the Cogen
system. The plant was constructed in 2003. A year later the Yokogawa control system was commissioned.
An interesting facet of the design is the use of two “once-through steam generators” (OTSGs) supplied by Innovative SteamTechnologies (IST)
of Cambridge, Ontario. These units offer several advantages over conventional designs. They are efficient,flexible and capable of full operation
from cold starts within less than 30 minutes. They start, run and finish dry. Conventional-pass stacks, diverter valve systems and stack silencers
are not needed.An OTSG is basically a heat exchanger composed of a series of tubes whose boiler water is simultaneously heated, evaporated
and superheated. Heat recovered in the OTSG supplies the steam turbine at its required temperature and pressure.
Yokogawa CENTUM CS 3000 control system
Encompassed by the Yokogawa monitoring and control system is the entire Cogen plant including the two OTSGs. Startup, operation and
shutdown of the OTSGs is fully automatic. The complex logic involved was developed by close cooperation of Yokogawa, IST and SNC-Lavalin2
engineers.
Background
Canada’s Toronto Pearson International Airport, along with millions of people in Eastern Canada and eight US states, suffered a severe electrical
power outage in 2003. This catastrophic failure made it painfully apparent that the airport neededa reliable, independent source of electricity.
Round-the-clock reliability was simply an absolute must, but the economics of such a system had also to be carefully considered.
These two factors – reliability and costs – have now been met by a cogeneration power plant design using twin GELM6000PD aero-derivative
gas turbines, each capable of producing 42 MW. Exhaust from the turbines passes through steam generators which run a third steam-driven
generator capable of 33 MW output. Remaining plant heat can be used to heat/cool the airport buildings. Economics were addressed in this
generous design to allow sale of excess power generated to the Ontario power grid. A Yokogawa CENTUM CS 3000 control system, selected
after careful evaluation of system reliability for various vendors, completes the plant.
Not shown but also in the control room is an engineering station. It allows access to technical drawings and related information such as
applicable codes and standards and other engineering information. It includes a system simulator used in operator training and to examine and
test changes in the CS-3000 logic. This logic can be modified through this station. A HART plug-in allows diagnostics for HART I/O. Naturally,
access to the station is fully protected and limited to only the plant’s certified engineers.
A monthly printout – both tabular and graphical – by a companion J.D. Edwards software package, using selected inputs from the Yokogawa
files, provides maintenance guidance. Since installation of the Yokogawa system, no major maintenance has been required.
Steve Sadecki in the Cogen Plant control room with multiple flat-screen
displays. Control is provided for plant balance and unit operations.
Monitors provide rapid and complete displays of all system assets. Says
Sadecki, “The display formats are very well thought out and extremely
operator friendly. It took me, and fellow operators, less than a week of
training to be completely familiar and comfortable with the system– even
though none of us had previous experience withYokogawa equipment.”
Steam fed to the OTSGs must be of ultra-high quality. Steam monitoring
and water purification control is included in the CENTUM system.
“Those involved with the Cogen plant have been very pleased with reliability of the Yokogawa control system,” states Henry Oberhauser, Senior
Manager, Utilities for Greater Toronto Airports Authority (GTAA). “The only substantial system outage occurred due to sub-standard process
water supplied by a sub-contractor. We feel Yokogawa’s claim of ‘seven 9’s’ reliability – which translates to less than one minute of downtime in
40 years – is well on its way to reality.”
Predicted reliability being achieved
System Details
The Honourable Donna Camsfield, Minister of Energy, at the Cogen Plant opening on Dec.2, 2005, said in part, “Today’s plant opening
is another step in Ontario’s cogenerational potential and another example of the Greater Toronto Airport Authority’s significant record of
environmental leadership.” She cited benefits of cogeneration to include:
• Adds more capacity added to the power grid
• Produces high combined fuel efficiency
• Helps control industry costs
• mitigates electricity cost increases
• Improves transmission and system reliability
• Helps replace coal thus creating a cleaner environment
• Increases the number of facilities that recover quickly or even continue to operate in the event of power interruption.
DCS:
CENTUM CS 3000
Total I/O:
Approximately 2000
System configuration: Dual LCD operator stations, engineering work stations with virtual test function, field controllers, I/O with HART,
sequence of events I/O
Scope:
Distributed control system including control system software, factory acceptance, commissioning assistance
Comments by those associated with the plant and echoed by other industry and government groups visiting the Toronto facility – about two such
tours per month since installation – attest to the central focus of system reliability. The GTAA facility and its Yokogawa control system qualify on
all counts.
1
GTAA operates Pearson Airport, an international gateway with 65 airlines via 82 gates in three terminal buildings. A fourth terminal is currently beingdesigned. The airport generates $14-billion
in annual revenues, $2.8-billion tax revenues and provides 135.000 jobs. It has 16,000 parking spaces.
2
SNC-Lavalin, one of the leading groups of engineering and construction companies in the world, has office across Canada and in thirty other countries. It is at work in over 100 countries.
20. 33
Thailand
Power
CENTUM CS 3000 Ensures Stable Supply of Electricity
and Steam to Bangkok’s Suvarnabhumi Airport
34
District Cooling System and Power Plant Co., Ltd.
Plant Information
The Challenges and the Solutions
Plant name: District cooling system and power
plant at Bangkok's Surarnabhumi airport
Location:
Samutprakarn, Thailand
Project type: New
Plant type: Combined cycle cogeneration
Output:
94 MW (2 x 41 MW electrical,
1 x 12 MW thermal)
Order date: 2002
Completion: 2004
1. Steady and safe supply of power and steam
DCAP’s mission is to ensure a steady supply of electricity and steam to the airport terminal, a hotel nearby, and a Thai Airways catering facility.
The steam is supplied to steam absorption chillers at east and west of the airport terminals that drive the cooling systems at the airport complex
and the airline catering facilities. The airport receives power over a main line from the DCAP power plant and a line from the Metropolitan
Electricity Authority (MEA).
There are four operation modes to meet any cases for power requirement and steam requirement situations.
• Full operation including steam chillers
• Half operation including steam chillers
• Half block + steam chiller operation
• Aux. boiler + steam chiller operation
The operation procedures carefully configured in the CENTUM CS 3000 ensure smooth transfers between these modes. Regarding gas and
steam turbine control, the turbine suppliers installed the respective controllers; however, they receive major settings from the CENTUM CS 3000
via a Modbus interface as master setpoints and all process data in the turbine systems can also be monitored by the CENTUM CS 3000. Safe
and steady supply of electricity to, and air conditioning at, the entire airport complex is thus assured all year round.
Executive Summary
District Cooling System and Power Plant Co., Ltd. (DCAP)
operates a power plant near Bangkok’s Suvarnabhumi
International Airport that supplies electricity and steam to the
Bangkok International airport main terminal, a hotel nearby and
a Thai Airways catering facility. The DCAP plant has two 41
MW gas turbines, two heat recovery steam generators (HRSG,
63 t/h each), and one 12 MW steam turbine. In average, 50
MW electricity is transferred to the Airport of Thailand (AOT),
30 MW is selling to the national grid (EGAT)and total left MW
is utilized in this DCAP power plant. The steam is sent to 10
steam absorption chillers located at the airport’s main terminal,
east and west, about 2 km away from DCAP facility .
Central control room
2. Environmentally optimized operations
Natural gas supplied by PTT Public Co., Ltd. powers DCAP’s main gas turbines and auxiliary
boilers. Even though natural gas is low in emissions, the CENTUM CS 3000 system tracks and
displays the relevant process data. The data are linked to a continuous emissions monitoring system
(CEMS) through a plant network that is connected to the government’s systems. Data on NOx, SO2,
CO, O2, and opacity are sent twice a day. The water used in this plant is also carefully monitored
and controlled to keep it within recommended limits.
To be a steady supply of electricity and steam to Suvarnabhumi
International Airport, which operates 24 hours a day / 365 days
around a year, is most important issue for DCAP. Yokogawa
Thailand successfully installed a CENTUM CS 3000 distributed
control system, field transmitters and magnetic flowmeters. The
facility is in operation without any problem since 2004.
Process overview
Continuous emissions monitoring system
Plant Details
Customer Satisfaction
Plant overview
- Gas turbines: 2 x 41MW, IHI
- HRSG: CMI
- Steam turbines: 12 MW, Shin Nippon
- Steam absorption chillers: 21,000 refrigerant tons
- Electric chillers: 12,480 refrigerant tons
- Steam generation: 126 t/h
- Steam temperature: 430 deg C
- Steam pressure: 60 bar
Systems Delivered
- Distributed control system: CENTUM CS 3000
- Total I/O: 1841
- Field devices: Yokogawa magnetic flowmeters
Chiller overview
Seree La-Ongutai, acting general manager, said, “We are producing electricity and steam for the whole airport terminal, adjacent hotel and
Thai Airways facilities. It is very hot in Thailand all through the year, so the airport always needs a stable utility. We very much appreciate the
reliability of Yokogawa’s CENTUM CS 3000, which is the cooling of all our airport facilities here. So far the plant has operated with great stability,
availability and safety, and I believe this is due in good part to the integration of the system’s sequence logic functions and the dynamic graphic
displays on the human machine interface (HMI). We are striving to save energy in the whole facility, so we would like to work together with
Yokogawa for continuous improvement.”
21. 35
Hungary
Power
Customized STARDOM & FAST/TOOLS Plant Management
Solution Helps Füredi CHP, Hungary Operate Optimally
Plant Information
Plant name:
Location:
Project type:
Plant type:
Furedi Power Plant
Budapest, Hungary
New
Gas fired combined heat and
power plant
Output:
34.5 MW (3 x 6 MW electrical,
and 1 x 16.5 MWt)
Order date: 2004
Completion: 2005
Kraftszer Kft
The Challenges and the Solutions
1. Easy set point definition for all plant power generation operations
The district heating set points are defined in Excel and sent to the district heating company.
As shown below, the Excel data can be imported into FAST/TOOLS with just one mouse click.
Plant operators can see the actual daily plant set points on screen.
Set points of No. 3
gas engine
Set points of No. 1
gas engine
2. Stable electric power generation
The Füredi Power Plant project is a showcase for the use of SCADA and STARDOM in a power sector application, and it posed certain unique
operation and control requirements. A FAST/TOOLS SCADA system was seamlessly integrated with a STARDOM automation system, providing
the information needed by power plant managers, operators, and maintenance personnel to efficiently monitor the plant’s operation and analyze
its performance. A history database integrated into FAST/TOOLS collects and stores the measured and calculated parameters.
The system covers approximately 16,000 items, collects data, creates shift/daily/weekly reports, and makes monthly calculations. The collected
and calculated data is kept for the lifetime of the plant. Through this project, Zugló-Therm Energy Supply Ltd. has achieved the following:
• Easy set point definition for all plant power generation operations
The heat produced by the entire plant and the electrical set points for the engines can be defined in an Excel file every 24 hours, with 15
minute resolution, and this data can be easily exported into the FAST/TOOLS system.
• Stable electric power generation
The superior control system can respond flexibly to changing heat demand, focusing on the operational conditions of the gas engines.
• Power plant optimization
The control system supports on-line calculation of both plant and gas engine efficiency, enabling adjustments for optimal operation.
• Control of electric power generation based on net performance
The control application in STARDOM can automatically calculate the in-house power consumption of the power plant. With this function, the
plant can more accurately control the required amount of power to be supplied to the national grid operator.
The automation system realized in STARDOM can also recalculate the set points for each gas
engine in the event of a malfunction such as a trip of a gas engine. If one of the gas engines
shuts down, the other two gas engines will increase power output to compensate.
3. Power plant optimization
STARDOM calculates the efficiency factors for each gas engine and for the entire power
plant, and provides data that operators can use to make the plant operate economically and
efficiently.
Scope/Special Features of the Control System
Three fully redundant STARDOM field control node (FCN) stations control
different parts of the plant, including the electrical system, district heating system
(including the gas engines connected to the PLCs), and air system.
Redundancy is realized at different levels in the FCN controllers such as the
power supply, CPU, communications between the nodes, and I/Os. One of the
most important criteria is the 10 msec time stamping of electrical signals.
The STARDOM controllers manage the plant’s measuring and supervisory control
activities, governing approximately 550 hardwired I/Os. Via serial communication
lines (MODBUS, IEC-103), they collect an additional 500 signals; 1,500 signals
are connected through redundant OPC interfaces.
About the Project
System Details
The plant is located at Füredi út in Budapest. The main contractor is Kraftszer Kft., a Hungarian engineering company that has built a number of
CHP plants, and the plant will be operated by Zugló-Therm Energiaszolgáltató Kft.
Control system:
STARDOM FCN and FAST/TOOLS SCADA system
Number of I/O points: 2,500
Field instruments:
EJA530A x 9, EJA110A x 13, EJA120 x 2, YTA70 x 2,
non-Yokogawa products x 116, manometers x 100
Installation:
March 15, 2005
Start-up:
April 4, 2005
Commissioning:
April 20, 2005
Training:
May 15-16, 2006
The Füredi power plant consists of three (3) Wärstilä 18V34SG gas engines rated for an electrical output of 18 MWe, three (3) heat exchangers
for each engine that supply the hot water for the district heating system, and auxiliary systems for such functions as fuel and air supply. Natural
gas is the main fuel for the power plant.
The hot water is distributed by Fötáv Rt., the main district heating utility in Budapest.
Although the emphasis is on the supply of hot water for district heating, the generated electricity is also supplied to approximately 20,000
households on the public power grid. In Hungary this kind of CHP plant is required to have a minimum total efficiency of 65% per month and
75% per year.
One click export
into FAST/TOOLS
Sum of the set
points
This system is used for the electrical set points as well. In this case the plant manager has to
define the set points for each of the three gas engines. Please refer to the Excel sheet below.
Executive Summary
36
Set points of No. 2
gas engine
22. 37
China
Power
Yokogawa’s CENTUM CS 3000 and PRM Assure Utility
Supply for Dushanzi Refinery & Petrochemical Complex
38
PetroChina Company Limited
Plant Information
The Challenges and the Solutions
Plant name: Utility plant for refinery and petrochemical plants
Location: Dushanzi, Xinjian Urghur Autonomous Region, China
Project type: New
Plant type: Circulating fluidized bed boiler
Output: 5 x 440 t/h, 2 x 220 t/h
Order date: June 2006
Completion: January 2010
1. Safe and steady operation
The utility plant operates non-stop throughout the year, ensuring an uninterrupted supply of steam, water, and electricity to the main process
facilities. In response to boiler master signals that are issued in real time by the production scheduling center, the four boilers must adjust their
output to match shifts in demand for steam by the processes and the turbines that generate electricity for the complex. With its highly reliable
dual redundant CPUs and seven 9s availability, Yokogawa’s CENTUM CS 3000 production control system maintains steady control of the boilers
and ensures that operations can continue nonstop without any major system problems.
Standard process graphics, process overview, trend, operator guidance, and alarm summary displays are all designed with safe operation in
mind, and can be accessed quickly and smoothly by operators, giving them a comprehensive overview of operations.
2. Total integration of information
Through an OPC interface, the PetroChina Dushanzi refinery and petrochemical complex uses a supervisory information system (SIS) as its
plant information management system (PIMS). All process data from throughout the complex are gathered by the CENTUM CS 3000 system
and the GE PLCs used in the water and ash treatment processes. Based on this process data, boiler efficiency, coal consumption, rate of
electricity generation, and many other kinds of useful data from the boilers can be accessed by the engineers at their desks, without having
to visit the central control room. The CENTUM CS 3000 system is a very steady platform and provides a very convenient process monitoring
environment.
The integration of information allows PetroChina Dushanzi to reduce its consumption of water, coal, and other resources. In many different
performance statistics, it is ranked number one in the PetroChina Group.
Executive Summary
At a cost of 30 billion yuan ($4.4 billion), PetroChina, China's largest oil producer,
constructed a large refinery and petrochemical complex on a 455 hectare parcel of land
in Dushanzi, a city in China’s Xinjiang Uyghur Autonomous Region. Using mainly high
sulfur crude oil from the Kazakhstan-China pipeline, the complex processes 10 million
tons of crude oil and produces 1 million tons of ethylene per year. As such it plays an
important role in the China-Kazakhstan energy cooperation strategy.
Production scheduling center
The utility plant that provides steam, electricity, and water to this complex include five
440 t/h circulating fluidized bed (CFB) boilers, three 100 MW turbines/ generators, and
chemical and water treatment systems.
SIS
The complex’s CFB boilers use brown coal as a fuel and are designed to keep CO2
emissions to a minimum. Normally, four of the complex’s five boilers are in use and the
remaining boiler is kept on standby and undergoes maintenance.
For the utility plant at this important industrial complex, Yokogawa China successfully
installed a CENTUM CS 3000 integrated production control system and the Plant
Resource Manager (PRM) package.
Boiler
(CENTUM CS 3000)
Water treatment
(GE-PLC)
Total system configuration
Ash treatment
(GE-PLC)
SIS boiler operation display
The PetroChina Dushanzi head office
Customer Satisfaction
Liu Jian Ming, Director of the Utility Control and Instrumentation Department said, “Every day we are trying to improve operations at our plant
and to reduce both coal consumption and CO2 emissions, because one of our targets is to achieve sustainable manufacturing. We very much
appreciate that Yokogawa supplies very reliable products and systems, and has been working together with us to provide support. Of the many
vendors that are supplying products and services for this PetroChina utility plant, Yokogawa is one of the best.”
Refinery
Petrochemical plant
23. 39
Australia
Power
Yokogawa Australia Undertakes Extensive Replacement and
Upgrade of Power Plant Control and Monitoring Systems
40
Energy Brix Australia Corporation
Plant Information
Plant name:
Location:
Project type:
Plant type:
Output:
Order date:
Completion:
Morwell Power Station
Victoria, Australia
Control system revamping
Coal-fired
180 MW
2005
2008
Low pressure condensing turbine generator
CENTUM CS 3000
control system cabinet
CENTUM CS 3000
station operator consoles
Executive Summary
The Challenges and the Solutions
Energy Brix Australia Corporation (EBAC) commissioned Yokogawa Australia Pty. Ltd. to modernize the Morwell Power Station and Brown Coal
Briquetting Plant by replacing their control and monitoring systems with a modern Yokogawa CENTUM CS 3000 distributed control system (DCS)
and a range of field instruments.
The application of modern DCS technology at the Morwell Power Station was highly successful in achieving EBAC’s objectives. This project
accomplished the following:
EBAC is a long established electric utility in Morwell, which is in the coal rich Latrobe Valley region approximately 150 kilometers east of
Melbourne, Victoria. The Morwell Power Station has an installed generating capacity of 180 MW and was built in the 1950s by the State
Electricity Commission of Victoria to generate power for the national power grid. The Morwell Station also provides process steam to the
adjacent brown coal briquette factory.
This extensive modernization of the Morwell Station’s control systems by EBAC and Yokogawa Australia was completed in 2008.
EBAC’s goals for undertaking this extensive DCS upgrade were to:
• Reduce station operating and maintenance costs
• Generate additional power for export
• Improve plant operating flexibility
• Provide modern conditions for plant operators
• Reduce plant emissions
Following the successful completion of this complex and challenging project, Yokogawa Australia and EBAC were jointly awarded the prestigious
2009 PACE Zenith Australia Industry Award for their leadership in the application of technological excellence and innovation.
The PACE Zenith Awards were established in 2004 and are presented to Australian industry annually for outstanding achievements in
technological excellence and innovation. Yokogawa Australia’s projects have previously won awards in 2005, 2007, and 2008.
• Optimized the use of labor by enabling a preventive maintenance approach
• Optimized the plant’s operating configuration by allocating turbine loads, allowing the station to operate at continuous maximum
capability
• Coordinated station control (range and pressure and process steam pressure), which in turn allows maximum plant flexibility by optimizing
boiler and turbine loading to take account of fuel quality variation, plant condition, and briquette factory process steam demand
• Optimized the consumption of brown coal fuel and minimized flue gas discharge by fully automating combustion control on all boilers
• Minimized the consumption of fuel oil, improved furnace stability, and reduced plant stress and operating costs as a result of the
automation of brown coal combustion
• Reduced thermal stress on the plant as a result of automating the boiler final steam temperature control
• Significantly improved plant safety by automating drum level control and furnace temperature control
• Increased operational flexibility and improved station response to load demand variations by fitting modern digital governors to all
five turbine generators
• Increased consistency of plant operations and reduced rate of load variation
• Reduced maintenance costs through tighter control and more consistent/less stressful operation by reducing the number of significant
excursions outside plant design parameters
• Significantly increased continuous MW load output from the available capacity while minimizing steam wastage and improving
operating efficiency by automating steam consumption across all turbines and condensers
• Introduced a new screen-based operator interface that allows operators to monitor plant operations while relying on automation systems
to maintain the plant in a stable and controlled condition throughout all steady state, load change, and plant upset conditions
Customer Satisfaction
EBAC believes that the engineering complexity and innovation involved in installing 21st century control systems technology in an old plant
was quite remarkable. Not only did the project increase the reliability of electricity supply, it reduced plant stress and decreased its maintenance
costs. This was accomplished by optimizing the use of raw fuels. The successful outcome of this control system modernization project will allow
the Morwell power generation and briquetting facility to operate well into the future while meeting anticipated economic and emissions standards.
Peter Morrow, General Manager of EBAC (left) and Philip Nicholson, Principal Engineer
of Yokogawa Australia (center) accepted the PACE Zenith Award from Jeremy Needham
of Mitsubishi Electric, the sponsor of the Transport, Power and Infrastructure category.
24. 41
Philippines
Power
Yokogawa's Reliable Control System is Running
at Geothermal Power Plant in the Philippines
42
PNOC-EDC
Plant Information
The Challenges and the Solutions
Plant name: Northern Negros Geothermal
Power Plant
Location:
Negros Occidental, the Philippines
Project type: New
Plant type: Geothermal power plant
Output:
49 MW
Order date: December 2005
Completion: February 2007
State-of-the-art FF technology
PNOC-EDC had adopted FF and was aware that there were many vendors of this technology. They needed to select the best partner for the
long haul, and they did this through interviews and plant visits. After speaking with other end users of Yokogawa fieldbus products in the region,
PNOC-EDC saw that Yokogawa was best positioned for a long-term relationship.
Plant Resource Manager (PRM) field device management system
PNOC-EDC recognized the importance of optimizing its operational costs and realized that asset management would be a critical success factor
for attaining this objective. Yokogawa’s versatile PRM platform and fieldbus devices met the operational and technical requirements. With PRM,
PNOC-EDC anticipates lower operational costs, effective maintenance programs, and high system availability.
Remote data monitoring via WAN
Critical to the overall operation of the plant was the availability of plant information to PNOC control centers in Negros and in Manila. As part of
the project, the FCRS control system was connected to a WAN by another vendor.
System Layout
Executive Summary
The Northern Negros Geothermal Project (NNGP) was a breakthrough for
Yokogawa. After a long selection process, PNOC-EDC awarded the contract for
a Fluid Collection Re-injection System (FCRS) control system to Yokogawa. This
attested to the Company’s capabilities as a major automation vendor.
There were several key factors for this success, including:
1. Yokogawa had a strong track record in the region of executing projects involving
FOUNDATION fieldbus (FF) technology, which had been selected for the control
system. This was critical in gaining the trust and confidence of the PNOC-EDC.
The coordination and cooperation between Yokogawa Engineering Asia Pte. Ltd.
and other Yokogawa companies showed PNOC-EDC that Yokogawa was the best
partner for automation of the FCRS control system. Another advantage was that
Yokogawa’s infrastructure in the Philippines ensured long-term support.
2. The contract included not only CS 3000 Vnet/IP, field instrumentation from
Yokogawa and other suppliers, PRM, and engineering, but also construction.
Yokogawa’s project management expertise was another important success factor.
Through this project, PNOC-EDC obtained:
• State-of-the-art FF technology
• Plant Resource Manager (PRM) field device management system
• Remote data monitoring capability via wide area network (WAN)
PRM windows
Customer Satisfaction
System Details
PNOC-EDC was very satisfied with Yokogawa’s performance in the NNGP. The Company
earned the customer’s trust with its project management expertise and local engineering capabilities.
This project is part of the government’s efforts to reduce dependency on oil through the use of renewal
energy sources. The NNGP was inaugurated by no less than the President of The Philippines,
Ms. Gloria Arroyo, who was accompanied by key officials in the power sector.
Control system:
CENTUM CS 3000 & PRM
Number of I/O points: 112 points (14 segments)
Products:
EJX430A (52 units), EJX110A (52 units) and CA71 (1 unit)
System configuration:
• FF for advanced field instrumentation
• Standard-configuration transmitters for the geothermal application:
EJX430A-FAS3G-917DN/A/X2/D4/M11
EJX110A-FAS3G-917DN/A/X2/D4/M11
• PRM for optimal plant asset management
• WAN for remote data monitoring
President Arroyo (Left of console)