Many UX designers have a blind spot when it comes to creating useful, usable content. If our goal is a great experience for users, then UX designers need to go beyond creating page templates and interaction models and focus on content strategy.
This workshop used the familiar UX design process to talk about how content strategy contributes to activities and deliverables.
UX IS ABOUT SATISFACTION.
UX IS DESIGNING FOR USER TO COME BACK THE SITE.
UX FOCUSES ON THE STRUCTURE & LAYOUT OF CONTENT, NAVIGATION AND HOW USERS INTERACT WITH THEM.
A design system can vastly improve your team's productivity, but most of all, it leads to better products! The challenge lies in creating a mature system and leading its adoption across the company successfully. Let's talk about how we learned to meet the needs of different designers and developers on different products, on different tech stacks. Attendees will go home with tips they can use to improve design systems of any stage.
Scenarios For Design: Interaction10 Workshop by Elizabeth BaconElizabeth Bacon
This presentation supported a 4-hour workshop taught by Liz Bacon at the Interaction10 conference in Savannah, Georgia on February 4, 2010. It describes the nuts-and-bolts of applying a scenario-based approach to design. It also covers some of the theoretical underpinnings of this method as well as how it supports effective team communication and collaboration. Liz will be writing a book on this subject, and welcomes your comments here or directly via http://www.devise.com/contact.
Product Design and UX / UI Design Process in Digital Product DevelopmentVolodymyr Melnyk
Presentation about product design and its role in digital product development, UI / UX design process and methodologies, examples of their applications.
UX IS ABOUT SATISFACTION.
UX IS DESIGNING FOR USER TO COME BACK THE SITE.
UX FOCUSES ON THE STRUCTURE & LAYOUT OF CONTENT, NAVIGATION AND HOW USERS INTERACT WITH THEM.
A design system can vastly improve your team's productivity, but most of all, it leads to better products! The challenge lies in creating a mature system and leading its adoption across the company successfully. Let's talk about how we learned to meet the needs of different designers and developers on different products, on different tech stacks. Attendees will go home with tips they can use to improve design systems of any stage.
Scenarios For Design: Interaction10 Workshop by Elizabeth BaconElizabeth Bacon
This presentation supported a 4-hour workshop taught by Liz Bacon at the Interaction10 conference in Savannah, Georgia on February 4, 2010. It describes the nuts-and-bolts of applying a scenario-based approach to design. It also covers some of the theoretical underpinnings of this method as well as how it supports effective team communication and collaboration. Liz will be writing a book on this subject, and welcomes your comments here or directly via http://www.devise.com/contact.
Product Design and UX / UI Design Process in Digital Product DevelopmentVolodymyr Melnyk
Presentation about product design and its role in digital product development, UI / UX design process and methodologies, examples of their applications.
This is a slide deck from one of Marc Stickdorn's courses on service design. It is structured in three parts, the first one is about customer experience in general and how important it is. The second part explains service design in a nutshell, and thirdly you can apply your newly acquired knowledge and create a persona.
Journey mapping as insight tool - a healthcare case study UXLX 2012Kim Goodwin
Journey or experience mapping is a common UX tool, though it's not always applied as effectively as it could be. This presentation shows a simple template for making these maps useful, describes a few uses for them, and explores the health journey (courtesy of PatientsLikeMe.com) as an example of translating data to insight. However, the slides may not stand on their own very well without the narration.
AI Restart 2024: José Kadlec - Megapraktické využití AI v LinkedIn brandinguTaste
Jak používat implementace jazykových text-to-text modelů jako OpenAI ChatGPT, Google Bard, Anthropic Claude na LinkedIn profilech i pro psaní příspěvků? Unifikovaná profesionální LinkedIn fotografie pro všechny vaše zaměstnance pomocí AI a bez fotografa, studia a drahého vybavení. Text-to-image a image-to-image AI modely jako Midjourney, Leonardo, Stable Diffusion v denní praxi brand specialisty. Nebezpečí využívání AI v prostředí sociálních sítí - objektivní a subjektivní faktory.
AI Restart 2024: Lukáš Benzl - Keynote: AI v roce 2024? Myslete globálně, jed...Taste
Rok? 2024. Přesný čas? Za pět dvanáct. Odpověď na otázku, jestli AI změní svět, už známe. Teď je nutné odpovědět na otázku, jestli také změní váš marketing a mindset. Česká republika má neopakovatelnou příležitost konečně udávat tempo. Je však nutná akce. Pojďme naše odhodlání promítnout do toho, jak odvážní v používání AI budeme. Pojďme vsadit na tuhle kartu. Je to po dlouhé době a na dlouhou dobu poslední sázka na jistotu.
Mentální modely si můžete představit jako užitečné principy rozhodování a myšlení zabalené do praktických balíčků a konceptů, které pak můžeme využívat v životě. S nimi jsou nerozlučně spojená kognitivní zkreslení, chyby a tendence v našem myšlení, rozhodování a prožívání, které nás občas negativně ovlivňují.
Today, it's quite probable that the two most important words for marketers are "content strategy." Content strategy identifies which content will best achieve your business objectives while fulfilling your customers' needs. Developing a content strategy also helps answer questions that often get left until the eleventh hour: Who is going to create the content, and how? How can you ensure your communications are consistent across all channels? What role will user-generated content play in helping meet your marketing goals?
This presentation discusses:
* the practice of content strategy
* useful, actionable details your organization can take advantage of immediately
Effectiveness is at the heart of everything we do. David Ogilvy himself wrote a series of full-page ads in the New York Times in the 1960s with headlines such as "How To Create Advertising That Sells." His most famous book, Ogilvy on Advertising, is packed with guidance on the success factors of effective campaigns.
However, the marketing landscape has changed beyond recognition in the past fifty years. We are delighted to share our latest publication, The Ogilvy & Mather guide to effectiveness. In it, Worldwide Effectiveness Director, Tim Broadbent, deals with one of the most central questions in marketing: how to increase the effectiveness of our campaigns.
As marketing budgets come under increasing pressure in response to economic uncertainty in Europe and elsewhere, effectiveness is rising higher on clients' agendas. The message is timely.
This is a slide deck from one of Marc Stickdorn's courses on service design. It is structured in three parts, the first one is about customer experience in general and how important it is. The second part explains service design in a nutshell, and thirdly you can apply your newly acquired knowledge and create a persona.
Journey mapping as insight tool - a healthcare case study UXLX 2012Kim Goodwin
Journey or experience mapping is a common UX tool, though it's not always applied as effectively as it could be. This presentation shows a simple template for making these maps useful, describes a few uses for them, and explores the health journey (courtesy of PatientsLikeMe.com) as an example of translating data to insight. However, the slides may not stand on their own very well without the narration.
AI Restart 2024: José Kadlec - Megapraktické využití AI v LinkedIn brandinguTaste
Jak používat implementace jazykových text-to-text modelů jako OpenAI ChatGPT, Google Bard, Anthropic Claude na LinkedIn profilech i pro psaní příspěvků? Unifikovaná profesionální LinkedIn fotografie pro všechny vaše zaměstnance pomocí AI a bez fotografa, studia a drahého vybavení. Text-to-image a image-to-image AI modely jako Midjourney, Leonardo, Stable Diffusion v denní praxi brand specialisty. Nebezpečí využívání AI v prostředí sociálních sítí - objektivní a subjektivní faktory.
AI Restart 2024: Lukáš Benzl - Keynote: AI v roce 2024? Myslete globálně, jed...Taste
Rok? 2024. Přesný čas? Za pět dvanáct. Odpověď na otázku, jestli AI změní svět, už známe. Teď je nutné odpovědět na otázku, jestli také změní váš marketing a mindset. Česká republika má neopakovatelnou příležitost konečně udávat tempo. Je však nutná akce. Pojďme naše odhodlání promítnout do toho, jak odvážní v používání AI budeme. Pojďme vsadit na tuhle kartu. Je to po dlouhé době a na dlouhou dobu poslední sázka na jistotu.
Mentální modely si můžete představit jako užitečné principy rozhodování a myšlení zabalené do praktických balíčků a konceptů, které pak můžeme využívat v životě. S nimi jsou nerozlučně spojená kognitivní zkreslení, chyby a tendence v našem myšlení, rozhodování a prožívání, které nás občas negativně ovlivňují.
Today, it's quite probable that the two most important words for marketers are "content strategy." Content strategy identifies which content will best achieve your business objectives while fulfilling your customers' needs. Developing a content strategy also helps answer questions that often get left until the eleventh hour: Who is going to create the content, and how? How can you ensure your communications are consistent across all channels? What role will user-generated content play in helping meet your marketing goals?
This presentation discusses:
* the practice of content strategy
* useful, actionable details your organization can take advantage of immediately
Effectiveness is at the heart of everything we do. David Ogilvy himself wrote a series of full-page ads in the New York Times in the 1960s with headlines such as "How To Create Advertising That Sells." His most famous book, Ogilvy on Advertising, is packed with guidance on the success factors of effective campaigns.
However, the marketing landscape has changed beyond recognition in the past fifty years. We are delighted to share our latest publication, The Ogilvy & Mather guide to effectiveness. In it, Worldwide Effectiveness Director, Tim Broadbent, deals with one of the most central questions in marketing: how to increase the effectiveness of our campaigns.
As marketing budgets come under increasing pressure in response to economic uncertainty in Europe and elsewhere, effectiveness is rising higher on clients' agendas. The message is timely.
Web content: it’s the meat in the sandwich, not the icing on the cake. So why does planning for useful, usable content get short shrift in the design and development process? Thinking about the content is always left until the last minute, always thought to be “somebody else’s problem.” Teams are forced into crisis mode at the 11th hour, trying to deal with content that arrives too late, doesn't fit in the designs, or fails to live up to user expectations. In this session, User Experience expert Karen McGrane will talk about why we fail to plan for content, and how everyone involved can help make the process run more smoothly.
This was the presentation I gave at the Ross Net Impact 2011 conference at the Ross School of Business at the University of Michigan on the topic of Design Thinking for Social Innovation.
Web content: it's the meat in the sandwich, not the icing on the cake. Too often, organizations fail to deliver content that meets user needs and serves their business goals. Even during website redesigns, the editorial process gets short shrift in favor of building new features and creating new designs. Thinking about the content is always left until the last minute, always thought to be "somebody else's problem."
These are session keynote Karen McGrane's slides from her portion of the presentation. Thanks for coming!
UX Designers play many roles on a project. They must conduct primary end-user research, then utilize the findings to Design intuitive information architecture and interaction design, within the constraints of technical platforms.
Stakeholder Persuasion - How to quantify your gut feelingUser Intelligence
Using User Research to Convince Stakeholders
Everyone who has worked with large corporate clients knows how hard it can be to align a group of stakeholders and get them all to agree. They’re often hardly engaged in the project itself, and they are hard to convince when it comes to design decisions. In the past, we’ve worked with a number of these types of clients, and we have found a few ways to get the stakeholders more engaged. Next to that, we have learned to speak their language (sort of), which helps tremendously when you need to convince them that your solution is actually better.
In this presentation Jacco and Martijn will tell you how they have used different forms of user research to address these issues and use examples from recent project to illustrate their way of working.
The Essentials of Great Search Design (ECIR 2010)Vegard Sandvold
Enterprise search is a wicked problem - a problem that can't be solved merely with clever algorithms, beautiful code and lots of data. It takes dialog and cross-diciplinary collaboration with stakeholders, users and techies to explore all the requirements for a possibly great enterprise search solution.
Similar to Why UX Design Needs Content Strategy (20)
Adaptive: Content, Context, and ControversyKaren McGrane
What’s the difference between responsive and adaptive? While responsive design embraces an ethos of “One Web,” adaptive solutions aim to serve different information based on what we know about the person or the device. When people say they want to go “beyond responsive,” they often mean they want to implement adaptive solutions. In this talk Karen unpacks what people really mean when they talk about adaptive designs or adaptive content. She outlines scenarios in which it makes sense to target information to the device or context—and when it doesn’t.
You don't get to decide which device people use to access your content: they do. By 2015, more people will access the internet via mobile devices than on traditional computers. In the US today, one-third of people who browse the internet on their mobile phone say that's the only way they go online—for teens and young adults, those numbers are even higher. It's time to stop avoiding the issue by saying "no one will ever want to do that on mobile; "chances are, someone already wants to. In this session, Karen will discuss why you need to deliver content wherever your customer wants to consume it — and what the risks when you don't make content accessible to mobile users. Already convinced it's important? She'll also explain how to get started with your mobile content strategy, defining what you want to publish, what the relationship should be between your mobile and desktop site, and how your editorial workflow and content management tools need to evolve.
Friends, a zombie apocalypse is upon us: an onslaught of new mobile devices, platforms, and screen sizes, hordes of them descending every day. We're outmatched. There aren't enough designers and developers to battle every platform. There aren't enough editors and writers to populate every screen size. Defeating the zombies will require flexibility and stamina—in our content. We'll have to separate our content from its form, so it can adapt appropriately to different contexts and constraints. We'll have to change our production workflow so we're not just shoveling content from one output to another. And we'll have to enhance our content management tools and interfaces so they're ready for the future. Surviving the zombie apocalypse is possible. In this talk Karen will explain how: by developing a content strategy for mobile.
Thriving in a world of change: Future-friendly content with DrupalKaren McGrane
There's always another redesign. There's always another new must-have front-end design effect. There's always another platform, a new screen resolution, the latest device. Underneath it all, there's content. What if we could get away from the cyclical churn, the constant reinvention? What if we could stop throwing the baby out with the bathwater? Instead of trying to get all new content every time there's a redesign (or worse, shoving crappy old content into stylish new clothes) it's time to plan for the future.
In this session, Karen will explain how Drupal is the future of adaptive content. She's not saying that like she's some kind of Drupal fangirl (though she is.) She's saying that as a long-time information architect, content strategist, and user experience designer, who sees content through the eyes of the people who create it and maintain it. She'll explain why—from her perspective—Drupal's content modeling tools and flexible UI make it a powerful tool in our fight against the future.
Uncle Sam Wants You (To Optimize Your Content For Mobile)Karen McGrane
President Obama recently directed all government agencies to optimize their content for mobile, saying "Americans deserve a government that works for them anytime, anywhere, and on any device." Government has a responsibility to make its content available to all Americans equally. What about your organization? If the government has mandated its agencies to develop a content strategy for mobile, isn't it time you did too?
In this session, Karen will discuss why it's important to think holistically about publishing your content in whatever channel or device your customer wants to consume it — and what the risks are in not making content accessible to mobile users. Already convinced it's important? She'll also explain how to get started with your mobile content strategy, defining what you want to publish, what the relationship should be between your mobile and desktop site, and how your editorial workflow and content management tools need to evolve.
Full transcript available here: https://karenmcgrane.com/talks/adapting-ourselves-to-adaptive-content/
For years, we've been telling designers: the web is not print. You can't have pixel-perfect layouts. You can't determine how your site will look in every browser, on every platform, on every device. We taught designers to cede control, think in systems, embrace web standards. So why are we still letting content authors plan for where their content will "live" on a web page? Why do we give in when they demand a WYSIWYG text editor that works "just like Microsoft Word"? Worst of all, why do we waste time and money creating and recreating content instead of planning for content reuse? What worked for the desktop web simply won't work for mobile. As our design and development processes evolve, our content workflow has to keep up. Karen will talk about how we have to adapt to creating more flexible content.
For years, we've been telling designers: the web is not print. You can't have pixel-perfect layouts. You can't determine how your site will look in every browser, on every platform, on every device. We taught designers to cede control, think in systems, embrace web standards. So why are we still letting content authors plan for where their content will "live" on a web page? Why do we give in when they demand a WYSIWYG text editor that works "just like Microsoft Word"? Worst of all, why do we waste time and money creating and recreating content instead of planning for content reuse? What worked for the desktop web simply won't work for mobile. As our design and development processes evolve, our content workflow has to keep up. Karen will talk about how we have to adapt to creating more flexible content.
For years, we've been telling designers: the web is not print. You can't have pixel-perfect layouts. You can't determine how your site will look in every browser, on every platform, on every device. We taught designers to cede control, think in systems, embrace web standards. So why are we still letting content authors plan for where their content will "live" on a web page? Why do we give in when they demand a WYSIWYG text editor that works "just like Microsoft Word"? Worst of all, why do we waste time and money creating and recreating content instead of planning for content reuse? What worked for the desktop web simply won't work for mobile. As our design and development processes evolve, our content workflow has to keep up. Karen will talk about how we have to adapt to creating more flexible content.
The Way Forward: What's next for content strategyKaren McGrane
Businesses that struggle to maintain their core website are now facing a dizzying array of new challenges. The hungry mouth of social media demands constant feeding. New mobile devices proliferate, and users expect apps tailored for each platform. Creaky and cumbersome content management technology struggles to keep up with the pace of publishing. And internal organisational structures, hiring practices, budgeting processes, and incentive systems don’t fit the realities of modern web teams.
In this talk, Karen outlines some of the biggest challenges organisations face in dealing with their content—today, and over the next five years. She explains what matters most for our field, and what we can do as practitioners to fix the content problem.
How do you convince people they need content strategy? Karen has been persuading organizations they need it since 1998. In this session, she'll discuss different approaches for talking about content strategy with people who have never heard of it and don't know why they should care. You'll leave with techniques you can use to evangelize the importance of content in your company or agency.
Web content: it’s the meat in the sandwich, not the icing on the cake. Too often, organizations fail to deliver content that meets user needs and serves their business goals. Even during website redesigns, the editorial process gets short shrift in favor of building new features and creating new designs. Thinking about the content is always left until the last minute, always thought to be somebody else’s problem.
Ever wonder why so many websites feature dense, unreadable prose? Force you to navigate through pages of brochure copy and legalese? Look like they backed up a truck full of PDFs and dumped them in the content management system?
No content strategy, that’s why.
When done the wrong way, creating new content and managing the approval process takes longer and is more painful than anyone expects. But planning for useful, usable content is possible-and necessary. It’s time to do it right.
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Tobias Schneck
As AI technology is pushing into IT I was wondering myself, as an “infrastructure container kubernetes guy”, how get this fancy AI technology get managed from an infrastructure operational view? Is it possible to apply our lovely cloud native principals as well? What benefit’s both technologies could bring to each other?
Let me take this questions and provide you a short journey through existing deployment models and use cases for AI software. On practical examples, we discuss what cloud/on-premise strategy we may need for applying it to our own infrastructure to get it to work from an enterprise perspective. I want to give an overview about infrastructure requirements and technologies, what could be beneficial or limiting your AI use cases in an enterprise environment. An interactive Demo will give you some insides, what approaches I got already working for real.
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Albert Hoitingh
In this session I delve into the encryption technology used in Microsoft 365 and Microsoft Purview. Including the concepts of Customer Key and Double Key Encryption.
Essentials of Automations: Optimizing FME Workflows with ParametersSafe Software
Are you looking to streamline your workflows and boost your projects’ efficiency? Do you find yourself searching for ways to add flexibility and control over your FME workflows? If so, you’re in the right place.
Join us for an insightful dive into the world of FME parameters, a critical element in optimizing workflow efficiency. This webinar marks the beginning of our three-part “Essentials of Automation” series. This first webinar is designed to equip you with the knowledge and skills to utilize parameters effectively: enhancing the flexibility, maintainability, and user control of your FME projects.
Here’s what you’ll gain:
- Essentials of FME Parameters: Understand the pivotal role of parameters, including Reader/Writer, Transformer, User, and FME Flow categories. Discover how they are the key to unlocking automation and optimization within your workflows.
- Practical Applications in FME Form: Delve into key user parameter types including choice, connections, and file URLs. Allow users to control how a workflow runs, making your workflows more reusable. Learn to import values and deliver the best user experience for your workflows while enhancing accuracy.
- Optimization Strategies in FME Flow: Explore the creation and strategic deployment of parameters in FME Flow, including the use of deployment and geometry parameters, to maximize workflow efficiency.
- Pro Tips for Success: Gain insights on parameterizing connections and leveraging new features like Conditional Visibility for clarity and simplicity.
We’ll wrap up with a glimpse into future webinars, followed by a Q&A session to address your specific questions surrounding this topic.
Don’t miss this opportunity to elevate your FME expertise and drive your projects to new heights of efficiency.
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf91mobiles
91mobiles recently conducted a Smart TV Buyer Insights Survey in which we asked over 3,000 respondents about the TV they own, aspects they look at on a new TV, and their TV buying preferences.
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...DanBrown980551
Do you want to learn how to model and simulate an electrical network from scratch in under an hour?
Then welcome to this PowSyBl workshop, hosted by Rte, the French Transmission System Operator (TSO)!
During the webinar, you will discover the PowSyBl ecosystem as well as handle and study an electrical network through an interactive Python notebook.
PowSyBl is an open source project hosted by LF Energy, which offers a comprehensive set of features for electrical grid modelling and simulation. Among other advanced features, PowSyBl provides:
- A fully editable and extendable library for grid component modelling;
- Visualization tools to display your network;
- Grid simulation tools, such as power flows, security analyses (with or without remedial actions) and sensitivity analyses;
The framework is mostly written in Java, with a Python binding so that Python developers can access PowSyBl functionalities as well.
What you will learn during the webinar:
- For beginners: discover PowSyBl's functionalities through a quick general presentation and the notebook, without needing any expert coding skills;
- For advanced developers: master the skills to efficiently apply PowSyBl functionalities to your real-world scenarios.
UiPath Test Automation using UiPath Test Suite series, part 4DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 4. In this session, we will cover Test Manager overview along with SAP heatmap.
The UiPath Test Manager overview with SAP heatmap webinar offers a concise yet comprehensive exploration of the role of a Test Manager within SAP environments, coupled with the utilization of heatmaps for effective testing strategies.
Participants will gain insights into the responsibilities, challenges, and best practices associated with test management in SAP projects. Additionally, the webinar delves into the significance of heatmaps as a visual aid for identifying testing priorities, areas of risk, and resource allocation within SAP landscapes. Through this session, attendees can expect to enhance their understanding of test management principles while learning practical approaches to optimize testing processes in SAP environments using heatmap visualization techniques
What will you get from this session?
1. Insights into SAP testing best practices
2. Heatmap utilization for testing
3. Optimization of testing processes
4. Demo
Topics covered:
Execution from the test manager
Orchestrator execution result
Defect reporting
SAP heatmap example with demo
Speaker:
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP
JMeter webinar - integration with InfluxDB and GrafanaRTTS
Watch this recorded webinar about real-time monitoring of application performance. See how to integrate Apache JMeter, the open-source leader in performance testing, with InfluxDB, the open-source time-series database, and Grafana, the open-source analytics and visualization application.
In this webinar, we will review the benefits of leveraging InfluxDB and Grafana when executing load tests and demonstrate how these tools are used to visualize performance metrics.
Length: 30 minutes
Session Overview
-------------------------------------------
During this webinar, we will cover the following topics while demonstrating the integrations of JMeter, InfluxDB and Grafana:
- What out-of-the-box solutions are available for real-time monitoring JMeter tests?
- What are the benefits of integrating InfluxDB and Grafana into the load testing stack?
- Which features are provided by Grafana?
- Demonstration of InfluxDB and Grafana using a practice web application
To view the webinar recording, go to:
https://www.rttsweb.com/jmeter-integration-webinar
Connector Corner: Automate dynamic content and events by pushing a buttonDianaGray10
Here is something new! In our next Connector Corner webinar, we will demonstrate how you can use a single workflow to:
Create a campaign using Mailchimp with merge tags/fields
Send an interactive Slack channel message (using buttons)
Have the message received by managers and peers along with a test email for review
But there’s more:
In a second workflow supporting the same use case, you’ll see:
Your campaign sent to target colleagues for approval
If the “Approve” button is clicked, a Jira/Zendesk ticket is created for the marketing design team
But—if the “Reject” button is pushed, colleagues will be alerted via Slack message
Join us to learn more about this new, human-in-the-loop capability, brought to you by Integration Service connectors.
And...
Speakers:
Akshay Agnihotri, Product Manager
Charlie Greenberg, Host
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualityInflectra
In this insightful webinar, Inflectra explores how artificial intelligence (AI) is transforming software development and testing. Discover how AI-powered tools are revolutionizing every stage of the software development lifecycle (SDLC), from design and prototyping to testing, deployment, and monitoring.
Learn about:
• The Future of Testing: How AI is shifting testing towards verification, analysis, and higher-level skills, while reducing repetitive tasks.
• Test Automation: How AI-powered test case generation, optimization, and self-healing tests are making testing more efficient and effective.
• Visual Testing: Explore the emerging capabilities of AI in visual testing and how it's set to revolutionize UI verification.
• Inflectra's AI Solutions: See demonstrations of Inflectra's cutting-edge AI tools like the ChatGPT plugin and Azure Open AI platform, designed to streamline your testing process.
Whether you're a developer, tester, or QA professional, this webinar will give you valuable insights into how AI is shaping the future of software delivery.
Epistemic Interaction - tuning interfaces to provide information for AI supportAlan Dix
Paper presented at SYNERGY workshop at AVI 2024, Genoa, Italy. 3rd June 2024
https://alandix.com/academic/papers/synergy2024-epistemic/
As machine learning integrates deeper into human-computer interactions, the concept of epistemic interaction emerges, aiming to refine these interactions to enhance system adaptability. This approach encourages minor, intentional adjustments in user behaviour to enrich the data available for system learning. This paper introduces epistemic interaction within the context of human-system communication, illustrating how deliberate interaction design can improve system understanding and adaptation. Through concrete examples, we demonstrate the potential of epistemic interaction to significantly advance human-computer interaction by leveraging intuitive human communication strategies to inform system design and functionality, offering a novel pathway for enriching user-system engagements.
GraphRAG is All You need? LLM & Knowledge GraphGuy Korland
Guy Korland, CEO and Co-founder of FalkorDB, will review two articles on the integration of language models with knowledge graphs.
1. Unifying Large Language Models and Knowledge Graphs: A Roadmap.
https://arxiv.org/abs/2306.08302
2. Microsoft Research's GraphRAG paper and a review paper on various uses of knowledge graphs:
https://www.microsoft.com/en-us/research/blog/graphrag-unlocking-llm-discovery-on-narrative-private-data/
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...James Anderson
Effective Application Security in Software Delivery lifecycle using Deployment Firewall and DBOM
The modern software delivery process (or the CI/CD process) includes many tools, distributed teams, open-source code, and cloud platforms. Constant focus on speed to release software to market, along with the traditional slow and manual security checks has caused gaps in continuous security as an important piece in the software supply chain. Today organizations feel more susceptible to external and internal cyber threats due to the vast attack surface in their applications supply chain and the lack of end-to-end governance and risk management.
The software team must secure its software delivery process to avoid vulnerability and security breaches. This needs to be achieved with existing tool chains and without extensive rework of the delivery processes. This talk will present strategies and techniques for providing visibility into the true risk of the existing vulnerabilities, preventing the introduction of security issues in the software, resolving vulnerabilities in production environments quickly, and capturing the deployment bill of materials (DBOM).
Speakers:
Bob Boule
Robert Boule is a technology enthusiast with PASSION for technology and making things work along with a knack for helping others understand how things work. He comes with around 20 years of solution engineering experience in application security, software continuous delivery, and SaaS platforms. He is known for his dynamic presentations in CI/CD and application security integrated in software delivery lifecycle.
Gopinath Rebala
Gopinath Rebala is the CTO of OpsMx, where he has overall responsibility for the machine learning and data processing architectures for Secure Software Delivery. Gopi also has a strong connection with our customers, leading design and architecture for strategic implementations. Gopi is a frequent speaker and well-known leader in continuous delivery and integrating security into software delivery.
The Art of the Pitch: WordPress Relationships and SalesLaura Byrne
Clients don’t know what they don’t know. What web solutions are right for them? How does WordPress come into the picture? How do you make sure you understand scope and timeline? What do you do if sometime changes?
All these questions and more will be explored as we talk about matching clients’ needs with what your agency offers without pulling teeth or pulling your hair out. Practical tips, and strategies for successful relationship building that leads to closing the deal.
12. Current Site Audit
Stakeholder & Competitive &
User Interviews Market Research
Vision
Insight
Design
Development
QA
Requirements IA Design Creative
Design
Usability Testing Post Launch
Paper Prototype & Creative Comps Analytics Report
Test, Measure, and Optimize
13. User Experience Design Process: Critical Path
Kickoff
Project Initiation Initial Design Cyc l e Design Iteration / Testing / Itera
Meeting
Project is
Product Marketing
Prod. Marketing does P&L, content evaluation, Product Team meets -
inititated by Product creates materials that describe needs, goals,
Marketing with Prod. Mktg. feeds team Design presents functional
objectives, dependencies, partnerships, user flow, potential user
Program business issues and any other relev a n t any results from Marke t
Management scenarios and high level
content or functionality issues, pulls together Resear c h
screens need e d
cross-functional tea m Approval cycle h e r e
Feasability Studies / Field
Resear c h Expert advice on
Usability
What do Users w a n t previous research a n d feedback cyc l e
How do they want to do it Meeting new research need e d
(Usability Conceptual Phase) (Usability 2nd Phase)
coordinated by
Program
feedback cy
Management
UE Team member
Create D e s i g n
assigned to
Spec/Creative Rapid prototype for
Experience Design
project
Brie f proof of concept
attends meeting UE Team
Material is from and early testing w /
brainstorm with
Initial concept MRP/PRD and Early functionality usability
brainstorms wit h Takes input from Usability - led by
brainstorming notes designs and
all members as project team
Product Marketing to and other definitions of Could be paper
UE Team member assigned related to UI member
collect and gather requirements, distills pages needed for prototype, functional
to project design
requirements and info, looks at developed static HTML, Flash
what's the best
understand competitive functionality interaction,
Receives Requirements scenario fo r
competitive landscape landscape, rev i e w s Mockups/
Document use r s
scope in context of Wireframes as
Needs:
network and sit e image maps
List of team
precedenc e
members,
contact info, initial
schedule,
approval process
Initial exposure to
(people)
scope of design and
functionality
HTML
Assess techn i c a l
limitations and
alternatives
Engineering
Engineering might
begin coding
work from initial
functionality
spe c s
Credits: Erin Malone: Designed for AltaVista November 10, 2000
9
14. Refinement / Copy / Final Visual Design / Robust Testing Production Build / Reviews / Design Team Sign Offs
Product Team meets - Product Team meets -
Design meeting with Hand off to
Product Marketing, Product Team production,
Engineering, and Approval cycle here engineering and
Usability to review operations mode of
recommendations the product cycle
Detailed Product
testing - both for
functionality and
specific content and
visual design iteration cycle
iteration cycle
Design works w i t h
gn team Usability to provide Design team Final functionality &
storms, iterates prototype and presents visual design signoff
collaborates on guidance of what Refine Visual wireframes a n d User Ed. delivers all - Production
l representation Visual Design Experience priorities of direction, copy, mockups to Help text and - Engineering
nctionality and exploration, Design team discovery shoul d user instructions, production with full associate d - QA
en design s copy writte n review Visual be - i.e. business help and UI set of style specs screenshots a n d - Partner (if applicable)
can begin while and finetuned direction constraints, components as [font size & color, specs t o - Usability
flow a n d technical necessary line spacing, Production - Creative Director
ionality is constraints, colors, images, - Product Marketing
ing optional versions to links, etc] - VP (as necessary)
test
Production receives Production builds
approved mockups site and features
and works w i t h working wi t h
Design on product Engineering as
area as needed applicable
Engineering informs
Design if there are
changes, issues w i t h
planned functionality
9
15. An Example LEGEND MILESTONE
DELIVERABLE IDEA REVIEW CHECKPOINT
Product / Software / Web Design Process Guide KEY MEETING INFORM
PHASES concept discover definition refinement developmen
conceptual
MILESTONES start concept
approval
proposal approval and scheduling design
review
PRD
approval
UI design
approval
committed
schedule
Communicate business needs Communicate business needs Brand Positioning Review Promotional & Marketing Needs Business developm
& brand identity & brand identity
{
Mockups to marke
Note: In some companies these roles are
business
owners
encompassed by one person
Collect team input Product Roadmap Promotion plan
Describe problem or needs, Develop strategic rationale, business case,
proposed solution, and benefits. financial analysis, policy considerations,
implementation plans. Research: Solicit input from Business owners/ Point release plan
product Gather information for and
brands - contact other associated stakeholders
(legal, customer support, international)
manager create the Concept Document Gather supporting market research, etc.
Write Draft PRD and Review
Gather information for and create the Deliverables:
ROLES
Proposal Document
Project kickoff Product
Requirements
Document
Review user feedback on previous product Refine design concepts
(PRD) Wireframes and navigation maps
UI's and analyze competitive products. (authored by a
{
ui/id/ia Develop navigation model and Product Manager) Product prototype, e.g. paper, HTML, director, or flash
refine scenarios
design Provide input for level of effort
UI Design Approval
or two people. i.e. ui may do user research or visual designers may do ia, etc.
and
Idea Deliverable: Deliverable: Deliverable:
Define personas, usage scenarios, user Proposal Templates
Concept goals, and perform task analysis I T E R AT I O N S I T E R AT I O
Document Document Concept Design Review
&
Develop usage scenarios this step Navigation
and/or design concepts Concept
and / or may be (authored by
Note: In some companies these roles are blended into one
optional Design UI / ID / IA Design)
Provide input for level of effort Visual design explorations Refined Visual design explorations Art direction
Materials
Leads brainstorming Concept
(authored by
visual Prototype
blended design
design team)
Provide input for level of effort UCD research cont'd. (i.e. paper prototyping, Competitive usability testing Prototype usability test Prototype testing
participatory design, field studies, surveys,
etc.
Define personas, usage scenarios, user
user goals, and perform task analysis.
research
production Provide input for level of effort
credits Design based on earlier maps created by various UI design teams at America Online Incorporated. Revised and edited by Erin Malone, September 2003 for the AIfIA.
10
16. DELIVERABLE IDEA REVIEW CHECKPOINT
MILESTONE
KEY MEETING INFORM
inement development launch preparation post launch
RD UI design committed visual design beta launch
pproval approval schedule approval
Review Promotional & Marketing Needs Business development / partnering
Mockups to marketing
Product Roadmap Promotion plan
Point release plan
L
Evangelize
A Post mortem
U
Wireframes and navigation maps
Final product
Product prototype, e.g. paper, HTML, director, or flash Begin writing functional spec specification Design fidelity checks and bug fixes UI maintenance
& handoff to
UI Design Approval UI Revisions based on testing build team
N
Deliverable:
I T E R AT I O N S
Templates I T E R AT I O N S
&
Navigation
C
(authored by
UI / ID / IA Design)
Refined Visual design explorations Art direction Visual Design Approval Handoff to build team Visual maintenance
H
Competitive usability testing Prototype usability test Prototype testing Write/update test plans for final usability
Usability test release product
capture issues for next release
Focus Group, Field Studies,
Survey Analysis, etc.
Execute visual design Build/publish
Build HTML QA
10
17. PHASE 1 PHASE 2
Design Analysis Design Solutions
TSDesign User Experience Audit SM
Product Strategy and Product Design Strategy Blueprint* Technology Audit
description:
• an expert design analysis from the user’s perspective
description:
• define ‘what the product should be’ and ‘how it
1 understand 2 investigate 3 define users 4 qualify features
should work’
benefits: corporate mission persona user profiles user, feature, objective matrix
• benchmarks the effectiveness of your site based upon stated benefits: core competencies
• the achievement of clearly articulated, agreed- user profiles
business objectives for the site and your users corporate goals
• analyzes the design of the site to find out if the benefits of use
upon and aligned mission, core competencies,
culture and values User Personae &
corporate goals, and objectives for the site
are actually being delivered
Profiling Module speculate &
+ interviews
SM
skills and methodologies
• the articulation and understanding of your users,
• recommends methods for substantially improving your users
experiences and meeting future business objectives
their needs and and your business objectives for
knowledge capital and experience (UP&P) innovate
people, processes & technology
establishing and extending relationships
with each one stakeholders and initiatives
Intentional User Experience table •
TSDesign Analysis FrameworkSM
• the definition of the organizational resources enterprise-wide challenges competitive and comparative analysis experience brief:
1 Delivery of User Benefits The intended value the organization
required to build and maintain the site Internet objectives strategy story
and positioning
delivers to users and customers through its site.
• the creation of a detailed blueprint for design or customers and users
redesign:
The sequence of questions, prompts, and results - site organization (footprint) competitive landscape
2 Transaction Flow that make up a task. - useful and usable features and functions
for the users * workbooks not shown
The degree to which a site affords the user to easily - descriptions of intended functionality scope or
3 Navigation & Hierarchy navigate the environment and efficiently locate rele-
- messaging strategy rescope
relationship
5 7
vant content.
The representation and support of the identity,
• the receipt of a phased implementation plan with
associated costs innovate 6 refine describe
4 Visual Language brand and information architecture through
visual elements and overall style.
new ideas new footprint and reclustered content Product Strategy Blueprint/Functional Description
existing
Audit comments: and new
• Users arriving at the front page of the
site may not understand what information
is there for them.
technology
• The names of the sections do not give
users a path to follow to find the informa-
tion they need.
• No specific path has been established for
each user type. Users must use their best
judgement to find the information they’re
looking for and often may not be successful.
Identity and Visual Language Audit Visual Identity Systems visual language research
description: description:
• By collecting and reviewing print, other tangible artifacts and • establish, with the client, a shared
Web sites your company creates and disseminates, and understanding and common language for
corporate standards (if they exist) we can then distill the basis visual design and how it effectively
for the visual language to be developed that is consistent with communicates the brand
the company's identity and product brands. This work is • define a visual language for the site
continued in the Visual Systems Design phase. - logo, logotype systems
- typography
- grid system
- color palette
- imagery style and usage
benefits:
• provides the visual language components
with which to build the interface
11
18. ation
ng Interaction Design Information Architecture Interface Design Production
description: description: description: description:
echnology to • create seamless and consistent transaction flow • define site hierarchy • using the components, defined in the Visual Systems • create sample HTML files to illustrate page layout
ith client's • define widgets and technologies to best support • define navigation scheme Design Phase, create design styles for each page-type and design styles
the features and functionality • define hierarchy of information on pages needed to support interaction, navigation and hierarchy • deliver and present documentation
s • identifies content workflow and organizational • apply these design styles to page schematics • Interface QA / training
ical teams responsibilities and resources
usability testing usability testing
process overviews site maps schematic drawing digital sketches HTML interface files online styleguide
innovate
page schematics & content development
Discount Usability
scription:
testing to discover usability problems to provide
information to team to help detect and resolve
transaction flow and navigation and techinal
problems
11
32. IMAGINE DEBRIEF
ENVISION LAUNCH
DEFINE DESIGN DEVELOP DEPLOY
Dubberly Design Office, How Do You Design? 21
33. ENGAGE IMAGINE DEBRIEF
DISCOVER ENVISION LAUNCH
DEFINE DESIGN DEVELOP DEPLOY
Dubberly Design Office, How Do You Design? 21
34. ENGAGE IMAGINE DEBRIEF ENHANCE
DISCOVER ENVISION LAUNCH MAINTAIN
DEFINE DESIGN DEVELOP DEPLOY
Dubberly Design Office, How Do You Design? 21
35. ENGAGE IMAGINE DEBRIEF ENHANCE
DISCOVER ENVISION LAUNCH MAINTAIN
DEFINE DESIGN DEVELOP DEPLOY
ANALYZE
PLAN
Dubberly Design Office, How Do You Design? 21
36. ENGAGE IMAGINE DEBRIEF ENHANCE
DISCOVER ENVISION LAUNCH MAINTAIN
DEFINE DESIGN DEVELOP DEPLOY
ANALYZE EVALUATE
PLAN TEST
Dubberly Design Office, How Do You Design? 21
37. ENGAGE IMAGINE DEBRIEF ENHANCE
DISCOVER ENVISION LAUNCH MAINTAIN
DEFINE DESIGN DEVELOP DEPLOY
INCEPTION ELABORATION CONSTRUCTION TRANSITION
ANALYZE EVALUATE
PLAN TEST
Dubberly Design Office, How Do You Design? 21
38. CONTENT?
ENGAGE IMAGINE DEBRIEF ENHANCE
DISCOVER ENVISION LAUNCH MAINTAIN
DEFINE DESIGN DEVELOP DEPLOY
INCEPTION ELABORATION CONSTRUCTION TRANSITION
ANALYZE EVALUATE
PLAN TEST
Dubberly Design Office, How Do You Design? 21
39. CONTENT!
ENGAGE IMAGINE DEBRIEF ENHANCE
DISCOVER ENVISION LAUNCH MAINTAIN
DEFINE DESIGN DEVELOP DEPLOY
INCEPTION ELABORATION CONSTRUCTION TRANSITION
ANALYZE EVALUATE
PLAN TEST
Dubberly Design Office, How Do You Design? 21
41. • What are my business objectives?
• What do my users want to do?
• What does my brand stand for?
STRATEGY
22
42. • What are my business objectives?
• What do my users want to do?
• What does my brand stand for?
DE
SIG
N
STRATEGY
• How will users interact with it?
• How will it be structured?
• What will it look like?
22
43. • What are my business objectives?
• What do my users want to do?
• What does my brand stand for?
DE
SIG
N
STRATEGY
• How will users interact with it?
• How will it be structured?
• What will it look like?
TECHNOLOGY
• How will we build it?
• Who will maintain it?
22
44. • What are my business objectives?
• What do my users want to do?
• What does my brand stand for?
DE E NT
SIG
N O NT
C
STRATEGY
• How will users interact with it? • What do we want to say?
• How will it be structured? • Where will we get the content?
• What will it look like? • Who will maintain it?
TECHNOLOGY
• How will we build it?
• Who will maintain it?
22
55. DEFINE DESIGN DEVELOP DEPLOY
PLAN
PROJECT ACTIVITIES CONTENT STRATEGY ACTIVITIES
_Business Strategy
_Brand Strategy
_Personas + Scenarios Content strategy
_Competitive Analysis can contribute to all
of these activities.
_Web Analytics
_Technical Assessment
_Creative/UX Brief
27
56. BUSINESS STRATEGY
_ Content strategy isn’t
What business about creating content
are we in?
“just because you can.”
_ It’s about aligning a
publishing model with
ENGAGEMENT COMPETENCY business goals.
_ Understanding how
content aligns with
business goals is the
“strategy” part of
Who are our ALIGNMENT How do we content strategy.
constituents? create value?
Marigo Raftopoulous,
Business Strategy Fundamentals 28
57. BRAND STRATEGY
Content strategy ensures
POSITIONING
that brand strategy carries
through to:
VISION
_Messaging
MISSION
_Tone of voice
_Content creation
_Content style guide
29
58. PERSONAS +
SCENARIOS
_ Personas document the
user’s information needs.
_ Content strategy goes
“the last mile” to make
sure we actually deliver
that information.
Steve Mulder and Ziv Yaar,
The User is Always Right 30
59. PERSONAS +
SCENARIOS
_ Personas document the
user’s information needs.
_ Content strategy goes
Learn more about the “the last mile” to make
home-buying process, sure we actually deliver
including jargon, that information.
realtors, mortgages,
insurance, and how to
evaluate houses.
Steve Mulder and Ziv Yaar,
The User is Always Right 30
60. COMPETITIVE
ANALYSIS
Competitive audits tend to
answer the following:
_What features do our
competitors offer?
_How are their sites
architected and designed?
Content strategy can
answer:
_What messages do they
communicate?
_How good is the content?
31
61. WEB ANALYTICS
Use analytics data to
inform:
_Content inventories
_Content audits
Search engine data is quite
useful in developing:
_Naming/Labeling systems
_SEO-friendly content
32
62. TECH ASSESSMENT
_ CMS evaluations in
particular tend to focus
on features and technical
architecture.
_ Content strategy looks at
the CMS like a user,
evaluating interfaces and
task flow.
cmsmatrix.org 33
63. CREATIVE/UX BRIEF
The brief summarizes the
project inputs and defines
the “vision” for the site.
Be sure content is
reflected:
_How content helps meet
business goals and user
needs
_How tone of voice and
messaging supports brand
strategy
_Who will own and
maintain content
BBH
via The Planning Lab 34
64. EXERCISE 1A:
USER NEEDS
_ Review the sample user persona and scenario on Page 3 of your
handout.
_ Write down a list of user needs on the worksheet on Page 2.
_ What does this user need or expect to find when he does his research?
35
65. EXERCISE 1B:
BUSINESS GOALS
_ Review the sample case study on Page 5 of your handout.
_ Write down a list of business goals on the worksheet on Page 4.
_ What does this company expect to achieve by putting information on
the web?
36
66. OUR TIME TOGETHER
MODULE 1: PLANNING 9:30–10:30
Exercise 1: User Needs and Business Goals
Break 10:30–11:00
MODULE 2: ANALYSIS 11:00–12:30
Exercise 2: Content Inventory and Audit
Lunch 12:30–2:00
MODULE 3: CREATION 2:00–3:30
Exercise 3: Messaging and Content Annotations
Break 3:30–4:00
MODULE 4: RESEARCH + TESTING 4:00–5:30
Exercise 4: User Interviews
37
68. DEFINE DESIGN DEVELOP DEPLOY
PLAN ANALYZE
PROJECT ACTIVITIES CONTENT STRATEGY ACTIVITIES
_Requirements _Content inventory
_Page inventory _Content audit
_Sitemap _Gap analysis
_Data model _Sourcing plan
39
69. CONTENT COMES
FIRST!
_ Content inventory
informs the page
inventory and sitemap
_ Content gap analysis and
sourcing plan are
analogous to the
functional requirements
40
70. GIANT
SPREADSHEET FTW!
Separate activities,
evolving document:
_Content inventory:
Quantitative list of all the
content on the site
_Content audit: Subjective
assessment of quality
_Gap analysis: What’s
missing that you need?
_Sourcing plan: Who, how
and where you’re going to
get new content
41
71. CONTENT INVENTORY
WHAT CONTENT DO YOU HAVE?
Look at (all) the pages of the site
Make choices about what content to evaluate:
_How deep do you need to go?
_How do you ensure you see examples of all the different content types?
_What are common pathways that users are likely to take?
_Can you find content that has been lost or hidden?
Assume this will be a living document you use throughout your process
72. EXERCISE 2A:
CONTENT INVENTORY
_ Go to http://www.cisco.com/
_ Inventory the content related to business collaboration and
videoconferencing
_ Make choices about what to evaluate and how to document it
_ A sample spreadsheet has been provided to get you started
43
73. EXERCISE 2A:
WRAP-UP
Why do a content inventory? When is it useful?
_To understand the story the site is trying to tell
_To get a sense of the range of pages that need to be designed
_To determine the range of content types the site will support
_To decide what content to eliminate or migrate
When is a content inventory unnecessary? Why not do this?
_You can learn 80% of what you need to know by sampling representative
content
_When the site is too large for a full inventory
_Consider automated tools to index the site
44
74. AUTOMATED INVENTORIES
Use tools to gather information Benefits of Automated Tools
_Power Mapper _When you just need a page count
_SiteOrbiter (for Macs) _Helps find “lost” pages
_HTTrack (For PCs) _Useful when scanning thousands
of similar pages (products, articles)
Get help from the CMS team
_Output data or metadata from the Limitations of Automated Tools
CMS _May only index to a certain depth
_Results may not be organized in a
meaningful way
_You don’t get firsthand insights
about the content
45
75. CONTENT QUALITY
HOW GOOD IS THE CONTENT?
Ask yourself:
_Do you have all the content that needs to be there?
_Is the content up-to-date? Are the examples presented fresh?
_Is it communicating clearly?
_Is the content relevant to its intended audience?
_Is the tone and style appropriate for your goals and reader? Is it
appropriate for your brand?
_Is it meeting your business needs?
There is no overall definition of content quality—only quality within your
business and user context.
46
76. EXERCISE 2B:
CONTENT AUDIT
_ Working off the inventory you just completed, assess the quality of this
content
_ Make decisions about how to assess “quality.” What evaluation criteria
will you use?
_ How will you document your findings? What columns would you add to
your spreadsheet?
_ How will you persuade your stakeholders that your findings are valid?
47
77. EXERCISE 2B:
WRAP-UP
Why do this?
_To determine what content needs to be eliminated or updated
_To evaluate if content is meeting business and user needs
_To establish an editorial calendar and messaging strategy
_To create a sustainable content strategy that can be supported by your
staff
_To set guidelines for tone and style
48
78. OUR TIME TOGETHER
MODULE 1: PLANNING 9:30–10:30
Exercise 1: User Needs and Business Goals
Break 10:30–11:00
MODULE 2: ANALYSIS 11:00–12:30
Exercise 2: Content Inventory and Audit
Lunch 12:30–2:00
MODULE 3: CREATION 2:00–3:30
Exercise 3: Messaging and Content Annotations
Break 3:30–4:00
MODULE 4: RESEARCH + TESTING 4:00–5:30
Exercise 4: User Interviews
49
81. SCHEMATICS +
WIREFRAMES
728x90
Leaderboard Content strategy partners
Home About Us Contact Us Newsletter Change the World
WOW Header
(includes time and temp and women)
find something... Search
with information
men • art • money • fashion • sex • careers • politics • beauty • friends • gossip • age • travel • business • health • love architecture to answer:
Conversation | Today 9:39 am
Welcome back, Mamacita!
Growing Up, I Was Bored
'Quite Often' ... Today,
Nobody Is Bored
Let’s talk about the way kids grow up
Edit your profile
Update your picture
Read your horoscope
_Where will we get all the
today versus the way we grew up.
with Lesley Stahl, Liz Smith and Mary
Wells and 37 readers
Check your weather
ADVERTISEMENT
content to fill each region
Question | Today 8:00 am
What lasting effect did the
murder of Dr. Martin Luther
Fiction | Thursday April 3
She Lied About Her Age of the page?
King, Jr. have on this country? Posts | Thursday April 3
_Who will provide and
Gypsy’s Personal Guide 336x280
Large Rectangle
to Doctors, Drivers,
Taxis, Shippers and
Helicopters in the Med
with Lesley Stahl, Liz Smith and Mary
Wells and 37 readers
Question | Weekday Month ##
"South Pacific" returns to
Broadway — what musical
comedy from your or your
maintain that content?
parent's youth still
_How will “related” items
resonates with you today?
Poll | Friday April 4
Do You Earn More than Your Conversation | Weekday Month ##
A Secret to Success:
Mate? 'Make Every Boss's
Yes
No
What Mate?
Problem Your Problem'
Posts | Weekday Month ##
Come Walk With Me:
be associated?
Remembering Dr.
_What happens if we have
See 107 votes and
Vote 37 comments Martin Luther King, Jr. 300x600
Half Page
more or less content for a
Mother Earth Care-
toons
What the Hell
Happened to Lara
wOw on FOX
Business Network
How to Become A
Millionaire ... If You
Meg Whitman on
What's Next After
given section?
Flynn Boyle? Aren't Born Rich eBay
Talk To Us
52
Editor's Notes
To determine what web initiatives would create the biggest impact, we completed an assessment project with three components:
A Market Overview to determine competitor best practices and industry benchmarks
Analytics of current site usage
Usability Audit of the site with philosophy's target demographic performing tasks on the site
During the design phase we continued with usability research, testing and optimizing the design.
Finally we followed up with a post launch analysis to see how we did and provide further recommendations.
Any content that doesn’t meet these needs is just getting in the way.
Avoid wasting money on designing, creating and maintaining unnecessary content.
Any content that doesn’t meet these needs is just getting in the way.
Avoid wasting money on designing, creating and maintaining unnecessary content.
Any content that doesn’t meet these needs is just getting in the way.
Avoid wasting money on designing, creating and maintaining unnecessary content.
Any content that doesn’t meet these needs is just getting in the way.
Avoid wasting money on designing, creating and maintaining unnecessary content.
Any content that doesn’t meet these needs is just getting in the way.
Avoid wasting money on designing, creating and maintaining unnecessary content.
Any content that doesn’t meet these needs is just getting in the way.
Avoid wasting money on designing, creating and maintaining unnecessary content.
Any content that doesn’t meet these needs is just getting in the way.
Avoid wasting money on designing, creating and maintaining unnecessary content.
Any content that doesn’t meet these needs is just getting in the way.
Avoid wasting money on designing, creating and maintaining unnecessary content.