WELDING
S.J.S.Manikanta
Reg no: 160080008
1st semester, 3rd year, Petroleum Engineering
KL(Deemed to be University)
Green Fields, Vaddeswaram, Guntur,
Andhra Pradesh, India Pin code - 522502
E-mail: kanta313795@gmail.com
10/2/2018 1
• Introduction
• Welding method
• Steps involved in pipe line welding.
10/2/2018 2
Introduction
• Welding is the pivotal operation in the
construction of a pipeline.
• The technique of welding pipes to form an
integral conduit for oil and gas transmission.
• The time taken for completion of the pipeline
directly depends on the speed at which the
welding crew works.
10/2/2018 3
Welding method
• The methods of the pipe depends on the
direction of welding in the vertical plane
established by the pipe ends.
• The two methods are i) Vertical up or uphill
ii) Vertical down or down hill
10/2/2018 4
i) Uphill method
• This weld is made with the arc progressing
from bottom towards top. Welder makes
settings of voltage and current on the welding
machine so that he can able to increase &
decrease the current rapidly.
• There by increasing the welding current &
deposition rate to achieve good penetration.
10/2/2018 5
10/2/2018 6
ii) Downhill method
• Welding is vertically down. Welder has to
maintain the proper angle between the
electrode and the metal.
• It utilize higher welding current and faster
welding speeds is advantageous for pipes with
thickness of ½ inch.
• Majority of the pipelines have thickness of less
than ½ inch , so downhill technique is
commonly used.
10/2/2018 7
10/2/2018 8
Steps involved in pipeline welding :
Root or Stringer bead : Once the alignment
has been completed , the joint is ready for initial
weld.
• The initial weld is known as root or stringer
bead. It is the most important bead of the pipe
weld.
• Two welders work on opposite sides of the
pipe , each is responsible for welding portion.
10/2/2018 9
• The pressure on the internal clamp is to
maintain untill root bead to completed. The
clamp is then carefully released & withdraw.
• In case of external clamp being used, the
clamp can be removed after the root bead is
50% completed.
• For pipe diameter 8” or less, one welder may
be used.
10/2/2018 10
Hot Pass ( higher weld currents ) :
The hot pass bead follows the root bead.
Normally a second crew follows behind the
root bead crew.
• The hot pass weld before the stringer weld
has cooled & it prevent the cracking of
stringer bead .
• The stringer bead is cleaned thoroughly before
the hot pass is applied.
10/2/2018 11
Filler and cap beads :
Proper cleaning of slag, scale and dirt after
application of each bead is essential for
obtaining high quality weld.
• Following completion of stringer and hot pass
beads, another welding crew takes over.
• They build on the another material already in
place. These additional beads are known as
‘Filler beads’.
10/2/2018 12
10/2/2018 13
Semi automatic welding :
• It uses bare wire electrode shielded by an
inert gas, usually carbondioxide.
• The arc heats the pipe and melts the electrode
which provides filler metal for joint.
• Apparatus consist of spool of coiled wire, a
pair of driving rolls, control switch & gas
supply.
• It is favoured for heavy-walled metals.
10/2/2018 14
THANK YOU
10/2/2018 15

Welding ppt

  • 1.
    WELDING S.J.S.Manikanta Reg no: 160080008 1stsemester, 3rd year, Petroleum Engineering KL(Deemed to be University) Green Fields, Vaddeswaram, Guntur, Andhra Pradesh, India Pin code - 522502 E-mail: kanta313795@gmail.com 10/2/2018 1
  • 2.
    • Introduction • Weldingmethod • Steps involved in pipe line welding. 10/2/2018 2
  • 3.
    Introduction • Welding isthe pivotal operation in the construction of a pipeline. • The technique of welding pipes to form an integral conduit for oil and gas transmission. • The time taken for completion of the pipeline directly depends on the speed at which the welding crew works. 10/2/2018 3
  • 4.
    Welding method • Themethods of the pipe depends on the direction of welding in the vertical plane established by the pipe ends. • The two methods are i) Vertical up or uphill ii) Vertical down or down hill 10/2/2018 4
  • 5.
    i) Uphill method •This weld is made with the arc progressing from bottom towards top. Welder makes settings of voltage and current on the welding machine so that he can able to increase & decrease the current rapidly. • There by increasing the welding current & deposition rate to achieve good penetration. 10/2/2018 5
  • 6.
  • 7.
    ii) Downhill method •Welding is vertically down. Welder has to maintain the proper angle between the electrode and the metal. • It utilize higher welding current and faster welding speeds is advantageous for pipes with thickness of ½ inch. • Majority of the pipelines have thickness of less than ½ inch , so downhill technique is commonly used. 10/2/2018 7
  • 8.
  • 9.
    Steps involved inpipeline welding : Root or Stringer bead : Once the alignment has been completed , the joint is ready for initial weld. • The initial weld is known as root or stringer bead. It is the most important bead of the pipe weld. • Two welders work on opposite sides of the pipe , each is responsible for welding portion. 10/2/2018 9
  • 10.
    • The pressureon the internal clamp is to maintain untill root bead to completed. The clamp is then carefully released & withdraw. • In case of external clamp being used, the clamp can be removed after the root bead is 50% completed. • For pipe diameter 8” or less, one welder may be used. 10/2/2018 10
  • 11.
    Hot Pass (higher weld currents ) : The hot pass bead follows the root bead. Normally a second crew follows behind the root bead crew. • The hot pass weld before the stringer weld has cooled & it prevent the cracking of stringer bead . • The stringer bead is cleaned thoroughly before the hot pass is applied. 10/2/2018 11
  • 12.
    Filler and capbeads : Proper cleaning of slag, scale and dirt after application of each bead is essential for obtaining high quality weld. • Following completion of stringer and hot pass beads, another welding crew takes over. • They build on the another material already in place. These additional beads are known as ‘Filler beads’. 10/2/2018 12
  • 13.
  • 14.
    Semi automatic welding: • It uses bare wire electrode shielded by an inert gas, usually carbondioxide. • The arc heats the pipe and melts the electrode which provides filler metal for joint. • Apparatus consist of spool of coiled wire, a pair of driving rolls, control switch & gas supply. • It is favoured for heavy-walled metals. 10/2/2018 14
  • 15.