CONTENT
• What???
• Why???
• Accessibility
Work
Breakdown
Structure
• Uses
• Types
• Gantt Chart
Bar Chart
• Site Study
• WBS
• Bar Chart
Case Study
What is WBS ?
 Hierarchical listing of tasks and deliverables that constitute the total
scope of the project.
 In simple words, dividing complex projects to simpler and manageable
tasks is the process identified as Work Breakdown Structure (WBS).
Project WBS levels
 Project Level
 Sub Project level
 Derived by decomposing the scope of project work in independent large volume
sub projects.
 Task Level
 Task is an identifiable and deliverable major work.
 Work Package Level
 It contains a sizeable, identifiable, measureable and controllable package of
work.
 Activity Level
 Work package can be further broken down into various identifiable jobs,
operations and process, which consume time and possible recourses.
 Operational Level
 Each operation includes a part of work content of the activity.
Why WBS?
 It provides the necessary framework for detailed cost estimating
and control along with providing guidance for schedule
development and control.
 Provides management with information appropriate to each
organizational level.
 Defines communication channels and assists in coordinating the
various project elements.
Three Reasons to adopt WBS for any project:
Work
Breakdown
Structure
helps more accurately
and specifically define
and organize the scope
of the total project
help with assigning
responsibilities, resource
allocation, monitoring the
project, and controlling
the project.
double check all the
deliverables' specifics with
the stakeholders and
make sure there is nothing
missing or overlapping
 A bar chart is a chart or a graph that presents categorical data in
category form with rectangular bars with heights or lengths
proportional to the values that they represents.
 The bars can be plotted vertically or horizontally. One axis of the chart
shows the specific categories being compared ,and the other axis
represents a measured value.
History
Many sources consider William Playfair (1759-1824) to have invented
the bar chart and the exports and imports of Scotland to and from
different parts for one year from Christmas 1780 to Christmas 1781
graph from his commercial and political atlas to be the first bar chart in
history.
Uses
 Bar chart/graphs provide a visual presentation of categorical data.
 The bar chart (Gantt chart) is used for the representation of a project in
which the activities are represented by horizontal segments ,of which
the length is proportional to the time necessary to conclude the task in
question.
 The bar chart is an effective tool for the management of work in a
project.
Gantt Chart
 A Gantt chart is a horizontal bar chart developed as a production
control tool in 1917 by Henry L. Gantt, an American engineer.
 Frequently used in project management, a Gantt chart provides a
graphical illustration of a schedule that helps to plan, coordinate, and
track specific tasks in a project.
 A Gantt chart is constructed with a horizontal axis representing the total
time span of the project, broken down into increments (for example,
days, weeks, or months) and a vertical axis representing the tasks that
make up the project
Types of Bar Chart
Introduction to the site
Project PROPOSED FACTORY BUILDING FOR HIGHTEMP FURNACES LTD
Client High-Temp.
Architect V.B .T. CONSORTIUM
Assumed Duration 17 Months
Actual Start Date 02 February 2017
Tender Cost 13.9 Cr
Location Ahmedabad, Gujarat
Tentative Finish Date 31 July 2018
PROJECTS PRIVATE Ltd.
BAR CHART (prepared in MS Project)
Network Diagram
Fig. 1
Fig. 2
Fig. 3
Fig. 4
Work Breakdown Structure
Fig. 1
Fig. 1
Fig. 2
Fig. 3
Wbs & Bar chart for Civil engg

More Related Content

What's hot

Line of balance in civil engineering
Line of balance in civil engineeringLine of balance in civil engineering
Line of balance in civil engineeringrathodjaydeep2
 
Project management in construction
Project management in constructionProject management in construction
Project management in constructionNAVNEET KUMAR JHA
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & ScheduleVîñõđ Kůmåř
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Managementsrinivas2036
 
Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Hamza Waheed
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)El Moro
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial buildinglckr117
 
Introduction To Primavera (P6)
Introduction To Primavera (P6)Introduction To Primavera (P6)
Introduction To Primavera (P6)Sandip Kumar Verma
 
Primavera p6 18.8 planning and scheduling guide r3
Primavera p6 18.8 planning and  scheduling guide r3Primavera p6 18.8 planning and  scheduling guide r3
Primavera p6 18.8 planning and scheduling guide r3Matiwos Tsegaye
 
Central Public Works Department (CPWD) summer training report
Central Public Works Department (CPWD) summer training reportCentral Public Works Department (CPWD) summer training report
Central Public Works Department (CPWD) summer training reportAman Gupta
 
Time cost optimisation
Time cost optimisationTime cost optimisation
Time cost optimisationCharul Sharma
 
Construction of Utility Tunnel phase ll
Construction of Utility Tunnel phase  llConstruction of Utility Tunnel phase  ll
Construction of Utility Tunnel phase llRavi Bhadani
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.NAVNEET KUMAR JHA
 
Construction Project management
Construction Project management Construction Project management
Construction Project management Anupama holla
 
Chapter 2 construction project planning and scheduling
Chapter 2 construction project planning and schedulingChapter 2 construction project planning and scheduling
Chapter 2 construction project planning and schedulingSubash Bhattarai
 

What's hot (20)

Bar chart
Bar chart Bar chart
Bar chart
 
Bar chart
Bar chartBar chart
Bar chart
 
Construction Cost Control
Construction Cost ControlConstruction Cost Control
Construction Cost Control
 
Line of balance in civil engineering
Line of balance in civil engineeringLine of balance in civil engineering
Line of balance in civil engineering
 
ppt for primevera
ppt for primeverappt for primevera
ppt for primevera
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & Schedule
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Management
 
Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial building
 
Introduction To Primavera (P6)
Introduction To Primavera (P6)Introduction To Primavera (P6)
Introduction To Primavera (P6)
 
Estimating and-costing
Estimating and-costingEstimating and-costing
Estimating and-costing
 
Primavera p6 18.8 planning and scheduling guide r3
Primavera p6 18.8 planning and  scheduling guide r3Primavera p6 18.8 planning and  scheduling guide r3
Primavera p6 18.8 planning and scheduling guide r3
 
Central Public Works Department (CPWD) summer training report
Central Public Works Department (CPWD) summer training reportCentral Public Works Department (CPWD) summer training report
Central Public Works Department (CPWD) summer training report
 
Time cost optimisation
Time cost optimisationTime cost optimisation
Time cost optimisation
 
Construction of Utility Tunnel phase ll
Construction of Utility Tunnel phase  llConstruction of Utility Tunnel phase  ll
Construction of Utility Tunnel phase ll
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
Construction Project management
Construction Project management Construction Project management
Construction Project management
 
Chapter 2 construction project planning and scheduling
Chapter 2 construction project planning and schedulingChapter 2 construction project planning and scheduling
Chapter 2 construction project planning and scheduling
 

Similar to Wbs & Bar chart for Civil engg

An Introduction to Gantt Charts
An Introduction to Gantt Charts An Introduction to Gantt Charts
An Introduction to Gantt Charts Litunya Laurean
 
Creating and Using a Gannt Chart A Gantt chart is a t.docx
Creating and Using a Gannt Chart  A Gantt chart is a t.docxCreating and Using a Gannt Chart  A Gantt chart is a t.docx
Creating and Using a Gannt Chart A Gantt chart is a t.docxwillcoxjanay
 
Bar Graph Method in Engineering management
Bar Graph Method in Engineering management Bar Graph Method in Engineering management
Bar Graph Method in Engineering management Nzar Braim
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULEAjeesh Mk
 
WBS Gantt chart and project management for Jira users
WBS Gantt chart and project management for Jira usersWBS Gantt chart and project management for Jira users
WBS Gantt chart and project management for Jira usersTam Nguyen, PMP, CSM
 
Project Management Tools Software Engineering.pptx
Project Management Tools Software Engineering.pptxProject Management Tools Software Engineering.pptx
Project Management Tools Software Engineering.pptxSachin675135
 
project management -04.ppt
project management -04.pptproject management -04.ppt
project management -04.pptMdHelalHossain6
 
Benchmarking and Gantt chart
Benchmarking and Gantt chartBenchmarking and Gantt chart
Benchmarking and Gantt chartAbhijeet Malkar
 
TID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft ProjectTID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft ProjectWanBK Leo
 
GANTT CHART nursing Management for Msc nursing
GANTT CHART nursing Management for Msc nursingGANTT CHART nursing Management for Msc nursing
GANTT CHART nursing Management for Msc nursingThangamjayarani
 
TILOS: World Pipelines Article
TILOS: World Pipelines ArticleTILOS: World Pipelines Article
TILOS: World Pipelines ArticleCisco
 

Similar to Wbs & Bar chart for Civil engg (20)

An Introduction to Gantt Charts
An Introduction to Gantt Charts An Introduction to Gantt Charts
An Introduction to Gantt Charts
 
Project Management.pptx
Project Management.pptxProject Management.pptx
Project Management.pptx
 
Gantt
GanttGantt
Gantt
 
Creating and Using a Gannt Chart A Gantt chart is a t.docx
Creating and Using a Gannt Chart  A Gantt chart is a t.docxCreating and Using a Gannt Chart  A Gantt chart is a t.docx
Creating and Using a Gannt Chart A Gantt chart is a t.docx
 
Construction management
Construction managementConstruction management
Construction management
 
Bar Graph Method in Engineering management
Bar Graph Method in Engineering management Bar Graph Method in Engineering management
Bar Graph Method in Engineering management
 
Gantt chart discuss 1
Gantt chart discuss 1Gantt chart discuss 1
Gantt chart discuss 1
 
civil engineer
civil engineercivil engineer
civil engineer
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
WBS Gantt chart and project management for Jira users
WBS Gantt chart and project management for Jira usersWBS Gantt chart and project management for Jira users
WBS Gantt chart and project management for Jira users
 
Project Management Tools Software Engineering.pptx
Project Management Tools Software Engineering.pptxProject Management Tools Software Engineering.pptx
Project Management Tools Software Engineering.pptx
 
Gantt chart
Gantt chartGantt chart
Gantt chart
 
What is a Gantt chart
What is a Gantt chartWhat is a Gantt chart
What is a Gantt chart
 
project management -04.ppt
project management -04.pptproject management -04.ppt
project management -04.ppt
 
CCP_SEC3_Planning and Scheduling
CCP_SEC3_Planning and SchedulingCCP_SEC3_Planning and Scheduling
CCP_SEC3_Planning and Scheduling
 
Benchmarking and Gantt chart
Benchmarking and Gantt chartBenchmarking and Gantt chart
Benchmarking and Gantt chart
 
Gantt and PERT chart
Gantt and PERT chartGantt and PERT chart
Gantt and PERT chart
 
TID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft ProjectTID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft Project
 
GANTT CHART nursing Management for Msc nursing
GANTT CHART nursing Management for Msc nursingGANTT CHART nursing Management for Msc nursing
GANTT CHART nursing Management for Msc nursing
 
TILOS: World Pipelines Article
TILOS: World Pipelines ArticleTILOS: World Pipelines Article
TILOS: World Pipelines Article
 

Recently uploaded

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 

Recently uploaded (20)

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 

Wbs & Bar chart for Civil engg

  • 1. FACTORY BUILDING (PROPOSED FACTORY BUILDING FOR HIGHTEMP FURNACES LTD.) Kunal G. (IU1541040025) Vrutant J. (IU1541040030) Meet S. (IU1541040041) Rumit M. (IU1541040043) Samarth M. (IU1541040045)
  • 2.
  • 3. CONTENT • What??? • Why??? • Accessibility Work Breakdown Structure • Uses • Types • Gantt Chart Bar Chart • Site Study • WBS • Bar Chart Case Study
  • 4.
  • 5. What is WBS ?  Hierarchical listing of tasks and deliverables that constitute the total scope of the project.  In simple words, dividing complex projects to simpler and manageable tasks is the process identified as Work Breakdown Structure (WBS).
  • 6. Project WBS levels  Project Level  Sub Project level  Derived by decomposing the scope of project work in independent large volume sub projects.  Task Level  Task is an identifiable and deliverable major work.  Work Package Level  It contains a sizeable, identifiable, measureable and controllable package of work.  Activity Level  Work package can be further broken down into various identifiable jobs, operations and process, which consume time and possible recourses.  Operational Level  Each operation includes a part of work content of the activity.
  • 7. Why WBS?  It provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.  Provides management with information appropriate to each organizational level.  Defines communication channels and assists in coordinating the various project elements.
  • 8. Three Reasons to adopt WBS for any project: Work Breakdown Structure helps more accurately and specifically define and organize the scope of the total project help with assigning responsibilities, resource allocation, monitoring the project, and controlling the project. double check all the deliverables' specifics with the stakeholders and make sure there is nothing missing or overlapping
  • 9.  A bar chart is a chart or a graph that presents categorical data in category form with rectangular bars with heights or lengths proportional to the values that they represents.  The bars can be plotted vertically or horizontally. One axis of the chart shows the specific categories being compared ,and the other axis represents a measured value.
  • 10. History Many sources consider William Playfair (1759-1824) to have invented the bar chart and the exports and imports of Scotland to and from different parts for one year from Christmas 1780 to Christmas 1781 graph from his commercial and political atlas to be the first bar chart in history.
  • 11. Uses  Bar chart/graphs provide a visual presentation of categorical data.  The bar chart (Gantt chart) is used for the representation of a project in which the activities are represented by horizontal segments ,of which the length is proportional to the time necessary to conclude the task in question.  The bar chart is an effective tool for the management of work in a project.
  • 12. Gantt Chart  A Gantt chart is a horizontal bar chart developed as a production control tool in 1917 by Henry L. Gantt, an American engineer.  Frequently used in project management, a Gantt chart provides a graphical illustration of a schedule that helps to plan, coordinate, and track specific tasks in a project.  A Gantt chart is constructed with a horizontal axis representing the total time span of the project, broken down into increments (for example, days, weeks, or months) and a vertical axis representing the tasks that make up the project
  • 13. Types of Bar Chart
  • 14. Introduction to the site Project PROPOSED FACTORY BUILDING FOR HIGHTEMP FURNACES LTD Client High-Temp. Architect V.B .T. CONSORTIUM Assumed Duration 17 Months Actual Start Date 02 February 2017 Tender Cost 13.9 Cr Location Ahmedabad, Gujarat Tentative Finish Date 31 July 2018 PROJECTS PRIVATE Ltd.
  • 15. BAR CHART (prepared in MS Project)

Editor's Notes

  1. Kunal: (1). Usually, the project managers use this method for simplifying the project execution. In WBS, much larger tasks are broken-down to manageable chunks of work. These chunks can be easily supervised and estimated. Items at the lowest level must be assignable and measureable. The lowest level of WBS where the work is actually assigned is called a work package. (2). Facilitates evaluation of cost, time, and technical performance of the organization on a project. ◦ Provides management with information appropriate to each organizational level. ◦ breakdown structure assigns project responsibilities to organizational units and individuals ◦ Helps manager plan, schedule, and budget. ◦ Defines communication channels and assists in coordinating the various project elements.
  2. 1.A vertical bar chart is sometimes called a line graph 2. A bar graph shows comparisons among discrete categories.