PROJECT PLANNING AND
SCHEDULING
The purpose of this lesson is to
provide you with the knowledge
to plan and supervise activities
forconstruction projects.
Type
text
Type
text
Type
text
Type
text
Type
text
Type
text
Type
text
CRITICAL PATHMETHOD(CPM)
CPM is a form of analysis that is used for planning,
scheduling, and controlling construction activities for a
project from start to finish.
The CPM requires a formal, detailed listing of all work
related activities that make up the project.
Also referred to as:
Construction Management
Project Planning and Scheduling
Critical Path Analysis
PRELIMINARY PLANNING
Preliminary planning is a quick overall picture of
the project and the capacity of the unit to
accomplish it.
Serves as a guide for detailed planning.
Includes site recon, preliminary material and
equipment estimates, and procurement of critical
items, identify work activities.
DETAILEDPLANNING
Develops an accurate estimation of work activities,
materials, man-hours, and equipment requirements
needed from start to finish.
Detailed planning includes:
Reviewing project specifications and drawings.
Detailed estimates of resources,(i.e. equip.
hours).
Scheduling work activities.
Procurement of materials.
Submitted in the form of a Gantt chart, Pert chart,
Activity-on-the-Arrow logic diagram, or Activity-
on-the-Node logic diagram.
Job Directive Format
The job directive is the tasking of a unit to perform
construction tasks, and draw needed materials to
complete the project assigned.
Job directives vary in form and content. They
are issued in one of two ways:
Verbally for simple projects.
Written for more complex projects.
Stages of Detail
Job directives can be in any one of three
stages of detail:
Contain detailed plans and specifications. The more stable
the conditions are, the more detailed the job directive
becomes.
May simply refer to standardized drawings, or automated
software programs already published.
May require preparation of complete plans and project
specifications to be approved by higher headquarters.
Job Directive Information
Mission: Exact assignment with all necessary
details.
Location: May be given, or left to the unit to
select.
Time: Starting time and/or required completion
date.
Manpower: Additional manpower that is
available.
Job Directive Information
Equipment: Any additional equipment available
with especial conditions.
Materials: Source of and authority to request
materials.
Priorities: Single priority for the whole project, or
separate priorities for various portions of the
project.
Reports: Any required reports. (i.e. Daily or
Weekly status report)
Special Instructions: Any additional information
pertaining to the job that is requested.
Questions
In what two forms may a job directive be issued?
Verbally or in writing
In Military construction, the planning process is
divided into what two stages?
Preliminary planning and detailed planning
ACTIVITY LISTS (Brainstorming)
An activities (task) list is a complete listing of all required work
activities that must be performed from start to finish.
An activity list can be brief, or as detailed as need be. The guiding
factor to how much detail that is required is dictated by size and
complexity of the project.
An activity list must be developed mentally and on paperto
determine actual activities and their interrelationships to each
other.
The most difficult step is your ability to think logically, and make a
mental picture of the project in your mind. Brainstorming is
needed with the assistance of the 1349, 1371 and 1361 Chief's,
and the Project Officer.
Activities
“Topo” project site Establish road grades
Lay gravel Set road alignments
Order gravel Place concrete forms
Clear roadway Clear pad site
Prefabricate forms Create project drawings
Layout pad batterboards Excavate pad footings
Pour concrete Cure concrete
Check pad elevations Check Road grades
Remove forms Perform “As-built”
ROUGHACTIVITIES LISTING
Sequencing Activities
After you have developed your rough activity
list in no specific order, you must now put the
activities into a "logical" sequence to be
performed. The finished activity list is broken
down as follows:
Activity Number Column
Activity Column
"Immediately Proceeded By" (IPB) Column
Types of Activities
There are five types of activities associated
with the development of a finished activities
list. Keeping these activities in mind will help
you in your logical thinking to develop the
activity list on paper.
Starting activities. (be g inning activity)
Pre ce ding activities. (pre vio us activity)
Co ncurring activities. (o ccurring at the sam e
tim e )
Succe e ding activities. (fo llo wing activity)
Lag g ing activities. (slo w o r ling e ring activitie s)
Sample Finished Activities List
Activity
Number Activity IPB
5 "Topo" project site None
10 Create project drawings 5
15 Order gravel None
20 Prefabricate forms None
25 Clear roadway 10
30 Set road alignments 25
35 Establish road grades 30
40 Check road grades 35
45 Lay gravel 15,40
50 Clear pad site 10
55 Layout pad batterboards 50
60 Excavate pad footings 55
65 Check pad elevations 60
70 Place concrete forms 20,65
75 Pour concrete 70
80 Cure concrete 75
85 Remove forms 80
90 Perform "as-built" 45,85
Questions
What is the process called to develop your
activities list?
Brainstorming
What are the five types of activities that are kept
in mind when developing a finish activity list?
Starting, proceeding, Succeeding, concurring,
and lagging activities.
PLANNING DIAGRAMS
The most important part of the CPM is the
planning diagram. The planning diagram
graphically shows the interrelationship
between project activities.
It provides a visual blueprint of the work activities
that must be performed during construction.
There are four types of diagrams that can be
created.
Each type of diagram serves a specific purpose.
GANTT CHART
Also known as a bar chart.
Gantt charts are "time" oriented.
Activities are graphically shown on a calendar
time scale, used primarily for small projects.
Bars show an activities duration in its entirety,
regardless of its dependency on other activities.
Effortless to construct, and are brief in format.
ID Task Name
1 Topo project site
2 Create project drawings
3 Order gravel
4 Prefabricate forms
5 Clear roadway
6 Set road alignments
7 Establish road grades
8 Check road grades
9 Lay gravel
10 Clear pad site
11 Layout pad batterboards
M T W T F S S M T W T F S S M T W T F S S M T W
April 7 April 14 April 21 A
ID Task Name
1 TEC 1-99
2 TEC Core
3 Marine Unique
4 TEC 5-99
5 TEC Core
6 Marine Unique
10/6/98 2/1/99
TEC 1-99
10/6/98 1/8/99
TEC Core
1/11/99 2/1/99
Marine Unique
11/3/98 3/1/99
TEC 5-99
11/3/98 2/5/99
TEC Core
2/8/99 3/1/99
Marine Unique
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
4, 1998 Qtr 1, 1999 Qtr 2, 1999 Qtr 3, 1999 Qtr 4, 1999
GANTT CHART DISADVANTAGES
Does not give you the ability to visualize the exact
progress of the project.
Anticipate delays orproblems soon enough to correct
them.
Does not show detailed sequence of activities.
Does not show "critical activities".
Does not show precise effect of a delay orfailure to
complete an activity on time.
PERT CHART DIAGRAM
The Program Evaluation and Review
Technique (PERT) addresses probability,
and is "event" oriented.
This type of logic diagram is used primarily
for research and development projects.
Clearroadway
5 2d
4/15/97 4/16/97
Clearpad site
10 1d
4/15/97 4/15/97
Createprojectdrawings
2 2d
4/11/97 4/14/97
Topoprojectsite
1 2d
4/9/97 4/10/97
Activity-On-The-Arrow Format
(CPM)
More complex in its creation.
Tendency to lead to confusion when trying
to interpret it.
Least desirable format to use because of
these factors.
Activity-On-The-Node Format
(CPM)
Eliminates confusion, and allows you to
adjust for problems that may arise during the
construction of the project.
AON format is "activity" oriented.
This is the primary format used for planning
military construction, and especially used for
large projects.
Activity-On-The-Node Uses:
Construction planning.
Maintenance planning.
Project Design.
Military combat task planning.
Logistics planning.
AON Advantages
Reduces risk of overlooking essential tasks.
Provides a blueprint for long-range planning.
Shows activity interrelationships.
Focuses attention on critical activities.
Allows you to make timely decisions.
Allows you to manage manpower, material, and
equipment
resources more effectively.
AON Disadvantages
The AON format does not solve
engineering problems that may occur.
Does not make planning decisions for you.
Does not provide anything substantial to
the actual construction of the project itself.
LOGIC DIAGRAMS ELEMENTS
After the activity relationships are identified, they
are applied to a logic diagram. The standard
format for a logic diagram is the "Activity-on-the-
Node". The four basic elements are :
Start Nodes.
Activity Nodes.
Finish Nodes.
Precedence Arrows.
ACTIVITY NODE
PRECEDENCE ARROWS
START ANDFINISHNODES
QUESTIONS
What type of diagram is event oriented?
What type of diagram is time oriented?
What type of diagram is activity oriented?
LOGIC DIAGRAMS
Shown as a Critical Path Method (CPM) logic
diagram.
Shows accurate, timely, and easily understood
picture of the whole project.
Easier to plan, schedule, and manage the
sequence of required work activities.
Graphically shows the interrelationship of each
work activity as they relate to the completion of the
whole project.
CPMDIAGRAMLOGIC RULES
Which activities start at the beginning of the project?
(Starting)
Which activities must be finished before the start of
another? (Preceding)
Which activities can start or finish at the same time as
another? (Concurring)
Which activities cannot begin until another is finished?
(Succeeding)
Which activities may start when a portion of another
activity is complete? (Lagging)
LOGIC DIAGRAM
DEMONSTRATION
Questions
What logic rules are used to create a logic
diagram?
Starting, proceeding, succeeding, concurring, and
lagging activities.
What type of planning diagram is “event”
oriented?
Pert chart.
Questions
What type of planning diagram is “time” oriented?
Gantt chart
What type of planning diagram is “activity”
oriented?
AON and AOA diagrams.
PRACTICAL EXERCISE
ACTIVITY ESTIMATES
Estimating each activities required
resources and duration times.
Estimated resources are:
Materials.
Personnel.
Equipment.
Man-hours.
Equipment-hours.
MATERIAL ESTIMATES
Work Items.
Materials.
Quantities.
Waste Factors.
Total Material Requirements.
Bills of Materials.
EQUIPMENT/PERSONNEL
ESTIMATES
Work Items. (Activities)
Material Quantities. (Units of work)
Work Rate. (Man-hourTables)
Standard Work Effort (Labor). (Quantity x WorkRate)
Efficiency Factor. Represented as a Percentage)
Troop Effort (Total Labor Hours). (Standard Effort /
Efficiency)
Duration (Hours, Days, Weeks, or Months). (Troop Effort /
Crew Size)
EARLY/LATE EVENT TIMES
After all duration's have been computed, you are now
able to calculate each activities Early and Late event
times. (Forward Pass and Backward Pass)
Early Start (ES): The earliest time a activity can logically start.
Early Finish (EF): The earliest an activity can finish without delaying
follow on
activities. (ES + Duration)
Late Finish (LF): The latest an activity can finish without delaying the
entire project.
Late Start (LS): The latest time an activity can start without delaying
the entire project. (LF - Duration)
CRITICAL PATH& CRITICAL
ACTIVITIES
After completing the event times, you can
determine the "critical path" of the project
and all of the "critical activities" by simple
observation using the following guidelines:
The ES for an activity is the same as its LS.
The EF for an activity is the same as its LF.
Activity
Number Activity IPB Duration
5 “Topo” project site None 2 days
10 Create project drawings 5 2 days
15 Order gravel None 6 days
20 Prefabricate forms None 1 day
25 Clear roadway 10 2 days
30 Set road alignments 25 1 day
35 Establish road grades 30 1 day
40 Check road grades 35 2 days
45 Lay gravel 15,40 2 days
50 Clear pad site 10 1 day
55 Layout pad batterboards 50 1 day
60 Excavate pad footings 55 2 days
65 Check pad elevations 60 1 day
70 Place concrete forms 20,65 1 day
75 Pour concrete 70 1 day
80 Cure concrete 75 6 days
85 Remove forms 80 1 day
90 Perform “As-built” 45,85 2 days
ACTIVITY LIST WITHESTIMATED
DURATION'S
DEMONSTRATION
S
5 10
15
20
25 30 35
40 45
50 55 60 65 70 75 80 85
90
F
2 2
6
1
2 22
1
1
1
1
2 1 1 1 6 1
2
0
0
0
2 4
4
4
6 6 7
7 8
8 10
5 5 6 6 8 8 9
6
10 12
1
9 10 10 11 11 17 17 18
18 20
20
2018
18
18
171711111010998866554
1616
1610
98
141413131210
4220
2
12
EARLY/LATE EVENT
TIMES
DEMONSTRATION
Questions
What type of resources must be estimated for
each activity?
Material, personnel, equipment quantities, man
hours and equipment hours.
What effect does increasing equipment quantities
have on the duration of an Activity?
It decreases it’s duration time.
Questions
What do we call the process use to calculate the
early event times for a project?
Forward pass.
What do we call the process use to calculate the
late event times for a project?
Backward pass.
PRACTICAL EXERCISES
Complete worksheets 3 and 4 on pg 24 and
25 in your student outline.
EARLY START SCHEDULES
An early start schedule, when joined with
the logic diagram, graphically shows all of the
planning information that is needed to
manage the construction project from start to
finish.
Any activity not on the "Critical Path" will
contain some float. Float is any extra time
that is available to complete an activity
beyond its actual duration, without effecting
the entire project.
EARLY START SCHEDULE DEMO
Worksheet 5 pg 26 in student
outline
FLOAT
Total Float (TF): The entire amount of time that an
activity can be delayed without delaying the entire
project completion time. TF = LS - ES orLF -
EF.
Interfering Float (IF): Time that is available to delay
an activity without delaying the projects entire
completion time, but may delay the start of one or
more non-critical activities. IF = LF -ES of following
activity. (Use the smallest ES time)
Free Float (FF): Time that is available to delay an
activity without delaying the start of any other
activity, or the entire projects completion time. FF =
TF - IF
FLOAT
ALL FINISHING ACTIVITIES WILL CONTAIN
ONLY FREE FLOAT
NOCALCULATIONS NEEDED
Free Float (FF): Time that is available to delay
an activity without delaying the start of any other
activity, or the entire projects completion time.
EARLY START
SCHEDULE
DEMONSTRATION
RESOURCE ABBREVIATIONS
SQUAD= SQ 5-TON = 5T TRAM= TR
SCRAPER= SC DOZER= DZ GRADER=
GD
SEE TRAC = ST EXCAVATOR= EX
COMPACTOR= CP SHEEPS FOOT = SF
SURVEY CREW= S HUMMER= HV
DRAFTSMAN = D
S
5
10
15
20
25
30
35
40
F
6
2
6
2
1
61
6
0
0
0
EARLY START SCHEDULE
DEMONSTRATION
2
2 4
6
6 7 7 13
6
6 7 7 13
13
13
137
7
6
6
60
4
42
7
76
60
TF = 2-0=2
IF =4-2=2
FF=2-2=0
TF =4-2=2
IF =6-6=0
FF= 2-0=2
ACTIVITY
NUMBER 1 2 3 4 5 6 7 8 9 10 11 12 13
5(30)
10(20)
15(25)
20(30)
25(35)
30(40)
35(F)
40(F)
4/5T 4/5T 4/4T 4/5T 4/5T 4/5T
2/TR 2/TR X X
2/SQ 2/SQ 2/SQ 2/SQ 2/SQ 2/SQ
2/CP 2/CP
1/SC
3/GR
2/SQ 2/SQ 2/SQ 2/SQ 2/SQ 2/SQ
2/5T 2/5T 2/5T 2/5T 2/5T 2/5T
TOTALS
5 TON 4 4 4 4 4 4 2 2 2 2 2 2
TRAM 2 2
SQUAD 2 2 2 2 2 2 2 2 2 2 2 2
COMPACTORS 2 2
SURVEY CREW 1
GRADER 3
Questions
What is float?
Is any extra time that is available to complete an
activity beyond its actual duration without affecting
the entire project.
What is interfering float?
Time that is available to delay an activity without
delaying the projects entire completion time, but may
delay the start of one or more non-critical activities.
Questions
What is free float?
Is any Time that is available to delay an activity
without delaying the start of any other activity, or the
entire projects completion time.
You have now been given
all the tools necessary to
use construction
management to your
advantage to better control
how your projects are ran.

More Related Content

What's hot

PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERSPLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERSHafiz JUNAID
 
Scheduling of a project
Scheduling of a projectScheduling of a project
Scheduling of a projectSailish Cephas
 
Construction scheduling
Construction schedulingConstruction scheduling
Construction schedulingZTE Nepal
 
CPM Scheduling best practicies within the Construction Indistry
CPM Scheduling best practicies within the Construction IndistryCPM Scheduling best practicies within the Construction Indistry
CPM Scheduling best practicies within the Construction IndistryMichael Pink
 
Gantt- Pert Chart Activities
Gantt- Pert Chart ActivitiesGantt- Pert Chart Activities
Gantt- Pert Chart Activitieslearnt
 
Meeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsMeeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsAcumen
 
4 an activity analysis of project scheduling problem a case study 1
4 an activity analysis of project scheduling problem   a case study 14 an activity analysis of project scheduling problem   a case study 1
4 an activity analysis of project scheduling problem a case study 1pmb25
 
Project Management 4 Schedule Management
Project Management 4 Schedule ManagementProject Management 4 Schedule Management
Project Management 4 Schedule Managementgrmkslideshare
 
construction project planing
 construction project planing construction project planing
construction project planingSANJEEV Wazir
 
00 Introduction of project scheduling
00 Introduction of project scheduling00 Introduction of project scheduling
00 Introduction of project schedulingSoe Naing Win
 
Fundamentals of scheduling
Fundamentals of schedulingFundamentals of scheduling
Fundamentals of schedulingjmd2011
 
An Introduction to Gantt Charts
An Introduction to Gantt Charts An Introduction to Gantt Charts
An Introduction to Gantt Charts Litunya Laurean
 
Literature Review in Project Scheduling Techniques
Literature Review in Project Scheduling TechniquesLiterature Review in Project Scheduling Techniques
Literature Review in Project Scheduling TechniquesObi-Ugbo Alex
 
Planning, scheduling and resource allocation
Planning, scheduling and resource allocationPlanning, scheduling and resource allocation
Planning, scheduling and resource allocationJatin Mandhyan
 
Visio-Planning FlowChart-3
Visio-Planning FlowChart-3Visio-Planning FlowChart-3
Visio-Planning FlowChart-3Allan Leyte
 
Unit 02 unit – ii project planning and scheduling
Unit 02 unit – ii project planning and schedulingUnit 02 unit – ii project planning and scheduling
Unit 02 unit – ii project planning and schedulingRAMCHANDRA KODAM
 
Project Management focused on Scheduling of a Project
Project Management focused on Scheduling of a ProjectProject Management focused on Scheduling of a Project
Project Management focused on Scheduling of a ProjectMeryem Yıldız
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & ScheduleVîñõđ Kůmåř
 

What's hot (20)

PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERSPLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
 
Scheduling of a project
Scheduling of a projectScheduling of a project
Scheduling of a project
 
Construction scheduling
Construction schedulingConstruction scheduling
Construction scheduling
 
CPM Scheduling best practicies within the Construction Indistry
CPM Scheduling best practicies within the Construction IndistryCPM Scheduling best practicies within the Construction Indistry
CPM Scheduling best practicies within the Construction Indistry
 
Gantt- Pert Chart Activities
Gantt- Pert Chart ActivitiesGantt- Pert Chart Activities
Gantt- Pert Chart Activities
 
Meeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsMeeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance Standards
 
4 an activity analysis of project scheduling problem a case study 1
4 an activity analysis of project scheduling problem   a case study 14 an activity analysis of project scheduling problem   a case study 1
4 an activity analysis of project scheduling problem a case study 1
 
Project Management 4 Schedule Management
Project Management 4 Schedule ManagementProject Management 4 Schedule Management
Project Management 4 Schedule Management
 
construction project planing
 construction project planing construction project planing
construction project planing
 
Project Scheduling & Controls
Project Scheduling & ControlsProject Scheduling & Controls
Project Scheduling & Controls
 
00 Introduction of project scheduling
00 Introduction of project scheduling00 Introduction of project scheduling
00 Introduction of project scheduling
 
Fundamentals of scheduling
Fundamentals of schedulingFundamentals of scheduling
Fundamentals of scheduling
 
An Introduction to Gantt Charts
An Introduction to Gantt Charts An Introduction to Gantt Charts
An Introduction to Gantt Charts
 
Literature Review in Project Scheduling Techniques
Literature Review in Project Scheduling TechniquesLiterature Review in Project Scheduling Techniques
Literature Review in Project Scheduling Techniques
 
Planning, scheduling and resource allocation
Planning, scheduling and resource allocationPlanning, scheduling and resource allocation
Planning, scheduling and resource allocation
 
Visio-Planning FlowChart-3
Visio-Planning FlowChart-3Visio-Planning FlowChart-3
Visio-Planning FlowChart-3
 
Pert, cpm & gert
Pert, cpm & gertPert, cpm & gert
Pert, cpm & gert
 
Unit 02 unit – ii project planning and scheduling
Unit 02 unit – ii project planning and schedulingUnit 02 unit – ii project planning and scheduling
Unit 02 unit – ii project planning and scheduling
 
Project Management focused on Scheduling of a Project
Project Management focused on Scheduling of a ProjectProject Management focused on Scheduling of a Project
Project Management focused on Scheduling of a Project
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & Schedule
 

Similar to civil engineer

Road Project Schedule M S Project.ppt
Road Project Schedule M S Project.pptRoad Project Schedule M S Project.ppt
Road Project Schedule M S Project.pptkilldudeMohan
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULEAjeesh Mk
 
Project management and control
Project management and controlProject management and control
Project management and controlShruti Pendharkar
 
Project Management Techniques ( WBS & Critical Path Method )
Project Management Techniques ( WBS & Critical Path Method )Project Management Techniques ( WBS & Critical Path Method )
Project Management Techniques ( WBS & Critical Path Method )Surajkumar Sonar
 
EO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.pptEO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.pptyashchotaliyael21
 
project management -04.ppt
project management -04.pptproject management -04.ppt
project management -04.pptMdHelalHossain6
 
44259126 ms-project-presentation
44259126 ms-project-presentation44259126 ms-project-presentation
44259126 ms-project-presentationFarrukh Raja
 
project management-cpm and pert methods for managers
project management-cpm and pert methods for managersproject management-cpm and pert methods for managers
project management-cpm and pert methods for managersNaganna Chetty
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTS.Vijaya Bhaskar
 
Critical Path Analysis
Critical Path AnalysisCritical Path Analysis
Critical Path Analysissimu_mihai
 
PROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptxPROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptxTecnicoItca
 
Ms project presentation
Ms project presentationMs project presentation
Ms project presentationKhem Singh
 

Similar to civil engineer (20)

Road Project Schedule M S Project.ppt
Road Project Schedule M S Project.pptRoad Project Schedule M S Project.ppt
Road Project Schedule M S Project.ppt
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Project management and control
Project management and controlProject management and control
Project management and control
 
Project Management Techniques ( WBS & Critical Path Method )
Project Management Techniques ( WBS & Critical Path Method )Project Management Techniques ( WBS & Critical Path Method )
Project Management Techniques ( WBS & Critical Path Method )
 
EO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.pptEO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.ppt
 
project management -04.ppt
project management -04.pptproject management -04.ppt
project management -04.ppt
 
Lecture 6
Lecture 6Lecture 6
Lecture 6
 
PMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptxPMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptx
 
44259126 ms-project-presentation
44259126 ms-project-presentation44259126 ms-project-presentation
44259126 ms-project-presentation
 
project management-cpm and pert methods for managers
project management-cpm and pert methods for managersproject management-cpm and pert methods for managers
project management-cpm and pert methods for managers
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
 
Critical path
Critical pathCritical path
Critical path
 
Critical path
Critical pathCritical path
Critical path
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
Critical Path Analysis
Critical Path AnalysisCritical Path Analysis
Critical Path Analysis
 
PROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptxPROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptx
 
Ms project presentation
Ms project presentationMs project presentation
Ms project presentation
 
Chapter 3
Chapter 3Chapter 3
Chapter 3
 
pert-cpm.pptx
pert-cpm.pptxpert-cpm.pptx
pert-cpm.pptx
 
Chapter 3.pptx
Chapter 3.pptxChapter 3.pptx
Chapter 3.pptx
 

More from AHMED NADIM JILANI

More from AHMED NADIM JILANI (20)

Scaffolding by vn prabhu source facebook group survey & engineering de...
Scaffolding  by  vn prabhu source facebook group survey  & engineering de...Scaffolding  by  vn prabhu source facebook group survey  & engineering de...
Scaffolding by vn prabhu source facebook group survey & engineering de...
 
Nanotechnology in civil engineering0
Nanotechnology in civil engineering0Nanotechnology in civil engineering0
Nanotechnology in civil engineering0
 
Staadpresentation1 159
Staadpresentation1 159Staadpresentation1 159
Staadpresentation1 159
 
Pres staadpro
Pres staadproPres staadpro
Pres staadpro
 
Corenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materialsCorenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materials
 
DESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTUREDESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTURE
 
Ccna day5
Ccna day5Ccna day5
Ccna day5
 
Ccna day4
Ccna day4Ccna day4
Ccna day4
 
Ccna day3
Ccna day3Ccna day3
Ccna day3
 
Ccna day2
Ccna day2Ccna day2
Ccna day2
 
Ccna day1
Ccna day1Ccna day1
Ccna day1
 
What is nanotechnology
What is nanotechnologyWhat is nanotechnology
What is nanotechnology
 
Nanotechnology in civil engineering by shahid
Nanotechnology in  civil engineering by shahidNanotechnology in  civil engineering by shahid
Nanotechnology in civil engineering by shahid
 
What is nanotechnology
What is nanotechnologyWhat is nanotechnology
What is nanotechnology
 
Nanotechnology in civil engineering by shahid
Nanotechnology in  civil engineering by shahidNanotechnology in  civil engineering by shahid
Nanotechnology in civil engineering by shahid
 
Corenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materialsCorenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materials
 
Carbon nanotubes
Carbon nanotubesCarbon nanotubes
Carbon nanotubes
 
Nanotechnology in civil engineering
Nanotechnology in civil engineeringNanotechnology in civil engineering
Nanotechnology in civil engineering
 
electrical engineering
electrical engineeringelectrical engineering
electrical engineering
 
Water balance & management
Water balance & managementWater balance & management
Water balance & management
 

Recently uploaded

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 

civil engineer

  • 1. Construction Management Type period Type period Type period Type period Type task Type task Type task Type task Type task
  • 2. PROJECT PLANNING AND SCHEDULING The purpose of this lesson is to provide you with the knowledge to plan and supervise activities forconstruction projects. Type text Type text Type text Type text Type text Type text Type text
  • 3. CRITICAL PATHMETHOD(CPM) CPM is a form of analysis that is used for planning, scheduling, and controlling construction activities for a project from start to finish. The CPM requires a formal, detailed listing of all work related activities that make up the project. Also referred to as: Construction Management Project Planning and Scheduling Critical Path Analysis
  • 4. PRELIMINARY PLANNING Preliminary planning is a quick overall picture of the project and the capacity of the unit to accomplish it. Serves as a guide for detailed planning. Includes site recon, preliminary material and equipment estimates, and procurement of critical items, identify work activities.
  • 5. DETAILEDPLANNING Develops an accurate estimation of work activities, materials, man-hours, and equipment requirements needed from start to finish. Detailed planning includes: Reviewing project specifications and drawings. Detailed estimates of resources,(i.e. equip. hours). Scheduling work activities. Procurement of materials. Submitted in the form of a Gantt chart, Pert chart, Activity-on-the-Arrow logic diagram, or Activity- on-the-Node logic diagram.
  • 6. Job Directive Format The job directive is the tasking of a unit to perform construction tasks, and draw needed materials to complete the project assigned. Job directives vary in form and content. They are issued in one of two ways: Verbally for simple projects. Written for more complex projects.
  • 7. Stages of Detail Job directives can be in any one of three stages of detail: Contain detailed plans and specifications. The more stable the conditions are, the more detailed the job directive becomes. May simply refer to standardized drawings, or automated software programs already published. May require preparation of complete plans and project specifications to be approved by higher headquarters.
  • 8. Job Directive Information Mission: Exact assignment with all necessary details. Location: May be given, or left to the unit to select. Time: Starting time and/or required completion date. Manpower: Additional manpower that is available.
  • 9. Job Directive Information Equipment: Any additional equipment available with especial conditions. Materials: Source of and authority to request materials. Priorities: Single priority for the whole project, or separate priorities for various portions of the project. Reports: Any required reports. (i.e. Daily or Weekly status report) Special Instructions: Any additional information pertaining to the job that is requested.
  • 10. Questions In what two forms may a job directive be issued? Verbally or in writing In Military construction, the planning process is divided into what two stages? Preliminary planning and detailed planning
  • 11. ACTIVITY LISTS (Brainstorming) An activities (task) list is a complete listing of all required work activities that must be performed from start to finish. An activity list can be brief, or as detailed as need be. The guiding factor to how much detail that is required is dictated by size and complexity of the project. An activity list must be developed mentally and on paperto determine actual activities and their interrelationships to each other. The most difficult step is your ability to think logically, and make a mental picture of the project in your mind. Brainstorming is needed with the assistance of the 1349, 1371 and 1361 Chief's, and the Project Officer.
  • 12. Activities “Topo” project site Establish road grades Lay gravel Set road alignments Order gravel Place concrete forms Clear roadway Clear pad site Prefabricate forms Create project drawings Layout pad batterboards Excavate pad footings Pour concrete Cure concrete Check pad elevations Check Road grades Remove forms Perform “As-built” ROUGHACTIVITIES LISTING
  • 13. Sequencing Activities After you have developed your rough activity list in no specific order, you must now put the activities into a "logical" sequence to be performed. The finished activity list is broken down as follows: Activity Number Column Activity Column "Immediately Proceeded By" (IPB) Column
  • 14. Types of Activities There are five types of activities associated with the development of a finished activities list. Keeping these activities in mind will help you in your logical thinking to develop the activity list on paper. Starting activities. (be g inning activity) Pre ce ding activities. (pre vio us activity) Co ncurring activities. (o ccurring at the sam e tim e ) Succe e ding activities. (fo llo wing activity) Lag g ing activities. (slo w o r ling e ring activitie s)
  • 15. Sample Finished Activities List Activity Number Activity IPB 5 "Topo" project site None 10 Create project drawings 5 15 Order gravel None 20 Prefabricate forms None 25 Clear roadway 10 30 Set road alignments 25 35 Establish road grades 30 40 Check road grades 35 45 Lay gravel 15,40 50 Clear pad site 10 55 Layout pad batterboards 50 60 Excavate pad footings 55 65 Check pad elevations 60 70 Place concrete forms 20,65 75 Pour concrete 70 80 Cure concrete 75 85 Remove forms 80 90 Perform "as-built" 45,85
  • 16. Questions What is the process called to develop your activities list? Brainstorming What are the five types of activities that are kept in mind when developing a finish activity list? Starting, proceeding, Succeeding, concurring, and lagging activities.
  • 17. PLANNING DIAGRAMS The most important part of the CPM is the planning diagram. The planning diagram graphically shows the interrelationship between project activities. It provides a visual blueprint of the work activities that must be performed during construction. There are four types of diagrams that can be created. Each type of diagram serves a specific purpose.
  • 18. GANTT CHART Also known as a bar chart. Gantt charts are "time" oriented. Activities are graphically shown on a calendar time scale, used primarily for small projects. Bars show an activities duration in its entirety, regardless of its dependency on other activities. Effortless to construct, and are brief in format.
  • 19. ID Task Name 1 Topo project site 2 Create project drawings 3 Order gravel 4 Prefabricate forms 5 Clear roadway 6 Set road alignments 7 Establish road grades 8 Check road grades 9 Lay gravel 10 Clear pad site 11 Layout pad batterboards M T W T F S S M T W T F S S M T W T F S S M T W April 7 April 14 April 21 A
  • 20. ID Task Name 1 TEC 1-99 2 TEC Core 3 Marine Unique 4 TEC 5-99 5 TEC Core 6 Marine Unique 10/6/98 2/1/99 TEC 1-99 10/6/98 1/8/99 TEC Core 1/11/99 2/1/99 Marine Unique 11/3/98 3/1/99 TEC 5-99 11/3/98 2/5/99 TEC Core 2/8/99 3/1/99 Marine Unique Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 4, 1998 Qtr 1, 1999 Qtr 2, 1999 Qtr 3, 1999 Qtr 4, 1999
  • 21. GANTT CHART DISADVANTAGES Does not give you the ability to visualize the exact progress of the project. Anticipate delays orproblems soon enough to correct them. Does not show detailed sequence of activities. Does not show "critical activities". Does not show precise effect of a delay orfailure to complete an activity on time.
  • 22. PERT CHART DIAGRAM The Program Evaluation and Review Technique (PERT) addresses probability, and is "event" oriented. This type of logic diagram is used primarily for research and development projects.
  • 23. Clearroadway 5 2d 4/15/97 4/16/97 Clearpad site 10 1d 4/15/97 4/15/97 Createprojectdrawings 2 2d 4/11/97 4/14/97 Topoprojectsite 1 2d 4/9/97 4/10/97
  • 24. Activity-On-The-Arrow Format (CPM) More complex in its creation. Tendency to lead to confusion when trying to interpret it. Least desirable format to use because of these factors.
  • 25.
  • 26. Activity-On-The-Node Format (CPM) Eliminates confusion, and allows you to adjust for problems that may arise during the construction of the project. AON format is "activity" oriented. This is the primary format used for planning military construction, and especially used for large projects.
  • 27. Activity-On-The-Node Uses: Construction planning. Maintenance planning. Project Design. Military combat task planning. Logistics planning.
  • 28. AON Advantages Reduces risk of overlooking essential tasks. Provides a blueprint for long-range planning. Shows activity interrelationships. Focuses attention on critical activities. Allows you to make timely decisions. Allows you to manage manpower, material, and equipment resources more effectively.
  • 29. AON Disadvantages The AON format does not solve engineering problems that may occur. Does not make planning decisions for you. Does not provide anything substantial to the actual construction of the project itself.
  • 30.
  • 31. LOGIC DIAGRAMS ELEMENTS After the activity relationships are identified, they are applied to a logic diagram. The standard format for a logic diagram is the "Activity-on-the- Node". The four basic elements are : Start Nodes. Activity Nodes. Finish Nodes. Precedence Arrows.
  • 35. QUESTIONS What type of diagram is event oriented? What type of diagram is time oriented? What type of diagram is activity oriented?
  • 36. LOGIC DIAGRAMS Shown as a Critical Path Method (CPM) logic diagram. Shows accurate, timely, and easily understood picture of the whole project. Easier to plan, schedule, and manage the sequence of required work activities. Graphically shows the interrelationship of each work activity as they relate to the completion of the whole project.
  • 37. CPMDIAGRAMLOGIC RULES Which activities start at the beginning of the project? (Starting) Which activities must be finished before the start of another? (Preceding) Which activities can start or finish at the same time as another? (Concurring) Which activities cannot begin until another is finished? (Succeeding) Which activities may start when a portion of another activity is complete? (Lagging)
  • 39. Questions What logic rules are used to create a logic diagram? Starting, proceeding, succeeding, concurring, and lagging activities. What type of planning diagram is “event” oriented? Pert chart.
  • 40. Questions What type of planning diagram is “time” oriented? Gantt chart What type of planning diagram is “activity” oriented? AON and AOA diagrams.
  • 42. ACTIVITY ESTIMATES Estimating each activities required resources and duration times. Estimated resources are: Materials. Personnel. Equipment. Man-hours. Equipment-hours.
  • 43. MATERIAL ESTIMATES Work Items. Materials. Quantities. Waste Factors. Total Material Requirements. Bills of Materials.
  • 44. EQUIPMENT/PERSONNEL ESTIMATES Work Items. (Activities) Material Quantities. (Units of work) Work Rate. (Man-hourTables) Standard Work Effort (Labor). (Quantity x WorkRate) Efficiency Factor. Represented as a Percentage) Troop Effort (Total Labor Hours). (Standard Effort / Efficiency) Duration (Hours, Days, Weeks, or Months). (Troop Effort / Crew Size)
  • 45.
  • 46. EARLY/LATE EVENT TIMES After all duration's have been computed, you are now able to calculate each activities Early and Late event times. (Forward Pass and Backward Pass) Early Start (ES): The earliest time a activity can logically start. Early Finish (EF): The earliest an activity can finish without delaying follow on activities. (ES + Duration) Late Finish (LF): The latest an activity can finish without delaying the entire project. Late Start (LS): The latest time an activity can start without delaying the entire project. (LF - Duration)
  • 47. CRITICAL PATH& CRITICAL ACTIVITIES After completing the event times, you can determine the "critical path" of the project and all of the "critical activities" by simple observation using the following guidelines: The ES for an activity is the same as its LS. The EF for an activity is the same as its LF.
  • 48. Activity Number Activity IPB Duration 5 “Topo” project site None 2 days 10 Create project drawings 5 2 days 15 Order gravel None 6 days 20 Prefabricate forms None 1 day 25 Clear roadway 10 2 days 30 Set road alignments 25 1 day 35 Establish road grades 30 1 day 40 Check road grades 35 2 days 45 Lay gravel 15,40 2 days 50 Clear pad site 10 1 day 55 Layout pad batterboards 50 1 day 60 Excavate pad footings 55 2 days 65 Check pad elevations 60 1 day 70 Place concrete forms 20,65 1 day 75 Pour concrete 70 1 day 80 Cure concrete 75 6 days 85 Remove forms 80 1 day 90 Perform “As-built” 45,85 2 days ACTIVITY LIST WITHESTIMATED DURATION'S
  • 49. DEMONSTRATION S 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 F 2 2 6 1 2 22 1 1 1 1 2 1 1 1 6 1 2 0 0 0 2 4 4 4 6 6 7 7 8 8 10 5 5 6 6 8 8 9 6 10 12 1 9 10 10 11 11 17 17 18 18 20 20 2018 18 18 171711111010998866554 1616 1610 98 141413131210 4220 2 12 EARLY/LATE EVENT TIMES DEMONSTRATION
  • 50. Questions What type of resources must be estimated for each activity? Material, personnel, equipment quantities, man hours and equipment hours. What effect does increasing equipment quantities have on the duration of an Activity? It decreases it’s duration time.
  • 51. Questions What do we call the process use to calculate the early event times for a project? Forward pass. What do we call the process use to calculate the late event times for a project? Backward pass.
  • 52. PRACTICAL EXERCISES Complete worksheets 3 and 4 on pg 24 and 25 in your student outline.
  • 53. EARLY START SCHEDULES An early start schedule, when joined with the logic diagram, graphically shows all of the planning information that is needed to manage the construction project from start to finish. Any activity not on the "Critical Path" will contain some float. Float is any extra time that is available to complete an activity beyond its actual duration, without effecting the entire project.
  • 54. EARLY START SCHEDULE DEMO Worksheet 5 pg 26 in student outline
  • 55. FLOAT Total Float (TF): The entire amount of time that an activity can be delayed without delaying the entire project completion time. TF = LS - ES orLF - EF. Interfering Float (IF): Time that is available to delay an activity without delaying the projects entire completion time, but may delay the start of one or more non-critical activities. IF = LF -ES of following activity. (Use the smallest ES time) Free Float (FF): Time that is available to delay an activity without delaying the start of any other activity, or the entire projects completion time. FF = TF - IF
  • 56. FLOAT ALL FINISHING ACTIVITIES WILL CONTAIN ONLY FREE FLOAT NOCALCULATIONS NEEDED Free Float (FF): Time that is available to delay an activity without delaying the start of any other activity, or the entire projects completion time.
  • 58. RESOURCE ABBREVIATIONS SQUAD= SQ 5-TON = 5T TRAM= TR SCRAPER= SC DOZER= DZ GRADER= GD SEE TRAC = ST EXCAVATOR= EX COMPACTOR= CP SHEEPS FOOT = SF SURVEY CREW= S HUMMER= HV DRAFTSMAN = D
  • 59. S 5 10 15 20 25 30 35 40 F 6 2 6 2 1 61 6 0 0 0 EARLY START SCHEDULE DEMONSTRATION 2 2 4 6 6 7 7 13 6 6 7 7 13 13 13 137 7 6 6 60 4 42 7 76 60 TF = 2-0=2 IF =4-2=2 FF=2-2=0 TF =4-2=2 IF =6-6=0 FF= 2-0=2 ACTIVITY NUMBER 1 2 3 4 5 6 7 8 9 10 11 12 13 5(30) 10(20) 15(25) 20(30) 25(35) 30(40) 35(F) 40(F) 4/5T 4/5T 4/4T 4/5T 4/5T 4/5T 2/TR 2/TR X X 2/SQ 2/SQ 2/SQ 2/SQ 2/SQ 2/SQ 2/CP 2/CP 1/SC 3/GR 2/SQ 2/SQ 2/SQ 2/SQ 2/SQ 2/SQ 2/5T 2/5T 2/5T 2/5T 2/5T 2/5T TOTALS 5 TON 4 4 4 4 4 4 2 2 2 2 2 2 TRAM 2 2 SQUAD 2 2 2 2 2 2 2 2 2 2 2 2 COMPACTORS 2 2 SURVEY CREW 1 GRADER 3
  • 60. Questions What is float? Is any extra time that is available to complete an activity beyond its actual duration without affecting the entire project. What is interfering float? Time that is available to delay an activity without delaying the projects entire completion time, but may delay the start of one or more non-critical activities.
  • 61. Questions What is free float? Is any Time that is available to delay an activity without delaying the start of any other activity, or the entire projects completion time.
  • 62. You have now been given all the tools necessary to use construction management to your advantage to better control how your projects are ran.