ESTIMATION 
Estimate is a calculation of various items of an engineering 
works so as to know its approximate cost and quantities of 
various kinds of materials required with labour involved 
for its satisfactory completion.
Purpose of Estimation 
1) To ascertain the necessary amount of money required by the owner to complete the proposed work. 
2) For public construction works, estimates are required in order to obtain administrative approval, 
allotment of funds and technical sanction. 
3) To ascertain quantities of materials required in order to program their timely procurement. 
4) To calculate the number of different categories of workers that are to be employed to complete the 
work within the scheduled time of completion. 
5) To assess the requirements of Tools, Plants and equipment required to complete the work according to 
the program. 
6) To fix up the completion period from the volume of works involve in the estimate. 
7) To draw up a construction schedule and program and also to arrange the funds required according to 
the programming. 
8) To justify the investment from benefit cost ratio. (For ideal investment, this ratio should be more than 
one). 
9) To invite tenders and prepare bills for payment. 
10) An estimate for an existing property is required for valuation.
DATA FOR 
ESTIMATE 
DRAWINGS 
SPECIFICATION 
RATES
VIADUCT 
• Is a bridge composed of several small spans. 
• Derived from latin word via for “road” and “ducere” to lead. 
• A viaduct is thus a bridge spanning in the order of 50m between 
piers. 
• Gautrain route with the longest spanning 650m.
VIADUCT SEGMENT 
• Viaduct Segments are cast in sections of about 2,5m in length. 
• Weigh up to 55 tons and assembled by means of a launching girder 
between piers. 
• Formed by several stages.
PRECASTING OF VIADUCT SEGMENT 
• Mould are placed in position. Check the level and flatness. 
• Rebars are cut and bend as per bbs. 
• Bars are tied with binding wire. And than its lifted up and put in 
position in mould. 
• Concrete is poured using pump. And than is vibrated with shutter 
vibrator and needle vibrator 
• Wet Curing is done for 7 days. Moist curing by sprinkling water for 14 
days. 
• De shuttering is done. 
• Segment is lifted with gantry crane through lifting holes.
Viaduct segment

More Related Content

What's hot

segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridges
Sravan Kumar
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
ShuBham RaNa
 
Lecture 7 strap footing
Lecture 7  strap  footingLecture 7  strap  footing
Lecture 7 strap footing
Dr.Abdulmannan Orabi
 
Marine and offshore construction equipments
Marine and offshore construction equipmentsMarine and offshore construction equipments
Marine and offshore construction equipments
fabil thottathil
 
Well foundation ppt
Well foundation pptWell foundation ppt
Well foundation ppt
Alauddin aziz khan
 
Balanced Cantilever Bridge
Balanced Cantilever BridgeBalanced Cantilever Bridge
Balanced Cantilever Bridge
Jeelkumar Patel
 
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
Construction Tech. and Mgmt., VNIT Nagpur
 
Deep excavation
Deep excavationDeep excavation
Deep excavation
PALLA NARASIMHUDU
 
Box culvert
Box culvertBox culvert
ERECTION/LAUNCHING OF PRECAST SEGMENT USING GROUND SUPPORT SYSTEM (UNDER SLUNG)
ERECTION/LAUNCHING OF PRECAST SEGMENT USING GROUND SUPPORT SYSTEM (UNDER SLUNG)ERECTION/LAUNCHING OF PRECAST SEGMENT USING GROUND SUPPORT SYSTEM (UNDER SLUNG)
ERECTION/LAUNCHING OF PRECAST SEGMENT USING GROUND SUPPORT SYSTEM (UNDER SLUNG)
Rakesh Kumar Choubey
 
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
Akanksha Priya
 
Bridge components
Bridge componentsBridge components
Bridge components
AratiSavant
 
rock anchor methodology
rock anchor methodologyrock anchor methodology
rock anchor methodology
Gautam Sharma
 
Lining in tunnels
Lining in tunnelsLining in tunnels
Lining in tunnels
Himanshu Batra
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segments
Axay Sharma
 
Ppt of pre casting yard
Ppt of pre casting yardPpt of pre casting yard
Ppt of pre casting yard
Ravinder Singh
 
Pile Foundations
Pile FoundationsPile Foundations
Pile Foundations
VARANASI RAMA RAO
 
Precast Wings segment casting NHAI Spine
Precast Wings segment casting NHAI Spine Precast Wings segment casting NHAI Spine
Precast Wings segment casting NHAI Spine
Roshan Sharma
 
Construction of diaphragm wall
Construction of diaphragm wallConstruction of diaphragm wall
Construction of diaphragm wall
Ghanashyam Prajapati
 
Shallow and deep excavation & dewatering
Shallow and deep excavation & dewateringShallow and deep excavation & dewatering
Shallow and deep excavation & dewatering
Adil Vahora
 

What's hot (20)

segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridges
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
 
Lecture 7 strap footing
Lecture 7  strap  footingLecture 7  strap  footing
Lecture 7 strap footing
 
Marine and offshore construction equipments
Marine and offshore construction equipmentsMarine and offshore construction equipments
Marine and offshore construction equipments
 
Well foundation ppt
Well foundation pptWell foundation ppt
Well foundation ppt
 
Balanced Cantilever Bridge
Balanced Cantilever BridgeBalanced Cantilever Bridge
Balanced Cantilever Bridge
 
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
 
Deep excavation
Deep excavationDeep excavation
Deep excavation
 
Box culvert
Box culvertBox culvert
Box culvert
 
ERECTION/LAUNCHING OF PRECAST SEGMENT USING GROUND SUPPORT SYSTEM (UNDER SLUNG)
ERECTION/LAUNCHING OF PRECAST SEGMENT USING GROUND SUPPORT SYSTEM (UNDER SLUNG)ERECTION/LAUNCHING OF PRECAST SEGMENT USING GROUND SUPPORT SYSTEM (UNDER SLUNG)
ERECTION/LAUNCHING OF PRECAST SEGMENT USING GROUND SUPPORT SYSTEM (UNDER SLUNG)
 
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
 
Bridge components
Bridge componentsBridge components
Bridge components
 
rock anchor methodology
rock anchor methodologyrock anchor methodology
rock anchor methodology
 
Lining in tunnels
Lining in tunnelsLining in tunnels
Lining in tunnels
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segments
 
Ppt of pre casting yard
Ppt of pre casting yardPpt of pre casting yard
Ppt of pre casting yard
 
Pile Foundations
Pile FoundationsPile Foundations
Pile Foundations
 
Precast Wings segment casting NHAI Spine
Precast Wings segment casting NHAI Spine Precast Wings segment casting NHAI Spine
Precast Wings segment casting NHAI Spine
 
Construction of diaphragm wall
Construction of diaphragm wallConstruction of diaphragm wall
Construction of diaphragm wall
 
Shallow and deep excavation & dewatering
Shallow and deep excavation & dewateringShallow and deep excavation & dewatering
Shallow and deep excavation & dewatering
 

Similar to Viaduct segment

Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1
Padmasinh Patil
 
overview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptxoverview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptx
TemitopeBello6
 
Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)
Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)
Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)
Shubham Arora
 
shishir_cv
shishir_cvshishir_cv
shishir_cv
shishir kumar
 
Estimation Costing and Valuation Unit 1 to Unit 6
Estimation Costing and Valuation Unit 1 to Unit 6Estimation Costing and Valuation Unit 1 to Unit 6
Estimation Costing and Valuation Unit 1 to Unit 6
Padmasinh Patil
 
Estimation and costing of civil engineering works
Estimation and costing of civil engineering worksEstimation and costing of civil engineering works
Estimation and costing of civil engineering works
AnshulPal39
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
Saqib Shahzad
 
ECV All Chapters
ECV All ChaptersECV All Chapters
ECV All Chapters
Padmasinh Patil
 
9C404.5.ppt
9C404.5.ppt9C404.5.ppt
potato 2.pptx
potato 2.pptxpotato 2.pptx
potato 2.pptx
BetshaTizazu1
 
Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphb
hlksd
 
Curriculum Vitae Of Khalid
Curriculum Vitae Of KhalidCurriculum Vitae Of Khalid
Curriculum Vitae Of Khalid
Khalid Masood Khan
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
sounder duraisamy
 
sounder
soundersounder
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
Raghavendra Velayutharaja
 
dean resume (1)
dean resume (1)dean resume (1)
dean resume (1)
Dean McNulty
 
specification estimation and valuation of a building
specification estimation and valuation of a buildingspecification estimation and valuation of a building
specification estimation and valuation of a building
swethasekhar5
 
AH15019
AH15019AH15019
Submarine outfalls & intakes ppt
Submarine outfalls & intakes pptSubmarine outfalls & intakes ppt
Submarine outfalls & intakes ppt
Abhay Ocean India ltd.
 
estimation,costingandvaluation.pdf
estimation,costingandvaluation.pdfestimation,costingandvaluation.pdf
estimation,costingandvaluation.pdf
Ictsol
 

Similar to Viaduct segment (20)

Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1
 
overview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptxoverview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptx
 
Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)
Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)
Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)
 
shishir_cv
shishir_cvshishir_cv
shishir_cv
 
Estimation Costing and Valuation Unit 1 to Unit 6
Estimation Costing and Valuation Unit 1 to Unit 6Estimation Costing and Valuation Unit 1 to Unit 6
Estimation Costing and Valuation Unit 1 to Unit 6
 
Estimation and costing of civil engineering works
Estimation and costing of civil engineering worksEstimation and costing of civil engineering works
Estimation and costing of civil engineering works
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
 
ECV All Chapters
ECV All ChaptersECV All Chapters
ECV All Chapters
 
9C404.5.ppt
9C404.5.ppt9C404.5.ppt
9C404.5.ppt
 
potato 2.pptx
potato 2.pptxpotato 2.pptx
potato 2.pptx
 
Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphb
 
Curriculum Vitae Of Khalid
Curriculum Vitae Of KhalidCurriculum Vitae Of Khalid
Curriculum Vitae Of Khalid
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
 
sounder
soundersounder
sounder
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
dean resume (1)
dean resume (1)dean resume (1)
dean resume (1)
 
specification estimation and valuation of a building
specification estimation and valuation of a buildingspecification estimation and valuation of a building
specification estimation and valuation of a building
 
AH15019
AH15019AH15019
AH15019
 
Submarine outfalls & intakes ppt
Submarine outfalls & intakes pptSubmarine outfalls & intakes ppt
Submarine outfalls & intakes ppt
 
estimation,costingandvaluation.pdf
estimation,costingandvaluation.pdfestimation,costingandvaluation.pdf
estimation,costingandvaluation.pdf
 

Recently uploaded

Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
IJECEIAES
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
AjmalKhan50578
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 

Recently uploaded (20)

Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 

Viaduct segment

  • 1. COST ESTIMATION OF PRECAST VIADUCT SEGMENT • Prepared by- • Navneet singh(pp14062) • Ashish jain(pp14110)
  • 2. ESTIMATION Estimate is a calculation of various items of an engineering works so as to know its approximate cost and quantities of various kinds of materials required with labour involved for its satisfactory completion.
  • 3. Purpose of Estimation 1) To ascertain the necessary amount of money required by the owner to complete the proposed work. 2) For public construction works, estimates are required in order to obtain administrative approval, allotment of funds and technical sanction. 3) To ascertain quantities of materials required in order to program their timely procurement. 4) To calculate the number of different categories of workers that are to be employed to complete the work within the scheduled time of completion. 5) To assess the requirements of Tools, Plants and equipment required to complete the work according to the program. 6) To fix up the completion period from the volume of works involve in the estimate. 7) To draw up a construction schedule and program and also to arrange the funds required according to the programming. 8) To justify the investment from benefit cost ratio. (For ideal investment, this ratio should be more than one). 9) To invite tenders and prepare bills for payment. 10) An estimate for an existing property is required for valuation.
  • 4. DATA FOR ESTIMATE DRAWINGS SPECIFICATION RATES
  • 5. VIADUCT • Is a bridge composed of several small spans. • Derived from latin word via for “road” and “ducere” to lead. • A viaduct is thus a bridge spanning in the order of 50m between piers. • Gautrain route with the longest spanning 650m.
  • 6. VIADUCT SEGMENT • Viaduct Segments are cast in sections of about 2,5m in length. • Weigh up to 55 tons and assembled by means of a launching girder between piers. • Formed by several stages.
  • 7. PRECASTING OF VIADUCT SEGMENT • Mould are placed in position. Check the level and flatness. • Rebars are cut and bend as per bbs. • Bars are tied with binding wire. And than its lifted up and put in position in mould. • Concrete is poured using pump. And than is vibrated with shutter vibrator and needle vibrator • Wet Curing is done for 7 days. Moist curing by sprinkling water for 14 days. • De shuttering is done. • Segment is lifted with gantry crane through lifting holes.