Sounder Duraisamy is a mechanical engineer with 9 years of experience in quantity surveying, estimation, costing, and project management. He has a Bachelor's degree in Mechanical Engineering from Kumaraguru College of Technology in India. He is currently working as an Assistant Manager at Sobha Limited in Bangalore, India, where he is responsible for quantity surveying, tendering, estimation, and cost controlling activities. Previously, he has worked on oil and gas projects in Qatar, UAE, and India.
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)Imteyaz Ahmad
My self Imteyaz. Ahmad. having reach experience(12 yrs) in MEP field Site /Project management (specially hotel project) . with design review & drawing coordination, tendering , cost budgeting , bill verification.
I got technical education from central university i.e A.M.U. Aligarh.
Currently working with Maxim infrastructure & real estate Pvt. Ltd.(HM GROUP) on the Marriott Hotel Project Shillong (Meghalaya).
Thanks & Regards
8014316443
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)Imteyaz Ahmad
My self Imteyaz. Ahmad. having reach experience(12 yrs) in MEP field Site /Project management (specially hotel project) . with design review & drawing coordination, tendering , cost budgeting , bill verification.
I got technical education from central university i.e A.M.U. Aligarh.
Currently working with Maxim infrastructure & real estate Pvt. Ltd.(HM GROUP) on the Marriott Hotel Project Shillong (Meghalaya).
Thanks & Regards
8014316443
Employer branding is more than just attracting winning candidates. Jazz & Surfline discuss creative ways to boost your employer brand to help with the recruiting process. Learn how to:
- Create engaging job postings that relate to your brand
- Leverage social media for recruiting
- Encourage your employees to think like recruiters
- Other creative ways to promote (and develop) your employer brand
Want to learn more? Sign up for a free trial of Jazz today - https://tryjazz.com/
Result oriented professional with 4 years experience in field of steel structure.
Proficient in developing & streamlining systems with proven ability to enhance
operational effectiveness and meet operational goals within the cost, time & quality
parameters.
Adept in enhancing production process operations, optimizing resource utilization,
escalating productivity and operational efficiencies.
Possess strong analytical, problem-solving and interpersonal communication skills
with a good positive attitude in team play.
1. SOUNDER DURAISAMY
Mobile number: +919620336911, +918746998086
Email ID : sounder3@gmail.com; souns_2@yahoo.co.in
Skype ID: Souns123
Place: Bangalore, India.
OBJECTIVE
Qualified: B.E. (Bachelor of Mechanical Engineering)
Career Exposure:
Estimation, Quantity Survey, Tendering, Project Co-ordination,
Area of Experience:
Plumbing, Fire Fighting, HVAC, Piping, Structural, Oil & Gas,
Computer Skills and Software Used :
MS Office, MS Project, Auto CAD, Pro-Engineering 2001, CATIA,HAP ,
Years of Experience: 9 years
Countries worked: Qatar, UAE & India
OBJECTIVE:
Experienced and trained professional engineer, dealing with complicated projects, creating high quality
And timely work result,
EDUCATION QUALIFICATION:
BACHELOR OF MECHANICAL ENGINEERING - FULL TIME
INSTITUTE : KUMARAGURU COLLEGE OF TECHNOLOGY, INDIA
AFFILIED TO : ANNA UNIVERSITY, CHENNAI, INDIA
COURSE DURATION: 2002 to 2006 (4 years)
GRADE: FIRST CLASS – 71. 5 %
2. WORK EXPERIENCE:
Current organization: SOBHA LIMITED, Bangalore, INDIA
• Assistant Manager : Estimation, billing, costing, procurement, QS, Vendor Development
• Period : February 2011 – Till Date
RESPONSIBILITY
Quantity Surveyor:
• Preparation of Bill Of Quantities based on supplied materials and executed works ,
• Prepare consolidated and break-up bills of quantities for various services with all required
specifications and material properties ensuring the exercise of all available records.
• Submission of Invoices for claims along with inward documents & certified measurement sheet
• Preparation of project cash flow forecasts and update periodically
• Monitoring & controlling the process of sub contractor measurement & payment
• Variation order request & claims based on client information and approved documents
• Attending for the monthly progress meeting of projects
• Regular follow up with consultants & clients for certification of payments and payments request as per
payment terms and conditions.
• Preparing of budget allocation for the new projects
• Request of mobilization advance by submission of Bank guarantee
• Assisting to prepare the As-Built Drawings & handing Over documents
• Preparing Management Information System(MIS) every month
• Co-ordination with Finance department for cash flow & with HR department for labor related
documents to Clients ,
Tendering:
• Studying & reviewing the all Tender Conditions and scope of work of the contract to be executed.
• Checking all commercial clauses of contract , terms of payment, advance payment, penalties, labor documents &
insurances to be covered ,
• Preparation, compilation, and submission of Pre-Qualifications, Budgetary offers and formal Tender
submissions from receipt of requests from Clients, review clarifications and attend negotiation, to award and
handover to the execution teams
• Collecting the offers for the materials from the approved suppliers and sub-contractors for the services. On
collection of offers to further negotiate for any discounts.
• Attending the pre bid meeting , negotiating with clients to offer our best quotation and getting approval for
proposed materials and equipment as per technical specification and finalizing make of material for execution
• Analyzing the offer negotiated with client and discussing with top management for approval of the offer
• Submitting final offer for award of the project
• Management of interfaces with supporting functions, e.g. Procurement, Engineering, Project Services, Project
& Operations, Finance, Legal etc. to facilitate technically robust and commercially competitive submissions
• Taking care of contract policies, insurance, license & Mobilization advance request, bank guarantees.
Estimation:
• Measurement Quantity take off (MTO) from approved GFC Drawings for Bill of quantities (BOQ) and
Preparing Rate Analysis for approved make materials and installation works.
• Working of Central Over heads cost & expense & preparing Preliminaries expense of projection execution
3. • Arriving percentage for COH expense, preliminaries, indirect expense to finalize the Over head profit margin
(OHP), Apart from OHP fixing material and labor expense to monitor the profit margin.
• Providing the estimated labor and material cost to site engineer/cost engineer to monitor and control the cost .
• Develop an estimation methodology and maintain with actual execution / progress on site
Costing:
• Preparation of Costing Sheet to Monitor the project execution by controlling of materials &
manpower, Vendor works .
• Tracking & Monitoring Cash inflow & outflow every month of Project & Central over heads.
• Preparing the Costing sheet and doing Reconciliation of the project expenditure Vs Estimation expenditure
• Preparing Profitability statement/ costing sheet for every project every month to monitor the
material & labor expense and OHP.
• Working on AutoCAD drawings to arrive BOQ (Bill of Quantities) and preparing As-installed
Drawings as per executed projects.
Cost controlling:
• Shifting closed projects stock to other running projects or do scrap sales to avoid loss
• Maintaining existing quality manpower and controlling the requirement of new technicians based on
estimated budget for the project,
• Controlling of procuring the new materials and trying to clear the existing stock ,
• Analyzing the other expense , preliminaries to control the project expense.
Reporting to the General Manager and Senior Vice President
PROJECT TWO:
Previous organization: TOPAZ- ENGINEERING, ABUDHABI- UAE
• ROLE : QUANTITY SURVEYOR (OIL& GAS)
• PROJECT : MOBILE OFFSHORE OIL PRODUCTION AND STORAGE .
. UNIT (MOPU)-Offshore Oïl construction
• Project details : construction of offshore oil production and storage unit ,
Total weight around 14000 tons.
• Project Value : 65 million dollars (USD)
• CLIENT : TALISMAN ENERGY, NORWAY
• SUB-CONTRACT TO : SINGLE BOUY MOORINGS LTD (SBM)
• PERIOD :[OCT 2008 – MAR 2010]
RESPONSIBILITY
4. Quantity surveying:
• Post tender Measurement Take-off For Structural, piping ,insulation, Main Equipments, Instruments,
Painting and insulation based on Installed Drawings and supply of Equipment,
• Calculating weight (metric tons) and area measurement take off from drawings to prepare the Bill of quantities
(BOQ) & follow up for Client Work order
• Site visit along with clients for approval on drawings for the executed quantity and preparing the invoice for
executed work as the approved work order for payment process
• Tracking the materials & labor works to cost control and for cash flow
• Checking & Reviewing of Structure and Piping layouts, isometrics drawing for preparation of BOQ
• Variation preparation for timesheet of man hours, welding machines, equipments, cranes, scaffolding,
office usage etc….
• Claiming For Demolition and Re-modification Work As per Engineering Drawing Revision and Site
Communication
• The following job as per Steel specification based on ASME, ANSI, API & ASTM Standards, and
Codes.
• Claiming variation order as per client instruction & contract agreement
• Cost input to weekly and monthly reports
• Regular meeting with Clients and Discussing About Past And Future work,
• Reporting to the Project Manager & Cost Control Manager,
• Working on AutoCAD drawings.
Cost controlling:
Major part is covered for cost controlling:
• Reducing man power if the work not in peak, clearing scrap and manage to control the purchase
• Tracking sub contractor bills and control the cash flow
• Painting & Piping insulation (personnel protection, fire proof, thermal insulation) cost controlled for
various claims
Vendor installation:
Had done deck crane measurement and calculation to check the weight and painting area done proper
by vendor supply (2 deck cranes) & helipad installation.
Reported to the Cost Manager and Project Manager
PROJECT THREE:
COMPANY: NASSER S ALHAJRI CORPORATION LTD, QATAR.
MNC COMPANY
• ROLE : Junior Quantity Surveyor
• PROJECT : GAS PLANT CONSTRUCTION
5. • CLIENT : RAS GAS,RAS LAFFAN INDUSTRIAL CITY,QATAR
• CONTRACTOR : FLOUR ,USA
• PERIOD : [Dec 2007 –JUNE 2008]
RESPONSIBILITY
• Preparing Bill of Quantities for Structural, Piping, Supports and prepare contract documents.
• Cost input to weekly and monthly reports
• Site Inspection Along With Client And Approving The Engineering Drawing of Fabrication and
Erection Work done,
• Measurements Done For BOQ Will Submit Weekly To Our Client,
• Demolition Material Charges Claim From Client According to Site Communication Approval
• Variation Submission of Timesheet, Office & Construction Usage to Clients,
• Regular meeting with Clients and Discussing About Past And Future work
• Reporting To Cost Manager And Project Manager,
• Making AutoCAD drawing for extra work.
PROJECT FOUR: Valve Production
COMPANY: Sri Ranganathar Industries (P) ltd.
ROLE : Production Engineer
PERIOD : [April 2006 –September 2007]
RESPONSIBLITIES:
• Production in charge for Metro Water Pipeline Valves production
• Supervising and managing the lathe production work
• Finalizing the Finished product and checking errors before inspection,
• preparing AutoCAD drawings
• Designing Valve from 3”to 6” by using AutoCAD drawings
• Finalizing the product and arranging drawing for workers
• Daily report submission of completed products to my senior.
• Finished products finalization for delivery
• products are water pipe line joints from ½” to 6” valves (
• Gate, Ball, Piston, Globe Valves)
SAFETY TRAINING:
COMPANY : QATAR INTERNATIONAL SAFETY TRAINING CENTRE.
ROLE : H2S GAS AWARENESS TRAINEE
PERIOD : [DEC 2006 –JANUARY 2007]
• Trained to work with safety equipment in danger work
• Safety training to work in running plant & construction work
• Got hot permit to work in oil and gas refinery construction
6. CATIA V5:
Internship training undergone in CATIA v5 r19
a) Basic sketching
b) Part designing
c) Assembly modeling
d) Drafting
e) Wireframe and surface designing
f) Duration one month training program from April 2010 to May 2010
Trained in UMS Technologies Training centre-Coimbatore, India.
PROJECT DONE:
COMPANY : BIMETAL BEARINGS LTD, INDIA.
ROLE : PROJECT TRAINEE
PERIOD : [DECEMBER 2005 –APRIL 2006]
PRODUCTIVITY IMPROVEMENT THROUGH RE-ENGINEERING:
• CONVERSION OF 8–WORKSTATIONS TO 2–WORKSTATIONS CHAMPERING MACHINE BY USING
INDEXING MECHANISM.
• AUTOMATING THE WORKPIECE REMOVAL PROCESS BY USING
PICK AND PLACE ELECTROMAGNET.
AREA OF INTEREST:
MEP Services, OIL & GAS, MECHANICAL Projects. Purchase
REFERENCE:
1. Mr. CHANDRASEKAR-Cost control manager, Topaz Engineering, Abu Dhabi.UAE
Contact number: +971508113077, +9710505547722, Email id:Chandra.sekar@topaz-engineering.com.
2. Mr. Murali Krishna – DGM , M&E Contracts Dept , Sobha Ltd , Bangalore ,India
Contact Number: 9880730397
3. Mr. SENGOTUVEL-STO , PWD Office- Indian Government , Pudukkottai, India
Contact number: +919443550673
7. PERSONAL PROFILE:
Date of Birth : 11.8.1984
Sex : Male
Nationality : Indian
Mother tongue : Tamil
Marital Status : Married
Language proficiency : English, Tamil (Listen, Read, Write & Speak),
Other : Hindi, kanada (Listen & Speak)
Passport Number : N6544439- VALID UPTO 2026
Availability: One month Notice period
DATE:
Location: Bangalore
YOUR’S FAITHFULLY
(Sounder Duraisamy)