INDUSTRIAL INTERNSHIP
AT
SHAPOORJI PALLONJI & CO. PVT.
LTD.
PREPARED BY-
SHUBHAM ARORA
140357/1410736
D4CE
GNDEC, LUDHIANA.
PROJECT OVERVIEW
• Name- Homi Bhabha Cancer Hospital & Research Centre.
• Client- Tata Memorial Centre.
• Consultant- DDF Consultants Pvt. Ltd.
• Contractor- Shapoorji Pallonji & Co. Pvt. Ltd.
• Type of Contract- Lump Sum (Design & Build).
• Project Value- 217Cr.
PROJECT OVERVIEW
• Scope of Work- Civil, Structural, Finishing, MEP &
Infrastructure.
• Total Built Up Area- 4.9 Lacs sqft.
• Start Date- 06-10-2016
• End Date- 05-10-2018
• Extension of Time- 215 days
• Revised End Date- 08-05-2019
PROJECT OVERVIEW
HOMI BHABHA CANCER HOSPITAL & RESEARCH
CENTRE
BILLING DEPARTMENT
• Read through the contract conditions.
• Read Bill of Quantities (BOQ).
• Prepared Bar Bending Schedule for 110mT for different
elements like Beams, Columns, Slabs, etc.
• BBS is generally used by-
• Detailer
• Quantity Surveyor
• Contractor Ordering Reinforcement
BAR BENDING SCHEDULE
• Cutting Length- Steel is ductile in nature & is subjected to
elongation while bending during hooks.
• Cutting Length = True Length of bar – deductions
• For 45 degree, deductions = 1*d
• For 90 degree, deductions = 2*d
• For Stirrups, Length = 2*A+2*B+20*D (For 90 degree hook)
• For 135 degree hook = 2*A+2*B+24*D
BAR BENDING SCHEDULE
• I did calculated the BBS for Plinth Beam of Porch Area, Plinth
Beams of Service Block, 1st Floor Slab of Dharamshala, Plinth
Beam of Canopy Area, Slab & Beams of 1st Floor of Canopy
Area, Columns of Service Block, etc.
CALCULATION OF CIVIL QUANTITIES
• Formwork- This involves 20-25% of the cost of structure.
Stripped formwork can be reused. The disadvantage of timber
formwork is it can shrink, swell, etc
• Types of Formwork- 1. Timber Formwork ( traditional type)
2. Plywood Formwork
3. GI Sheet (Steel Formwork)
• Method of Removing Formwork- Formwork of vertical faces of
walls, beams, columns, should be removed first, followed by
soffit of slabs, then soffit of beams, girders, any heavy
structure.
CALCULATION OF CIVIL QUANTITIES
• I did calculated the formwork for 1st Floor Beams of Entrance
Area, Corridor Area Wing A & Wing B, and some part of Wing D.
I also did calculation of concrete in 1st Floor Entrance Area and
Canopy Area.
The calculations for
beams of corridor area
are shown in the form of
sample.
INVITING QUOTATIONS FOR PIECE WORK &
WORK ORDER ACCEPTANCE
• A Work Order is generally task or job assigned to a particular
contractor or sub-contractor. It generally includes cost, date & time
of execution, information about location, etc.
• Piece Work is type of employment in which worker is paid a fixed
piece rate for each unit produced.
• Guarantee Certificate is certificate issued by different contractors
regarding their services, products, etc. to Client directly so that in
case any problem arises, they can directly get in touch.
• Document Handing Over is handling over every work done by EPC
Contractor is handed over to Client including drawings, bills, etc.
EXECUTION DEPARTMENT
• The project is commercial building & construction of all the
elements is done by this department itself.
• This department helped me learn different types of materials to
be used at site for supporting, casting, etc.
• Plywood Formwork was used along with wooden battens for
shuttering.
• Reinforcement of 500D grade was used.
• Scaffolding was done using ledgers, standards of different
sizes along with plane jacks or base plates.
• U-jacks, waller, I-sections, tie-rods, etc. were used for
Supporting.
EXECUTION DEPARTMENT
• Site Supervision mainly includes-
• Calculating Quantity of Concrete
• Calculating No. of Ply-boards required for Formworks & their different
sizes.
• Supervising which work is being done by which Contractor, so that
problem does not arise at the time of billing.
• Construction being done as per drawings.
• Asking for RFIs wherever needed.
• Maintaining Daily Labour Report, both departmental & measurement
basis.
• Keeping a check on quality specifically about levels, alignments, etc.
• Keeping a check on proper safety measures being adopted & followed by
everyone at site.
EXECUTION DEPARTMENT
• Safety- A HSE plan is devised by safety department which works
as rulebook for every person on site. Its objective to promote
Health, Safety & Environment for people working.
EXECUTION DEPARTMENT
• Material mobilisation- This includes Licenses, Permits &
activities as shown-
• Storage, Canteen facility, etc.
• Steel Yard, Fabrication Yard, Site office, etc.
• Electricity, Water & Sanitation facilities, etc.
• Workmen Daily Report- In order to calculate the productivity,
this is most important activity at site. It tells what has been
spent to what milestone have been achieved.
• Work as per Drawings- The work is to be executed as per
drawings, i.e. pits, Cut-Outs, Sunk areas, typical sections etc.
should be taken care off.
EXECUTION DEPARTMENT
• Quality- There is particular methodology which is followed as
per Client’s requirement. Different Codes & Practices are
followed for those.
• Daily Progress Report- This is submitted by Site Engineer to
Planning department which helps to keep a check on Pace of
Project & decide necessary steps needed to achieve task.
• Monthly Bill- Payment in SPCPL is done monthly basis to
contractor against the work done by his team.
• Contractor Review- On the basis of different parameters,
contractors are retained or expelled which helps the company
to work with best workers.
EXECUTION DEPARTMENT (SITE WORK)
• I was involved in 3 different Wings, namely, Entrance Area,
Canopy Area (Wing A & B and Wing B & C).
EXECUTION DEPARTMENT (SITE WORK)
S. No. Formwork (sqm.) Reinforcement (mT.) Concrete (Cum.)
1. Canopy Area
(Plinth Beams)
172.56 8.5(including
columns)
10.36
2. Entrance Area
(1st Floor)
650 19.5(Slab)+7.6(colu
mns)
103
3. Corridor Area
(1st Floor)
386 5.2(Column)+16.3(S
lab)
59
4. Canopy Area
(1st Floor)
432 3.2(Beams)+2.97(Sl
ab)
61.18
QUALITY DEPARTMENT
• Quality in Construction is defined as ‘meeting or exceeding the
requirement of client/owners. Quality in construction is
employed with conformity with which specifications are met.
Quality in construction is related to -
Satisfying the specification mentioned in the contract
Completing the project time.
Fulfilling the owner's requirement within budget.
Avoiding disputes claims and
Ensuring the faculties performs its intended purpose.
QUALITY DEPARTMENT
• Elements of Quality- Quality Characteristics- Colour, Strength, Texture,
etc.
Quality of Design- Subjected to IS Codes being
followed.
Quality of Conformance- 1. Construction Methodology
2. Supervision
3. Inspection.
• A project quality plan (PQP), sometimes referred to as a quality
management plan, quality assurance plan, is a project-specific
quality plan that describes the activities, standards, tools and
processes necessary to achieve quality in the delivery of a project.
QUALITY DEPARTMENT
• Quality Inspection at Site-
1. Checking points for Reinforcements-
(a) Details & BBS should be as per drawing.
(b) Lapping zone should be checked.
(c) Spacing between bars, stirrups, chairs
should be checked.
QUALITY DEPARTMENT
2. Checking points for Formwork-
(a) Formwork material like ply-board, battens should be checked
for any
bends or corrosion.
(b) Checking of supports, inside/outside panels.
(c) Checking of proper scaffolding.
(d) Execution of formwork should be done as per drawing.
(e) Size and sections of beam & columns should be checked.
(f) Proper Levels and alignment should be checked.
QUALITY DEPARTMENT
• 3. Checking points for Casting-
(a) Check all the activities like cleaning, formwork oiling, etc. before
ordering concrete.
(b) Arrangement for additional equipment like vibrator, needle,
trowels, plumbs, etc. should be done.
(c) Sufficient Manpower for handling house pipe, whole pipeline,
finishing, etc. should be available.
(d) No extra water should be allowed to mix at Site.
(e) Proper Slump test and cubes should be taken for each time concrete
is ordered.
(f) Concrete should not be poured from height more than 1 meter.
QUALITY DEPARTMENT
• Material Testing at Site- Different kinds of tests are done for
different kinds of materials in QA/QC lab at site.
• I did witnessed 3 tests- 1. Slump Test.
2. Cube Test.
3. Dry density Test.
SUMMARY
• With an exclusive opportunity to work in 3 departments (Billing,
Execution & Quality), I completed this intern, gaining a lot of
knowledge about construction activities.
THANK YOU!!!

More Related Content

What's hot

Project study report c&b
Project  study report c&bProject  study report c&b
Project study report c&bParam Saxena
 
Morocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case StudyMorocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case StudyCCL Concrete
 
PREFABRICATION BUILDING
PREFABRICATION BUILDINGPREFABRICATION BUILDING
PREFABRICATION BUILDINGsathish sak
 
Prefabricated Structures
Prefabricated Structures Prefabricated Structures
Prefabricated Structures B2BNews
 
Prefabrication for improving Sustainability and Economics of Civil Engineerin...
Prefabrication for improving Sustainability and Economics of Civil Engineerin...Prefabrication for improving Sustainability and Economics of Civil Engineerin...
Prefabrication for improving Sustainability and Economics of Civil Engineerin...Ankit Singhai
 
TECHNICAL REPORT_Turbo-Abrasive Machining
TECHNICAL REPORT_Turbo-Abrasive MachiningTECHNICAL REPORT_Turbo-Abrasive Machining
TECHNICAL REPORT_Turbo-Abrasive MachiningDave Davidson
 
Method painting works emulsion paint
Method painting works   emulsion paintMethod painting works   emulsion paint
Method painting works emulsion paintMinh Bui Si
 
Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Minh Bui Si
 
HC PRECAST SYSTEM's Technical Property
HC PRECAST SYSTEM's Technical PropertyHC PRECAST SYSTEM's Technical Property
HC PRECAST SYSTEM's Technical PropertyTeow Beng Hur
 
Building work method statement cm - ms- bw - 001
Building work method statement  cm - ms- bw - 001Building work method statement  cm - ms- bw - 001
Building work method statement cm - ms- bw - 001Minh Bui Si
 
Turbo abrasive machining and finishing
Turbo abrasive machining and finishingTurbo abrasive machining and finishing
Turbo abrasive machining and finishingDave Davidson
 
Presentation 2016
Presentation  2016Presentation  2016
Presentation 2016Teow Beng Hur
 
Method statement for repair of concrete surface
Method statement for repair of concrete surfaceMethod statement for repair of concrete surface
Method statement for repair of concrete surfaceMinh Bui Si
 
Ct iii presentation
Ct iii presentationCt iii presentation
Ct iii presentationPui Chun Shian
 
Summer training report
Summer training reportSummer training report
Summer training reportRaj Vaibhav Singh
 
Modular Construction Advancements
Modular Construction AdvancementsModular Construction Advancements
Modular Construction AdvancementsAkhil Saxena
 
Multi Storey Steel Structures
Multi Storey Steel StructuresMulti Storey Steel Structures
Multi Storey Steel StructuresRicha Industries Ltd
 
Prefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusPrefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusIEI GSC
 

What's hot (20)

Project study report c&b
Project  study report c&bProject  study report c&b
Project study report c&b
 
Morocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case StudyMorocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case Study
 
PREFABRICATION BUILDING
PREFABRICATION BUILDINGPREFABRICATION BUILDING
PREFABRICATION BUILDING
 
Prefabricated Structures
Prefabricated Structures Prefabricated Structures
Prefabricated Structures
 
M.Salah cv1
M.Salah cv1M.Salah cv1
M.Salah cv1
 
Prefabrication for improving Sustainability and Economics of Civil Engineerin...
Prefabrication for improving Sustainability and Economics of Civil Engineerin...Prefabrication for improving Sustainability and Economics of Civil Engineerin...
Prefabrication for improving Sustainability and Economics of Civil Engineerin...
 
TECHNICAL REPORT_Turbo-Abrasive Machining
TECHNICAL REPORT_Turbo-Abrasive MachiningTECHNICAL REPORT_Turbo-Abrasive Machining
TECHNICAL REPORT_Turbo-Abrasive Machining
 
Method painting works emulsion paint
Method painting works   emulsion paintMethod painting works   emulsion paint
Method painting works emulsion paint
 
Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0
 
A PRESENTATION ON PREFABRICATED STRUCTURES
A PRESENTATION ON PREFABRICATED STRUCTURES A PRESENTATION ON PREFABRICATED STRUCTURES
A PRESENTATION ON PREFABRICATED STRUCTURES
 
HC PRECAST SYSTEM's Technical Property
HC PRECAST SYSTEM's Technical PropertyHC PRECAST SYSTEM's Technical Property
HC PRECAST SYSTEM's Technical Property
 
Building work method statement cm - ms- bw - 001
Building work method statement  cm - ms- bw - 001Building work method statement  cm - ms- bw - 001
Building work method statement cm - ms- bw - 001
 
Turbo abrasive machining and finishing
Turbo abrasive machining and finishingTurbo abrasive machining and finishing
Turbo abrasive machining and finishing
 
Presentation 2016
Presentation  2016Presentation  2016
Presentation 2016
 
Method statement for repair of concrete surface
Method statement for repair of concrete surfaceMethod statement for repair of concrete surface
Method statement for repair of concrete surface
 
Ct iii presentation
Ct iii presentationCt iii presentation
Ct iii presentation
 
Summer training report
Summer training reportSummer training report
Summer training report
 
Modular Construction Advancements
Modular Construction AdvancementsModular Construction Advancements
Modular Construction Advancements
 
Multi Storey Steel Structures
Multi Storey Steel StructuresMulti Storey Steel Structures
Multi Storey Steel Structures
 
Prefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusPrefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed Impetus
 

Similar to Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)

Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1Padmasinh Patil
 
Cost effectiveness in qulaity construction
Cost effectiveness in qulaity constructionCost effectiveness in qulaity construction
Cost effectiveness in qulaity constructionSeetha Ram P G
 
iosh-temporary-works.pdf
iosh-temporary-works.pdfiosh-temporary-works.pdf
iosh-temporary-works.pdfXiMdhk
 
Mouyadin moumin abdillahi.pptx
Mouyadin moumin abdillahi.pptxMouyadin moumin abdillahi.pptx
Mouyadin moumin abdillahi.pptxZakaria156221
 
Estimation Costing and Valuation Unit 1 to Unit 6
Estimation Costing and Valuation Unit 1 to Unit 6Estimation Costing and Valuation Unit 1 to Unit 6
Estimation Costing and Valuation Unit 1 to Unit 6Padmasinh Patil
 
Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphbhlksd
 
Summer Internship in Jaypee Group
Summer Internship in Jaypee Group Summer Internship in Jaypee Group
Summer Internship in Jaypee Group Abhimanyu Saraswat
 
Waji Ul Hassan_original
Waji Ul Hassan_originalWaji Ul Hassan_original
Waji Ul Hassan_originalwaji waji
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERSajjad Ali
 
arun megarme
arun megarmearun megarme
arun megarmeARUN KUMAR A
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cvwaleed ibrahim
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC SupervisorPranesh Kumar
 
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...DougDos
 

Similar to Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site) (20)

AH15019
AH15019AH15019
AH15019
 
Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1
 
Cost effectiveness in qulaity construction
Cost effectiveness in qulaity constructionCost effectiveness in qulaity construction
Cost effectiveness in qulaity construction
 
AHMED MOHIY 21
AHMED MOHIY 21 AHMED MOHIY 21
AHMED MOHIY 21
 
iosh-temporary-works.pdf
iosh-temporary-works.pdfiosh-temporary-works.pdf
iosh-temporary-works.pdf
 
Mouyadin moumin abdillahi.pptx
Mouyadin moumin abdillahi.pptxMouyadin moumin abdillahi.pptx
Mouyadin moumin abdillahi.pptx
 
Estimation Costing and Valuation Unit 1 to Unit 6
Estimation Costing and Valuation Unit 1 to Unit 6Estimation Costing and Valuation Unit 1 to Unit 6
Estimation Costing and Valuation Unit 1 to Unit 6
 
Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphb
 
Summer Internship in Jaypee Group
Summer Internship in Jaypee Group Summer Internship in Jaypee Group
Summer Internship in Jaypee Group
 
Waji Ul Hassan_original
Waji Ul Hassan_originalWaji Ul Hassan_original
Waji Ul Hassan_original
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
arun megarme
arun megarmearun megarme
arun megarme
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
 
Resume
ResumeResume
Resume
 
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
 
Mohammed Asif Hassan-cv
Mohammed Asif Hassan-cvMohammed Asif Hassan-cv
Mohammed Asif Hassan-cv
 
wsa
wsawsa
wsa
 
Umar iqbal qc.cv
Umar iqbal qc.cvUmar iqbal qc.cv
Umar iqbal qc.cv
 

More from Shubham Arora

Self healing concrete
Self healing concreteSelf healing concrete
Self healing concreteShubham Arora
 
Design & Modelling of Slab using Macro, VBA & AutoCAD
Design & Modelling of Slab using Macro, VBA & AutoCADDesign & Modelling of Slab using Macro, VBA & AutoCAD
Design & Modelling of Slab using Macro, VBA & AutoCADShubham Arora
 
Design of lifts & escalators
Design of lifts & escalatorsDesign of lifts & escalators
Design of lifts & escalatorsShubham Arora
 
Bubble deck slab
Bubble deck slabBubble deck slab
Bubble deck slabShubham Arora
 
Lifts and escalators
Lifts and escalatorsLifts and escalators
Lifts and escalatorsShubham Arora
 
Chemical Admixtures
Chemical AdmixturesChemical Admixtures
Chemical AdmixturesShubham Arora
 

More from Shubham Arora (6)

Self healing concrete
Self healing concreteSelf healing concrete
Self healing concrete
 
Design & Modelling of Slab using Macro, VBA & AutoCAD
Design & Modelling of Slab using Macro, VBA & AutoCADDesign & Modelling of Slab using Macro, VBA & AutoCAD
Design & Modelling of Slab using Macro, VBA & AutoCAD
 
Design of lifts & escalators
Design of lifts & escalatorsDesign of lifts & escalators
Design of lifts & escalators
 
Bubble deck slab
Bubble deck slabBubble deck slab
Bubble deck slab
 
Lifts and escalators
Lifts and escalatorsLifts and escalators
Lifts and escalators
 
Chemical Admixtures
Chemical AdmixturesChemical Admixtures
Chemical Admixtures
 

Recently uploaded

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoĂŁo Esperancinha
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEslot gacor bisa pakai pulsa
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 

Recently uploaded (20)

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 

Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)

  • 1. INDUSTRIAL INTERNSHIP AT SHAPOORJI PALLONJI & CO. PVT. LTD. PREPARED BY- SHUBHAM ARORA 140357/1410736 D4CE GNDEC, LUDHIANA.
  • 2. PROJECT OVERVIEW • Name- Homi Bhabha Cancer Hospital & Research Centre. • Client- Tata Memorial Centre. • Consultant- DDF Consultants Pvt. Ltd. • Contractor- Shapoorji Pallonji & Co. Pvt. Ltd. • Type of Contract- Lump Sum (Design & Build). • Project Value- 217Cr.
  • 3. PROJECT OVERVIEW • Scope of Work- Civil, Structural, Finishing, MEP & Infrastructure. • Total Built Up Area- 4.9 Lacs sqft. • Start Date- 06-10-2016 • End Date- 05-10-2018 • Extension of Time- 215 days • Revised End Date- 08-05-2019
  • 5. HOMI BHABHA CANCER HOSPITAL & RESEARCH CENTRE
  • 6. BILLING DEPARTMENT • Read through the contract conditions. • Read Bill of Quantities (BOQ). • Prepared Bar Bending Schedule for 110mT for different elements like Beams, Columns, Slabs, etc. • BBS is generally used by- • Detailer • Quantity Surveyor • Contractor Ordering Reinforcement
  • 7. BAR BENDING SCHEDULE • Cutting Length- Steel is ductile in nature & is subjected to elongation while bending during hooks. • Cutting Length = True Length of bar – deductions • For 45 degree, deductions = 1*d • For 90 degree, deductions = 2*d • For Stirrups, Length = 2*A+2*B+20*D (For 90 degree hook) • For 135 degree hook = 2*A+2*B+24*D
  • 8. BAR BENDING SCHEDULE • I did calculated the BBS for Plinth Beam of Porch Area, Plinth Beams of Service Block, 1st Floor Slab of Dharamshala, Plinth Beam of Canopy Area, Slab & Beams of 1st Floor of Canopy Area, Columns of Service Block, etc.
  • 9. CALCULATION OF CIVIL QUANTITIES • Formwork- This involves 20-25% of the cost of structure. Stripped formwork can be reused. The disadvantage of timber formwork is it can shrink, swell, etc • Types of Formwork- 1. Timber Formwork ( traditional type) 2. Plywood Formwork 3. GI Sheet (Steel Formwork) • Method of Removing Formwork- Formwork of vertical faces of walls, beams, columns, should be removed first, followed by soffit of slabs, then soffit of beams, girders, any heavy structure.
  • 10. CALCULATION OF CIVIL QUANTITIES • I did calculated the formwork for 1st Floor Beams of Entrance Area, Corridor Area Wing A & Wing B, and some part of Wing D. I also did calculation of concrete in 1st Floor Entrance Area and Canopy Area. The calculations for beams of corridor area are shown in the form of sample.
  • 11. INVITING QUOTATIONS FOR PIECE WORK & WORK ORDER ACCEPTANCE • A Work Order is generally task or job assigned to a particular contractor or sub-contractor. It generally includes cost, date & time of execution, information about location, etc. • Piece Work is type of employment in which worker is paid a fixed piece rate for each unit produced. • Guarantee Certificate is certificate issued by different contractors regarding their services, products, etc. to Client directly so that in case any problem arises, they can directly get in touch. • Document Handing Over is handling over every work done by EPC Contractor is handed over to Client including drawings, bills, etc.
  • 12. EXECUTION DEPARTMENT • The project is commercial building & construction of all the elements is done by this department itself. • This department helped me learn different types of materials to be used at site for supporting, casting, etc. • Plywood Formwork was used along with wooden battens for shuttering. • Reinforcement of 500D grade was used. • Scaffolding was done using ledgers, standards of different sizes along with plane jacks or base plates. • U-jacks, waller, I-sections, tie-rods, etc. were used for Supporting.
  • 13. EXECUTION DEPARTMENT • Site Supervision mainly includes- • Calculating Quantity of Concrete • Calculating No. of Ply-boards required for Formworks & their different sizes. • Supervising which work is being done by which Contractor, so that problem does not arise at the time of billing. • Construction being done as per drawings. • Asking for RFIs wherever needed. • Maintaining Daily Labour Report, both departmental & measurement basis. • Keeping a check on quality specifically about levels, alignments, etc. • Keeping a check on proper safety measures being adopted & followed by everyone at site.
  • 14. EXECUTION DEPARTMENT • Safety- A HSE plan is devised by safety department which works as rulebook for every person on site. Its objective to promote Health, Safety & Environment for people working.
  • 15. EXECUTION DEPARTMENT • Material mobilisation- This includes Licenses, Permits & activities as shown- • Storage, Canteen facility, etc. • Steel Yard, Fabrication Yard, Site office, etc. • Electricity, Water & Sanitation facilities, etc. • Workmen Daily Report- In order to calculate the productivity, this is most important activity at site. It tells what has been spent to what milestone have been achieved. • Work as per Drawings- The work is to be executed as per drawings, i.e. pits, Cut-Outs, Sunk areas, typical sections etc. should be taken care off.
  • 16. EXECUTION DEPARTMENT • Quality- There is particular methodology which is followed as per Client’s requirement. Different Codes & Practices are followed for those. • Daily Progress Report- This is submitted by Site Engineer to Planning department which helps to keep a check on Pace of Project & decide necessary steps needed to achieve task. • Monthly Bill- Payment in SPCPL is done monthly basis to contractor against the work done by his team. • Contractor Review- On the basis of different parameters, contractors are retained or expelled which helps the company to work with best workers.
  • 17. EXECUTION DEPARTMENT (SITE WORK) • I was involved in 3 different Wings, namely, Entrance Area, Canopy Area (Wing A & B and Wing B & C).
  • 18. EXECUTION DEPARTMENT (SITE WORK) S. No. Formwork (sqm.) Reinforcement (mT.) Concrete (Cum.) 1. Canopy Area (Plinth Beams) 172.56 8.5(including columns) 10.36 2. Entrance Area (1st Floor) 650 19.5(Slab)+7.6(colu mns) 103 3. Corridor Area (1st Floor) 386 5.2(Column)+16.3(S lab) 59 4. Canopy Area (1st Floor) 432 3.2(Beams)+2.97(Sl ab) 61.18
  • 19. QUALITY DEPARTMENT • Quality in Construction is defined as ‘meeting or exceeding the requirement of client/owners. Quality in construction is employed with conformity with which specifications are met. Quality in construction is related to - Satisfying the specification mentioned in the contract Completing the project time. Fulfilling the owner's requirement within budget. Avoiding disputes claims and Ensuring the faculties performs its intended purpose.
  • 20. QUALITY DEPARTMENT • Elements of Quality- Quality Characteristics- Colour, Strength, Texture, etc. Quality of Design- Subjected to IS Codes being followed. Quality of Conformance- 1. Construction Methodology 2. Supervision 3. Inspection. • A project quality plan (PQP), sometimes referred to as a quality management plan, quality assurance plan, is a project-specific quality plan that describes the activities, standards, tools and processes necessary to achieve quality in the delivery of a project.
  • 21. QUALITY DEPARTMENT • Quality Inspection at Site- 1. Checking points for Reinforcements- (a) Details & BBS should be as per drawing. (b) Lapping zone should be checked. (c) Spacing between bars, stirrups, chairs should be checked.
  • 22. QUALITY DEPARTMENT 2. Checking points for Formwork- (a) Formwork material like ply-board, battens should be checked for any bends or corrosion. (b) Checking of supports, inside/outside panels. (c) Checking of proper scaffolding. (d) Execution of formwork should be done as per drawing. (e) Size and sections of beam & columns should be checked. (f) Proper Levels and alignment should be checked.
  • 23. QUALITY DEPARTMENT • 3. Checking points for Casting- (a) Check all the activities like cleaning, formwork oiling, etc. before ordering concrete. (b) Arrangement for additional equipment like vibrator, needle, trowels, plumbs, etc. should be done. (c) Sufficient Manpower for handling house pipe, whole pipeline, finishing, etc. should be available. (d) No extra water should be allowed to mix at Site. (e) Proper Slump test and cubes should be taken for each time concrete is ordered. (f) Concrete should not be poured from height more than 1 meter.
  • 24. QUALITY DEPARTMENT • Material Testing at Site- Different kinds of tests are done for different kinds of materials in QA/QC lab at site. • I did witnessed 3 tests- 1. Slump Test. 2. Cube Test. 3. Dry density Test.
  • 25. SUMMARY • With an exclusive opportunity to work in 3 departments (Billing, Execution & Quality), I completed this intern, gaining a lot of knowledge about construction activities.