Unit 4 Memory and Performance
So… How good is your
memory? Let’s try a simple
test of it. Without writing
anything down, see if you can
memorize the following list of
words in their correct order.
Remember the following 10 items in the correct
order so that If I ask you what was word three,
you would remember it.
   Watch
   Missile
   Muffler
   Candy
   Tomato
   Fingernail
   Scarf
   Disease
   Elephant
   pillar
What is memory?
 Raise your hand as soon as you recognize the music
  and can identify how it is connected to you.
 How do you remember this?
 What is the name of the actual song?
 Do you remember any Peanuts Trivia?
A collection of neural networks
formed through repetition from
past experiences or events in one’s
life.
What are some of your earliest
memories?
The ability to access the neural
networks in order to perform a task or
skill. Example recalling multiplication
facts such as 6x7, or the muscle memory
of how to hit a backhand tennis shot.
Peg method
 A mnemonic device used to recall words or events in
  their correct order.
 First memorize the peg words that rhyme with the
  numbers 1-10
 1-bun, 2-shoe, 3-tree, 4-door, 5-hive, 6-sticks, 7-
  heaven, 8-gate, 9-vine, 10-hen
One Bun
2-shoe
3 tree
4 door
5-hive
6- sticks
7- Heaven
8-gate
9-Vine
10-Hen
Peg method: peg the word to the peg word: example if word number
one was motorcycle, you could peg the bun to the motorcycle with a
visual like this:
Let’s try it. Memorize the following items in
their correct order using the peg method. Any
questions?
   Motorcycle
   Cricket
   Silver dollars
   Dart
   Baseball Bat
   Doughnut
   Helmet
   Emeralds
   Soap Bubbles
   Lawn mower
Peg: It will come back to you!
 I've seen your picture                  I like your pin shot
 Your name in lights above it            I keep it with your letter
 This is your big debut                  Done up in blueprint blue
 It's like a dream come true             It sure looks good on you
 And when you smile for the              So won't you smile for the camera
  camera                                  I know I'll love you better
 I know they're gonna love it


   Peg
   It will come back to you
   Peg
   It will come back to you
   Then the shutter falls
   You see it all in 3-D
   It's your favorite foreign movie
So… did it come back to you?
 Can you not only recall the peg words but the words we
    learned with them? What were your images?
   1-bun- motorcycle
   2-shoe-cricket
   3-tree- silver dollars
   4-door-dart
   5-hive-baseball bat
   6-sticks- doughnut
   7-heaven-helmet
   8-gate-emeralds
   9-vine-soap bubbles
   10-hen-lawnmower
Remember the more crazy outrageous and wild they
are, the more likely you can recall them. C.O.W.M.=
recall.
Peg is great for up to 10 items, what
about more? The Loci Method.
 Another mnemonic device.
 Loci- for location. Using a template of known locations to
    place words on.
   Again, use visualization to see the “item” to memorize on
    that particular location. Don’t be afraid to C.O.W.M. 
   5 rooms, 5 locations is enough to remember 25 words.
   10 rooms, 10 locations = 100 words!!!!
   Lets try it.
   You may look at the locations you wrote in your journal.
Example: word #1 is diaper
 I put a diaper on my pillow
Let’s try it. Visualize the word in the location. You
may look at your room locations but you may not
write anything down.
   1. diaper                    11. dog catcher
   2. mustard                   12. swimsuit
   3. oar                       13. buffalo
   4. meatball                  14. ship
   5. basketball                15. grapefruit
   6. pliers                    16. bucket
   7. paperclip                 17. Tire
   8. magazine                  18. marathon
   9. ring                      19. icecube
   10. grease                   20. candle
 21. cloud       I like turtles 
 22. corn
 23. dancer
 24. windmill
 25. turtle
Video: 26:43
Short term memory
 As incoming information is processed it travels from the
  cerebrum to the limbic system for an emotional response.
  Here is where the hippocampus comes into play.
 If the information is emotionally relevant the information
  may be stored in the hippocampus. This is the short term
  memory holding area. It may remain there for a few
  seconds or for over a year.
 If the memory is rehearsed (repetition) it becomes part of
  your life it can be moved from the hippocampus back to
  the cerebrum as part of a functional long term memory.
Primacy and Recency Effects
 Emotion aids a memory.
 Since there can be a lot of emotion with something that has
  never been experienced before, firsts become more easily
  recalled. This is called the primacy effect.
 Example: I remember my first bass tournament more easily
  than many of the other tournaments, the first time I rode a
  bike, the first time I ate lobster, etc.
 Due to the fact that something has just happened we also
  tend to remember our lasts if it has emotional value. The
  last tournament I fished, the last class I taught. This is
  called the recency effect. The most recent event.
Recall and the primacy/recency effects.
 Can you recall the first and last words from our peg
    method?
   One-bun-motorcycle
   Ten-hen-lawnmower
   What about the loci method?
   What was in location one?
   What was in location 25?
Implications for learning
 By breaking study sessions into several smaller units
  rather than one long session what are we doing?
 More beginnings and endings create more primacy
  and recency.
 Remember on day one of brain studies? It is difficult
  to eat a burrito in one bite? Consider the metaphor!
Long Term memories
 Long term memories are delivered from the
  hippocampus to the cerebrum. This process can take a
  while as neurons and their networks need to initiate
  and turn on genes in the cell to manufacture proteins
  that change the response of the cell to other neurons.
 This is called long term potentiation.
 The memories are broken up into varies elements
  associated with the information such as visual,
  auditory, and other senses and delivered around the
  cerebrum. This creates multiple pathways to the
  information.
Recall
 Because long term memories are stored throughout
  the cerebrum this is why a smell or sound or visual clue
  can stimulate and initiate the recall of a memory.
 There are virtually many access points throughout the
  brain to recall an event or information needed to
  process something.
 So you smell cookies and it triggers a host of memories
  about going to grandma’s house.
 I say apple and you have a working/functional memory
  about what apples look like, taste, where they grow,
  how good they are for you, etc.
More pathways, stronger memories.
 If you can create more neural networks of information
  through active processing and orchestrated immersion
  into a topic.
 Practice and repetition then strengthens the pathways
  and makes access (recall) easier.
 This is why writing something down makes it easier to
  remember than just reading something, or watching
  something. Some students highlight information in
  their textbooks which is less effective than physically
  taking notes.
Mnemonic devices aid recall
 Mnemonic device: any technique that aids the ability
    to recall past information or events.
   Examples, peg, link, and loci methods, initialization:
    remember acronyms? S.C.U.B.A., M.A.D.D., S.A.D.D.?
   What about this one? Please excuse my dear aunt
    Sally? Or this one, My very excellent mother just
    served us nachos (used to be nine pizzas.)
   Who could ever forget, Never Eat Soggy Waffles?
   Songs can be mnemonic devices.
Substitution Memory Method
Substitute a word or phrase that
 sounds like the word or term you
 want to memorize.
Use the substitution word to create
 a visual that helps to remember
 the definition of the term.
You can use the substitution method for many different
terms or concepts that you want to remember.
 Example of old English vocabulary words.
 Turlough means a winter pond.
 Turlough sounds like Turtle: I see a turtle frozen in the
  ice of a pond during winter.
 Piet means chatterbox. I see a person putting a piece of
  pie into a person’s mouth who won’t shut up.
 Griffonage means illegible handwriting. I substitute
  graffiti as an example of illegible handwriting.
 Others:
Example:
 Palmary = outstanding
 I see two people slapping palms when they accomplish
 something outstanding.
Try it!
 In your journal write the word.
 Then write the definition.
 Then write your substitution word and the visual it
  creates.
 Make it yours!
 Make it C.O.W.M.
It’s time for orchestrated immersion!
Please get out your journals and study your
     new vocabulary words using the
           substitution method.

 Begin by reading the word, then looking at your
  substitution you wrote down for it.
 In your minds eye, recall the visual you attached to the
  word, that should trigger the definition if you made a
  good substitution and perhaps a crazy, outrageous,
  and wild image.
Palmary=Outstanding
Make sure to visualize the
substitution and definition
 You have 5 minutes to concentrate on 25 words.
 Focus and use repetition of the substitution method.
 You may only use your journal and not the sheet with
  the words on it.
 At the end of class there will be a quiz. 10 words will be
  chosen from the list and you will be given the word
  and have to write the definition.
Memory Loss
Memory Loss
 Memory loss can occur for a variety of reasons.
 Most of us forget things, especially if we don’t attend to
  them or use mnemonic devices. Perhaps they aren’t all
  that important to us in the first place.
 What is chronic memory loss called?
 Amnesia or dementia.
Retrograde Amnesia
 Loss of past (retro) memories
 Very uncommon with the exception of older people
  experiencing amnesia associated with aging diseases
  like Alzheimer’s or senile dementia.
 Getting hit on the head and forgetting who you are but
  functioning normally in every other way is mainly the
  stuff of movies and fiction novels.
 Some people experience isolated retrograde dementia
  when subject to severe physical or emotional trauma.
Anterograde amnesia
 Anterograde amnesia (anterior = out in front)is a
  loss of the ability to create new memories after the
  event that caused the amnesia, leading to a partial or
  complete inability to recall the recent past, while long-
  term memories from before the event remain intact.
 This is typically caused by stroke or damage to the
  hippocampus.
 Ten second Tom from 50 first dates.
Memory movie
Let’s go to college.
In order to graduate with a degree.
 You need to accumulate credits, most
  colleges/universities use semester hours.
 128 semester hours in the proper courses will get you
  an undergraduate degree.
 What the heck is a semester hour?
Semester Hours!
 Semester hours are the way credits towards graduation
  are counted.
 1 semester hour roughly equals one hour per week in
  class for an entire semester.
 So… if you sign up for a class that is worth 3 semester
  hours that class would probably meet three times for
  approximately 1 hour each time, per week. Or say, 90
  minutes twice a week.
 A typical full time schedule would have between 15-17
  semester hours.
Semester hours continued.
 16 s.h. x 8 semesters =128 semester hours of
  credit. 4 year degree! ~31% of students
  graduate with a degree in 4 years from state
  schools, 53% private school.
 12 s.h. to have full time status.
 20 s.h. is the maximum. Why?
 Lots of outside of class studying. Especially
  reading.
How much studying?
 ~1 to 1.5 actual hours per semester hour of
  homework reading/writing/problem
  solving/studying for most classes. (plan on a
  40 h0ur work week for classes and studying
  to be successful.) Depending on your major
  and the classes you take it may be more or
  less.
 How efficient/disciplined are you with your
  time?
I’m talkin’ bout study habits, skills
and strategies.
 You’re a big boy/girl now. Locus of control.
 The world is your oyster.
 The world is competitive.
 How will you play the game of life?
ASK YOURSELF, “WHAT DO YOU
WANT OUT OF YOUR LIFE?”
 Consider if you are working hard/smart/or not at all.
 What do you want from your advanced educational
    experience, what are your goals?
   Organize yourself with a schedule that is true to
    yourself and your goals.
   Use study strategies to work smart.
   Pick a schedule and use the chart at the back of the
    packet to see what it would look like each week.
   Consider when you might study during each day. Don’t
    forget to eat, exercise , work? play?
Study Strategies.
 Go to class!
 S.L.A.N.T.
 Stay current with syllabus. Schedule your time and
    follow your schedule.
   Limit distractions (environment/phone/computer.)
   Study in the same environment as the test! State
    bound learning.
   Study for max. 30 minutes then take a break. This
    creates many beginnings and endings makes for more
    primacy and recency effects.
   Chunk material. Study by class/section/topic.
   Stay active when reading: notes vs. highlighter.
Study strategies continued…
 Don’t cram before a test. Little bites.
 Stress/wellness management, diet, exercise, sleep,
    rewards.
   Attend discussion sessions, find support services, see
    your prof. or their website when you have questions.
   Form a study group.
   Get into the class and what you are learning.
   If you are majoring in something and you hate it, that
    might mean you need to change what you are
    studying.
   Undecided? Who isn’t? It is the majority.
Test taking strategies:
 Wake up early if you have a morning test. Eat some
    protein. Get to the test early with the materials you
    need.
   Objective test. Cover up answers and visualize what
    you believe to be appropriate answers to the questions.
    Then reveal the choices.
   Essay: Use key words and concepts from lectures and
    notes/text.
   Manage your time and stay relaxed.
   Don’t cheat.
Study groups-2 brains are better
than one.
 One way to remain active as a studier is to form a study
  group.
 We are creatures of habit. Meet people in class and ask if
  they would like to study together.(3 is a good number for a
  study group.)
 Study on your own but come together to prep for tests or
  discuss a lecture over coffee after a class. Help each other
  with predicting test questions over the material (remember
  predict a quiz?)Professor’s web site. Discussion sessions are
  another way to interact with the material. Remember T
  from SLANT?
 Talk about the class and the material.
Case study-active processing of
study groups-Face Substitution
 Today we will model forming a study group with a
    specific task.
   You will be given 20 names and faces to remember.
    Your group will use the substitution method to learn
    the names.
   You will have 12 minutes to study the names and come
    up with substitutions for them.
   You must study as a group and work as a team on each
    name.
   End of class a chance for extra credit.
You can also use the substitution method to remember
names with faces. So how could we remember
Mr. Piskel? Pick out a prominent feature to key in with
his name. So…
Example: Mr. Piskel- substitute Skull for Pi(skel) then remember his name
because you can see his “skull” through his bald head.
You try it. Your groups creates the
substitutions.
Let’s try it!

Unit 4 memory and performance

  • 1.
    Unit 4 Memoryand Performance
  • 2.
    So… How goodis your memory? Let’s try a simple test of it. Without writing anything down, see if you can memorize the following list of words in their correct order.
  • 3.
    Remember the following10 items in the correct order so that If I ask you what was word three, you would remember it.  Watch  Missile  Muffler  Candy  Tomato  Fingernail  Scarf  Disease  Elephant  pillar
  • 4.
    What is memory? Raise your hand as soon as you recognize the music and can identify how it is connected to you.  How do you remember this?  What is the name of the actual song?  Do you remember any Peanuts Trivia?
  • 5.
    A collection ofneural networks formed through repetition from past experiences or events in one’s life. What are some of your earliest memories?
  • 6.
    The ability toaccess the neural networks in order to perform a task or skill. Example recalling multiplication facts such as 6x7, or the muscle memory of how to hit a backhand tennis shot.
  • 7.
    Peg method  Amnemonic device used to recall words or events in their correct order.  First memorize the peg words that rhyme with the numbers 1-10  1-bun, 2-shoe, 3-tree, 4-door, 5-hive, 6-sticks, 7- heaven, 8-gate, 9-vine, 10-hen
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
    Peg method: pegthe word to the peg word: example if word number one was motorcycle, you could peg the bun to the motorcycle with a visual like this:
  • 19.
    Let’s try it.Memorize the following items in their correct order using the peg method. Any questions?  Motorcycle  Cricket  Silver dollars  Dart  Baseball Bat  Doughnut  Helmet  Emeralds  Soap Bubbles  Lawn mower
  • 20.
    Peg: It willcome back to you!  I've seen your picture  I like your pin shot  Your name in lights above it  I keep it with your letter  This is your big debut  Done up in blueprint blue  It's like a dream come true  It sure looks good on you  And when you smile for the  So won't you smile for the camera camera  I know I'll love you better  I know they're gonna love it  Peg  It will come back to you  Peg  It will come back to you  Then the shutter falls  You see it all in 3-D  It's your favorite foreign movie
  • 21.
    So… did itcome back to you?  Can you not only recall the peg words but the words we learned with them? What were your images?  1-bun- motorcycle  2-shoe-cricket  3-tree- silver dollars  4-door-dart  5-hive-baseball bat  6-sticks- doughnut  7-heaven-helmet  8-gate-emeralds  9-vine-soap bubbles  10-hen-lawnmower
  • 22.
    Remember the morecrazy outrageous and wild they are, the more likely you can recall them. C.O.W.M.= recall.
  • 25.
    Peg is greatfor up to 10 items, what about more? The Loci Method.  Another mnemonic device.  Loci- for location. Using a template of known locations to place words on.  Again, use visualization to see the “item” to memorize on that particular location. Don’t be afraid to C.O.W.M.   5 rooms, 5 locations is enough to remember 25 words.  10 rooms, 10 locations = 100 words!!!!  Lets try it.  You may look at the locations you wrote in your journal.
  • 26.
    Example: word #1is diaper  I put a diaper on my pillow
  • 27.
    Let’s try it.Visualize the word in the location. You may look at your room locations but you may not write anything down.  1. diaper  11. dog catcher  2. mustard  12. swimsuit  3. oar  13. buffalo  4. meatball  14. ship  5. basketball  15. grapefruit  6. pliers  16. bucket  7. paperclip  17. Tire  8. magazine  18. marathon  9. ring  19. icecube  10. grease  20. candle
  • 28.
     21. cloud  I like turtles   22. corn  23. dancer  24. windmill  25. turtle
  • 29.
  • 30.
    Short term memory As incoming information is processed it travels from the cerebrum to the limbic system for an emotional response. Here is where the hippocampus comes into play.  If the information is emotionally relevant the information may be stored in the hippocampus. This is the short term memory holding area. It may remain there for a few seconds or for over a year.  If the memory is rehearsed (repetition) it becomes part of your life it can be moved from the hippocampus back to the cerebrum as part of a functional long term memory.
  • 31.
    Primacy and RecencyEffects  Emotion aids a memory.  Since there can be a lot of emotion with something that has never been experienced before, firsts become more easily recalled. This is called the primacy effect.  Example: I remember my first bass tournament more easily than many of the other tournaments, the first time I rode a bike, the first time I ate lobster, etc.  Due to the fact that something has just happened we also tend to remember our lasts if it has emotional value. The last tournament I fished, the last class I taught. This is called the recency effect. The most recent event.
  • 32.
    Recall and theprimacy/recency effects.  Can you recall the first and last words from our peg method?  One-bun-motorcycle  Ten-hen-lawnmower  What about the loci method?  What was in location one?  What was in location 25?
  • 33.
    Implications for learning By breaking study sessions into several smaller units rather than one long session what are we doing?  More beginnings and endings create more primacy and recency.  Remember on day one of brain studies? It is difficult to eat a burrito in one bite? Consider the metaphor!
  • 34.
    Long Term memories Long term memories are delivered from the hippocampus to the cerebrum. This process can take a while as neurons and their networks need to initiate and turn on genes in the cell to manufacture proteins that change the response of the cell to other neurons.  This is called long term potentiation.  The memories are broken up into varies elements associated with the information such as visual, auditory, and other senses and delivered around the cerebrum. This creates multiple pathways to the information.
  • 35.
    Recall  Because longterm memories are stored throughout the cerebrum this is why a smell or sound or visual clue can stimulate and initiate the recall of a memory.  There are virtually many access points throughout the brain to recall an event or information needed to process something.  So you smell cookies and it triggers a host of memories about going to grandma’s house.  I say apple and you have a working/functional memory about what apples look like, taste, where they grow, how good they are for you, etc.
  • 36.
    More pathways, strongermemories.  If you can create more neural networks of information through active processing and orchestrated immersion into a topic.  Practice and repetition then strengthens the pathways and makes access (recall) easier.  This is why writing something down makes it easier to remember than just reading something, or watching something. Some students highlight information in their textbooks which is less effective than physically taking notes.
  • 37.
    Mnemonic devices aidrecall  Mnemonic device: any technique that aids the ability to recall past information or events.  Examples, peg, link, and loci methods, initialization: remember acronyms? S.C.U.B.A., M.A.D.D., S.A.D.D.?  What about this one? Please excuse my dear aunt Sally? Or this one, My very excellent mother just served us nachos (used to be nine pizzas.)  Who could ever forget, Never Eat Soggy Waffles?  Songs can be mnemonic devices.
  • 38.
    Substitution Memory Method Substitutea word or phrase that sounds like the word or term you want to memorize. Use the substitution word to create a visual that helps to remember the definition of the term.
  • 39.
    You can usethe substitution method for many different terms or concepts that you want to remember.  Example of old English vocabulary words.  Turlough means a winter pond.  Turlough sounds like Turtle: I see a turtle frozen in the ice of a pond during winter.  Piet means chatterbox. I see a person putting a piece of pie into a person’s mouth who won’t shut up.  Griffonage means illegible handwriting. I substitute graffiti as an example of illegible handwriting.  Others:
  • 40.
    Example:  Palmary =outstanding  I see two people slapping palms when they accomplish something outstanding.
  • 41.
    Try it!  Inyour journal write the word.  Then write the definition.  Then write your substitution word and the visual it creates.  Make it yours!  Make it C.O.W.M.
  • 42.
    It’s time fororchestrated immersion!
  • 43.
    Please get outyour journals and study your new vocabulary words using the substitution method.  Begin by reading the word, then looking at your substitution you wrote down for it.  In your minds eye, recall the visual you attached to the word, that should trigger the definition if you made a good substitution and perhaps a crazy, outrageous, and wild image.
  • 44.
  • 45.
    Make sure tovisualize the substitution and definition  You have 5 minutes to concentrate on 25 words.  Focus and use repetition of the substitution method.  You may only use your journal and not the sheet with the words on it.  At the end of class there will be a quiz. 10 words will be chosen from the list and you will be given the word and have to write the definition.
  • 46.
  • 47.
    Memory Loss  Memoryloss can occur for a variety of reasons.  Most of us forget things, especially if we don’t attend to them or use mnemonic devices. Perhaps they aren’t all that important to us in the first place.  What is chronic memory loss called?  Amnesia or dementia.
  • 48.
    Retrograde Amnesia  Lossof past (retro) memories  Very uncommon with the exception of older people experiencing amnesia associated with aging diseases like Alzheimer’s or senile dementia.  Getting hit on the head and forgetting who you are but functioning normally in every other way is mainly the stuff of movies and fiction novels.  Some people experience isolated retrograde dementia when subject to severe physical or emotional trauma.
  • 49.
    Anterograde amnesia  Anterogradeamnesia (anterior = out in front)is a loss of the ability to create new memories after the event that caused the amnesia, leading to a partial or complete inability to recall the recent past, while long- term memories from before the event remain intact.  This is typically caused by stroke or damage to the hippocampus.  Ten second Tom from 50 first dates.
  • 50.
  • 52.
    Let’s go tocollege.
  • 53.
    In order tograduate with a degree.  You need to accumulate credits, most colleges/universities use semester hours.  128 semester hours in the proper courses will get you an undergraduate degree.  What the heck is a semester hour?
  • 54.
    Semester Hours!  Semesterhours are the way credits towards graduation are counted.  1 semester hour roughly equals one hour per week in class for an entire semester.  So… if you sign up for a class that is worth 3 semester hours that class would probably meet three times for approximately 1 hour each time, per week. Or say, 90 minutes twice a week.  A typical full time schedule would have between 15-17 semester hours.
  • 55.
    Semester hours continued. 16 s.h. x 8 semesters =128 semester hours of credit. 4 year degree! ~31% of students graduate with a degree in 4 years from state schools, 53% private school.  12 s.h. to have full time status.  20 s.h. is the maximum. Why?  Lots of outside of class studying. Especially reading.
  • 56.
    How much studying? ~1 to 1.5 actual hours per semester hour of homework reading/writing/problem solving/studying for most classes. (plan on a 40 h0ur work week for classes and studying to be successful.) Depending on your major and the classes you take it may be more or less.  How efficient/disciplined are you with your time?
  • 58.
    I’m talkin’ boutstudy habits, skills and strategies.  You’re a big boy/girl now. Locus of control.  The world is your oyster.  The world is competitive.  How will you play the game of life?
  • 59.
    ASK YOURSELF, “WHATDO YOU WANT OUT OF YOUR LIFE?”  Consider if you are working hard/smart/or not at all.  What do you want from your advanced educational experience, what are your goals?  Organize yourself with a schedule that is true to yourself and your goals.  Use study strategies to work smart.  Pick a schedule and use the chart at the back of the packet to see what it would look like each week.  Consider when you might study during each day. Don’t forget to eat, exercise , work? play?
  • 61.
    Study Strategies.  Goto class!  S.L.A.N.T.  Stay current with syllabus. Schedule your time and follow your schedule.  Limit distractions (environment/phone/computer.)  Study in the same environment as the test! State bound learning.  Study for max. 30 minutes then take a break. This creates many beginnings and endings makes for more primacy and recency effects.  Chunk material. Study by class/section/topic.  Stay active when reading: notes vs. highlighter.
  • 63.
    Study strategies continued… Don’t cram before a test. Little bites.  Stress/wellness management, diet, exercise, sleep, rewards.  Attend discussion sessions, find support services, see your prof. or their website when you have questions.  Form a study group.  Get into the class and what you are learning.  If you are majoring in something and you hate it, that might mean you need to change what you are studying.  Undecided? Who isn’t? It is the majority.
  • 64.
    Test taking strategies: Wake up early if you have a morning test. Eat some protein. Get to the test early with the materials you need.  Objective test. Cover up answers and visualize what you believe to be appropriate answers to the questions. Then reveal the choices.  Essay: Use key words and concepts from lectures and notes/text.  Manage your time and stay relaxed.  Don’t cheat.
  • 65.
    Study groups-2 brainsare better than one.  One way to remain active as a studier is to form a study group.  We are creatures of habit. Meet people in class and ask if they would like to study together.(3 is a good number for a study group.)  Study on your own but come together to prep for tests or discuss a lecture over coffee after a class. Help each other with predicting test questions over the material (remember predict a quiz?)Professor’s web site. Discussion sessions are another way to interact with the material. Remember T from SLANT?  Talk about the class and the material.
  • 66.
    Case study-active processingof study groups-Face Substitution  Today we will model forming a study group with a specific task.  You will be given 20 names and faces to remember. Your group will use the substitution method to learn the names.  You will have 12 minutes to study the names and come up with substitutions for them.  You must study as a group and work as a team on each name.  End of class a chance for extra credit.
  • 67.
    You can alsouse the substitution method to remember names with faces. So how could we remember Mr. Piskel? Pick out a prominent feature to key in with his name. So…
  • 68.
    Example: Mr. Piskel-substitute Skull for Pi(skel) then remember his name because you can see his “skull” through his bald head.
  • 69.
    You try it.Your groups creates the substitutions.
  • 70.