DODSAL ENGINEERING & CONSTRUCTION PTE LTD
TASK RISK ASSESSMENT FOR HYDRO TEST OF PIPES TRA-23 Rev 1
TASK DESCRIPTION HYDRO TEST OF PIPES SUBCONTRACTOR Dodsal Engg. & Const. Pte Ltd.
TRA TEAM MEMBERS SOHAYAN MUKHERJEE , SIRISH , Prashanth Korenaga, Rajesh Page 1 of 3 DATE: 12.02.2012
STEP
NO.
DESCRIPTION OF
TASK STEP
HAZARD CONSEQUENC
ES
PEOPLE,
ENVIRONMENT,
ASSETS,
REPUTATION
CONTROLS
PREVENT, DETECT, CONTROL, MITIGATE
BASELI
NE RISK
ADDITIONAL CONTROL
MEASURES / ACTIONS
RESP.
PARTY
RESID
UAL
RISK
S P R S P R
1
1.
Air Blowing
Over air pressure
inside the system,
High noise.
Sudden release
metal piece.
Poor visivility due to
dust.
Whipping of air
hoses.
Noise
including
hearing lose.
Property
Damage
Personal
injury.
Obtain permit from SECL.
Conduct Tool box talk perior to start the work.
Barricate the area.
Provide warning/cautionary board.
Use ear plug/ ear muff.
Use all basic PPEs.
Use well maintained equipments and inspected
by SECL.
Whip arrester provision for all compressor hoses.
Un authorised entry restricted.
3 2 6
 Tool Box Talks
 Close Supervision
Engineer/
Site fore
man
1 1 1
2.
Filling,Pressurising
,Depressurising
and Draining of
water
Corrosion due to
cotaminated water.
Land pollution by
contaminated water
draining.
Piping
damage(buckling)
by vacuum.
Injury to
Personnel
Damage to the
piping and
equipments.
Damage to the
Environment.
Portable water after analyzing and approval from
the COMPANY/PMC only to be used.
Water should be disposed after checking the
contamination level.
Use proper tools and ensure tools in good shape
Proper "PPE" (Hand gloves, etc.)
Controlled rate of draining equivalent to venting
rate.
2 2 4

Tool Box Meetings.
Engineer/
Site fore
man
1 1 1
3
Pressure testing
(Pneumatic/Hydro)
Failure of Pressure
gauges.
Incrrect Pressure
indication.
Failure of Safety
Relief Valves.
Failure of control
valves.
Failure of Rapture
Disc.
Pipe
Bursting/Buckling.
High Pressure
stored in piping.
Sudden rush
out of water
carrying.
Instrument
parts leads to
injury.
Pipe bursting
leads to injury
& Buckling of
piping leads to
damage to
property.
Noise
pollution.
Obtain Permit from SECL.
Check list as per Pressure test/Hydro test
procedure must be followed.
Proper co-ordination between the two end to be
ensured.
Pressurising equipments must be in good
condition anmd well maintained.
Testing equipment must be tested/calibrated and
certified for use.
Testing area must be cordoned off.
Use proper sign boards.
3 2 6
Use of competent
personnel.
Tool Box Talks
Close Supervision
Piping
Engineer/
Site fore
man
1 1 1
DODSAL ENGINEERING & CONSTRUCTION PTE LTD
TASK RISK ASSESSMENT FOR HYDRO TEST OF PIPES TRA-23 Rev 1
TASK DESCRIPTION HYDRO TEST OF PIPES SUBCONTRACTOR Dodsal Engg. & Const. Pte Ltd.
TRA TEAM MEMBERS SOHAYAN MUKHERJEE , SIRISH , Prashanth Korenaga, Rajesh Page 1 of 3 DATE: 12.02.2012
STEP
NO.
DESCRIPTION OF
TASK STEP
HAZARD CONSEQUENC
ES
PEOPLE,
ENVIRONMENT,
ASSETS,
REPUTATION
CONTROLS
PREVENT, DETECT, CONTROL, MITIGATE
BASELI
NE RISK
ADDITIONAL CONTROL
MEASURES / ACTIONS
RESP.
PARTY
RESID
UAL
RISK
S P R S P R
2
4
General
Inadequate
provision of Portable
water,Food,Shelter
and First aid.
Poor weather
condition.
Non-availiability of
emergency vehicle.
Non availiability of
PPE's
Illness
Personnel
injuries.
Heat Stress in
summer.
Provision of adequate quantity of Portable
water,Food,Shelter and First aid box.
Provision of shaded rest place.
Provision of emergency vehicle.
No smoking policy to be followed while working
on site.
All manpower to be provided with proper PPE's.
TBT to be held prior to start of work
2 1 2 Close Supervision
Engineer /
Site fore
man
1 1 1
Remarks :
Prepared By: Name: Rajesh Somappa
HSE Officer
Sign:
Date: 15.02.2012
Approved by: Name: Arup Roy Chowdhary,
HSE Manager Dodsal
Sign:
Date: 15.02.2012
Approved by: Martin Kane,
HSE Manager SECL
Sign:
Date:15.02.2012
S: Severity, P: Probability, R: Risk
Probability
4 – Probable / Likely to occur immediately or shortly
3 – Reasonably probable – Probably will occur in
time
2 – Remote – May occur in time
1 – Extremely remote – Unlikely to occur
Risk Factor Matrix
Methodology
1. Identify Hazards
2. List Hazard Events
3. Calculate risk factor with initial risk rating
4. Detail controls and mitigation plan
5. Calculate residual risk factor with final risk rating
6. Enter risk priority
Probability Risk Priority
S
e
v
e
r
4 3 2 1 8-16 High Risk
4 16 12 8 4 5-7
Medium
Risk
3 12 9 6 3 1-4 Low Risk
2 8 6 4 2
DODSAL ENGINEERING & CONSTRUCTION PTE LTD
TASK RISK ASSESSMENT FOR HYDRO TEST OF PIPES TRA-23 Rev 1
TASK DESCRIPTION HYDRO TEST OF PIPES SUBCONTRACTOR Dodsal Engg. & Const. Pte Ltd.
TRA TEAM MEMBERS SOHAYAN MUKHERJEE , SIRISH , Prashanth Korenaga, Rajesh Page 1 of 3 DATE: 12.02.2012
STEP
NO.
DESCRIPTION OF
TASK STEP
HAZARD CONSEQUENC
ES
PEOPLE,
ENVIRONMENT,
ASSETS,
REPUTATION
CONTROLS
PREVENT, DETECT, CONTROL, MITIGATE
BASELI
NE RISK
ADDITIONAL CONTROL
MEASURES / ACTIONS
RESP.
PARTY
RESID
UAL
RISK
S P R S P R
3
I
t
y
1 4 3 2 1
7. Evaluate acceptability of risk
Severity
4 – Catastrophic – Imminent danger exists, hazard capable of causing death or illness at wide scale
3 – Critical – Hazard can result in serious illness, severe injury, property and equipment damage
2 – Marginal – Hazard can cause illness, injury or equipment damage but the damage is not expected to be serious
1 – Negligible – Hazard will not result in serious injury or illness, remote possibility of damage beyond minor first-aid case.

More Related Content

Similar to TRA-23 Hydro test of piping.doc

JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JESUSBASILIOANTONIO
 
17 1 Drilling Operations Risk assessment
17 1 Drilling Operations Risk assessment17 1 Drilling Operations Risk assessment
17 1 Drilling Operations Risk assessment
FESTUS RICHARD SIAME
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
JESUSBASILIOANTONIO
 
For the following research paper assignment, you have been asked to
For the following research paper assignment, you have been asked to For the following research paper assignment, you have been asked to
For the following research paper assignment, you have been asked to
renatas0nie
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
eSAT Publishing House
 

Similar to TRA-23 Hydro test of piping.doc (20)

JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
 
project defence 2016
project defence 2016project defence 2016
project defence 2016
 
Aniket seminar ppt.pdf
Aniket seminar ppt.pdfAniket seminar ppt.pdf
Aniket seminar ppt.pdf
 
17 1 Drilling Operations Risk assessment
17 1 Drilling Operations Risk assessment17 1 Drilling Operations Risk assessment
17 1 Drilling Operations Risk assessment
 
Basic concept of environment safeguard
Basic concept of environment safeguardBasic concept of environment safeguard
Basic concept of environment safeguard
 
1 guide to use risk assessment templates
1 guide to use  risk assessment templates1 guide to use  risk assessment templates
1 guide to use risk assessment templates
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
 
Unit 20 Risk Assessment
Unit 20 Risk AssessmentUnit 20 Risk Assessment
Unit 20 Risk Assessment
 
For the following research paper assignment, you have been asked to
For the following research paper assignment, you have been asked to For the following research paper assignment, you have been asked to
For the following research paper assignment, you have been asked to
 
Pipeline integrity assessment with LRUT method
Pipeline integrity assessment with LRUT methodPipeline integrity assessment with LRUT method
Pipeline integrity assessment with LRUT method
 
Sample risk assessment report for dcc safety students
Sample risk assessment report for dcc safety studentsSample risk assessment report for dcc safety students
Sample risk assessment report for dcc safety students
 
Procedure for Hazard Identification and Risk Assessment in Wastewater Treatme...
Procedure for Hazard Identification and Risk Assessment in Wastewater Treatme...Procedure for Hazard Identification and Risk Assessment in Wastewater Treatme...
Procedure for Hazard Identification and Risk Assessment in Wastewater Treatme...
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
29. Hand tools HIRA.docx
29. Hand tools HIRA.docx29. Hand tools HIRA.docx
29. Hand tools HIRA.docx
 
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Risk assessment for soil investigation at towers 5,6,7,8  rev01  a.doganiRisk assessment for soil investigation at towers 5,6,7,8  rev01  a.dogani
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
 
NDT
NDTNDT
NDT
 
Journal of Electronic & Information Systems | Vol.5, Iss.1 October 2023
Journal of Electronic & Information Systems | Vol.5, Iss.1 October 2023Journal of Electronic & Information Systems | Vol.5, Iss.1 October 2023
Journal of Electronic & Information Systems | Vol.5, Iss.1 October 2023
 
Iso 14001 aspect impact management
Iso 14001 aspect impact managementIso 14001 aspect impact management
Iso 14001 aspect impact management
 
NESHEP presentation february 2015
NESHEP presentation february 2015NESHEP presentation february 2015
NESHEP presentation february 2015
 
27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates
 

Recently uploaded

一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
zubnm
 
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
The Hebrew University of Jerusalem
 

Recently uploaded (20)

Peat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG LonderangPeat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG Londerang
 
Fuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionFuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An Introduction
 
Role of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRole of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease Management
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
 
Carbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, IndonesiaCarbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
 
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
 
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
 
My Museum presentation by Jamilyn Gonzalez
My Museum presentation by Jamilyn GonzalezMy Museum presentation by Jamilyn Gonzalez
My Museum presentation by Jamilyn Gonzalez
 
Christmas Palm Trees in Florida The Ultimate Guide to Festive Landscaping wit...
Christmas Palm Trees in Florida The Ultimate Guide to Festive Landscaping wit...Christmas Palm Trees in Florida The Ultimate Guide to Festive Landscaping wit...
Christmas Palm Trees in Florida The Ultimate Guide to Festive Landscaping wit...
 
NO1 Pakistan Black magic/kala jadu,manpasand shadi in lahore,karachi rawalpin...
NO1 Pakistan Black magic/kala jadu,manpasand shadi in lahore,karachi rawalpin...NO1 Pakistan Black magic/kala jadu,manpasand shadi in lahore,karachi rawalpin...
NO1 Pakistan Black magic/kala jadu,manpasand shadi in lahore,karachi rawalpin...
 
Heavy metals with their causes and effect.ppt
Heavy metals with their causes and effect.pptHeavy metals with their causes and effect.ppt
Heavy metals with their causes and effect.ppt
 
NO1 Pakistan online istikhara for love marriage vashikaran specialist love pr...
NO1 Pakistan online istikhara for love marriage vashikaran specialist love pr...NO1 Pakistan online istikhara for love marriage vashikaran specialist love pr...
NO1 Pakistan online istikhara for love marriage vashikaran specialist love pr...
 
Introducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnershipsIntroducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnerships
 
Rising temperatures also mean that more plant pests are appearing earlier and...
Rising temperatures also mean that more plant pests are appearing earlier and...Rising temperatures also mean that more plant pests are appearing earlier and...
Rising temperatures also mean that more plant pests are appearing earlier and...
 
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
 
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
 
Data analysis and findings
Data analysis and findingsData analysis and findings
Data analysis and findings
 
Lab Investigation.pptxjjjjjjjjjjjjjjjjjj
Lab Investigation.pptxjjjjjjjjjjjjjjjjjjLab Investigation.pptxjjjjjjjjjjjjjjjjjj
Lab Investigation.pptxjjjjjjjjjjjjjjjjjj
 
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
 
A Wide Range of Eco System Services with Mangroves
A Wide Range of Eco System Services with MangrovesA Wide Range of Eco System Services with Mangroves
A Wide Range of Eco System Services with Mangroves
 

TRA-23 Hydro test of piping.doc

  • 1. DODSAL ENGINEERING & CONSTRUCTION PTE LTD TASK RISK ASSESSMENT FOR HYDRO TEST OF PIPES TRA-23 Rev 1 TASK DESCRIPTION HYDRO TEST OF PIPES SUBCONTRACTOR Dodsal Engg. & Const. Pte Ltd. TRA TEAM MEMBERS SOHAYAN MUKHERJEE , SIRISH , Prashanth Korenaga, Rajesh Page 1 of 3 DATE: 12.02.2012 STEP NO. DESCRIPTION OF TASK STEP HAZARD CONSEQUENC ES PEOPLE, ENVIRONMENT, ASSETS, REPUTATION CONTROLS PREVENT, DETECT, CONTROL, MITIGATE BASELI NE RISK ADDITIONAL CONTROL MEASURES / ACTIONS RESP. PARTY RESID UAL RISK S P R S P R 1 1. Air Blowing Over air pressure inside the system, High noise. Sudden release metal piece. Poor visivility due to dust. Whipping of air hoses. Noise including hearing lose. Property Damage Personal injury. Obtain permit from SECL. Conduct Tool box talk perior to start the work. Barricate the area. Provide warning/cautionary board. Use ear plug/ ear muff. Use all basic PPEs. Use well maintained equipments and inspected by SECL. Whip arrester provision for all compressor hoses. Un authorised entry restricted. 3 2 6  Tool Box Talks  Close Supervision Engineer/ Site fore man 1 1 1 2. Filling,Pressurising ,Depressurising and Draining of water Corrosion due to cotaminated water. Land pollution by contaminated water draining. Piping damage(buckling) by vacuum. Injury to Personnel Damage to the piping and equipments. Damage to the Environment. Portable water after analyzing and approval from the COMPANY/PMC only to be used. Water should be disposed after checking the contamination level. Use proper tools and ensure tools in good shape Proper "PPE" (Hand gloves, etc.) Controlled rate of draining equivalent to venting rate. 2 2 4  Tool Box Meetings. Engineer/ Site fore man 1 1 1 3 Pressure testing (Pneumatic/Hydro) Failure of Pressure gauges. Incrrect Pressure indication. Failure of Safety Relief Valves. Failure of control valves. Failure of Rapture Disc. Pipe Bursting/Buckling. High Pressure stored in piping. Sudden rush out of water carrying. Instrument parts leads to injury. Pipe bursting leads to injury & Buckling of piping leads to damage to property. Noise pollution. Obtain Permit from SECL. Check list as per Pressure test/Hydro test procedure must be followed. Proper co-ordination between the two end to be ensured. Pressurising equipments must be in good condition anmd well maintained. Testing equipment must be tested/calibrated and certified for use. Testing area must be cordoned off. Use proper sign boards. 3 2 6 Use of competent personnel. Tool Box Talks Close Supervision Piping Engineer/ Site fore man 1 1 1
  • 2. DODSAL ENGINEERING & CONSTRUCTION PTE LTD TASK RISK ASSESSMENT FOR HYDRO TEST OF PIPES TRA-23 Rev 1 TASK DESCRIPTION HYDRO TEST OF PIPES SUBCONTRACTOR Dodsal Engg. & Const. Pte Ltd. TRA TEAM MEMBERS SOHAYAN MUKHERJEE , SIRISH , Prashanth Korenaga, Rajesh Page 1 of 3 DATE: 12.02.2012 STEP NO. DESCRIPTION OF TASK STEP HAZARD CONSEQUENC ES PEOPLE, ENVIRONMENT, ASSETS, REPUTATION CONTROLS PREVENT, DETECT, CONTROL, MITIGATE BASELI NE RISK ADDITIONAL CONTROL MEASURES / ACTIONS RESP. PARTY RESID UAL RISK S P R S P R 2 4 General Inadequate provision of Portable water,Food,Shelter and First aid. Poor weather condition. Non-availiability of emergency vehicle. Non availiability of PPE's Illness Personnel injuries. Heat Stress in summer. Provision of adequate quantity of Portable water,Food,Shelter and First aid box. Provision of shaded rest place. Provision of emergency vehicle. No smoking policy to be followed while working on site. All manpower to be provided with proper PPE's. TBT to be held prior to start of work 2 1 2 Close Supervision Engineer / Site fore man 1 1 1 Remarks : Prepared By: Name: Rajesh Somappa HSE Officer Sign: Date: 15.02.2012 Approved by: Name: Arup Roy Chowdhary, HSE Manager Dodsal Sign: Date: 15.02.2012 Approved by: Martin Kane, HSE Manager SECL Sign: Date:15.02.2012 S: Severity, P: Probability, R: Risk Probability 4 – Probable / Likely to occur immediately or shortly 3 – Reasonably probable – Probably will occur in time 2 – Remote – May occur in time 1 – Extremely remote – Unlikely to occur Risk Factor Matrix Methodology 1. Identify Hazards 2. List Hazard Events 3. Calculate risk factor with initial risk rating 4. Detail controls and mitigation plan 5. Calculate residual risk factor with final risk rating 6. Enter risk priority Probability Risk Priority S e v e r 4 3 2 1 8-16 High Risk 4 16 12 8 4 5-7 Medium Risk 3 12 9 6 3 1-4 Low Risk 2 8 6 4 2
  • 3. DODSAL ENGINEERING & CONSTRUCTION PTE LTD TASK RISK ASSESSMENT FOR HYDRO TEST OF PIPES TRA-23 Rev 1 TASK DESCRIPTION HYDRO TEST OF PIPES SUBCONTRACTOR Dodsal Engg. & Const. Pte Ltd. TRA TEAM MEMBERS SOHAYAN MUKHERJEE , SIRISH , Prashanth Korenaga, Rajesh Page 1 of 3 DATE: 12.02.2012 STEP NO. DESCRIPTION OF TASK STEP HAZARD CONSEQUENC ES PEOPLE, ENVIRONMENT, ASSETS, REPUTATION CONTROLS PREVENT, DETECT, CONTROL, MITIGATE BASELI NE RISK ADDITIONAL CONTROL MEASURES / ACTIONS RESP. PARTY RESID UAL RISK S P R S P R 3 I t y 1 4 3 2 1 7. Evaluate acceptability of risk Severity 4 – Catastrophic – Imminent danger exists, hazard capable of causing death or illness at wide scale 3 – Critical – Hazard can result in serious illness, severe injury, property and equipment damage 2 – Marginal – Hazard can cause illness, injury or equipment damage but the damage is not expected to be serious 1 – Negligible – Hazard will not result in serious injury or illness, remote possibility of damage beyond minor first-aid case.