RISK SCORE CALCULATOR Use the Risk Score Calculator to Determine the Level of Risk of each Hazard What would be the CONSEQUENCE of an occurrence be? What is the LIKELIHOOD of an occurrence? Hierarchy of Controls Frequent/Almost certain (5) Continuous or will happen frequently Often (4) 6 to 12 times a year Likely (3) 1 to 5 times a year Possible (2) Once every 5 years Rarely (1) Less than once every 5 years Can the hazard be Eliminated or removed from the work place? Catastrophic (5) Multiple Fatalities High 25 High 20 High 15 Medium 10 Medium 5 Can the product or process be substituted for a less hazardous alternative? Serious (4) Class 1 single fatality High 20 High 16 High 12 Medium 8 Low 4 Can the hazard be engineered away with guards or barriers? Moderate (3) Class2 (AWI or LTI) or Class 1 Permanently disabling effects High 15 High 12 Medium 9 Medium 6 Low 3 Can Administration Controls be adopted I.e. procedures, job rotation etc. Minor (2) Medical attention needed, no work restrictions. MTI Medium10 Medium 8 Medium 6 Low 4 Low 2 Can Personal Protective Equipment & Clothing be worn to safe guard against hazards? Insignificant (1) FAI Medium10 Medium 4 Low 3 Low 2 Low 1 Project Name: xxx RA Ref No.: xxx RA compilation Date: Review date: Date: Compiled by: CONSTRUCTION TEAM MEMBER Reviewed by: HSE MANAGER / LEAD Approved by: PROJECT DIRECTOR Overall Task Details THE GENERIC TEMPLATES ARE A GUIDE TO COMPILING RISK ASSESSMENTS, COVERING THE BASIC REQUIREMENTS FOR MAS COMPLIANCE Relevant Applicable MAS: BE AWARE OF THE LOCATION AND TYPE OF MAS -CONTAINED IN SAPPHIRE AVAILABLE FOR REVIEW Additional Training required: ADD ANY ADDITIONAL TRAINING REQUIRED FOR THE TASK NOC’s Required for task: ANY AUTHORITY NOCs – DM, ADM, RTA, DEWA, ETC. No Specific Task Step (In sequence of works) Hazard Details Consequence/Risk Initial Risk Rating Control Measures Residual Risks Additional Control Measures RR L C RR 1 COMPLETE RISK ASSESSMENT IN THE SEQUENCE OF TASK HAZARDS, NOT RISK. EXAMPLE: A FORKLIFT IS A HAZARD IT HAS THE POTENTIAL TO CAUSE HARM OR DAMAGE PROPERTY RISK LIKELYHOOD AND CONSEQUENCE OF INJURY, DAMAGE ETC. RESULTING FROM A HAZARD FORKLIFT EXAMPLE: • UNTRAINED OPERATOR; • COLLISION WITH PEDESTRIANS; • OVERLOADING; • OVERTURNING; • ETC. A B C CONTROLS TO MITIGATE THE RISKS ARISING FROM THE TASK • CONTROL MEASURES IN LINE WITH RELEVANT MINIMUM ACCEPTABLE STANDARD • INCLUDE SPECIFICS FOR THE TASK 2