SlideShare a Scribd company logo
For the Customer For the Employee For the Company
1) Work Satisfaction
2) Job Security
3) Consistent Income
1) Market Flexibility
2) Profit (= Sales Price - Cost)
1) Highest Quality
2) Lowest Cost
3) Shortest Lead-time
"Customer 1st" "Respect for Humanity" "Elimination of Waste (Muda)"
...by aiming for 100% creative effort
...by providing development
...by providing challenges
...by mutual trust with management
...in Man, Material, Method or Machine
...in areas of over-producing, waiting,
conveyance, processing, inventory,
motion, correction
... is the principle of considering the need and
desires of the customer when determining
direction and strategy.
LEAN
PRODUCTION SYSTEM
STANDARDIZATION
Flexible Motivated Employees
...maintain standards.
...kaizen (improve system).
Foundational Stability through...
Process of establishing the repeatability and predictability of Man, Material, Method & Machine in
work which when properly maintained forms the basis from which improvement can be made.
FOUNDATIONAL
GOALS
DESIRED
OUTCOMES
THE "PILLARS"
OF THE SYSTEM
Jidoka
The ability to stop a
process by man or
machine in event of a
problem
Tools:
Andon
Fixed-Position Stop
Line-Stop Cord
Pokayoke
Just in Time
Having only what is
needed, only when it's
needed and only where
it's needed
Tools:
Continuous Flow
Heijunka
Kanban
Multi-skilled Staff
Std In-Process Inv
Takt Time
JIDOKA:
1) Andon - a visual control mechanism that displays the current state
of work (i.e. abnormal conditions, work instructions and job
progress).
2) Fixed-Position Stop - the position on the assembly line where a
repeating process is completed. It is at these positions that the line
will stop should an abnormality not be corrected in time.
3) Line-Stop ("andon") Cord - a mechanism, usually a rope, that a
worker may pull to signal the need for assistance and which will stop
the line if it can not be resolved quickly.
4) Pokayoke - low cost, highly reliable devices that will stop
processes in order to prevent the production of defective parts.
JUST IN TIME:
1) Continuous Flow - deploying consecutive processes next to each
to eliminate in-process inventory and increase production flexibility.
2) Heijunka - the leveling of volume and variety produced over time.
(level production)
3) Kanban - A small card that provides instruction and request to
produce or request goods.
4) Multi-Skilled Staff - workers are able to perform a greater variety
of activities to increase flexibility and opportunity to improve
continuous flow.
5) Pull System - the system in which following processes draw from
preceding processes the required parts, when they are needed and
in the exact amount needed.
6) Standard In-Process Inventory - identifying an appropriate level of
inventory contained within the continuous flow system to achieve
optimal effectiveness.
7) Takt Time - the time allotted for the completion of each process in
the production system.
TPS TOOLS
Consensus &
Nemawashi
Genchi Genbutsu
"Go See"
Visual Control
Plan / Do
Check / Action
(reflection)
Root Cause
Analysis
STANDARDIZATION:
1) Nemawashi & Consensus Building - assuring success through good
relationships and good communication
2) Genchi Genbutsu - going and seeing first-hand a situation rather
than hearing second-hand
3) Visual Control - mechanisms that demonstrate visually condition
and status
4) Plan / Do / Check / Action - the process of setting a target,
performing an activity, evaluating the results and taking necessary
countermeasure activity to issues before setting a new target and
repeating the process.
5) Problem Solving (Root Cause) - identifying a problem and
pinpointing it to a specific and addressable root cause which can be
countermeasured to prevent the problem from occurring again.
© Nigel Thurlow 2012

More Related Content

What's hot

Lean Tools
Lean ToolsLean Tools
Lean Tools
Anand Subramaniam
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training Module
Frank-G. Adler
 
Shingo Prize for Operational Excellence
Shingo Prize for Operational ExcellenceShingo Prize for Operational Excellence
Shingo Prize for Operational Excellence
Mohammed Hamed Ahmed Soliman
 
Problem solving techniques
Problem solving techniquesProblem solving techniques
Problem solving techniques
Ahsan Saleem
 
Toyota production system
Toyota  production systemToyota  production system
Toyota production system
Enamul Khan
 
8 Disciplines (8D) Training
8 Disciplines (8D) Training8 Disciplines (8D) Training
8 Disciplines (8D) Training
J. García - Verdugo
 
Lean Transformation Model
Lean Transformation ModelLean Transformation Model
Lean Transformation Model
Lean Management Institute of India
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
TKMG, Inc.
 
Lean game air plane
Lean game air planeLean game air plane
Lean game air plane
인성 김
 
The Shingo Prize for Operational Excellence (The Shingo Model)
The Shingo Prize for Operational Excellence (The Shingo Model)The Shingo Prize for Operational Excellence (The Shingo Model)
The Shingo Prize for Operational Excellence (The Shingo Model)
Operational Excellence Consulting
 
Quick Changeover
Quick ChangeoverQuick Changeover
Quick Changeover
Engr. K.M. Sabbir Noman
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping Line
Parth Patel
 
Just In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter PresentationJust In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter Presentation
SINGHZEE
 
Operation Analysis - Process Mapping
Operation Analysis - Process Mapping Operation Analysis - Process Mapping
Operation Analysis - Process Mapping
Pavan Rajini
 
Lean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleLean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training Module
Frank-G. Adler
 
S&OP Process
S&OP ProcessS&OP Process
S&OP Process
Anand Subramaniam
 
8 Wastes in Lean
8 Wastes in Lean8 Wastes in Lean
8 Wastes in Lean
Marysmith401
 
Introduction to Kanban
Introduction to KanbanIntroduction to Kanban
Introduction to Kanban
TO THE NEW | Technology
 
Lean Lego Game
Lean Lego GameLean Lego Game
Lean Lego Game
Danilo Sato
 

What's hot (20)

Lean Tools
Lean ToolsLean Tools
Lean Tools
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training Module
 
Shingo Prize for Operational Excellence
Shingo Prize for Operational ExcellenceShingo Prize for Operational Excellence
Shingo Prize for Operational Excellence
 
Problem solving techniques
Problem solving techniquesProblem solving techniques
Problem solving techniques
 
Toyota production system
Toyota  production systemToyota  production system
Toyota production system
 
Takt Time, Cycle Time & Line Balancing
Takt Time, Cycle Time & Line BalancingTakt Time, Cycle Time & Line Balancing
Takt Time, Cycle Time & Line Balancing
 
8 Disciplines (8D) Training
8 Disciplines (8D) Training8 Disciplines (8D) Training
8 Disciplines (8D) Training
 
Lean Transformation Model
Lean Transformation ModelLean Transformation Model
Lean Transformation Model
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Lean game air plane
Lean game air planeLean game air plane
Lean game air plane
 
The Shingo Prize for Operational Excellence (The Shingo Model)
The Shingo Prize for Operational Excellence (The Shingo Model)The Shingo Prize for Operational Excellence (The Shingo Model)
The Shingo Prize for Operational Excellence (The Shingo Model)
 
Quick Changeover
Quick ChangeoverQuick Changeover
Quick Changeover
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping Line
 
Just In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter PresentationJust In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter Presentation
 
Operation Analysis - Process Mapping
Operation Analysis - Process Mapping Operation Analysis - Process Mapping
Operation Analysis - Process Mapping
 
Lean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleLean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training Module
 
S&OP Process
S&OP ProcessS&OP Process
S&OP Process
 
8 Wastes in Lean
8 Wastes in Lean8 Wastes in Lean
8 Wastes in Lean
 
Introduction to Kanban
Introduction to KanbanIntroduction to Kanban
Introduction to Kanban
 
Lean Lego Game
Lean Lego GameLean Lego Game
Lean Lego Game
 

Viewers also liked

Understanding Agile 11x17
Understanding Agile 11x17Understanding Agile 11x17
Understanding Agile 11x17Nigel Thurlow
 
Definition of Done Statement
Definition of Done StatementDefinition of Done Statement
Definition of Done StatementNigel Thurlow
 
Poka yoke
Poka yokePoka yoke
Poka yoke
alfredo fabian
 
Poka Yoke
Poka  YokePoka  Yoke
Poka Yoke
Jesus Sanchez
 
Poka Yoke Grupo 3 Lizbeth Rojas
Poka Yoke Grupo 3 Lizbeth RojasPoka Yoke Grupo 3 Lizbeth Rojas
Poka Yoke Grupo 3 Lizbeth Rojas
Lizbeth Rojas
 
POKA YOKE for Lock Out Tag Out LOTO
POKA YOKE for Lock Out Tag Out LOTOPOKA YOKE for Lock Out Tag Out LOTO
POKA YOKE for Lock Out Tag Out LOTO
leansavant
 
Poka yoke
Poka yokePoka yoke
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturingAdeel Javaid
 
Pokayoke tera quality
Pokayoke tera qualityPokayoke tera quality
Pokayoke tera quality
Jani Saheb Shaikw
 
Mistake Proofing
Mistake ProofingMistake Proofing
Mistake Proofing
Tom Curtis
 
Javier Garcia - Verdugo Sanchez - The Poka - Yoke System
Javier Garcia - Verdugo Sanchez -  The Poka - Yoke SystemJavier Garcia - Verdugo Sanchez -  The Poka - Yoke System
Javier Garcia - Verdugo Sanchez - The Poka - Yoke System
J. García - Verdugo
 
Poka yoke: The Science of Mistake Proofing in Software
Poka yoke: The Science of Mistake Proofing in SoftwarePoka yoke: The Science of Mistake Proofing in Software
Poka yoke: The Science of Mistake Proofing in Software
Gurpreet Luthra
 
Error proofing technique - Poka Yoke
Error proofing technique - Poka YokeError proofing technique - Poka Yoke
Error proofing technique - Poka Yoke
SEREE NET
 
The Toyota Way (Toyota Production System) [Operations Management]
The Toyota Way (Toyota Production System) [Operations Management]The Toyota Way (Toyota Production System) [Operations Management]
The Toyota Way (Toyota Production System) [Operations Management]
Arjun Parekh
 
5S, Kaizen, PokaYoke
5S, Kaizen, PokaYoke5S, Kaizen, PokaYoke
5S, Kaizen, PokaYoke
Prateek Singh Bapna
 
POKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingPOKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake Proofing
Timothy Wooi
 
Poka yoke (mistake proofing)
Poka yoke (mistake proofing)Poka yoke (mistake proofing)
Poka yoke (mistake proofing)Animesh Khamesra
 

Viewers also liked (19)

Understanding Agile 11x17
Understanding Agile 11x17Understanding Agile 11x17
Understanding Agile 11x17
 
Definition of Done Statement
Definition of Done StatementDefinition of Done Statement
Definition of Done Statement
 
Poka yoke
Poka yokePoka yoke
Poka yoke
 
Poka Yoke
Poka  YokePoka  Yoke
Poka Yoke
 
Poka Yoke Grupo 3 Lizbeth Rojas
Poka Yoke Grupo 3 Lizbeth RojasPoka Yoke Grupo 3 Lizbeth Rojas
Poka Yoke Grupo 3 Lizbeth Rojas
 
POKA YOKE for Lock Out Tag Out LOTO
POKA YOKE for Lock Out Tag Out LOTOPOKA YOKE for Lock Out Tag Out LOTO
POKA YOKE for Lock Out Tag Out LOTO
 
Poka yoke
Poka yokePoka yoke
Poka yoke
 
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturing
 
Pokayoke tera quality
Pokayoke tera qualityPokayoke tera quality
Pokayoke tera quality
 
Mistake Proofing
Mistake ProofingMistake Proofing
Mistake Proofing
 
Javier Garcia - Verdugo Sanchez - The Poka - Yoke System
Javier Garcia - Verdugo Sanchez -  The Poka - Yoke SystemJavier Garcia - Verdugo Sanchez -  The Poka - Yoke System
Javier Garcia - Verdugo Sanchez - The Poka - Yoke System
 
value creation on service through kaizen {rajesh.vesawkar@facebook.com}(online)
value creation on service through kaizen {rajesh.vesawkar@facebook.com}(online)value creation on service through kaizen {rajesh.vesawkar@facebook.com}(online)
value creation on service through kaizen {rajesh.vesawkar@facebook.com}(online)
 
Poka yoke: The Science of Mistake Proofing in Software
Poka yoke: The Science of Mistake Proofing in SoftwarePoka yoke: The Science of Mistake Proofing in Software
Poka yoke: The Science of Mistake Proofing in Software
 
Error proofing technique - Poka Yoke
Error proofing technique - Poka YokeError proofing technique - Poka Yoke
Error proofing technique - Poka Yoke
 
The Toyota Way (Toyota Production System) [Operations Management]
The Toyota Way (Toyota Production System) [Operations Management]The Toyota Way (Toyota Production System) [Operations Management]
The Toyota Way (Toyota Production System) [Operations Management]
 
5S, Kaizen, PokaYoke
5S, Kaizen, PokaYoke5S, Kaizen, PokaYoke
5S, Kaizen, PokaYoke
 
POKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingPOKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake Proofing
 
Poka yoke (mistake proofing)
Poka yoke (mistake proofing)Poka yoke (mistake proofing)
Poka yoke (mistake proofing)
 
Poka Yoke Final Ppt
Poka Yoke  Final PptPoka Yoke  Final Ppt
Poka Yoke Final Ppt
 

Similar to TPS Lean Production System

UNIT-I.ppt
UNIT-I.pptUNIT-I.ppt
UNIT-I.ppt
mahe49
 
PPC-Unit I- INTRODUCTION OF PRODUCTION PLANNING AND CONTROL
PPC-Unit I- INTRODUCTION OF PRODUCTION PLANNING AND CONTROL PPC-Unit I- INTRODUCTION OF PRODUCTION PLANNING AND CONTROL
PPC-Unit I- INTRODUCTION OF PRODUCTION PLANNING AND CONTROL
Dr.PERIASAMY K
 
Introduction to production planning and control
Introduction to production planning and controlIntroduction to production planning and control
Introduction to production planning and control
MohanKirthik
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
Prerna Toshniwal
 
Motion & time study
Motion & time studyMotion & time study
Motion & time study
Ahmad Alzbeidat
 
Introduction to Production Planning & Control & Manufacturing.pptx
Introduction to Production Planning & Control & Manufacturing.pptxIntroduction to Production Planning & Control & Manufacturing.pptx
Introduction to Production Planning & Control & Manufacturing.pptx
Tarek Erin
 
T 1 industry preparedness training course
T 1 industry preparedness training courseT 1 industry preparedness training course
T 1 industry preparedness training course
newar_07
 
PPC-Unit-1Godwin.ppt
PPC-Unit-1Godwin.pptPPC-Unit-1Godwin.ppt
PPC-Unit-1Godwin.ppt
GODWINPITHALISNE
 
Production Management Lec-01.pptx
Production Management Lec-01.pptxProduction Management Lec-01.pptx
DesignPeopleSystem
DesignPeopleSystemDesignPeopleSystem
DesignPeopleSystem
ahmad bassiouny
 
Just In Time
Just In TimeJust In Time
Just In Time
Sanjeev Deshmukh
 
Standard operations
Standard operationsStandard operations
Standard operations
globalsevensteps
 
Production and operation management
Production and operation managementProduction and operation management
Production and operation management
Harsha Mathad
 
Lean production and jit
Lean production and jitLean production and jit
Lean production and jitKusum Parmar
 
Work study
Work studyWork study
Work study
Sagar Raturi
 
MANT 265 S01.ppt
MANT 265 S01.pptMANT 265 S01.ppt
MANT 265 S01.ppt
MohammedRizwanSharif1
 
Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Industrial Engineering unit 4.Production planning and control Notes by badebhau.Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Er. Bade Bhausaheb
 

Similar to TPS Lean Production System (20)

LEAN Cheat Sheet
LEAN Cheat SheetLEAN Cheat Sheet
LEAN Cheat Sheet
 
UNIT-I.ppt
UNIT-I.pptUNIT-I.ppt
UNIT-I.ppt
 
PPC-Unit I- INTRODUCTION OF PRODUCTION PLANNING AND CONTROL
PPC-Unit I- INTRODUCTION OF PRODUCTION PLANNING AND CONTROL PPC-Unit I- INTRODUCTION OF PRODUCTION PLANNING AND CONTROL
PPC-Unit I- INTRODUCTION OF PRODUCTION PLANNING AND CONTROL
 
Introduction to production planning and control
Introduction to production planning and controlIntroduction to production planning and control
Introduction to production planning and control
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Motion & time study
Motion & time studyMotion & time study
Motion & time study
 
Introduction to Production Planning & Control & Manufacturing.pptx
Introduction to Production Planning & Control & Manufacturing.pptxIntroduction to Production Planning & Control & Manufacturing.pptx
Introduction to Production Planning & Control & Manufacturing.pptx
 
T 1 industry preparedness training course
T 1 industry preparedness training courseT 1 industry preparedness training course
T 1 industry preparedness training course
 
PPC-Unit-1Godwin.ppt
PPC-Unit-1Godwin.pptPPC-Unit-1Godwin.ppt
PPC-Unit-1Godwin.ppt
 
Production Management Lec-01.pptx
Production Management Lec-01.pptxProduction Management Lec-01.pptx
Production Management Lec-01.pptx
 
DesignPeopleSystem
DesignPeopleSystemDesignPeopleSystem
DesignPeopleSystem
 
LEAN
LEANLEAN
LEAN
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Standard operations
Standard operationsStandard operations
Standard operations
 
Production and operation management
Production and operation managementProduction and operation management
Production and operation management
 
Lean production and jit
Lean production and jitLean production and jit
Lean production and jit
 
JUST IN TIME
JUST IN TIMEJUST IN TIME
JUST IN TIME
 
Work study
Work studyWork study
Work study
 
MANT 265 S01.ppt
MANT 265 S01.pptMANT 265 S01.ppt
MANT 265 S01.ppt
 
Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Industrial Engineering unit 4.Production planning and control Notes by badebhau.Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Industrial Engineering unit 4.Production planning and control Notes by badebhau.
 

More from Nigel Thurlow

Scrum Meetings Infographic v12
Scrum Meetings Infographic v12Scrum Meetings Infographic v12
Scrum Meetings Infographic v12Nigel Thurlow
 
The Buffer Interupt Pattern v2
The Buffer Interupt Pattern v2The Buffer Interupt Pattern v2
The Buffer Interupt Pattern v2Nigel Thurlow
 
Scrum Clock Instructions
Scrum Clock InstructionsScrum Clock Instructions
Scrum Clock InstructionsNigel Thurlow
 
The Product Owner Role
The Product Owner RoleThe Product Owner Role
The Product Owner RoleNigel Thurlow
 
The Scrum Master Role
The Scrum Master RoleThe Scrum Master Role
The Scrum Master RoleNigel Thurlow
 
Continuous Integration Approach
Continuous Integration ApproachContinuous Integration Approach
Continuous Integration ApproachNigel Thurlow
 
User Story Composition
User Story CompositionUser Story Composition
User Story CompositionNigel Thurlow
 
Lifecycle of an Idea
Lifecycle of an IdeaLifecycle of an Idea
Lifecycle of an IdeaNigel Thurlow
 
Continuous Improvement - Kaizen vs Problem Solving
Continuous Improvement - Kaizen vs Problem SolvingContinuous Improvement - Kaizen vs Problem Solving
Continuous Improvement - Kaizen vs Problem SolvingNigel Thurlow
 
Problem Solving A3 Approach
Problem Solving A3 ApproachProblem Solving A3 Approach
Problem Solving A3 ApproachNigel Thurlow
 

More from Nigel Thurlow (17)

Scrum Meetings Infographic v12
Scrum Meetings Infographic v12Scrum Meetings Infographic v12
Scrum Meetings Infographic v12
 
The Buffer Interupt Pattern v2
The Buffer Interupt Pattern v2The Buffer Interupt Pattern v2
The Buffer Interupt Pattern v2
 
Story Mapping v4
Story Mapping v4Story Mapping v4
Story Mapping v4
 
Scrum Clock Instructions
Scrum Clock InstructionsScrum Clock Instructions
Scrum Clock Instructions
 
Scrum Clock 2 week
Scrum Clock 2 weekScrum Clock 2 week
Scrum Clock 2 week
 
Test Driven Agile
Test Driven AgileTest Driven Agile
Test Driven Agile
 
The Product Owner Role
The Product Owner RoleThe Product Owner Role
The Product Owner Role
 
The Scrum Master Role
The Scrum Master RoleThe Scrum Master Role
The Scrum Master Role
 
Continuous Integration Approach
Continuous Integration ApproachContinuous Integration Approach
Continuous Integration Approach
 
User Story Composition
User Story CompositionUser Story Composition
User Story Composition
 
Lifecycle of an Idea
Lifecycle of an IdeaLifecycle of an Idea
Lifecycle of an Idea
 
Nemawashi
NemawashiNemawashi
Nemawashi
 
Downtime 8 Wastes
Downtime 8 WastesDowntime 8 Wastes
Downtime 8 Wastes
 
Prioritise
PrioritisePrioritise
Prioritise
 
PDCA
PDCAPDCA
PDCA
 
Continuous Improvement - Kaizen vs Problem Solving
Continuous Improvement - Kaizen vs Problem SolvingContinuous Improvement - Kaizen vs Problem Solving
Continuous Improvement - Kaizen vs Problem Solving
 
Problem Solving A3 Approach
Problem Solving A3 ApproachProblem Solving A3 Approach
Problem Solving A3 Approach
 

TPS Lean Production System

  • 1. For the Customer For the Employee For the Company 1) Work Satisfaction 2) Job Security 3) Consistent Income 1) Market Flexibility 2) Profit (= Sales Price - Cost) 1) Highest Quality 2) Lowest Cost 3) Shortest Lead-time "Customer 1st" "Respect for Humanity" "Elimination of Waste (Muda)" ...by aiming for 100% creative effort ...by providing development ...by providing challenges ...by mutual trust with management ...in Man, Material, Method or Machine ...in areas of over-producing, waiting, conveyance, processing, inventory, motion, correction ... is the principle of considering the need and desires of the customer when determining direction and strategy. LEAN PRODUCTION SYSTEM STANDARDIZATION Flexible Motivated Employees ...maintain standards. ...kaizen (improve system). Foundational Stability through... Process of establishing the repeatability and predictability of Man, Material, Method & Machine in work which when properly maintained forms the basis from which improvement can be made. FOUNDATIONAL GOALS DESIRED OUTCOMES THE "PILLARS" OF THE SYSTEM Jidoka The ability to stop a process by man or machine in event of a problem Tools: Andon Fixed-Position Stop Line-Stop Cord Pokayoke Just in Time Having only what is needed, only when it's needed and only where it's needed Tools: Continuous Flow Heijunka Kanban Multi-skilled Staff Std In-Process Inv Takt Time JIDOKA: 1) Andon - a visual control mechanism that displays the current state of work (i.e. abnormal conditions, work instructions and job progress). 2) Fixed-Position Stop - the position on the assembly line where a repeating process is completed. It is at these positions that the line will stop should an abnormality not be corrected in time. 3) Line-Stop ("andon") Cord - a mechanism, usually a rope, that a worker may pull to signal the need for assistance and which will stop the line if it can not be resolved quickly. 4) Pokayoke - low cost, highly reliable devices that will stop processes in order to prevent the production of defective parts. JUST IN TIME: 1) Continuous Flow - deploying consecutive processes next to each to eliminate in-process inventory and increase production flexibility. 2) Heijunka - the leveling of volume and variety produced over time. (level production) 3) Kanban - A small card that provides instruction and request to produce or request goods. 4) Multi-Skilled Staff - workers are able to perform a greater variety of activities to increase flexibility and opportunity to improve continuous flow. 5) Pull System - the system in which following processes draw from preceding processes the required parts, when they are needed and in the exact amount needed. 6) Standard In-Process Inventory - identifying an appropriate level of inventory contained within the continuous flow system to achieve optimal effectiveness. 7) Takt Time - the time allotted for the completion of each process in the production system. TPS TOOLS Consensus & Nemawashi Genchi Genbutsu "Go See" Visual Control Plan / Do Check / Action (reflection) Root Cause Analysis STANDARDIZATION: 1) Nemawashi & Consensus Building - assuring success through good relationships and good communication 2) Genchi Genbutsu - going and seeing first-hand a situation rather than hearing second-hand 3) Visual Control - mechanisms that demonstrate visually condition and status 4) Plan / Do / Check / Action - the process of setting a target, performing an activity, evaluating the results and taking necessary countermeasure activity to issues before setting a new target and repeating the process. 5) Problem Solving (Root Cause) - identifying a problem and pinpointing it to a specific and addressable root cause which can be countermeasured to prevent the problem from occurring again. © Nigel Thurlow 2012