Lean Mindsets & Behaviors
Creating a High-Performance Climate for
       Sustained Transformation

      Mike Osterling & Karen Martin




              AMEChicago2012
              October 15, 2012
Learning Objectives
• The macro‐ and micro‐behaviors that are at the core of 
  excellence.
• How to identify the gaps between “what is” and “what 
  needs to be.”
• How to create an operational climate that enables 
  people to grow and succeed.
• How to develop Lean mindsets and behaviors 
  throughout your organization.
• How to instill and reinforce the new ways of operating.


                                                       2
Success with Improvement
           2001 – The Economist
70%
                    63%
60%

50%

40%

30%

20%        17%                 20%

10%

0%
           None   Temporary   Lasting
                                        3
…A Decade Later
           2010 – Accenture
80%

70%                                        69%
60%                       58%
50%

40%
         33%
30%

20%

10%

0%
        “Mixed” to       Minimal      Needs re‐evaluation, 
      “disappointing”    financial    restart or complete 
           results        impact           makeover           4
To Err is Human
 Institute of Medicine, 1999

98,000 lives lost

Improvement Goal:
Reduce by 50% 
in 5 years.

                               5
6
Something Is Terribly Wrong…

Up to 98,000 people                                    180,000 Medicare 
 die from medical                                    patients die annually 
       errors.                                       from medical errors.
   To Error is Human,                                 Office of the Inspector 
  Institute of Medicine           2005                        General                     2011



        1999              Progress has been                   2010                  33% hospitalized 
                                slow.                                             patients are harmed; 
                                                                                 7% result in permanent 
                          Journal of the American 
                            Medical Association                                      injury or death.
                                                                                       Health Affairs




                                                                                                        7
We need to 
   improve
     how we improve.



                       8
Self‐inflicted



                 9
A Chaos‐Cracked Foundation 
  Can’t Support Excellence




                              10
11




                     Resilience
                       Agility
Business Results




                     Innovation
                     Continuous 
                    Improvement
                   Problem Solving




                                     that Reduce 
                                     Mindsets & 
                                      Behaviors 

                                        Chaos
Clarity

Engagement        Focus

        Discipline




                          12
“Effectiveness is a 
      habit.”
         — Peter Drucker




                           13
Group Discussion
1. Clarity


2. Focus


3. Discipline


4. Engagement

                                   14
Group Activity ‐ Behavioral Gaps
• Part 1 – Rate your organization (company, facility, 
  department, etc.).  2 minutes
   – Which of the four behaviors is it weakest in?
• Part 2 – Move to the appropriate corner for your 
  weakest org behavior. 15 minutes
   – Give examples of the lack of that behavior
   – Which metric(s) do they affect (hard impact)?
   – How do they affect customers, employees and/or 
     suppliers (soft impact)?
   – Select one example & its impact to share with the full 
     group.
• Part 3 – Report out. 10 minutes
                                                               15
Activity: Behavioral Gaps
                             Hard Costs          Soft Costs
Lack of Clarity




Lack of Focus




Lack of Discipline




Lack of Engagement



                                                              16
17

                     Resilience
                       Agility
Business Results




                     Innovation
                     Continuous 
                    Improvement
                   Problem Solving
18
Junk Words* (10 mins)

• The line at Starbucks is long. _________________

• That car is expensive.  ______________________

• That would be a long commute. ______________




                     * Conceptualized by Sammy Obara, Toyota by Toyota
                                                                         19
Seek Unbridled Clarity Around…
1. The direction your organization is heading in.
2. Who your customers truly are and what needs 
   they have.
3. What value you deliver.
4. How specifically you deliver and support the 
   delivery of value.
5. Who delivers and supports the delivery of 
   value.
6. How you’re performing.
7. The language you use.
                                                    20
“Going to the gemba 
has been life changing 
for me as a leader.”
   ‐ Ginny Cattaneo, Sr. VP, Franklin
  Templeton Investor Services 




                                        21
Lean Management System

   Plant Manager 
   Standard Work
 Value Stream Manager 
     Standard Work

Supervisor Standard Work


Team Leader Standard Work

                         Standardized Processes   22
Truth
    Truth
        Truth
            Truth
                Truth
                    Truth
                        Truth
                            Truth
                                Truth   23
24

                     Resilience
                       Agility
Business Results




                     Innovation
                     Continuous 
                    Improvement
                   Problem Solving
Distraction Kills




                    25
Focus Needs
1. Priorities – What are you striving for? What’s 
   important to accomplish THIS year?
  –   Products
  –   Processes
  –   Marketplace
  –   Margins
  –   People
2. Meetings – What’s the purpose of the 
   meeting? 


                                                     26
Booz & Company Findings
90%
                                    82%
80%
70%
                       64%
60%
         49%
50%
40%
30%
20%
10%
0%
      No written    Conflicting   Competing
       priorities    priorities    demands

                                              27
There is no such thing 
  as multitasking.*


      * For cognitive tasks.


                               28
The Myth of Multi‐tasking

• It’s not possible to do two conscious activities at 
  once.
• You are “switch‐tasking.”
• David Meyer – University of Michigan
   – Engineers switched between projects 5‐8 times per 
     day
   – Each switch added 20 minutes of process time
   – If switch only 5x per day, adds 1.7 hrs per day or 407 
     hours (10 weeks) of process time per engineer
   – In company w/ 15 engineers = 3 FTEs* worth of labor.
                   * FTE = Full Time Equivalent


                                                               29
A Key to Apple’s Success?

“…saying no to 1,000 
things to make sure we don’t 
get on the wrong track or try to 
do too much. We’re always 
thinking about new markets we 
could enter, but it’s only by 
saying no that you can 
concentrate on the things that 
are really important.”
                — Steve Jobs

                                      30
Round 1
      Task 1: Lack of focus causes chaos

 Task 2: 1   2   3   4   5   6   7   8   9   10   11 
    12 13 14 15 16 17 18 19 20 21 22

Round 1 – Letter, number, letter, number: L, 1, A, 2, C, 3, etc.

_________________________________________________

_________________________________________________
                                                               31
Round 2
     Task 1: Lack of focus causes chaos

 Task 2: 1   2   3   4   5   6   7   8   9   10   11 
    12 13 14 15 16 17 18 19 20 21 22
    Round 2 – full sentence, followed by numbers 1‐22.

_________________________________________________

_________________________________________________
                                                         32
The Countermeasure: Strategy Deployment
 Aka Hoshin kanri; policy deployment
    Hoshin – Direction; compass; shining needle
    Kanri – Management
 Two key parts: Creating the plan itself & 
  and fanatic management to that plan.
 Purpose: Organizational focus & 
  alignment
    Aligns everyone toward a few high impact 
     objectives while also keeping them 
     accountable for their commitments through 
     visual management and review.


                                                   33
Strategy Deployment Key Feature: 
                Catchball
What?
How?    Executive 
Who?      Team
When?


               What?
               How?    Senior 
               Who?    Mgmt
               When?


                             What?
                             How?    Middle 
                             Who?    Mgmt
                             When?


                                           What?
                                           How?    Frontlines
                                           Who?
                                           When?
                                                                34
Improve Productivity through Greater Focus

                  Productivity (Pounds Produced / Hr Worked)
115.0


                         Pactiv
108.0
                      Implements
                        Strategy                                   105.9
                      Deployment

101.0


                                                          95.2
 94.0                                        93.0
                                90.6

 87.0              86.3
         84.8


 80.0
         FY '06   FY '07       FY '08        FY '09       FY '10   YTD '11

                                                                             35
Activity: Achieving Focus 
 List Potential Projects
               Lean Mindsets & Behaviors
          Achieving Focus: Project Prioritization

   Project / Priority




                                                    36
“Hoshin‐Lite” Annual Work Plan
PRE ‐ Gain clarity around overarching business needs.

1. List everything you could do (and that you are doing and 
   you plan to do).
2. Categorize into:
   –   Must‐do, can’t fail
   –   Maybe
   –   Eliminate
   –   Delay (next fiscal year)
3. Decide what you will do; gain consensus.
4. Prioritize and create plan.

POST ‐ Manage plan via weekly updates (may be able to reduce 
to monthly reviews – but be careful!).
                                                                37
Achieving Focus
    Categorize project list
                        Lean Mindsets & Behaviors
                   Achieving Focus: Project Prioritization

            Project / Priority             Must Do Eliminate   Delay   Maybe

Project A                                    X
Project B                                              X
Project C                                              X
Project D                                                               X
Project E                                                       X
Project F                                                               X
Project G                                                               X
Project H                                    X
Project I                                              X




                                                                               38
To create new 
ideas is a gift, but 
to choose 
wisely is a skill.
       ‐ Ryan Morgan




                        39
Achieving Focus
Move “Maybe’s” into Other Categories
                               Lean Mindsets & Behaviors
                          Achieving Focus: Project Prioritization

                   Project / Priority             Must Do Eliminate   Delay   Maybe

       Project A                                    X
       Project B                                              X
       Project C                                              X
       Project D                                                               X
       Project E                                                       X
       Project F                                                               X
       Project G                                                               X
       Project H                                    X
       Project I                                              X




                                                                                      40
Label Four Flip Chart Pages & Hang on Wall
                                  Must do        Maybe
1. List what you could do on 
   3x6” post‐its (active or 
   planned initiatives, 
   projects & improvement 
   activities). Gain consensus.

2. Categorize them (place 
   post‐it on appropriate 
   page. Gain consensus.
                                   Delay       Eliminate
3. Decide what you will do. 
   (Move “maybe’s” onto one 
   of the other three pages.) 
   Gain consensus.




                                                           41
Must do    Maybe

 Step 4
 Prioritize 
must‐do’s; 
Create Plan


                Delay    Eliminate




                                     42
PACE Improvement Prioritization Grid
                                         9                       22            17
                                                   23
                                                             8             3         21
                         Easy
                                                        10                                               4
                                             13
                                         5
                                                                      15
Ease of Implementation



                                                                 20                       14
                                                                                19                           1
                                                  16

                                     7                       6




                                     2                                 11                           18

                                                                                               12
                         Difficult




                                     Low                                                             High
                                                         Anticipated Benefit                                     43
Achieving Focus
                                           Prioritize Must‐Do’s

                         Easy
Ease of Implementation
                         Difficult




                                     Low                          High
                                           Anticipated Benefit           44
Annual Improvement Plan
                                                                                 Company ABC
                                                                                   Priorities
                                                                FY 2012                                                  FY 2013                  Exec      Tactical 
     Priority                                                                                                                                                             Others
                       Jan       Feb       Mar        Apr         May      Jun       Jul        Aug       Sep      Oct     Nov         Dec       Owner      Owner
                                                                                                          MS‐2 
                                                     MS‐1
  Integrate DHR        Begin                                                                              Acct                                   Brad P
                                                     Ops
                                                                                                        Complete
  Complete New 
 Travel Program        Begin                       Complete                                                                                      Scott R    Fred S
    Roll‐out

Roll‐out Tablets to             Begin & 
                                                                                                                                                 Brad P
   Installation                Complete

                                                                                                                                                                        Lisa D, 
  Complete 360                                                                                                                                                          Marina,
                       Begin                                                      Complete                                                       Justin C   Steve R
    Roll‐out                                                                                                                                                            SM, Tech,
                                                                                                                                                                        Hal, Doug

 Create Line‐item 
                       Begin                                    Complete                                                                         Lisa B     Mark C
      P.O.s


 Refinance credit 
                                           Begin                                                                                                 Scott R
      facility


  Complete ADP 
                       Begin   Complete                                                                                                          Gary O
    Roll‐out

                                                                                                                                       Not 
Develop & Roll‐out                                    MS‐1       MS‐2                                                      MS‐3
                       Begin                                                                                                        complete     Steve C     TBD
  Handheld 2.2                                     Clean Code    Pilot                                                    Go live
                                                                                                                                    until 2013

  Complete GPS                                                                                                                                                          RDs Cons., 
                                                                 Begin                                                   Complete                Steve C
    Roll‐out                                                                                                                                                             HR, Fleet

Complete "River" 
   (One Soft)                                                    Begin                       Complete                                            Lisa B
    Roll‐out

 Develop Safety 
                                 Begin                                                                  Complete                                 Gary O
   Program


                                                                                                                                                                                45
Annual Improvement Plan
Tier 1 Priority:                                                 Executive Owner:                                          Date Created:

Tier 2 Priority:                                                 Tactical Owner:
Background/Scope:                                                                                                          Next Review:



Measurable Objective(s):
Core work team:                                                  Input/Review needed by:
Relationship to Annual Business Goal(s):                                                Timeline
                                                                                                                                       Status
                                                                             = Original Plan       X = Complete               %         (Red, 
                                                                  Due                                                      Complete    Yellow, 
                                                                                               2012
                                                                  Date                                                                 Green)
 #                         Action Item     Owner   Deliverable           Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

 1
 2
 3
 4
 5
 6
 7
 8
 9
10
11
12
13
14
15
16
17
18
19
20
                                                                                                                                                  46
Frequent Status 
Meetings Assure 
Ongoing Alignment & 
Distraction Avoidance




                        47
Sporting Goods Manufacturer
  Product Launches Per Year
80
                    73
70
60                            No additional 
                              resources; 
50                            higher quality 
40                            products 
                              launched
30
        24
20
10
 0
     Pre‐Focus   Post‐Focus
                                                48
Rockwell Automation

25
      20
20                            Projects
15                            Started
                  12 12
10                            Projects
 5                            Completed
           3
 0
     Pre‐Focus   Post‐Focus


                                          49
Avoiding the Shiny Ball Syndrome 
        (Organizational ADD) Requires…

• Clarity – about what really 
  matters & organizational 
  direction.
• Consensus – about how best 
  to get there.
• Courage – to actively choose 
  to “not do” or “not do now.”
• Commitment – to stick with 
  the plan.
                   From The Outstanding Organization, Karen Martin

                                                                     50
51

                     Resilience
                       Agility
Business Results




                     Innovation
                     Continuous 
                    Improvement
                   Problem Solving
Greatness results from
Disciplined people engaged in disciplined 
 thinking that leads to disciplined
         action.
                      — Jim Collins, Good to Great




                                                     52
Building Mastery Requires Deliberate Practice




                                                53
How much deliberate practice?




10,000 hours   Tied deliberate practice 
 (10 Years)    to myelin development 

                                           54
Practice vs. Performance
                                      Perform 
        Train                           99%
100%    90%

90%
80%
70%
60%                                                                 Train
50%                                                                 Perform
40%
30%               Perform 
20%                 10%       Train
                               1%
10%
 0%
       Athletes              Businesses
                                            Jim Loehr & Tony Schwartz,              
                                            The Power of Full Engagement
                                                                                 55
Building Mastery




© 2012 Karen Martin & Associates, LLC                      56
MASTERY



          57
Discipline is Needed…

•   Planning
•   Decision making
•   Executing
•   Problem Solving & Improving
•   Managing processes



                                  58
“It takes a different kind of thinking to 
solve a problem than the kind of thinking 
       that produced the problem.”
                    — Albert Einstein




                                               59
“Most people spend more time and 
 energy going around problems         

 than in trying to solve them.  ”
                 — Henry Ford




                                         60
The Scientific Method for Problem Solving        
               and Improving




                                                    61
Clarifying the PDSA Cycle

                    Phase                             Detailed Steps

                                                                                                   New 
                                      1.  Define and break down the  problem.
                                                                                                 Problem
50‐80%                                2.  Grasp the current condition.
 of the                 Develop 
            Plan                      3.  Set a target condition.
 total                 Hypothesis

                                      4.  Conduct root cause & gap analysis.
  time
                                                                                         Continuous 
                                      5.  Identify potential countermeasures.           Improvement

                                      6.  Develop & test countermeasure(s)

                         Conduct 
            Do                      7.  Refine and finalize countermeasure(s).
                       Experiment

                                      8.  Implement countermeasure(s).

                        Evaluate 
           Study                      9.  Measure process performance.
                         Results

                                    10. Refine, standardize, & stabilize the process.
                          Refine 
           Adjust      Standardize  11. Monitor process performance.
                         Stabilize
                                    12.  Reflect & share learning.

                                                                                                           62
Developing PDSA Capabilities

Complex   • A3 Management

          • Kaizen Events

Simple    • Daily Kaizen




                                    63
Group Discussion
• How many of you are familiar with A3 
  Management?
• How many of you have a disciplined A3 
  development program across your organization 
  (including coach development)?
• If it’s a good idea, why aren’t more 
  organizations doing it?
• What can you do about it?


                                                  64
Discipline is Needed…

•   Planning
•   Decision making
•   Executing
•   Problem Solving & Improving
•   Managing Processes



                                   65
Every key process…
   Clearly documented

       2‐5 Key Performance Indicators

                Continually  
                monitored & improved


                                        66
How are you performing?


              Gray – Highest industry quality scores
              Purple – Median industry quality scores
              Blue – Our quality scores




                                                        67
Value Stream Maps: 
Gaining Clarity around Process Performance
Processes MUST be Clearly Documented, 
                     Monitored & Improved
                                                                       Current State Metrics-Based Process Map
     PT Units                                       Process Details                                                                                    Mapping Team
   Seconds      Hours           Process Name Order Fulfillment                                        Dianne O'Shea                           Ryan Austin
   Minutes      Days       Specific Conditions Domestic orders through sales force                    Sean Michaels                           Mary Townsend
     LT Units            Occurrences per Year 37,500                                                  Sam Parks
   Seconds      Hours    Hours Worked per Day 8                                                       Paul Dampier
   Minutes      Days             Date Mapped 26-Nov-07                                                Michael Prichard
              Step # ?                   6                                       7                                       8                                       9
      Function /
     Department            Activity       PT      LT    %C&A       Activity          PT   LT   %C&A       Activity       PT      LT    %C&A      Activity        PT   LT




Customer




                                                                                                       Notify customer
                                                                  Fax PO to
Sales Rep                 Approve PO      15      240   100%                         5    20   100%    when they can     15      300   95%
                                                               Account Manager
                                                                                                       expect delivery




                                                                                                         Review and
Account Manager                                                                                       approve PO; send       5   240   100%
                                                                                                        to Order Entry




                                                                                                                                              Enter order into
Order Entry                                                                                                                                                      10   240
                                                                                                                                                   SAP




Finance / Credit



                                                                                                                                                                            69
We need to shift our focus from
    managing   people
 to managing processes.




                                  70
Non‐standard Processes Yield Inconsistent Results
                                     R1

                                          R2
                                               Inconsistent
 People                         R3             Results
                           R4
            Inconsistent
             Processes



 Standard Processes Yield Predictable Results

                                                Desired
People                                          Results
              Standardized 
                Processes

                                                              71
Process Ownership:
         Working On The Business
• All processes MUST have a process owner.
  – Closer than farther from the work.
  – Recognized as having the authority to lead 
    improvement.
• Accountable for process performance.
  – Frequent measurement and review.
  – Lead/organize cross‐functional problem solving.




                                                      72
Don’t Look Away. Ever.




                         73
Before improving a process,
        understand –
  really understand –
 how it is being performed
            today.


                              74
Traditional Mapping Method:
        Process Flow Chart




 How long does the process take?  
How well is the process performing? 
    Where are the problems?            75
The Genesis of MBPM
               Second Edition




August 2008     October 2012




                                76
What is Metrics‐Based Process Mapping (MBPM)?

• A visual process analysis tool, which integrates:
  – Functional orientation of traditional swim lane          
    process maps
  – Key Lean metrics:
     • Lead Time
     • Process Time
     • Quality (Percent Complete and Accurate)




                                                                77
Metrics‐Based Process Mapping (MBPM)
Why Create an MBPM?

• To map admin / office processes
• Understand the steps, disconnects, waste, and 
  delays – at a micro level
• Measure process performance in terms of:
  – Time (lead time and process time)
  – Quality
• Visualizes the steps and flow
• Use as standard work for training and process 
  monitoring
                                                   79
Typical Current State Findings

              Islands of value‐adding activities.
             Shift the focus to the NVA elements.
                                          Rework




First Step                                          Last Step
                           Adding Value


                            Lead Time



                                                                80
MBPM Results
                                                        %
    Process         Before            After
                                                   Improvement
New Hire
                LT = 25.75 days   LT = 17.5 days      32%
Logistics

Purchase
                 LT = 21 days      LT = 8 days        62%
Requisition

Sales Order
                PT = 2.7 hours    PT = 1.3 hours      52%
Change

Supplies
                   17 steps          11 steps         35%
replenishment

Product Demo     %C&A = 2%        %C&A = 20%          900%


                                                                 81
MBPM – Getting Started
• Define a clear scope – narrow and deep
   – Define the first and last steps for the process to be improved
   – Lay out the specific conditions for the process to be mapped
                                           Metrics-Based Process Mapping Charter
                                  Improvement Scope                                Leadership                               Mapping Schedule
                 Value Stream                                            Executive
                                                                                                                         Date(s)
                 Process Name                                             Sponsor

                      Specific                                                                                        Start/End
                                                                     Process Owner
                    Conditions                                                                                           Times
             Customer Demand
                                                                         Facilitator                                   Location
                       Trigger
                     First Step                                      Mapping Team                                         Food
                     Last Step                                               Lead                                      Provided

                 Boundaries &                                                                                           Briefing
                   Limitations                                                                                      Dates/Times
                                                               Required Briefing
                                                                      Attendees
            FS Implementation                                                                                         Logistics
                   Timeframe                                                                                        Coordinator

                  Improvement Drivers / Current State Issues                                       Mapping Team
             1                                                                 Function                      Name
             2                                                   1
             3                                                   2
             4                                                   3
             5                                                   4
                 Improvement Goals & Measurable Objectives       5
             1                                                   6
             2                                                   7
             3                                                   8
             4                                                   9
             5                                                  10
                                  Potential Deliverables                                           On-Call Support
             1                                                                 Function                      Name                      Contact Information
             2                                                   1
             3                                                   2
             4                                                   3
             5                                                   4
                                   Possible Obstacles                                                 Approvals
             1                                                          Executive Sponsor          Value Stream Champion                   Facilitator
             2
             3                                                 Signature:                       Signature:                         Signature:
             4                                                 Date:                            Date:                              Date:
                                                                                                                                                             82
Scope: Refining the Focus
                                    Units


                  Domestic       Consumables
                                                 Warranty
                                 Service Parts
  Order                                           Non‐
Fulfillment                                      Warranty
                                    Units


                 International   Consumables
                                                 Warranty
                                 Service Parts
                                                  Non‐
                                                 Warranty
                                                            83
MBPM – Getting Started (continued)
• Select the team (most effective within a kaizen  event)
   – Highly cross‐functional – workers, upstream suppliers, 
     downstream customers, outside eyes, etc.
      • Those who currently do the job
   – No more than 10 individuals
   – Don’t avoid the “difficult” people
   – Include “outside eyes” if possible
• Use a skilled, objective facilitator
• Have a room with (long) wall space for 36” wide 
  butcher paper
• Map on consecutive days


                                                               84
Steps in Creating the Current State MBPM
1.    Label the map (process, date, team or facilitator)
2.    List the functions involved
3.    Document all activities / steps
4.    Review the map for completeness
5.    Number the activities
6.    Add activity‐specific information (metrics, etc.)
7.    Determine the timeline critical path
8.    Create the timeline
9.    Calculate the summary metrics
10.   Identify value‐adding (VA) and necessary non‐value‐adding 
      (N) activities


                                                                   85
Documenting the Current State
Step 1 – Label the map in the upper right hand 
  corner.
  – Include process name, conditions mapped, date, 
    and facilitator name and/or team members.




                                                      86
Document the Current State
Step 2 – Label the swim lanes with the functions 
  involved.
  – Include external functions, if appropriate (e.g. 
    customers, suppliers/contractors, etc.)
  – Sequence in which functions are listed is not 
    important




                                                        87
Document the Current State
Step 3 – Document all activities/steps on 3” x 6” 
  post‐its.  Don’t include metrics yet!
  – Use verb/noun format; clear and concise
  – Include function.
  – Separate tasks that have different quality outputs 
    or timeframes; combine tasks otherwise.
  – Place post‐its in appropriate swim lane, 
    sequentially.




                                                          88
Document Each Activity

    Activity              
 (Verb / Noun)                                Function that 
                                              performs the 
                                                  task


 Best to use 
3 x 6” Post‐its




                                                               89
Step Step               Concurrent 
  1    2                 Activities




       Ticking clock 
                                      90
Document the Current State

Step 4 – Review map for completeness 
   (someone other than the facilitator)
  – Walk through the map, reading aloud.
  – Verify sequence
  – Add missing steps and barriers to flow (“flow‐
    stoppers”) if any.




                                                     91
Document the Current State
Step 5 ‐ Number the activities
  – Number the activities sequentially from left to right.
  – For parallel (concurrent) activities, add “A,” “B,” etc.
     • Example: Step 8A, Step 8B, etc.
  – Don’t number the post‐its until the map is “final.”




                                                               92
Document the Current State
Step 6 – Add activity‐specific information
  –       LT – Lead time
  –       PT – Process time
  –       %C&A – Percent Complete & Accurate
  –       Number of people who perform the work
  –       Barriers to flow
      •     Batches
      •     Equipment downtime
      •     Shared resources, etc.



                                                  93
Key Metrics: Time
• Process time (PT)
  – The time it takes to actually perform the work to 
    complete one item, if it could be worked on 
    uninterrupted.
• Lead time (LT)
  – The elapsed time from when work is available to be 
    worked on until it’s completed and made available to 
    the next person or department in the process




                                                            94
Key Metrics:  Quality
• %Complete and Accurate (%C&A)
  – % of the time the downstream customer can 
    perform task without having to “CAC”:
    • Correct information or material that was 
      supplied
    • Add missing information that should have been 
      supplied
    • Clarify information provided that should have 
      been clear


                                                       95
Add Activity‐Specific Information
                     Additional Information




      # Staff  
  (if relevant)
                                           Barriers to flow 
                                            (if relevant)




% Complete &                                  PT
  Accurate                                    LT
                                                          96
Adding Metrics:  Tips
• LT, PT and %C&A are typically acquired via 
  interviews – ask high‐quality questions.
• Usually looking for the “typical” LT and PT; 
  what happens 80% of the time?
• Select units of measure that are easiest to 
  comprehend (e.g. 6 hours instead of 360 
  minutes).
• PT is the time required to complete one “thing”
• If your LT is 4 hours, don’t debate a PT of 5 vs. 
  7 minutes.

                                                       97
Adding Metrics: Tips (continued)
• May be OK to group the LT for a series of 
  activities performed by the same function 
  (rather than each individual step). 
• Place %C&A value on the post‐it of the source 
  step.
  – If %C&A issues are identified by multiple 
    downstream customers, record each of the 
    %C&As on the Post‐it of the source step (can also 
    indicate on the Post‐it which step reported the 
    problem). 
  – 0% C&A is not uncommon


                                                         98
Barriers to Flow
• Look at the process from “the thing’s” 
  perspective
• Identify issues that prevent one‐piece‐flow of 
  the work
  – Batching / periodic processing
  – Rework
  – Bottlenecks
  – Handoffs
  – Inventory
  – Setup / changeover
  – Physical layout

                                                    99
Document the Current State
Step 7 – Determine the “timeline critical 
  path” of the process
  – For parallel activities:
     • Don’t include “dead end activities”
        – Steps / path which don’t move the process forward 
          (e.g. filing a document)
     • If both paths are required to move forward, 
       select the path with the longest total lead time



                                                               100
Timeline Critical Path




Critical 
 Path




                         101
Document the Current State
 Step 8 – Create the timeline
    – Bring down the PT & LT from the critical path steps.




Timeline



                                                             102
Document the Current State
Step 9 ‐ Calculate Summary Metrics
  –   Critical Path PT
  –   Critical Path LT
  –   Activity Ratio (AR)
  –   Rolled Percent Complete and Accurate 
      (R%C&A)
  –   Total PT
  –   Labor Requirements
  –   Number of Activities


                                              103
Summary Metrics: Time
• Timeline Critical Path PT
  – Quantifies how much of the response time (LT) is 
    spent actually working on the “thing”
• Timeline Critical Path LT
  – Measures speed of delivery to customer & an 
    indicator of cash flow
• Activity Ratio (AR)
  – The percentage of time work is being done to the 
    patient/item/data passing through the process
  – AR = (Σ PT ÷ Σ LT) × 100
  – 100 – AR = Idle time

                                                        104
Summary Metrics: Quality
• Rolled Percent Complete and Accurate 
  (R%C&A) = 
  – %C&A × %C&A × %C&A × … 
  – Out of 100 occurrences, the number of times the 
    data/material/people pass through the entire 
    process with no rework required (expressed as a 
    percentage).




                                                   105
Summary Metrics: Labor Requirements

• Total PT
  – Sum of all activities, not just critical path
  – Factor in determining labor requirements
• # FTEs* Required (Total Labor Effort)
    # FTEs             Total PT (in hrs) X # occurrences/year
    Required      =
                                Available work hrs/year



    * FTE = Full‐time Equivalent
    (2 half time employees = 1 FTE)

                                                                106
Summary Metrics: Labor Effort
• Total PT
  – Sum of all activities, not just timeline
• Labor Effort
      Time     =     Total PT (in hrs) x # occurrences/year

                     Total PT (in hrs) x # occurrences/year
    # FTEs* =
                        Available work hrs/year/employee**
     Freed 
             = Current State FTEs – Future State FTEs
    Capacity

          * FTE = Full‐time Equivalent (2 half time employees = 1 FTE)
        ** Available work hrs/year = 2,080 ‐ paid holidays and vacations
                                                                           107
Documenting the Current State
Step 10 – Identify Value‐adding (VA) &
   Necessary Non‐value‐adding (N) activities
  –   Use small post‐its in different colors to 
      differentiate VA and N
  –   Monitor time allowed for debate
  –   Unlabelled activities = waste




                                                   108
Value‐adding activity




   Necessary non‐value‐adding activities
Metrics‐Based Process 
     Mapping (MBPM) 
         Simulation

          Order Fulfillment Process:
          Demand = 2,500 orders per year
Available work hours per employee per year = 1,800



                                                     110
Create the Current State MBPM
                        Phase I
1. Label the map in upper right corner.
  •   Process name, date, facilitator and/or team members
2. List the functions involved in left column.
3. Document all activities/steps. No metrics yet!
  •   Verb/noun; concise language; include function as well.
4. Review the map for completeness.
5. Number the activities.
   One number per column; concurrent activities are labeled A, B, C, etc.
6. Add activity‐specific metrics (PT, LT, %C&A). (We are not 
   considering number of workers and barriers to flow in 
   this simulation.)
                                                                             111
Create the Current State MBPM
                     Phase II

7.   Define the critical timeline path.
      • Longest LT unless “dead‐end” step; use colored marker
8.   Create the timeline.
9.   Calculate the summary metrics
      • CP PT Sum, CP LT Sum, AR, R%C&A, Total PT, Labor Required
10. Identify the VA and necessary NVA activities
      • Use small colored post‐it labeled with “VA” and “N.”
11. Circle the step‐specific metrics that indicate the greatest 
    opportunity for improvement.
      • Use red marker.
      • Long LTs, low %C&As, high PTs, low step‐specific ARs



                                                                    112
Document Summary Metrics
                                    Projected      Projected %
     Metric        Current State   Future State   Improvement

Timeline
Critical Path PT
Timeline
Critical Path LT
Activity Ratio

Rolled %C&A
Total
Process Time
Freed capacity
Future State Design
      • Goals
         –   Reduce overall LT & PT
         –   Improve quality (increase RFPY)
         –   Increase % activity
         –   Improve LT, PT, and %C&A at individual steps
      • May need to perform root cause analysis before 
        determining countermeasures to realize the future 
        state
      • Mapping steps
         – Clean sheet or modify current state map
         – Same steps as current state
         – Calculate projected metrics


114
Future State Design Considerations
•   Eliminate steps / handoffs      • Eliminate motion & 
•   Combine steps                     transportation
•   Create parallel paths           • Standardize work
•   Alter task sequencing and/or    • Eliminate unnecessary 
    timing                            approvals / authorizations
•   Implement pull                  • Stop performing non‐value 
•   Reduce / eliminate batches        adding (NVA) tasks
•   Improve quality                 • Co‐locate functions based 
                                      on flow; create cells 
•   Create an organized, visual       (teams of cross‐functional 
    workplace                         staff)
•   Reduce changeover               • Balance work to meet takt
                                      time requirements


                                                                    115
116

                     Resilience
                       Agility
Business Results




                     Innovation
                     Continuous 
                    Improvement
                   Problem Solving
Energy Crisis: Widespread Disengagement




                                          11
                                          7
Engagement Drivers: The Three C’s 


             Connection




     Creativity       Control



                                     118
Engagement Drivers
• Connection ‐ to mission, annual goals, 
  immediate supervisor, people within the 
  organization, customers.
• Control – heavy involvement in decisions that 
  influence their work life.
• Creativity – Full use of talents, capacities, 
  potentialities, and skills




                                                   119
It’s disrespectful to…
1. Not engage employees in work design and 
   improvement.
2. First blame people instead of systems and processes.
3. Not help employees develop skills.
4. Not coach employees through problem solving – on an 
   ongoing basis.
5. Have poorly designed processes which inhibit 
   performance.
6. Fail to create and clearly communicate organizational 
   goals and priorities.
7. Lack honesty and omit relevant information.

                                                       120
Group Activity – Driving Engagement
• Three groups:
  – Connection
  – Control
  – Creativity
• Each group: 
  – Identify activities and practices within your 
    organization that engage or disengage employees in 
    that area.
• Report out

                                                          121
Activity: Engage or Disengage?
                         Engage           Disengage
Connection




Control




Creativity




                                                      122
Reducing Self‐Inflicted Chaos: 
  Where Should You Start?




                                  123
Places to Start…
1. Develop an intolerance for ambiguity.
2. Prioritize your work; reduce the number of 
   active projects at once.
3. Ban electronic devices from meetings.
4. Adopt a problem‐solving methodology and 
   deploy it broadly; get a coach!
5. Document, standardize and improve all major 
   processes with significant involvement of the 
   workers themselves.
6. Identify process owners and KPIs for each.

                                                    124
Group Activity – Closing the Gap
• Go back to your “weakest corner” (Clarity, Focus, 
  Discipline or Engagement)
  – List the lean practices/methods/tools that can be used 
    to improve your organizations’ behaviors
  – Report out to the class
• Next, look at your “self‐assessment” notecard, 
  select one of your organization’s weakest areas, 
  and begin creating a plan for how to start moving 
  the needle (what’s the problem, what are 
  potential root causes, what are potential 
  countermeasures, who needs to be involved, etc.) 



                                                              125
As Outstanding as They Come…


        Discipline




                               12
                               6
Mike Osterling, President          Karen Martin, Principal
 4320 Woodland Drive              7770 Regents Road #635
  La Mesa, CA 91941                 San Diego, CA 92122
     619.572.3632                      858.677.6799

  mike@mosterling.com                 ksm@ksmartin.com
                                  Twitter: @karenmartinopex
                            Subscribe: www.ksmartin.com/subscribe
                                                                    127
Our 
Books
        October 2012




        Just released   Contributing Author
                                              128

Lean Mindsets and Behaviors

  • 1.
    Lean Mindsets &Behaviors Creating a High-Performance Climate for Sustained Transformation Mike Osterling & Karen Martin AMEChicago2012 October 15, 2012
  • 2.
    Learning Objectives • The macro‐ and micro‐behaviors that are at the core of  excellence. • How to identify the gaps between “what is” and “what  needs to be.” • How to create an operational climate that enables  people to grow and succeed. • How to develop Lean mindsets and behaviors  throughout your organization. • How to instill and reinforce the new ways of operating. 2
  • 3.
    Success with Improvement 2001 – The Economist 70% 63% 60% 50% 40% 30% 20% 17% 20% 10% 0% None Temporary Lasting 3
  • 4.
    …A Decade Later 2010 – Accenture 80% 70% 69% 60% 58% 50% 40% 33% 30% 20% 10% 0% “Mixed” to  Minimal  Needs re‐evaluation,  “disappointing”  financial  restart or complete  results impact makeover 4
  • 5.
    To Err isHuman Institute of Medicine, 1999 98,000 lives lost Improvement Goal: Reduce by 50%  in 5 years. 5
  • 6.
  • 7.
    Something Is Terribly Wrong… Up to 98,000 people  180,000 Medicare  die from medical  patients die annually  errors. from medical errors. To Error is Human,  Office of the Inspector  Institute of Medicine 2005 General 2011 1999 Progress has been  2010 33% hospitalized  slow. patients are harmed;  7% result in permanent  Journal of the American  Medical Association injury or death. Health Affairs 7
  • 8.
    We need to  improve how we improve. 8
  • 9.
  • 10.
  • 11.
    11 Resilience Agility Business Results Innovation Continuous  Improvement Problem Solving that Reduce  Mindsets &  Behaviors  Chaos
  • 12.
    Clarity Engagement Focus Discipline 12
  • 13.
    “Effectiveness is a  habit.” — Peter Drucker 13
  • 14.
    Group Discussion 1. Clarity 2. Focus 3.Discipline 4. Engagement 14
  • 15.
    Group Activity ‐ Behavioral Gaps • Part 1 –Rate your organization (company, facility,  department, etc.).  2 minutes – Which of the four behaviors is it weakest in? • Part 2 – Move to the appropriate corner for your  weakest org behavior. 15 minutes – Give examples of the lack of that behavior – Which metric(s) do they affect (hard impact)? – How do they affect customers, employees and/or  suppliers (soft impact)? – Select one example & its impact to share with the full  group. • Part 3 – Report out. 10 minutes 15
  • 16.
    Activity: Behavioral Gaps Hard Costs Soft Costs Lack of Clarity Lack of Focus Lack of Discipline Lack of Engagement 16
  • 17.
    17 Resilience Agility Business Results Innovation Continuous  Improvement Problem Solving
  • 18.
  • 19.
    Junk Words* (10 mins) • The line at Starbucks is long. _________________ • That car is expensive.  ______________________ •That would be a long commute. ______________ * Conceptualized by Sammy Obara, Toyota by Toyota 19
  • 20.
    Seek Unbridled Clarity Around… 1. The direction your organization is heading in. 2.Who your customers truly are and what needs  they have. 3. What value you deliver. 4. How specifically you deliver and support the  delivery of value. 5. Who delivers and supports the delivery of  value. 6. How you’re performing. 7. The language you use. 20
  • 21.
    “Going to the gemba  has been life changing  for me as a leader.” ‐ Ginny Cattaneo, Sr. VP, Franklin Templeton Investor Services  21
  • 22.
    Lean Management System Plant Manager  Standard Work Value Stream Manager  Standard Work Supervisor Standard Work Team Leader Standard Work Standardized Processes 22
  • 23.
    Truth Truth Truth Truth Truth Truth Truth Truth Truth 23
  • 24.
    24 Resilience Agility Business Results Innovation Continuous  Improvement Problem Solving
  • 25.
  • 26.
    Focus Needs 1. Priorities – What are you striving for? What’s  important to accomplish THIS year? – Products – Processes – Marketplace – Margins – People 2. Meetings – What’s the purpose of the  meeting?  26
  • 27.
    Booz & Company Findings 90% 82% 80% 70% 64% 60% 49% 50% 40% 30% 20% 10% 0% No written Conflicting Competing priorities priorities demands 27
  • 28.
  • 29.
    The Myth of Multi‐tasking • It’s not possible to do two conscious activities at  once. • You are “switch‐tasking.” • David Meyer – University of Michigan – Engineers switched between projects 5‐8 times per  day – Each switch added 20 minutes of process time – If switch only 5x per day, adds 1.7 hrs per day or 407  hours (10 weeks) of process time per engineer – In company w/ 15 engineers = 3 FTEs* worth of labor. * FTE = Full Time Equivalent 29
  • 30.
  • 31.
    Round 1 Task 1: Lack of focus causes chaos Task 2: 1   2   3   4   5   6   7   8   9   10   11  12 13 14 15 16 17 18 19 20 21 22 Round 1 – Letter, number, letter, number: L, 1, A, 2, C, 3, etc. _________________________________________________ _________________________________________________ 31
  • 32.
    Round 2 Task 1: Lack of focus causes chaos Task 2: 1   2   3   4   5   6   7   8   9   10   11  12 13 14 15 16 17 18 19 20 21 22 Round 2 – full sentence, followed by numbers 1‐22. _________________________________________________ _________________________________________________ 32
  • 33.
    The Countermeasure: Strategy Deployment  Aka Hoshin kanri; policy deployment  Hoshin – Direction; compass; shining needle  Kanri – Management  Two key parts: Creating the plan itself &  and fanatic management to that plan.  Purpose: Organizational focus &  alignment  Aligns everyone toward a few high impact  objectives while also keeping them  accountable for their commitments through  visual management and review. 33
  • 34.
    Strategy Deployment Key Feature:  Catchball What? How? Executive  Who? Team When? What? How? Senior  Who? Mgmt When? What? How? Middle  Who? Mgmt When? What? How? Frontlines Who? When? 34
  • 35.
    Improve Productivity through Greater Focus Productivity (Pounds Produced / Hr Worked) 115.0 Pactiv 108.0 Implements Strategy 105.9 Deployment 101.0 95.2 94.0 93.0 90.6 87.0 86.3 84.8 80.0 FY '06 FY '07 FY '08 FY '09 FY '10 YTD '11 35
  • 36.
    Activity: Achieving Focus  List Potential Projects Lean Mindsets & Behaviors Achieving Focus: Project Prioritization Project / Priority 36
  • 37.
    “Hoshin‐Lite” Annual Work Plan PRE ‐ Gain clarity around overarching business needs. 1.List everything you could do (and that you are doing and  you plan to do). 2. Categorize into: – Must‐do, can’t fail – Maybe – Eliminate – Delay (next fiscal year) 3. Decide what you will do; gain consensus. 4. Prioritize and create plan. POST ‐ Manage plan via weekly updates (may be able to reduce  to monthly reviews – but be careful!). 37
  • 38.
    Achieving Focus Categorize project list Lean Mindsets & Behaviors Achieving Focus: Project Prioritization Project / Priority Must Do Eliminate Delay Maybe Project A X Project B X Project C X Project D X Project E X Project F X Project G X Project H X Project I X 38
  • 39.
  • 40.
    Achieving Focus Move “Maybe’s” into Other Categories Lean Mindsets & Behaviors Achieving Focus: Project Prioritization Project / Priority Must Do Eliminate Delay Maybe Project A X Project B X Project C X Project D X Project E X Project F X Project G X Project H X Project I X 40
  • 41.
    Label Four Flip Chart Pages & Hang on Wall Must do Maybe 1. List what you could do on  3x6” post‐its (active or  planned initiatives,  projects & improvement  activities). Gain consensus. 2. Categorize them (place  post‐it on appropriate  page. Gain consensus. Delay Eliminate 3. Decide what you will do.  (Move “maybe’s” onto one  of the other three pages.)  Gain consensus. 41
  • 42.
    Must do Maybe Step 4 Prioritize  must‐do’s;  Create Plan Delay Eliminate 42
  • 43.
    PACE Improvement Prioritization Grid 9 22 17 23 8 3 21 Easy 10 4 13 5 15 Ease of Implementation 20 14 19 1 16 7 6 2 11 18 12 Difficult Low High Anticipated Benefit 43
  • 44.
    Achieving Focus Prioritize Must‐Do’s Easy Ease of Implementation Difficult Low High Anticipated Benefit 44
  • 45.
    Annual Improvement Plan Company ABC Priorities FY 2012 FY 2013 Exec  Tactical  Priority Others Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Owner Owner MS‐2  MS‐1 Integrate DHR Begin Acct Brad P Ops Complete Complete New  Travel Program  Begin Complete Scott R Fred S Roll‐out Roll‐out Tablets to  Begin &  Brad P Installation Complete Lisa D,  Complete 360  Marina, Begin Complete Justin C Steve R Roll‐out SM, Tech, Hal, Doug Create Line‐item  Begin Complete Lisa B Mark C P.O.s Refinance credit  Begin Scott R facility Complete ADP  Begin Complete Gary O Roll‐out Not  Develop & Roll‐out  MS‐1 MS‐2 MS‐3 Begin complete  Steve C TBD Handheld 2.2 Clean Code Pilot Go live until 2013 Complete GPS  RDs Cons.,  Begin Complete Steve C Roll‐out HR, Fleet Complete "River"  (One Soft)  Begin Complete Lisa B Roll‐out Develop Safety  Begin Complete Gary O Program 45
  • 46.
    Annual Improvement Plan Tier 1 Priority: Executive Owner: Date Created: Tier 2 Priority: Tactical Owner: Background/Scope: Next Review: Measurable Objective(s): Core work team: Input/Review needed by: Relationship to Annual Business Goal(s): Timeline Status = Original Plan X = Complete %  (Red,  Due  Complete Yellow,  2012 Date Green) # Action Item Owner Deliverable Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 46
  • 47.
  • 48.
    Sporting Goods Manufacturer Product Launches Per Year 80 73 70 60 No additional  resources;  50 higher quality  40 products  launched 30 24 20 10 0 Pre‐Focus Post‐Focus 48
  • 49.
    Rockwell Automation 25 20 20 Projects 15 Started 12 12 10 Projects 5 Completed 3 0 Pre‐Focus Post‐Focus 49
  • 50.
    Avoiding the Shiny Ball Syndrome  (Organizational ADD) Requires… • Clarity – about what really  matters & organizational  direction. • Consensus – about how best  to get there. • Courage – to actively choose  to “not do” or “not do now.” • Commitment – to stick with  the plan. From The Outstanding Organization, Karen Martin 50
  • 51.
    51 Resilience Agility Business Results Innovation Continuous  Improvement Problem Solving
  • 52.
    Greatness results from Disciplined people engaged in disciplined  thinkingthat leads to disciplined action. — Jim Collins, Good to Great 52
  • 53.
  • 54.
    How much deliberate practice? 10,000 hours Tied deliberate practice  (10 Years) to myelin development  54
  • 55.
    Practice vs. Performance Perform  Train 99% 100% 90% 90% 80% 70% 60% Train 50% Perform 40% 30% Perform  20% 10% Train 1% 10% 0% Athletes Businesses Jim Loehr & Tony Schwartz,               The Power of Full Engagement 55
  • 56.
  • 57.
  • 58.
    Discipline is Needed… • Planning • Decision making • Executing • Problem Solving & Improving • Managing processes 58
  • 59.
  • 60.
  • 61.
  • 62.
    Clarifying the PDSA Cycle Phase Detailed Steps New    1.  Define and break down the  problem. Problem 50‐80%    2.  Grasp the current condition. of the  Develop  Plan   3.  Set a target condition. total  Hypothesis   4.  Conduct root cause & gap analysis. time Continuous    5.  Identify potential countermeasures. Improvement   6.  Develop & test countermeasure(s) Conduct  Do   7.  Refine and finalize countermeasure(s). Experiment   8.  Implement countermeasure(s). Evaluate  Study   9.  Measure process performance. Results 10. Refine, standardize, & stabilize the process. Refine  Adjust Standardize  11. Monitor process performance. Stabilize 12.  Reflect & share learning. 62
  • 63.
    Developing PDSA Capabilities Complex • A3 Management • Kaizen Events Simple • Daily Kaizen 63
  • 64.
    Group Discussion • How many of you are familiar with A3  Management? • How many of you have a disciplined A3  development program across your organization  (including coach development)? • If it’s a good idea, why aren’t more  organizations doing it? • What can you do about it? 64
  • 65.
    Discipline is Needed… • Planning • Decision making • Executing • Problem Solving & Improving • Managing Processes 65
  • 66.
    Every key process… Clearly documented 2‐5 Key Performance Indicators Continually   monitored & improved 66
  • 67.
    How are you performing? Gray – Highest industry quality scores Purple – Median industry quality scores Blue – Our quality scores 67
  • 68.
  • 69.
    Processes MUST be Clearly Documented,  Monitored & Improved Current State Metrics-Based Process Map PT Units Process Details Mapping Team Seconds Hours Process Name Order Fulfillment Dianne O'Shea Ryan Austin Minutes Days Specific Conditions Domestic orders through sales force Sean Michaels Mary Townsend LT Units Occurrences per Year 37,500 Sam Parks Seconds Hours Hours Worked per Day 8 Paul Dampier Minutes Days Date Mapped 26-Nov-07 Michael Prichard Step # ? 6 7 8 9 Function / Department Activity PT LT %C&A Activity PT LT %C&A Activity PT LT %C&A Activity PT LT Customer Notify customer Fax PO to Sales Rep Approve PO 15 240 100% 5 20 100% when they can 15 300 95% Account Manager expect delivery Review and Account Manager approve PO; send 5 240 100% to Order Entry Enter order into Order Entry 10 240 SAP Finance / Credit 69
  • 70.
    We need toshift our focus from managing people to managing processes. 70
  • 71.
    Non‐standard Processes Yield Inconsistent Results R1 R2 Inconsistent People R3 Results R4 Inconsistent Processes Standard Processes Yield Predictable Results Desired People Results Standardized  Processes 71
  • 72.
    Process Ownership: Working On The Business • All processes MUST have a process owner. – Closer than farther from the work. – Recognized as having the authority to lead  improvement. • Accountable for process performance. – Frequent measurement and review. – Lead/organize cross‐functional problem solving. 72
  • 73.
  • 74.
    Before improving aprocess, understand – really understand – how it is being performed today. 74
  • 75.
    Traditional Mapping Method: Process Flow Chart How long does the process take?   How well is the process performing?  Where are the problems? 75
  • 76.
    The Genesis of MBPM Second Edition August 2008 October 2012 76
  • 77.
    What is Metrics‐Based Process Mapping (MBPM)? • A visual process analysis tool, which integrates: – Functional orientation of traditional swim lane           process maps – Key Lean metrics: • Lead Time • Process Time • Quality (Percent Complete and Accurate) 77
  • 78.
  • 79.
    Why Create an MBPM? • To map admin / office processes • Understand the steps, disconnects, waste, and  delays – at a micro level • Measure process performance in terms of: – Time (lead time and process time) – Quality • Visualizes the steps and flow • Use as standard work for training and process  monitoring 79
  • 80.
    Typical Current State Findings Islands of value‐adding activities. Shift the focus to the NVA elements. Rework First Step Last Step Adding Value Lead Time 80
  • 81.
    MBPM Results % Process Before After Improvement New Hire LT = 25.75 days LT = 17.5 days 32% Logistics Purchase LT = 21 days LT = 8 days 62% Requisition Sales Order PT = 2.7 hours PT = 1.3 hours 52% Change Supplies 17 steps 11 steps 35% replenishment Product Demo %C&A = 2% %C&A = 20% 900% 81
  • 82.
    MBPM – Getting Started • Define a clear scope –narrow and deep – Define the first and last steps for the process to be improved – Lay out the specific conditions for the process to be mapped Metrics-Based Process Mapping Charter Improvement Scope Leadership Mapping Schedule Value Stream Executive Date(s) Process Name Sponsor Specific Start/End Process Owner Conditions Times Customer Demand Facilitator Location Trigger First Step Mapping Team Food Last Step Lead Provided Boundaries & Briefing Limitations Dates/Times Required Briefing Attendees FS Implementation Logistics Timeframe Coordinator Improvement Drivers / Current State Issues Mapping Team 1 Function Name 2 1 3 2 4 3 5 4 Improvement Goals & Measurable Objectives 5 1 6 2 7 3 8 4 9 5 10 Potential Deliverables On-Call Support 1 Function Name Contact Information 2 1 3 2 4 3 5 4 Possible Obstacles Approvals 1 Executive Sponsor Value Stream Champion Facilitator 2 3 Signature: Signature: Signature: 4 Date: Date: Date: 82
  • 83.
    Scope: Refining the Focus Units Domestic Consumables Warranty Service Parts Order  Non‐ Fulfillment Warranty Units International Consumables Warranty Service Parts Non‐ Warranty 83
  • 84.
    MBPM – Getting Started (continued) • Select the team (most effective within a kaizen  event) – Highly cross‐functional – workers, upstream suppliers,  downstream customers, outside eyes, etc. • Those who currently do the job – No more than 10 individuals – Don’t avoid the “difficult” people – Include “outside eyes” if possible • Use a skilled, objective facilitator • Have a room with (long) wall space for 36” wide  butcher paper • Map on consecutive days 84
  • 85.
    Steps in Creating the Current State MBPM 1. Label the map (process, date, team or facilitator) 2. List the functions involved 3. Document all activities / steps 4. Review the map for completeness 5. Number the activities 6. Add activity‐specific information (metrics, etc.) 7. Determine the timeline critical path 8. Create the timeline 9. Calculate the summary metrics 10. Identify value‐adding (VA) and necessary non‐value‐adding  (N) activities 85
  • 86.
    Documenting the Current State Step 1 – Label the map in the upper right hand  corner. – Include process name, conditions mapped, date,  and facilitator name and/or team members. 86
  • 87.
    Document the Current State Step 2 – Label the swim lanes with the functions  involved. – Include external functions, if appropriate (e.g.  customers, suppliers/contractors, etc.) – Sequence in which functions are listed is not  important 87
  • 88.
    Document the Current State Step 3 – Document all activities/steps on 3” x 6”  post‐its.  Don’t include metrics yet! – Use verb/noun format; clear and concise – Include function. – Separate tasks that have different quality outputs  or timeframes; combine tasks otherwise. – Place post‐its in appropriate swim lane,  sequentially. 88
  • 89.
    Document Each Activity Activity               (Verb / Noun) Function that  performs the  task Best to use  3 x 6” Post‐its 89
  • 90.
    Step Step Concurrent  1 2 Activities Ticking clock  90
  • 91.
    Document the Current State Step 4 – Review map for completeness  (someone other than the facilitator) – Walk through the map, reading aloud. – Verify sequence – Add missing steps and barriers to flow (“flow‐ stoppers”) if any. 91
  • 92.
    Document the Current State Step 5 ‐ Number the activities – Number the activities sequentially from left to right. – For parallel (concurrent) activities, add “A,” “B,” etc. • Example: Step 8A, Step 8B, etc. – Don’t number the post‐its until the map is “final.” 92
  • 93.
    Document the Current State Step 6 – Add activity‐specific information – LT – Lead time – PT – Process time – %C&A – Percent Complete & Accurate – Number of people who perform the work – Barriers to flow • Batches • Equipment downtime • Shared resources, etc. 93
  • 94.
    Key Metrics: Time • Process time (PT) – The time it takes to actually perform the work to  complete one item, if it could be worked on  uninterrupted. • Lead time (LT) – The elapsed time from when work is available to be  worked on until it’s completed and made available to  the next person or department in the process 94
  • 95.
    Key Metrics:  Quality • %Complete and Accurate (%C&A) – % of the time the downstream customer can  perform task without having to “CAC”: • Correct information or material that was  supplied • Add missing information that should have been  supplied • Clarify information provided that should have  been clear 95
  • 96.
    Add Activity‐Specific Information Additional Information # Staff   (if relevant) Barriers to flow  (if relevant) % Complete &  PT Accurate LT 96
  • 97.
    Adding Metrics:  Tips • LT, PT and %C&A are typically acquired via  interviews – ask high‐quality questions. • Usually looking for the “typical” LT and PT;  what happens 80% of the time? • Select units of measure that are easiest to  comprehend (e.g. 6 hours instead of 360  minutes). • PT is the time required to complete one “thing” • If your LT is 4 hours, don’t debate a PT of 5 vs.  7 minutes. 97
  • 98.
    Adding Metrics: Tips (continued) • May be OK to group the LT for a series of  activities performed by the same function  (rather than each individual step).  • Place %C&A value on the post‐it of the source  step. – If %C&A issues are identified by multiple  downstream customers, record each of the  %C&As on the Post‐it of the source step (can also  indicate on the Post‐it which step reported the  problem).  – 0% C&A is not uncommon 98
  • 99.
    Barriers to Flow • Look at the process from “the thing’s”  perspective • Identify issues that prevent one‐piece‐flow of  the work – Batching / periodic processing – Rework – Bottlenecks – Handoffs – Inventory – Setup / changeover – Physical layout 99
  • 100.
    Document the Current State Step 7 – Determine the “timeline critical  path” of the process – For parallel activities: • Don’t include “dead end activities” – Steps / path which don’t move the process forward  (e.g. filing a document) • If both paths are required to move forward,  select the path with the longest total lead time 100
  • 101.
  • 102.
    Document the Current State Step 8 –Create the timeline – Bring down the PT & LT from the critical path steps. Timeline 102
  • 103.
    Document the Current State Step 9 ‐ Calculate Summary Metrics – Critical Path PT – Critical Path LT – Activity Ratio (AR) – Rolled Percent Complete and Accurate  (R%C&A) – Total PT – Labor Requirements – Number of Activities 103
  • 104.
    Summary Metrics: Time • Timeline Critical Path PT – Quantifies how much of the response time (LT) is  spent actually working on the “thing” • Timeline Critical Path LT – Measures speed of delivery to customer & an  indicator of cash flow • Activity Ratio (AR) – The percentage of time work is being done to the  patient/item/data passing through the process – AR = (Σ PT ÷ Σ LT) × 100 – 100 – AR = Idle time 104
  • 105.
    Summary Metrics: Quality • Rolled Percent Complete and Accurate  (R%C&A) =  – %C&A × %C&A × %C&A × …  – Out of 100 occurrences, the number of times the  data/material/people pass through the entire  process with no rework required (expressed as a  percentage). 105
  • 106.
    Summary Metrics: Labor Requirements • Total PT – Sum of all activities, not just critical path – Factor in determining labor requirements • # FTEs* Required (Total Labor Effort) # FTEs  Total PT (in hrs) X # occurrences/year Required = Available work hrs/year * FTE = Full‐time Equivalent (2 half time employees = 1 FTE) 106
  • 107.
    Summary Metrics: Labor Effort • Total PT – Sum of all activities, not just timeline • Labor Effort Time = Total PT (in hrs) x # occurrences/year Total PT (in hrs) x # occurrences/year # FTEs* = Available work hrs/year/employee** Freed  = Current State FTEs – Future State FTEs Capacity * FTE = Full‐time Equivalent (2 half time employees = 1 FTE) ** Available work hrs/year = 2,080 ‐ paid holidays and vacations 107
  • 108.
    Documenting the Current State Step 10 – Identify Value‐adding (VA) & Necessary Non‐value‐adding (N) activities – Use small post‐its in different colors to  differentiate VA and N – Monitor time allowed for debate – Unlabelled activities = waste 108
  • 109.
    Value‐adding activity Necessary non‐value‐adding activities
  • 110.
    Metrics‐Based Process  Mapping (MBPM)  Simulation Order Fulfillment Process: Demand = 2,500 orders per year Available work hours per employee per year = 1,800 110
  • 111.
    Create the Current State MBPM Phase I 1. Label the map in upper right corner. • Process name, date, facilitator and/or team members 2. List the functions involved in left column. 3. Document all activities/steps. No metrics yet! • Verb/noun; concise language; include function as well. 4. Review the map for completeness. 5. Number the activities.  One number per column; concurrent activities are labeled A, B, C, etc. 6. Add activity‐specific metrics (PT, LT, %C&A). (We are not  considering number of workers and barriers to flow in  this simulation.) 111
  • 112.
    Create the Current State MBPM Phase II 7.   Define the critical timeline path. • Longest LT unless “dead‐end” step; use colored marker 8.   Create the timeline. 9.   Calculate the summary metrics • CP PT Sum, CP LT Sum, AR, R%C&A, Total PT, Labor Required 10. Identify the VA and necessary NVA activities • Use small colored post‐it labeled with “VA” and “N.” 11. Circle the step‐specific metrics that indicate the greatest  opportunity for improvement. • Use red marker. • Long LTs, low %C&As, high PTs, low step‐specific ARs 112
  • 113.
    Document Summary Metrics Projected Projected % Metric Current State Future State Improvement Timeline Critical Path PT Timeline Critical Path LT Activity Ratio Rolled %C&A Total Process Time Freed capacity
  • 114.
    Future State Design • Goals – Reduce overall LT & PT – Improve quality (increase RFPY) – Increase % activity – Improve LT, PT, and %C&A at individual steps • May need to perform root cause analysis before  determining countermeasures to realize the future  state • Mapping steps – Clean sheet or modify current state map – Same steps as current state – Calculate projected metrics 114
  • 115.
    Future State Design Considerations • Eliminate steps / handoffs • Eliminate motion &  • Combine steps transportation • Create parallel paths • Standardize work • Alter task sequencing and/or  • Eliminate unnecessary  timing approvals / authorizations • Implement pull • Stop performing non‐value  • Reduce / eliminate batches adding (NVA) tasks • Improve quality • Co‐locate functions based  on flow; create cells  • Create an organized, visual  (teams of cross‐functional  workplace staff) • Reduce changeover • Balance work to meet takt time requirements 115
  • 116.
    116 Resilience Agility Business Results Innovation Continuous  Improvement Problem Solving
  • 117.
  • 118.
    Engagement Drivers: The Three C’s  Connection Creativity Control 118
  • 119.
    Engagement Drivers • Connection ‐to mission, annual goals,  immediate supervisor, people within the  organization, customers. • Control – heavy involvement in decisions that  influence their work life. • Creativity – Full use of talents, capacities,  potentialities, and skills 119
  • 120.
    It’s disrespectful to… 1. Not engage employees in work design and  improvement. 2. First blame people instead of systems and processes. 3. Not help employees develop skills. 4. Not coach employees through problem solving – on an  ongoing basis. 5. Have poorly designed processes which inhibit  performance. 6. Fail to create and clearly communicate organizational  goals and priorities. 7. Lack honesty and omit relevant information. 120
  • 121.
    Group Activity – Driving Engagement • Three groups: – Connection – Control – Creativity • Each group:  – Identify activities and practices within your  organization that engage or disengage employees in  that area. • Report out 121
  • 122.
    Activity: Engage or Disengage? Engage Disengage Connection Control Creativity 122
  • 123.
  • 124.
    Places to Start… 1. Develop an intolerance for ambiguity. 2. Prioritize your work; reduce the number of  active projects at once. 3. Ban electronic devices from meetings. 4. Adopt a problem‐solving methodology and  deploy it broadly; get a coach! 5. Document, standardize and improve all major  processes with significant involvement of the  workers themselves. 6. Identify process owners and KPIs for each. 124
  • 125.
    Group Activity – Closing the Gap • Go back to your “weakest corner” (Clarity, Focus,  Discipline or Engagement) – List the lean practices/methods/tools that can be used  to improve your organizations’ behaviors – Report out to the class • Next, look at your “self‐assessment” notecard,  select one of your organization’s weakest areas,  and begin creating a plan for how to start moving  the needle (what’s the problem, what are  potential root causes, what are potential  countermeasures, who needs to be involved, etc.)  125
  • 126.
  • 127.
    Mike Osterling, President Karen Martin, Principal 4320 Woodland Drive 7770 Regents Road #635 La Mesa, CA 91941 San Diego, CA 92122 619.572.3632 858.677.6799 mike@mosterling.com ksm@ksmartin.com Twitter: @karenmartinopex Subscribe: www.ksmartin.com/subscribe 127
  • 128.
    Our  Books October 2012 Just released Contributing Author 128