5.TUCURUI DAM LOCATION:-
Tucuruí County in the
State of Pará, Brazil.
CONSTRUCTED ON:-
TOCANTINS RIVER,
STARTED IN YEAR 1975
OPENED IN TEAR 1984
LENGTH & HIGHT OF DAM;-
OVERALL LENGTH :- 12.5 KM
MAIN DAM :- 6.9 KM
HEIGHT :- 72M (236FT))
ABOUT TUCURUI DAM
It is an concrete gravity dam.
It is 1st large scale hydro power project.
Cost of construction is estimated to 3.6 billions but at the end of the
cost of construction it reaches 5.5 billions .and the final interest of cost
during the construction the overall cost is 7.5 billions.
Power generated capacity of dam is 8,370 MW.
Capacity of reservoir 45 km3(36,000,000 acre⋅ft ).
Catchup area 758,000 km2(293,000 sq mi).
4. GURI DAM
LOCATION :-
VENEZUELA , USA
CONSTRUCTED ON : -
CARONI RIVER
STARTED IN 1963
COMPLETED IN 1978
LENGTH & HEIGHT:-
7.426 KM LONG
163M HEIGHT
ABOUT GURI DAM
The cost of construction is 85 million USD.
Concrete volume of dam is 60,26,000m³.
Total capacity of reservoir 135,000,000,000m³.
Turbine capacity 10,235 mw.
Surface area is 4,250 sq km.
3. XILUODO DAM
LOCATION:-
CHINA
CONSTRUCTED ON:-
JINSHA RIVER,
STARTED IN YEAR 2003.
OPENED IN TEAR 2013.
LENGTH & HIGHT OF DAM;-
OVERALL LENGTH :- 700M
HEIGHT :- 285.5M (937FT))
ABOUT XILUODU DAM
 It is an double curvature arch concrete structure.
 It is 3rd tallest arch dam in the world.
 The capacity of reservoir is 126,00,00,000m3.
 The catchup area of dam is 4,54,000 km2.
 It consist of 18 turbines.
 Capacity of turbines is 13,860 mw.
2. ITAIPU DAM
LOCATION:-
BRAZIIL/PARAGUAS
CONSTRUCTED ON:-
PARANA RIVER,
STARTED IN YEAR 1971.
OPENED IN TEAR 1984.
LENGTH & HEIGHT:-
7.919 KM LONG
196M HEIGHT
ABOUT ITAIPU DAM
 Cost of construction 19.6 billion USD.
 Volume of dam 123,00,000 cubic ft.
 In 2016 new world record was recorded b 10,30,98,366 mw was
generated and surpassed the three gorges dam.
 The capacity of reservoir is 29 km3.
 And cathch up area is 13,50,000sq km
 Its consists of 2nd place in the world in hydraulic power generation.
1. THREE GORGES DAM
LOCATION:-
CHINA
CONSTRUCTED ON:-
YANGTZE RIVER,
STARTED IN DEC 14, 1994.
OPENED IN TEAR 2008.
LENGTH & HIGHT OF DAM;-
OVERALL LENGTH :- 2.335 KM
HEIGHT :- 181 M (594FT))
ABOUT THREE GORGES DAM
o Its has been the worlds largest largest power station in terms of installed capacity
22,500mw.
o It consist of 32 main turbines.
o The cost of the construction was 22.5 billion USD.
o The dam reduces the coal consumption by 31 million tonnes/year, avoiding 100 million
tonnes of green house gas emission.
o In 2010 nasa scientists calculated that shift of water mass stored by the dam would
increases the length of the earth increases 0.8 inches flate on the poles.
o And also it redues the speed of earth of 0.006 micro seconds every day.
Top 5 hydraulic dams

More Related Content

What's hot

mangla dam
mangla dammangla dam
mangla dam
Nadeem Maseed
 
Mahatma gandhi setu Bihar
Mahatma gandhi setu BiharMahatma gandhi setu Bihar
Mahatma gandhi setu Bihar
chauhansunny
 
Tarbela dam
Tarbela damTarbela dam
Tarbela dam
Ali Almahir Shaheen
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
Yousuf Captain
 
Presention ppt
Presention pptPresention ppt
Presention ppt
Muhammad Talha
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
peepkya
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
rajendrachotia
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealink
Amit Kumar
 
Mangla Dam
Mangla Dam Mangla Dam
Mangla Dam
EhteshamAkhtar3
 
dam
damdam
Bandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,IndiaBandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,India
oyepuneeta
 
Tarbela Hydro Power Plant
Tarbela Hydro Power PlantTarbela Hydro Power Plant
Tarbela Hydro Power Plant
SaQib MuGhal
 
Bandra - Worli sea link
Bandra - Worli sea linkBandra - Worli sea link
Bandra - Worli sea link
Ankita Pal
 
Pakistan dams
Pakistan damsPakistan dams
Pakistan dams
Roshan3246
 
Tarbela dam project97 2003
Tarbela dam project97 2003Tarbela dam project97 2003
Tarbela dam project97 2003
Muhammad Faisal Ashraf
 
Pm assignment
Pm assignmentPm assignment
Pm assignment
Syeda Haider
 
Bandra worli sea link jay
Bandra worli sea link jayBandra worli sea link jay
Bandra worli sea link jay
Dhruv Seth
 
Most expensive construction projects
Most expensive construction projectsMost expensive construction projects
Most expensive construction projects
NishchalKhatri
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea link
Unni Krishnan
 
Bandra worli sea link case study
Bandra worli sea link  case studyBandra worli sea link  case study
Bandra worli sea link case study
AKSHAY CHATURVEDI
 

What's hot (20)

mangla dam
mangla dammangla dam
mangla dam
 
Mahatma gandhi setu Bihar
Mahatma gandhi setu BiharMahatma gandhi setu Bihar
Mahatma gandhi setu Bihar
 
Tarbela dam
Tarbela damTarbela dam
Tarbela dam
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
 
Presention ppt
Presention pptPresention ppt
Presention ppt
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealink
 
Mangla Dam
Mangla Dam Mangla Dam
Mangla Dam
 
dam
damdam
dam
 
Bandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,IndiaBandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,India
 
Tarbela Hydro Power Plant
Tarbela Hydro Power PlantTarbela Hydro Power Plant
Tarbela Hydro Power Plant
 
Bandra - Worli sea link
Bandra - Worli sea linkBandra - Worli sea link
Bandra - Worli sea link
 
Pakistan dams
Pakistan damsPakistan dams
Pakistan dams
 
Tarbela dam project97 2003
Tarbela dam project97 2003Tarbela dam project97 2003
Tarbela dam project97 2003
 
Pm assignment
Pm assignmentPm assignment
Pm assignment
 
Bandra worli sea link jay
Bandra worli sea link jayBandra worli sea link jay
Bandra worli sea link jay
 
Most expensive construction projects
Most expensive construction projectsMost expensive construction projects
Most expensive construction projects
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea link
 
Bandra worli sea link case study
Bandra worli sea link  case studyBandra worli sea link  case study
Bandra worli sea link case study
 

Similar to Top 5 hydraulic dams

gilgel gibe dam
gilgel gibe damgilgel gibe dam
gilgel gibe dam
prashant saykar
 
The 10 biggest hydroelectric pp (hep) in the world (www.power-technology)
The 10 biggest hydroelectric pp (hep)  in the world   (www.power-technology)The 10 biggest hydroelectric pp (hep)  in the world   (www.power-technology)
The 10 biggest hydroelectric pp (hep) in the world (www.power-technology)
skthen72
 
25 biggest hydel power plant
25 biggest hydel power plant25 biggest hydel power plant
25 biggest hydel power plant
Mukesh Dak
 
ART integrated .pptx
ART integrated .pptxART integrated .pptx
ART integrated .pptx
yourbusiness074
 
Hydropowerplant 160313180104
Hydropowerplant 160313180104Hydropowerplant 160313180104
Hydropowerplant 160313180104
Mohammad Asif
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report
muhammad khurram
 
Hydro Power Plant -Surya
Hydro Power Plant -SuryaHydro Power Plant -Surya
Hydro Power Plant -Surya
suryakant soni
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
Prashant Arora
 
Libya great man made river project
Libya   great man made river projectLibya   great man made river project
Libya great man made river project
issa ibrahim
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
pranavn007
 
Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800
PRIYANSHU KUMAR
 
THE THREE GORGES ppt
THE THREE GORGES pptTHE THREE GORGES ppt
THE THREE GORGES ppt
pankaj kumar senapati
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
Rubnawaz Bhatti
 
Pong dam ppt
Pong dam pptPong dam ppt
Pong dam ppt
vikash7756
 
Three gorges dam pptx
Three gorges dam pptxThree gorges dam pptx
Three gorges dam pptx
Amit Kumar
 
Neelum jehlum hydropower project
Neelum jehlum hydropower projectNeelum jehlum hydropower project
Neelum jehlum hydropower project
Muhammad Aqeel
 
Top 3 Asia Oil & Gas Pipelines
Top 3 Asia Oil & Gas PipelinesTop 3 Asia Oil & Gas Pipelines
Top 3 Asia Oil & Gas Pipelines
NES Global Talent
 
Srisailam project final
Srisailam project finalSrisailam project final
Srisailam project final
Anil Venkata Nag Kothur
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPP
Saad Raja
 
Vaani presentation
Vaani presentationVaani presentation
Vaani presentation
ritikapoddar
 

Similar to Top 5 hydraulic dams (20)

gilgel gibe dam
gilgel gibe damgilgel gibe dam
gilgel gibe dam
 
The 10 biggest hydroelectric pp (hep) in the world (www.power-technology)
The 10 biggest hydroelectric pp (hep)  in the world   (www.power-technology)The 10 biggest hydroelectric pp (hep)  in the world   (www.power-technology)
The 10 biggest hydroelectric pp (hep) in the world (www.power-technology)
 
25 biggest hydel power plant
25 biggest hydel power plant25 biggest hydel power plant
25 biggest hydel power plant
 
ART integrated .pptx
ART integrated .pptxART integrated .pptx
ART integrated .pptx
 
Hydropowerplant 160313180104
Hydropowerplant 160313180104Hydropowerplant 160313180104
Hydropowerplant 160313180104
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report
 
Hydro Power Plant -Surya
Hydro Power Plant -SuryaHydro Power Plant -Surya
Hydro Power Plant -Surya
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
 
Libya great man made river project
Libya   great man made river projectLibya   great man made river project
Libya great man made river project
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
 
Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800
 
THE THREE GORGES ppt
THE THREE GORGES pptTHE THREE GORGES ppt
THE THREE GORGES ppt
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
 
Pong dam ppt
Pong dam pptPong dam ppt
Pong dam ppt
 
Three gorges dam pptx
Three gorges dam pptxThree gorges dam pptx
Three gorges dam pptx
 
Neelum jehlum hydropower project
Neelum jehlum hydropower projectNeelum jehlum hydropower project
Neelum jehlum hydropower project
 
Top 3 Asia Oil & Gas Pipelines
Top 3 Asia Oil & Gas PipelinesTop 3 Asia Oil & Gas Pipelines
Top 3 Asia Oil & Gas Pipelines
 
Srisailam project final
Srisailam project finalSrisailam project final
Srisailam project final
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPP
 
Vaani presentation
Vaani presentationVaani presentation
Vaani presentation
 

Recently uploaded

Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
Ratnakar Mikkili
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
nooriasukmaningtyas
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
PuktoonEngr
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 

Recently uploaded (20)

Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 

Top 5 hydraulic dams

  • 1.
  • 2. 5.TUCURUI DAM LOCATION:- Tucuruí County in the State of Pará, Brazil. CONSTRUCTED ON:- TOCANTINS RIVER, STARTED IN YEAR 1975 OPENED IN TEAR 1984 LENGTH & HIGHT OF DAM;- OVERALL LENGTH :- 12.5 KM MAIN DAM :- 6.9 KM HEIGHT :- 72M (236FT))
  • 3. ABOUT TUCURUI DAM It is an concrete gravity dam. It is 1st large scale hydro power project. Cost of construction is estimated to 3.6 billions but at the end of the cost of construction it reaches 5.5 billions .and the final interest of cost during the construction the overall cost is 7.5 billions. Power generated capacity of dam is 8,370 MW. Capacity of reservoir 45 km3(36,000,000 acre⋅ft ). Catchup area 758,000 km2(293,000 sq mi).
  • 4. 4. GURI DAM LOCATION :- VENEZUELA , USA CONSTRUCTED ON : - CARONI RIVER STARTED IN 1963 COMPLETED IN 1978 LENGTH & HEIGHT:- 7.426 KM LONG 163M HEIGHT
  • 5. ABOUT GURI DAM The cost of construction is 85 million USD. Concrete volume of dam is 60,26,000m³. Total capacity of reservoir 135,000,000,000m³. Turbine capacity 10,235 mw. Surface area is 4,250 sq km.
  • 6. 3. XILUODO DAM LOCATION:- CHINA CONSTRUCTED ON:- JINSHA RIVER, STARTED IN YEAR 2003. OPENED IN TEAR 2013. LENGTH & HIGHT OF DAM;- OVERALL LENGTH :- 700M HEIGHT :- 285.5M (937FT))
  • 7. ABOUT XILUODU DAM  It is an double curvature arch concrete structure.  It is 3rd tallest arch dam in the world.  The capacity of reservoir is 126,00,00,000m3.  The catchup area of dam is 4,54,000 km2.  It consist of 18 turbines.  Capacity of turbines is 13,860 mw.
  • 8. 2. ITAIPU DAM LOCATION:- BRAZIIL/PARAGUAS CONSTRUCTED ON:- PARANA RIVER, STARTED IN YEAR 1971. OPENED IN TEAR 1984. LENGTH & HEIGHT:- 7.919 KM LONG 196M HEIGHT
  • 9. ABOUT ITAIPU DAM  Cost of construction 19.6 billion USD.  Volume of dam 123,00,000 cubic ft.  In 2016 new world record was recorded b 10,30,98,366 mw was generated and surpassed the three gorges dam.  The capacity of reservoir is 29 km3.  And cathch up area is 13,50,000sq km  Its consists of 2nd place in the world in hydraulic power generation.
  • 10. 1. THREE GORGES DAM LOCATION:- CHINA CONSTRUCTED ON:- YANGTZE RIVER, STARTED IN DEC 14, 1994. OPENED IN TEAR 2008. LENGTH & HIGHT OF DAM;- OVERALL LENGTH :- 2.335 KM HEIGHT :- 181 M (594FT))
  • 11.
  • 12. ABOUT THREE GORGES DAM o Its has been the worlds largest largest power station in terms of installed capacity 22,500mw. o It consist of 32 main turbines. o The cost of the construction was 22.5 billion USD. o The dam reduces the coal consumption by 31 million tonnes/year, avoiding 100 million tonnes of green house gas emission. o In 2010 nasa scientists calculated that shift of water mass stored by the dam would increases the length of the earth increases 0.8 inches flate on the poles. o And also it redues the speed of earth of 0.006 micro seconds every day.