TARBELA DAM
Description
Tarbela Dam is located on the Indus
River in Swabi (Khyber Pakhtunkhwa),
Pakistan.
 It is the largest earth-filled dam in the
world and fifth-largest by structural
volume.
 It is also the second largest dam in the
world in terms of reservoir capacity.
Construction began in the year of 1968 and
has to be completed in the year of 1976.
The dam was operational in 1976 but its
completion occur in 1984.
The dam has to be completed in the
duration of 8 years but it takes 16 years to
completed.
Construction was undertaken by the
Italian firm Salini Impregilo .
The total height of the dam is 143.26
meters (470 ft) from river level and length
is 2,743.2 meters (9,000 ft).
The width of Tarbela Dam at its base is
600m
 Its reservoir capacity is 13.69 cubic
kilometers (3.28 cu mi).
 Its catchment area is
168,000 km
2
(65,000 sq mi).
Estimated cost of the project was $800
million.
Total cost of the project was $1.497 billion.
Causes for delay of the project
Around 70 "sinkholes" in the reservoir bed
appear which they tried covering between
1975 and 1978 by dumping thousands of
tones of earth by the barge load.
One sinkhole that appeared in 1984 was
still there in 1991
Two of the four tunnels being used to
control the rate of filling were damaged
and forced to close. Within a week, one of
the two remaining active tunnels also
collapsed, bringing down nearly half a
million cubic meters of concrete and rock.
Power generation
 It has 14 turbines in which 10 turbines
have capacity of 175 MW while the 4
have 432 MV.
Its production is 3478 MV and its
capacity of 6298 MV .
Background for Project construction
Tarbela dam was constructed as part of
the Indus Basin Project after signing of the
1960 Indus Waters
Treaty between Pakistan and India.
 The purpose was to compensate for the loss
of water supplies of the eastern rivers
(Ravi, Sutlej and Beas) .
 The primary objective of the dam was to
supply water for irrigation by storing flows
during the monsoon period and subsequently
releasing stored water during the low flow
period in winter.
Lifespan
Because the source of the Indus River is glacial
meltwater from the Himalayas, the river carries
huge amounts of sediment, with an annual
suspended sediment load of 200 million tons.
Live storage capacity of Terbela reservoir had
declined more than 33.5 % to 6.434 million acre
feet (MAF) against its original capacity of 9.679
MAF because of sedimentation over the past 38
years.
The useful life of the dam and reservoir was
estimated to be approximately fifty years.
However, sedimentation has been much
lower than predicted, and it is now
estimated that the useful lifespan of the dam
will be 85 years, to about 2060.
Construction
Construction of Tarbela Dam was carried out in three
stages to meet the diversion requirements of the river.
Stage 1
In stage 1 a diversion channel was made for
the flow of water.
Stage 2
In stage 2 main embankment dam was made
along with the tunnels.
Stage 3
In stage 3 spillways, closing of diversion
channel and upper portion of the embankment
dam was completed.
Stage 1
Stage 2
Stage 3
The main dam wall, built of earth and rock
fill, stretches 2,743 meters (8,999 ft) from the
island to river right, standing 148 meters
(486 ft) high.
 The main spillway has a discharge capacity
of 18,406 cubic meters per second
(650,000 cu ft/s) and the auxiliary spillway,
24,070 cubic meters per second
(850,000 cu ft/s).
15000 Pakistani workers and 800 European
work together on the consrtuction of the
dam
In the construction of embankment portion
about volume of 200 million cubic yard of
rock and soil is used.
Four large tunnels were constructed as part
of Tarbela Dam's outlet works.
Re-settlement of people
affected by Tarbela Dam
It has a reservoir area of about 260 square
kilometers and about 82,000 acres
(33,000 ha) of land was acquired for its
construction. The large reservoir of the dam
submerged 135 villages, which resulted in
displacement of a population of about
96,000 people.
For the land and built-up property acquired
under the Land Acquisition Act of 1984, a
cash compensation of Rs 469.65 million
was paid to those affected.
Till now many affectees of the Tarbela Dam
have still not been settled and have not been
given land as compensation by the
government of Pakistan.
Project benefits
In addition to fulfilling the primary purpose
of the dam, i.e. supplying water for
irrigation, Tarbela Power Station has
generated 341.139 billion kWh of
cheap hydro-electric energy since
commissioning.
 The station shared peak load of 3702 MW
during the year, which was 23.057% of total
WAPDA system peak
The project recover its total cost of
construction in 10 years .
Now the project gives benefit to the
economy of Pakistan.
Tarbela-IV Extension Project
In September 2013, Pakistan's Water and
Power Development Authority signed
a Rs. 26.053 billion contract with Chinese
firm Sinohydro and Germany's Voith Hydro
for executing civil works on the 1,410
MW Tarbela-IV Extension Project.
Construction commenced in February
2014, and is expected to be completed by
June 2017. Upon completion, the project
will augment the Early Harvest Project of
the China–Pakistan Economic Corridor.
Benefits of the Extension
After the completion of extension
project about 1410 MV of electricity is
produced which in result the less short
fall of electricity of Pakistan.
Cheap electricity is produced as a
result cost on per unit of electricity is
reduced.
Want to Know More?
 If you are interested in the topic and want to know more
about Tarbela Dam or Mangla dam you can freely ask me.
 I myself a civil engineering student, in the last year now.
 Any related topics, get contact me without any hesitation.
 Contact Email: contact@netodin.com
Largest Earth-Filled Dam Tarbela

More Related Content

What's hot

Headworks and barrages in pakistan
Headworks and barrages in pakistanHeadworks and barrages in pakistan
Headworks and barrages in pakistanMuhammad Bilal
 
Hydropower Generation in Pakistan
Hydropower Generation in PakistanHydropower Generation in Pakistan
Hydropower Generation in Pakistanimakshani
 
Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.Nikul Gopani
 
Indus Basin Irrigation System Of Pakistan
Indus Basin  Irrigation System Of PakistanIndus Basin  Irrigation System Of Pakistan
Indus Basin Irrigation System Of PakistanSajid Sarwar
 
Irrigation System Of Pakistan
Irrigation System Of PakistanIrrigation System Of Pakistan
Irrigation System Of Pakistanwajeeh hassan
 
KOYNA HYDROELECTRIC POWER PLANT
KOYNA HYDROELECTRIC POWER PLANTKOYNA HYDROELECTRIC POWER PLANT
KOYNA HYDROELECTRIC POWER PLANTuzma shaikh
 
Dam Of India.. Awesome!!!Ppt
Dam Of India.. Awesome!!!PptDam Of India.. Awesome!!!Ppt
Dam Of India.. Awesome!!!PptMD ZAHID SIDDIQUI
 
Tarbela Hydro Power Plant
Tarbela Hydro Power PlantTarbela Hydro Power Plant
Tarbela Hydro Power PlantSaQib MuGhal
 
diamir bhasha Dam
diamir bhasha Damdiamir bhasha Dam
diamir bhasha DamMir Haris
 
Canal System of Pakistan
Canal System of PakistanCanal System of Pakistan
Canal System of PakistanFahad Iqbal
 
Environmental aspects tehri dam final
Environmental aspects tehri dam finalEnvironmental aspects tehri dam final
Environmental aspects tehri dam finalektapatel40
 
Ghazi Barotha Hydropower project Internship Report
Ghazi Barotha Hydropower project Internship ReportGhazi Barotha Hydropower project Internship Report
Ghazi Barotha Hydropower project Internship ReportIhtisham Saeed
 
Headworks and barrages in pakistan
Headworks and barrages in pakistan Headworks and barrages in pakistan
Headworks and barrages in pakistan Abdul Mannan
 
Link canals, Baraages and Dams
Link canals, Baraages and DamsLink canals, Baraages and Dams
Link canals, Baraages and DamsRaees Shah
 
INDUS WATER TREATY.
INDUS WATER TREATY.INDUS WATER TREATY.
INDUS WATER TREATY.Komal Tiwari
 

What's hot (20)

Headworks and barrages in pakistan
Headworks and barrages in pakistanHeadworks and barrages in pakistan
Headworks and barrages in pakistan
 
Warsak Dam(16me07)
Warsak Dam(16me07)Warsak Dam(16me07)
Warsak Dam(16me07)
 
Hydropower Generation in Pakistan
Hydropower Generation in PakistanHydropower Generation in Pakistan
Hydropower Generation in Pakistan
 
Tarbela dam
Tarbela damTarbela dam
Tarbela dam
 
Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.
 
Indus Basin Irrigation System Of Pakistan
Indus Basin  Irrigation System Of PakistanIndus Basin  Irrigation System Of Pakistan
Indus Basin Irrigation System Of Pakistan
 
INTERLINKING OF RIVERS
INTERLINKING OF             RIVERSINTERLINKING OF             RIVERS
INTERLINKING OF RIVERS
 
Irrigation System Of Pakistan
Irrigation System Of PakistanIrrigation System Of Pakistan
Irrigation System Of Pakistan
 
KOYNA HYDROELECTRIC POWER PLANT
KOYNA HYDROELECTRIC POWER PLANTKOYNA HYDROELECTRIC POWER PLANT
KOYNA HYDROELECTRIC POWER PLANT
 
Dam Of India.. Awesome!!!Ppt
Dam Of India.. Awesome!!!PptDam Of India.. Awesome!!!Ppt
Dam Of India.. Awesome!!!Ppt
 
Tarbela Hydro Power Plant
Tarbela Hydro Power PlantTarbela Hydro Power Plant
Tarbela Hydro Power Plant
 
diamir bhasha Dam
diamir bhasha Damdiamir bhasha Dam
diamir bhasha Dam
 
Dam of india
Dam of indiaDam of india
Dam of india
 
Canal System of Pakistan
Canal System of PakistanCanal System of Pakistan
Canal System of Pakistan
 
Environmental aspects tehri dam final
Environmental aspects tehri dam finalEnvironmental aspects tehri dam final
Environmental aspects tehri dam final
 
Ghazi Barotha Hydropower project Internship Report
Ghazi Barotha Hydropower project Internship ReportGhazi Barotha Hydropower project Internship Report
Ghazi Barotha Hydropower project Internship Report
 
Headworks and barrages in pakistan
Headworks and barrages in pakistan Headworks and barrages in pakistan
Headworks and barrages in pakistan
 
Link canals, Baraages and Dams
Link canals, Baraages and DamsLink canals, Baraages and Dams
Link canals, Baraages and Dams
 
Dams in Pakistan
Dams in PakistanDams in Pakistan
Dams in Pakistan
 
INDUS WATER TREATY.
INDUS WATER TREATY.INDUS WATER TREATY.
INDUS WATER TREATY.
 

Similar to Largest Earth-Filled Dam Tarbela

Kala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehmanKala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehmansabir rehman
 
Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891usman ijaz
 
Ghazi Barotha Hydro power Projec
Ghazi Barotha Hydro power ProjecGhazi Barotha Hydro power Projec
Ghazi Barotha Hydro power ProjecAbdul Majid
 
Hydro potential in pakistan wapda 2008
Hydro potential in pakistan   wapda 2008Hydro potential in pakistan   wapda 2008
Hydro potential in pakistan wapda 2008zubeditufail
 
Hydro potential in pakistan wapda 2008
Hydro potential in pakistan   wapda 2008Hydro potential in pakistan   wapda 2008
Hydro potential in pakistan wapda 2008zubeditufail
 
Libya great man made river project
Libya   great man made river projectLibya   great man made river project
Libya great man made river projectissa ibrahim
 
Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800PRIYANSHU KUMAR
 
Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project Deshan Arachchige
 
Three gorges dam project
Three gorges dam projectThree gorges dam project
Three gorges dam projectNoor Fatima
 
Neelum jehlum hydropower project
Neelum jehlum hydropower projectNeelum jehlum hydropower project
Neelum jehlum hydropower projectMuhammad Aqeel
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam JunaidAshraf31
 
The Three Gorges Dam Ahmed Hussain
The Three Gorges Dam Ahmed HussainThe Three Gorges Dam Ahmed Hussain
The Three Gorges Dam Ahmed Hussaintonybattista
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plantSiraskarCom
 

Similar to Largest Earth-Filled Dam Tarbela (20)

Kala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehmanKala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehman
 
Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891
 
Tarbela dam
Tarbela damTarbela dam
Tarbela dam
 
Ghazi Barotha Hydro power Projec
Ghazi Barotha Hydro power ProjecGhazi Barotha Hydro power Projec
Ghazi Barotha Hydro power Projec
 
Hydro potential in pakistan wapda 2008
Hydro potential in pakistan   wapda 2008Hydro potential in pakistan   wapda 2008
Hydro potential in pakistan wapda 2008
 
Hydro potential in pakistan wapda 2008
Hydro potential in pakistan   wapda 2008Hydro potential in pakistan   wapda 2008
Hydro potential in pakistan wapda 2008
 
Libya great man made river project
Libya   great man made river projectLibya   great man made river project
Libya great man made river project
 
Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800
 
Dams%20report
Dams%20reportDams%20report
Dams%20report
 
Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project
 
Three gorges dam project
Three gorges dam projectThree gorges dam project
Three gorges dam project
 
Pong dam ppt
Pong dam pptPong dam ppt
Pong dam ppt
 
Ataturk dam
Ataturk damAtaturk dam
Ataturk dam
 
Neelum jehlum hydropower project
Neelum jehlum hydropower projectNeelum jehlum hydropower project
Neelum jehlum hydropower project
 
Polavaram project
Polavaram projectPolavaram project
Polavaram project
 
THE THREE GORGES ppt
THE THREE GORGES pptTHE THREE GORGES ppt
THE THREE GORGES ppt
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam
 
The Three Gorges Dam Ahmed Hussain
The Three Gorges Dam Ahmed HussainThe Three Gorges Dam Ahmed Hussain
The Three Gorges Dam Ahmed Hussain
 
Project report
Project reportProject report
Project report
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 

Recently uploaded

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 

Recently uploaded (20)

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 

Largest Earth-Filled Dam Tarbela

  • 2.
  • 3. Description Tarbela Dam is located on the Indus River in Swabi (Khyber Pakhtunkhwa), Pakistan.  It is the largest earth-filled dam in the world and fifth-largest by structural volume.  It is also the second largest dam in the world in terms of reservoir capacity.
  • 4.
  • 5. Construction began in the year of 1968 and has to be completed in the year of 1976. The dam was operational in 1976 but its completion occur in 1984. The dam has to be completed in the duration of 8 years but it takes 16 years to completed.
  • 6. Construction was undertaken by the Italian firm Salini Impregilo . The total height of the dam is 143.26 meters (470 ft) from river level and length is 2,743.2 meters (9,000 ft). The width of Tarbela Dam at its base is 600m
  • 7.  Its reservoir capacity is 13.69 cubic kilometers (3.28 cu mi).  Its catchment area is 168,000 km 2 (65,000 sq mi). Estimated cost of the project was $800 million. Total cost of the project was $1.497 billion.
  • 8. Causes for delay of the project Around 70 "sinkholes" in the reservoir bed appear which they tried covering between 1975 and 1978 by dumping thousands of tones of earth by the barge load. One sinkhole that appeared in 1984 was still there in 1991
  • 9. Two of the four tunnels being used to control the rate of filling were damaged and forced to close. Within a week, one of the two remaining active tunnels also collapsed, bringing down nearly half a million cubic meters of concrete and rock.
  • 10. Power generation  It has 14 turbines in which 10 turbines have capacity of 175 MW while the 4 have 432 MV. Its production is 3478 MV and its capacity of 6298 MV .
  • 11. Background for Project construction Tarbela dam was constructed as part of the Indus Basin Project after signing of the 1960 Indus Waters Treaty between Pakistan and India.  The purpose was to compensate for the loss of water supplies of the eastern rivers (Ravi, Sutlej and Beas) .
  • 12.  The primary objective of the dam was to supply water for irrigation by storing flows during the monsoon period and subsequently releasing stored water during the low flow period in winter.
  • 13. Lifespan Because the source of the Indus River is glacial meltwater from the Himalayas, the river carries huge amounts of sediment, with an annual suspended sediment load of 200 million tons. Live storage capacity of Terbela reservoir had declined more than 33.5 % to 6.434 million acre feet (MAF) against its original capacity of 9.679 MAF because of sedimentation over the past 38 years.
  • 14. The useful life of the dam and reservoir was estimated to be approximately fifty years. However, sedimentation has been much lower than predicted, and it is now estimated that the useful lifespan of the dam will be 85 years, to about 2060.
  • 15. Construction Construction of Tarbela Dam was carried out in three stages to meet the diversion requirements of the river. Stage 1 In stage 1 a diversion channel was made for the flow of water. Stage 2 In stage 2 main embankment dam was made along with the tunnels. Stage 3 In stage 3 spillways, closing of diversion channel and upper portion of the embankment dam was completed.
  • 19. The main dam wall, built of earth and rock fill, stretches 2,743 meters (8,999 ft) from the island to river right, standing 148 meters (486 ft) high.  The main spillway has a discharge capacity of 18,406 cubic meters per second (650,000 cu ft/s) and the auxiliary spillway, 24,070 cubic meters per second (850,000 cu ft/s).
  • 20. 15000 Pakistani workers and 800 European work together on the consrtuction of the dam In the construction of embankment portion about volume of 200 million cubic yard of rock and soil is used. Four large tunnels were constructed as part of Tarbela Dam's outlet works.
  • 21.
  • 22. Re-settlement of people affected by Tarbela Dam It has a reservoir area of about 260 square kilometers and about 82,000 acres (33,000 ha) of land was acquired for its construction. The large reservoir of the dam submerged 135 villages, which resulted in displacement of a population of about 96,000 people.
  • 23. For the land and built-up property acquired under the Land Acquisition Act of 1984, a cash compensation of Rs 469.65 million was paid to those affected. Till now many affectees of the Tarbela Dam have still not been settled and have not been given land as compensation by the government of Pakistan.
  • 24. Project benefits In addition to fulfilling the primary purpose of the dam, i.e. supplying water for irrigation, Tarbela Power Station has generated 341.139 billion kWh of cheap hydro-electric energy since commissioning.  The station shared peak load of 3702 MW during the year, which was 23.057% of total WAPDA system peak
  • 25. The project recover its total cost of construction in 10 years . Now the project gives benefit to the economy of Pakistan.
  • 26. Tarbela-IV Extension Project In September 2013, Pakistan's Water and Power Development Authority signed a Rs. 26.053 billion contract with Chinese firm Sinohydro and Germany's Voith Hydro for executing civil works on the 1,410 MW Tarbela-IV Extension Project.
  • 27. Construction commenced in February 2014, and is expected to be completed by June 2017. Upon completion, the project will augment the Early Harvest Project of the China–Pakistan Economic Corridor.
  • 28. Benefits of the Extension After the completion of extension project about 1410 MV of electricity is produced which in result the less short fall of electricity of Pakistan. Cheap electricity is produced as a result cost on per unit of electricity is reduced.
  • 29. Want to Know More?  If you are interested in the topic and want to know more about Tarbela Dam or Mangla dam you can freely ask me.  I myself a civil engineering student, in the last year now.  Any related topics, get contact me without any hesitation.  Contact Email: contact@netodin.com