SlideShare a Scribd company logo
Resume of Qualifications for
M. David Hindmon
20009 Saratoga Trl. Frisco, Texas 75034
Ph: (214) 537-7780
Occupations:
Sr. Mechanical Designer (38 Yrs) Piping & HVAC
AutoCad (30 Yrs) & MicroStation (27 Yrs)
CAD Mgr / Supervisor CAD Production / QA/QC (8 Yrs.)
Training/Instructor (4 Yrs)
Construction Manager (2 Yrs)
- - - - - EXPERIENCE SUMMARY - - - - -
Professionally oriented and highly motivated Mechanical Designer/detailer. Excellent 3D skills equally
capable in both
AutoCad and Microstation designing various Mechanical / Process / Conveyance piping and HVAC
systems. Other experience
includes commercial high-rise (tenant finish retail & residential), retail (malls & strip centers), light/heavy
industrial (factories & warehouses),
educational facilities, churches, hospitals and medical offices. Proficient in cleanroom design for
semiconductor and pharmaceutical
industries utilizing HEPA filtered air supply,laminar air flows, fully ducted return air and scrubbed exhaust
air systems.
Process piping experience includes UPW/RO systems, all aspects of water conveyance and water/wastewater
treatment, pump stations,
lift stations, steam systems, chemical dispensing systems, vacuum/med-gas systems, specialty/pyrophoric gases
and bulk gas systems.
Mechanical piping experience includes chilled water, glycol, condenser water, & hot water.
Petrochemical piping experience includes pumping/metering stations, skids, tanks and pressure vessels,
detailed fabrication documents.
Noteworthy skills and/or titles as listed below have been developed and are as follows:
CAD Manager, Production Supervisor, Instructor and Construction Management. Flexible and dynamic as
a supervisor/instructor,
quick and thorough to assess each individual's skill set for use that is suitable to the task.
Conscientious on-site Construction Manager for several projects, utilizing skills required of a Project
Manager as follows:
Review construction documents, generate and submit RFI’s to the GC, award contracts to subcontractors,
issue PO's to vendors
after thorough review and acceptance of bids for equipment and/or services, track delivery dates, assessment of
manpower / labor needs,
recruit and acquire appropriate skilled/unskilled craftsman/journeymen and laborers according to the tasks,
delegate duties to
superintendent and foremen, track man-hours, maintain daily reports to reflect progress of each crew, conduct
safety meetings and
maintain a safe, clean site. Familiar with project estimating utilizing Quickpen, bids, proposals, schedule of
values pay apps, retainage,
invoices and generating O&M’s for project closeout.
OBJECTIVE: To be insrumental in a company's growth and success while developing personal and professional
skills. Continued pursuit of
Supervisory position in Engineering / Design (CAD) and/or Construction Management position that is
challenging in overall scope and diversity.
- - DESIGN HISTORY - -
HVAC - Commercial/Industrial supply and exhaust systems for clean room applications, research labs, educational,
institutional, and correctional.
PIPING - Commercial & Industrial process piping for water conveyance, wastewater treatment, petrochemical
fluids/gases, chiller/condenser
water, high/low pressure steam, bulk & specialty gases, chemical dispense, power generation plants, pressure
vessels and skids.
STRUCTURAL - Concrete stuctures, Platforms, walkways and supports
- - DRAFTING HISTORY - -
Civil alignments & profiles, plumbing, P&ID's, controls, schematics, Structural & Architectural, Electrical wiring
diagrams.
- - EDUCATION: Eighteen months of Continued Education classes at Eastfield College in Mesquite, Texas.
SOFTWARE LITERACY: XM, Plantspace, Cadpipe, PipeGen, Excel, Word, Adobe Acrobat, Quickpen, Corel Draw.
EMPLOYMENT HISTORY:
01/08 to Present CH2M (formerly CH2M HILL) Dallas, Texas
Sr. Mechanical Designer (Conveyance/Process Piping, Structural, Civil & HVAC) Microstation &
AutoCad
Equipment layout / piping design for pump stations and Raw Water / Wastewater Treatment plants for
local municipalities throughout
Texas, Oklahoma and Arkansas utilizing DAF systems, Ozone Injection and RO Membranes. Various
other tasks include design of
lift / booster pump stations, large diameter conveyance systems, generating plan / profiles for sanitary
sewer / storm drainage piping.
***SPECIAL NOTE - Lead Designer for DFW Terminal ‘A’ (TRIP) HVAC replacement project Other
projects/clients are as follows:
RO Membrane Bldg - Sherman WTP, DAF / Ozone - City of Waco WTP, Trinity Lakes River Project,
Dallas Water Utilities,
North Texas Municipal Water District, Tarrant Regional Water District, Tulsa Regional Metropolitan,
San Marcos WaterUtilities,
Fayetteville Ozone Injection Facility.
M. David Hindmon (cont’d)
*** (PLEASE NOTE: MOST ENTRIES BELOW ARE CONTRACT) ***
03/07 to 10/07 TEI Construction & Engineering Dallas, Texas
CAD Manager - Microstation
Field verify and document as-built conditions for Terminal D project at DFW International.
Supervision of CAD techs and
Operations. Provide continuity, quality control and ensure conformity of client standards set forth by
DFW AE Division and
Assets Management of updated record drawings for final deliverables to the client.
05/06 to 03/07 Nelson Architects & Engineers - BravoTech Dallas, Texas
Sr. Mechanical Designer (HVAC/Process Piping) AutoCad
HVAC systems design including all ductwork / piping and layout equipment, for commercial / residential
and high rise tenant finish,
multi-family housing, hospitals and medical offices buildings.
01/06 to 05/06 Austin Commercial - BravoTech. Dallas, Texas
Senior CAD Tech – Microstation
Document as-built conditions during final construction phase of Terminal D project at DFW
International. Other duties included
field verify existing conditions inside terminal and update drawings. Submit record sets to the client as
required for closeout conditions
of contract. Ensure quality control and maintain drafting standards set forth by the client.
04/05 to 01/06 Garcia Technical Services Dallas, Texas
Project Manager & On-Site Construction manager (Mechanical Contractor - Construction)
Liaison to the GC as project manager to provide coordination and completion of scheduled tasks while
on-site at Jesse Owens
Athletics Complex during construction phase. Familiar with pay apps and retainage. Other duties
included but, were not limited to the
following: scheduling manpower, purchasing tools and materials, ordering equipment and tracking
delivery dates for start-up of newly
awarded plumbing contract while honoring existing mechanical contract. Review construction documents
and specifications, generate
RFI’s and change orders. Initiate bids from vendors and award contracts to subs. Provide O&M manuals
and edit contract documents.
06/04 to 10/04 AIRCO Mechanical Austin, Texas
Project manager & CAD detailing/production manager (Mechanical Contractor - Construction)
Liaison to the GC as project manager for Austin Diagnostic medical office building during construction
and completion of tenant
finish. Mechanical piping, HVAC and plumbing including medical gases and vacuum system. Other duties
included pay apps, daily
reports, invoicing, schedule manpower, order materials, track delivery dates, reviewed construction
documents and generate RFI’s
12/02 to 03/04 The Arizpe Group, Inc. Austin, Texas
Production Supervisor/Senior CAD Tech (MEP production) AutoCAD and Microstation
Provided quality assurance set forth by each of the company’s clients. Supervision of several CAD techs
and their production.
02/00 to 07/02 Criterion Consultants LLP Austin, Texas
Sr. Designer/CAD Manager (Process Piping/Tool hookup) AutoCAD and Microstation
Provided quality assurance and maintained drafting standards set forth by each of the company’s
clients. Supervision of
several CAD techs and their production, construction management and estimating materials during
installation of new
piping systems for UPW / RO system at Texas Instruments. Other systems included bulk/specialty gases &
chemical dispense units.
Clients are as follows: Atmel - Dallas, Texas Texas Instruments - Houston &
Dallas, Texas
Radiant Photonics - Austin, Texas Focus Interconnect - Austin, Texas
Intel - Colorado Springs, Colorado
08/98 to 11/99 PrimeTech Mechanical LLP San Antonio, Texas / Laredo, Texas
CAD Manager (Process Piping) AutoCad
Managed several CAD techs production, approved timesheets and delegated responsibility Other duties
included on-site support
during installation of mechanical piping systems throughout central utilities plant, hospital building and
administrative areas.
Systems included chilled water, condenser water, hot water, high/low pressure steam, condensate return
and medical gases for
new Sisters of Mercy Hospital in Laredo.
04/98 to 08/98 White Oak Semiconductor - ISinc Austin, Texas/Richmond, Virginia
Sr. Mechanical Designer (HVAC/Tool Hookup) MicroStation
Construction management requiring field verification and coordination through final installation,
inspection and startup.
11/97 to 04/98 Dynamic Systems Inc. Austin, Texas/San Antonio, Texas
Sr. Mechanical Designer (Process Piping) AutoCad & MicroStation
Piping detailer providing detailed construction documents & spool drawings for fabrication of process
piping to be installed during
FAB E/CUB expansion at VLSI in San Antonio. Worked closely with other disciplines, fab shop and
construction superintendents.
***NOTE: salary history and references provided upon request***

More Related Content

What's hot

CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping EngineerPopovici Adrian
 
Mechanical Engineer-Juffrie
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-JuffrieJuffrie Cuevas
 
KEO CV Rev. 1 of Harry Ramos-PMCM-
KEO CV Rev. 1 of Harry Ramos-PMCM-KEO CV Rev. 1 of Harry Ramos-PMCM-
KEO CV Rev. 1 of Harry Ramos-PMCM-Harry Ramos
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerNazrul Mokhtar
 
Oam mechanical eng
Oam mechanical engOam mechanical eng
Oam mechanical eng
Odoardo Merida
 
DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016D Venkatesh
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
Arun Das
 
LF Lanza Resume 2016
LF Lanza Resume 2016LF Lanza Resume 2016
LF Lanza Resume 2016
Lou Lanza
 
Latest_resume_10.9.14
Latest_resume_10.9.14Latest_resume_10.9.14
Latest_resume_10.9.14dnag12
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_ResumeJaime Navarro
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
Padmanabh Dhobale
 
ilayaraja_piping designer
ilayaraja_piping designerilayaraja_piping designer
ilayaraja_piping designermilaya_25 mani
 
Abdul ahad shahzad resume
Abdul ahad shahzad resumeAbdul ahad shahzad resume
Abdul ahad shahzad resume
Abdul Ahad shahzad
 
Tom resume' updated june 2016 pm
Tom resume' updated june 2016 pmTom resume' updated june 2016 pm
Tom resume' updated june 2016 pm
Tom Hinton
 

What's hot (20)

Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
 
Mechanical Engineer-Juffrie
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-Juffrie
 
updated habeeb cv
updated habeeb cvupdated habeeb cv
updated habeeb cv
 
KEO CV Rev. 1 of Harry Ramos-PMCM-
KEO CV Rev. 1 of Harry Ramos-PMCM-KEO CV Rev. 1 of Harry Ramos-PMCM-
KEO CV Rev. 1 of Harry Ramos-PMCM-
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping Designer
 
Jai Prakash sharma CV
Jai Prakash sharma CVJai Prakash sharma CV
Jai Prakash sharma CV
 
Oam mechanical eng
Oam mechanical engOam mechanical eng
Oam mechanical eng
 
DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
LF Lanza Resume 2016
LF Lanza Resume 2016LF Lanza Resume 2016
LF Lanza Resume 2016
 
Latest_resume_10.9.14
Latest_resume_10.9.14Latest_resume_10.9.14
Latest_resume_10.9.14
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
 
2016 Resume (3)
2016 Resume (3)2016 Resume (3)
2016 Resume (3)
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
 
CV R46
CV R46CV R46
CV R46
 
ilayaraja_piping designer
ilayaraja_piping designerilayaraja_piping designer
ilayaraja_piping designer
 
Marshall Steve (pm)
Marshall Steve (pm)Marshall Steve (pm)
Marshall Steve (pm)
 
Abdul ahad shahzad resume
Abdul ahad shahzad resumeAbdul ahad shahzad resume
Abdul ahad shahzad resume
 
Tom resume' updated june 2016 pm
Tom resume' updated june 2016 pmTom resume' updated june 2016 pm
Tom resume' updated june 2016 pm
 

Similar to DHindmon_Resume2016

New I&C Resume
New I&C ResumeNew I&C Resume
New I&C ResumeHal Coats
 
Arun das latest resume
Arun das latest resumeArun das latest resume
Arun das latest resume
Arun Das
 
Arun das latest resume
Arun das latest resumeArun das latest resume
Arun das latest resume
Arun Das
 
Resume of Qualifications (Mark Williams)
Resume of Qualifications (Mark Williams)Resume of Qualifications (Mark Williams)
Resume of Qualifications (Mark Williams)Mark Williams
 
Resume of qualifications (mark williams)
Resume of qualifications (mark williams)Resume of qualifications (mark williams)
Resume of qualifications (mark williams)
Mark Williams
 
jordan updated resume 2015
jordan updated resume 2015jordan updated resume 2015
jordan updated resume 2015Manolito Jordan
 
Jared Langham Resume 4
Jared Langham Resume 4Jared Langham Resume 4
Jared Langham Resume 4Jared Langham
 
Latest resume
Latest resumeLatest resume
Latest resume
Arun Das
 
Latest resume
Latest resumeLatest resume
Latest resume
Arun Das
 
Latest resume
Latest resumeLatest resume
Latest resume
Arun Das
 
Linkedin Summary
Linkedin SummaryLinkedin Summary
Linkedin SummaryIlyas Ahsan
 
CURRICULAM_VITAE (1)
CURRICULAM_VITAE (1)CURRICULAM_VITAE (1)
CURRICULAM_VITAE (1)VIKAS JHANWAR
 
Dexter Adona Resume
Dexter Adona ResumeDexter Adona Resume
Dexter Adona ResumeDexter Adona
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateMohamed Zawam
 

Similar to DHindmon_Resume2016 (20)

Sameer CV-DC
Sameer CV-DCSameer CV-DC
Sameer CV-DC
 
Bio - Resume
Bio - ResumeBio - Resume
Bio - Resume
 
New I&C Resume
New I&C ResumeNew I&C Resume
New I&C Resume
 
Arun das latest resume
Arun das latest resumeArun das latest resume
Arun das latest resume
 
Arun das latest resume
Arun das latest resumeArun das latest resume
Arun das latest resume
 
Resume of Qualifications (Mark Williams)
Resume of Qualifications (Mark Williams)Resume of Qualifications (Mark Williams)
Resume of Qualifications (Mark Williams)
 
Resume of qualifications (mark williams)
Resume of qualifications (mark williams)Resume of qualifications (mark williams)
Resume of qualifications (mark williams)
 
JWBRESUME
JWBRESUMEJWBRESUME
JWBRESUME
 
jordan updated resume 2015
jordan updated resume 2015jordan updated resume 2015
jordan updated resume 2015
 
Jared Langham Resume 4
Jared Langham Resume 4Jared Langham Resume 4
Jared Langham Resume 4
 
Latest resume
Latest resumeLatest resume
Latest resume
 
Latest resume
Latest resumeLatest resume
Latest resume
 
Latest resume
Latest resumeLatest resume
Latest resume
 
Linkedin Summary
Linkedin SummaryLinkedin Summary
Linkedin Summary
 
Resume 2015
Resume 2015Resume 2015
Resume 2015
 
CURRICULAM_VITAE (1)
CURRICULAM_VITAE (1)CURRICULAM_VITAE (1)
CURRICULAM_VITAE (1)
 
Dexter Adona Resume
Dexter Adona ResumeDexter Adona Resume
Dexter Adona Resume
 
ASIF CV - HVAC O & M
ASIF CV - HVAC O & MASIF CV - HVAC O & M
ASIF CV - HVAC O & M
 
RESUME 2015
RESUME 2015RESUME 2015
RESUME 2015
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last update
 

DHindmon_Resume2016

  • 1. Resume of Qualifications for M. David Hindmon 20009 Saratoga Trl. Frisco, Texas 75034 Ph: (214) 537-7780 Occupations: Sr. Mechanical Designer (38 Yrs) Piping & HVAC AutoCad (30 Yrs) & MicroStation (27 Yrs) CAD Mgr / Supervisor CAD Production / QA/QC (8 Yrs.) Training/Instructor (4 Yrs) Construction Manager (2 Yrs) - - - - - EXPERIENCE SUMMARY - - - - - Professionally oriented and highly motivated Mechanical Designer/detailer. Excellent 3D skills equally capable in both AutoCad and Microstation designing various Mechanical / Process / Conveyance piping and HVAC systems. Other experience includes commercial high-rise (tenant finish retail & residential), retail (malls & strip centers), light/heavy industrial (factories & warehouses), educational facilities, churches, hospitals and medical offices. Proficient in cleanroom design for semiconductor and pharmaceutical industries utilizing HEPA filtered air supply,laminar air flows, fully ducted return air and scrubbed exhaust air systems. Process piping experience includes UPW/RO systems, all aspects of water conveyance and water/wastewater treatment, pump stations, lift stations, steam systems, chemical dispensing systems, vacuum/med-gas systems, specialty/pyrophoric gases and bulk gas systems. Mechanical piping experience includes chilled water, glycol, condenser water, & hot water. Petrochemical piping experience includes pumping/metering stations, skids, tanks and pressure vessels, detailed fabrication documents. Noteworthy skills and/or titles as listed below have been developed and are as follows: CAD Manager, Production Supervisor, Instructor and Construction Management. Flexible and dynamic as a supervisor/instructor, quick and thorough to assess each individual's skill set for use that is suitable to the task. Conscientious on-site Construction Manager for several projects, utilizing skills required of a Project Manager as follows: Review construction documents, generate and submit RFI’s to the GC, award contracts to subcontractors, issue PO's to vendors after thorough review and acceptance of bids for equipment and/or services, track delivery dates, assessment of manpower / labor needs, recruit and acquire appropriate skilled/unskilled craftsman/journeymen and laborers according to the tasks, delegate duties to superintendent and foremen, track man-hours, maintain daily reports to reflect progress of each crew, conduct safety meetings and maintain a safe, clean site. Familiar with project estimating utilizing Quickpen, bids, proposals, schedule of values pay apps, retainage, invoices and generating O&M’s for project closeout. OBJECTIVE: To be insrumental in a company's growth and success while developing personal and professional skills. Continued pursuit of Supervisory position in Engineering / Design (CAD) and/or Construction Management position that is challenging in overall scope and diversity.
  • 2. - - DESIGN HISTORY - - HVAC - Commercial/Industrial supply and exhaust systems for clean room applications, research labs, educational, institutional, and correctional. PIPING - Commercial & Industrial process piping for water conveyance, wastewater treatment, petrochemical fluids/gases, chiller/condenser water, high/low pressure steam, bulk & specialty gases, chemical dispense, power generation plants, pressure vessels and skids. STRUCTURAL - Concrete stuctures, Platforms, walkways and supports - - DRAFTING HISTORY - - Civil alignments & profiles, plumbing, P&ID's, controls, schematics, Structural & Architectural, Electrical wiring diagrams. - - EDUCATION: Eighteen months of Continued Education classes at Eastfield College in Mesquite, Texas. SOFTWARE LITERACY: XM, Plantspace, Cadpipe, PipeGen, Excel, Word, Adobe Acrobat, Quickpen, Corel Draw. EMPLOYMENT HISTORY: 01/08 to Present CH2M (formerly CH2M HILL) Dallas, Texas Sr. Mechanical Designer (Conveyance/Process Piping, Structural, Civil & HVAC) Microstation & AutoCad Equipment layout / piping design for pump stations and Raw Water / Wastewater Treatment plants for local municipalities throughout Texas, Oklahoma and Arkansas utilizing DAF systems, Ozone Injection and RO Membranes. Various other tasks include design of lift / booster pump stations, large diameter conveyance systems, generating plan / profiles for sanitary sewer / storm drainage piping. ***SPECIAL NOTE - Lead Designer for DFW Terminal ‘A’ (TRIP) HVAC replacement project Other projects/clients are as follows: RO Membrane Bldg - Sherman WTP, DAF / Ozone - City of Waco WTP, Trinity Lakes River Project, Dallas Water Utilities, North Texas Municipal Water District, Tarrant Regional Water District, Tulsa Regional Metropolitan, San Marcos WaterUtilities, Fayetteville Ozone Injection Facility. M. David Hindmon (cont’d) *** (PLEASE NOTE: MOST ENTRIES BELOW ARE CONTRACT) *** 03/07 to 10/07 TEI Construction & Engineering Dallas, Texas CAD Manager - Microstation Field verify and document as-built conditions for Terminal D project at DFW International. Supervision of CAD techs and Operations. Provide continuity, quality control and ensure conformity of client standards set forth by DFW AE Division and Assets Management of updated record drawings for final deliverables to the client. 05/06 to 03/07 Nelson Architects & Engineers - BravoTech Dallas, Texas Sr. Mechanical Designer (HVAC/Process Piping) AutoCad HVAC systems design including all ductwork / piping and layout equipment, for commercial / residential and high rise tenant finish, multi-family housing, hospitals and medical offices buildings. 01/06 to 05/06 Austin Commercial - BravoTech. Dallas, Texas
  • 3. Senior CAD Tech – Microstation Document as-built conditions during final construction phase of Terminal D project at DFW International. Other duties included field verify existing conditions inside terminal and update drawings. Submit record sets to the client as required for closeout conditions of contract. Ensure quality control and maintain drafting standards set forth by the client. 04/05 to 01/06 Garcia Technical Services Dallas, Texas Project Manager & On-Site Construction manager (Mechanical Contractor - Construction) Liaison to the GC as project manager to provide coordination and completion of scheduled tasks while on-site at Jesse Owens Athletics Complex during construction phase. Familiar with pay apps and retainage. Other duties included but, were not limited to the following: scheduling manpower, purchasing tools and materials, ordering equipment and tracking delivery dates for start-up of newly awarded plumbing contract while honoring existing mechanical contract. Review construction documents and specifications, generate RFI’s and change orders. Initiate bids from vendors and award contracts to subs. Provide O&M manuals and edit contract documents. 06/04 to 10/04 AIRCO Mechanical Austin, Texas Project manager & CAD detailing/production manager (Mechanical Contractor - Construction) Liaison to the GC as project manager for Austin Diagnostic medical office building during construction and completion of tenant finish. Mechanical piping, HVAC and plumbing including medical gases and vacuum system. Other duties included pay apps, daily reports, invoicing, schedule manpower, order materials, track delivery dates, reviewed construction documents and generate RFI’s 12/02 to 03/04 The Arizpe Group, Inc. Austin, Texas Production Supervisor/Senior CAD Tech (MEP production) AutoCAD and Microstation Provided quality assurance set forth by each of the company’s clients. Supervision of several CAD techs and their production. 02/00 to 07/02 Criterion Consultants LLP Austin, Texas Sr. Designer/CAD Manager (Process Piping/Tool hookup) AutoCAD and Microstation Provided quality assurance and maintained drafting standards set forth by each of the company’s clients. Supervision of several CAD techs and their production, construction management and estimating materials during installation of new piping systems for UPW / RO system at Texas Instruments. Other systems included bulk/specialty gases & chemical dispense units. Clients are as follows: Atmel - Dallas, Texas Texas Instruments - Houston & Dallas, Texas Radiant Photonics - Austin, Texas Focus Interconnect - Austin, Texas Intel - Colorado Springs, Colorado 08/98 to 11/99 PrimeTech Mechanical LLP San Antonio, Texas / Laredo, Texas CAD Manager (Process Piping) AutoCad Managed several CAD techs production, approved timesheets and delegated responsibility Other duties included on-site support during installation of mechanical piping systems throughout central utilities plant, hospital building and administrative areas. Systems included chilled water, condenser water, hot water, high/low pressure steam, condensate return and medical gases for new Sisters of Mercy Hospital in Laredo. 04/98 to 08/98 White Oak Semiconductor - ISinc Austin, Texas/Richmond, Virginia Sr. Mechanical Designer (HVAC/Tool Hookup) MicroStation Construction management requiring field verification and coordination through final installation, inspection and startup. 11/97 to 04/98 Dynamic Systems Inc. Austin, Texas/San Antonio, Texas Sr. Mechanical Designer (Process Piping) AutoCad & MicroStation
  • 4. Piping detailer providing detailed construction documents & spool drawings for fabrication of process piping to be installed during FAB E/CUB expansion at VLSI in San Antonio. Worked closely with other disciplines, fab shop and construction superintendents. ***NOTE: salary history and references provided upon request***