SlideShare a Scribd company logo
Henry Cieplucha - CV 1 / 11
RESUME
HENRY CIEPLUCHA
Contact details
Email henrycieplucha@hotmail.com
Mobile 0400 332 524
Home 02 4257 0881
SUMMARY OF PERSONAL SKILLS AND ATTRIBUTES
 Highly qualified Construction Manager / SMP Superintendent with experience in the Mining,
Oil and Gas, Wastewater, Solar and Heavy Industry
 Vast construction experience on green field and brown field sites
 Coordinating and supervising turnarounds/shutdowns
 Able to work independently, and enjoy working as part of the team.
 Demonstrated excellent leadership skills including supervising and motivating teams
 First-class analytical and problem solving skills
 Dedicated to setting and maintaining high standards for quality
 Committed to high safety standards
SUMMARY OF PLANT AND EQUIPMENT AND INDUSTRYEXPERTISE
 Conveyor Systems, Crushing ball and sag circuits, gantry systems, twin vibrating screens
and screen houses
 Sewage / Desalination plants.
 Wastewater, Reverse Osmosis, Desalination Plants
 RCU residue cracking and CDU crude distillation units
 Black oil slurry systems and leaching processes, lime slurry and water filtration systems
 L'Air Liquide 240TPD oxygen plant
 Electric and hydrogen furnaces, calciner kilns, Dust suppression systems
 Ammonia plants, coolant towers
 Sinter machine emission
 Acid handling systems including hydrofluoric, nitric and sulphuric acid and pickling systems
 Gear box maintenance supervisor Falk Renew.
 Maintenance supervisor BHP stainless.
Henry Cieplucha - CV 2 / 11
EMPLOYMENT HISTORY
October 2013 – Jan 2015
EPC First Solar Australia. Construction Superintendent.
102MW power station - Nyngan
52MW power station - Broken Hill
Project Capital Expenditure > 250million
 Accountable for the Projects Health, Safety and Environmental policy’s
 Adhere to Company Safety Standards and promote safety culture among the ranks
through out the Company
 Conduct short, regular meetings to discuss and record milestones, accomplishments,
successes and challenges as they occur
 Give employees feedback during one-on-one meetings and informally as regularly as
possible.
 Commend your employee in front of their peers
 Responsible for Civil and Structural supervisor direct reports
 Conduct daily safety tool box meetings and safety briefs with site contractors
 Responsible for Civil infrastructure and access roads.
 Responsible for site Project work installing posting, brackets (PV) Photovoltaic screens.
Further leadership roles include, but not limited to the following:
 Responsible for Civil and Structural & Mechanical project leaders
 Responsible for Contracting and Sub Contracting workforce
 Extensive knowledge of Civil / Structural Codes, Standards and Practices
 Advanced knowledge in Mechanical and Pipework Codes, Standards and Practices
Henry Cieplucha - CV 3 / 11
Jun 2012 - March 2013
EPCM (MEIC) AMEC Mining & Metals Construction Manager.
NCA1 CIL Refurbishment Project Newcrest Gold Mine - Lihir Island PMG
NCA1 CIL Tank Refurbishment project
Project Capital Expenditure > 100 million
 Accountable for the Projects Health, Safety and Environmental policy’s
 Adhere to Company Safety Standards and promote safety culture among the ranks
through out the Company
 Manage and oversee the day-to-day construction management of the project
 Prepares, supervises and approves the construction schedule and its implementation
 Ensure Lessons Learned are properly documented through out the life of the project
including Project Close-out
 Manage the construction effort and be the construction representative of our company
with Client.
 Oversee the plan, develop and organise the construction effort to formulate the most
cost-effective plan
 Timely completion within budget and to implement the execution of that plan
Construction activities during the project include, but limited to the following:
 Supervise Dismantling 5 tanks pipe work superstructure and electrical.
 Fabricated 3 new tanks, refurbished 2 tanks & commissioned 5 tanks
 Oversee the installation and commissioning of Superstructures, electrical and IT
systems
 Responsible for 2 Structural 2 Civil and 2 Mechanical Superintendents / supervisor
direct reports
 Key accountability for Papua Natives during project
 Accountable for the dismantling of 5 tanks pipe work superstructure and electrical
instrumentation.
 Oversee the fabrication of 3 new tanks refurbishments, 2 tanks commissioned & 5 tanks
new pipe / spool fit out and installation
 Responsible for all project Superstructures, electrical and IT installations.
Henry Cieplucha - CV 4 / 11
June 2011 - May 2012
SMP Construction Superintendent / Acting Construction Manager.
Programmed Construction & Maintenance – Sino Iron Karratha.
Programmed Construction & Maintenance – Karara KML Geraldton.
Project Capital Expenditure > 50million
 Accountable for the Projects Health, Safety and Environmental policy’s
 Adhere to Company Safety Standards and promote safety culture among the ranks
through out the Company
 Monitor and report to Project Manager / Sr Construction Manager of project details,
including progress, risks and opportunities in a timely manner.
• Ensure all changes to specifications, work scope and drawings are documented
• Clearly outline roles & responsibilities to deliver requirements in terms of both scope
and schedule to all the team members.
• Review man-hours and duration forecasts to completion for onshore construction and
man-hours, duration and manning forecasts
• Monitor construction productivity and schedule performance and investigate reasons for
less than satisfactory performance
 Provide recommendations and institute measures for improvement by modification to
operating procedures/work instructions.
• Responsible for 3 Structural & 2 Mechanical Superintendents
• Manager of 250 Contracting and Sub Contracting workforce
• Extensive knowledge of Civil / Structural Codes, Standards and Practices
• Advanced knowledge in Mechanical / Pipework Codes, Standards and Practices
The following activities were carried out on the project, but not limited to the following:
Installation of the following equipment and systems
 Conveyor systems including, gravity take up towers, transfer chutes, pulleys and
conveyor tracking systems
• Polysius ball mills
• HP800 Secondary crushers
• Schenck Twin Deck Vibrating Screens
• Gyratory NT- 60 x 80 crusher
• Gyratory KB- 63 x 89 crusher
• Concentrate Thickeners
• Conveyor Shuttle and Tripper systems
Henry Cieplucha - CV 5 / 11
Jan 2011 - June 2011
SMP Construction Supervisor / Acting Construction Manager
Proteus Engineers EPCM Engineers - FMG Cloudbreak
Project Capital Expenditure >10million
 Accountable for the Projects Health, Safety and Environmental policy’s
 Adhere to Company Safety Standards and promote safety culture among the ranks
through out the Company
 Manage and oversee the day-to-day construction management of the project
 Responsible for implementation of the scope of work as related to construction/
fabrication, pre-commissioning activities
 Ensures all changes to specifications, work scope and drawings are documented
 Installation of Conveyor systems including, gravity take up towers, transfer chutes,
pulleys and conveyor tracking systems
• Removal of redundant HPGR roll press RPRS 15.0 – 140/160, hydraulic lubrication
cooling and structural equipment
• Installation of new High Pressure Grinding Rolls “HPGR” RP-S 13-170/140B roll press
including QA/QC inspection and sign-off on ITPs upon completion
• Pre-commission and commission of new High Pressure Grinding Rolls “HPGR” unit and
associated plant/equipment including hydraulic lubrication gear box oil and chilled-
water-cooling system
Jul 2010 - Oct 2010
SMP Construction Superintendent
Sino Iron Project Cape Preston
Project Capital Expenditure > 5million
 Accountable for the Projects Health, Safety and Environmental policy’s
 Adhere to Company Safety Standards and promote safety culture among the ranks
through out the Company
 Installation of pre-fabricated (China/India) modular desalination unit
 Mobilisation of personal and equipment to site, preparation of work packs
 NOTE: Letter of interest (LOI) not signed on due date, safety issues claims not met by
client, project stopped, equipment and crew demobilized from site
Henry Cieplucha - CV 6 / 11
May 2010
Mechanical Shutdown Supervisor - Rigging/Cranage
UGL - RPG5 Port Hedland
• Demonstrated excellent leadership skills including supervising and motivating teams
• Give employees feedback during one-on-one meetings and informally as regularly as
possible.
• Commend your employee in front of their peers
• Oversee the Installation of conveyor systems, gantries, shuttle and structural
steel/modules
• Coordination of cranes
• Regularly check in with employees on their progress on goals; offer coaching or
assistance, or revise goals as necessary
• Lead shutdown Pre-start and safety restart meetings
• Liaise with Senior management and Planning and Engineering teams for shutdown
schedule progress updates
Feb 2010 - Apr 2010
EPCM/SMP and QA/QC Supervisor
Bovis Lend Lease, Mulwala Re-development Project - Munitions Plant
 Propellant manufacture, chemical storage tanks, mixes, transfer conveyors and
associated pipe work, propellant finishing, extrusion press product-cutters, hydraulic
systems, including process ITPs, NCRs,
 Hydro-testing inspection and commissioning assistance
Dec 2009 - Jan 2010
EPCM/SM and QA/QC Construction / Refurbishment Superintendent
Toka Tindung Nusaja Gold Project, North Sulawesi, Indonesia
 Assess status of established plant for refunding to complete project
 Inspect percentage of plant completed, ITPs and QA/QC documents, structural material
on and off site, and verified consumable required
 Refurbish sag and ball mills and associated equipment.
Henry Cieplucha - CV 7 / 11
Aug 2008 - May 2009
SM Construction Superintendent
Monadelphous - Boddington Copper/Gold Mine, Heap Leach Project,
Dry Processing Plant - Fines Circuit
 Management and coordination of 14 supervisors and 230 personnel
 Oversee structural installation of primary and secondary Norberg crushers, conveyors,
crushing circuits, gantry systems, Schenck screen house, twin deck vibrating screens,
conveyor shuttles, and apron feeders.
 Generate daily work schedules
 Allocate resources
 Conduct supervisor meetings
 Sign-off on critical equipment
 Implement OHS policies and procedures and ensured time lines were kept
Feb 2008 - Jun 2008
SMP Construction Superintendent
Aker Kvaerner / Solutions EPCM - BP Refinery, Bulwer Island
 Coordinate project activities relating to the turn-around of the RCU (residue cracking
unit) and the CDU1 (crude distillation unit) including re-work
 Install new pipe work, valves (RCU flue gas system), pumps, vessels, relieve valves,
new flare header, associated platforms, black oil slurry system replacement (process
piping and pump replacements in the RCU)
 Install new pump seal flush panels and pipe work in the RCU
 Coordinate cranes, scaffolding and other resources
 Generate and submit construction reports to BP, review work packs, sign-off and
witness hydro-tests for process piping and vessels, sign-off mechanical completion of
project related scope, sign and review construction contractor time sheets and
equipment usage, conduct meetings, monitor JHAs
Henry Cieplucha - CV 8 / 11
Jul 2007 - Nov 2007
EPCM SMP Construction Superintendent
Ausenco - Dolores Gold + Silver Heap Leach Project - Mexico
 Technical and QA/QC support for structural/mechanical works, field engineering, and
the Merril Crowe leaching process
 Resolve contractual problems
 Oversee pipe work installation from diesel storage tanks to plant generator day tanks,
fabrication and mechanical installation of mobile and fixed plant equipment including
ore stackers, fine circuit conveyors, product reclaimers and trippers/shuttles
 Install Nordberg C160 primary jaw crushers and Nordberg HP1000 secondary bowl
mantle/cone crushers
 Supervise construction screen house, dust suppression systems (bag house), Schenck
twin deck vibrating screens, overhead shuttle and shuttle drive
Jan 2007 - Jul 2007
EPCM SMP Supervisor
Aker Kvaerner / Solution - Lihir Gold Flotation Project, PNG
 Accelerate the project to return it to schedule
 Front line supervision to major SMP contractor on the oxygen plant and other sections
as per client request
 Mechanical checks, blow through and pre-commissioning of the L'Air Liquide 240 TPD
oxygen plant
 Correct fabrication and installation errors including turbine pipe stresses
 Supervise contractor quality and safety performance
 Monitor equipment and materials requirements
 Expedite critical parts and materials
 Pre-commission and hand-over to commissioning completed flotation cells, ball and sag
mill, thickener pre-oxidation tank and all associated pipe work.
Henry Cieplucha - CV 9 / 11
Aug 2005 - Dec 2006
EPCM SMP Superintendent
Multiplex Hatch JV - Yabulu Nickel Refinery Expansion
Project Capital Expenditure > 650m
 Plan work for contractors involved in erection of new electric furnace and 110x5.5m
diameter calciner kiln, construction of final nickel building, sinter and reduction furnace
 Construct dust suppression system, saw dust facility and installation of new fuel oil
delivery pipelines to calciner furnace, new pumps and pipe work to existing steam
plants powerhouse
 Coordinate and supervise civil contractor night shifts
 Supervise shut down and tie in of new fuel oil and steam line pipe work and connecting
the bypass sawdust facility to calciner operating plant
 Coordinate construction activity of calciner project to completion and final punch listing
 Coordinate construction and commissioning of a WWTP (sewage plant)
 Supervise and assist with utilities packages, ammonia plant, coolant towers, steam and
powerhouse, and piping
Jun 2005 - Aug 2005
Site Manager
Veolia Water Systems - Pt Kembla and Bellambi Sewage Treatment Plant Upgrade
Apr 2004 - May 2005
EPCM SMP Superintendent
Veolia Water Systems - Desalination Plant Upgrade
 Administer sub-contracts
 Identify safety and environmental training needs of site crew
 Inspect and verify sub-contractor works
 Investigate causes of accidents and dangerous events
 Coordinate hydro testing of pipe work
 Final site inspections
 Conduct safety and tool box talks, promote quality, environmental and safety
awareness
Henry Cieplucha - CV 10 / 11
Aug 2003 - Apr 2004
Site Construction and Mechanical Supervisor
WGE Constructions - BlueScope BOS Water Filtration and
Lime Slurry Pipe Line to Metserv Briquetting Plant
< 2003
Site Supervisor
Tolco Engineering and Construction
SMERP Sinter Machine Emission Reduction Project for SHI Japans Company
SMP Site Construction Supervisor
Manildra Group - Ethanol Plant
Maintenance Shift Supervisor
Port Kembla Copper
Shut Down Supervisor
Transfield Services - Caltex Refinery Kurnell and Shell Clyde Refinery Parramatta
Engineering Consultant - Site mechanical installation and commissioning
Jindal Strips Ltd, India
Specialist Gear Box Fitter Hands-onSupervisor
Falk Renew/Gear box refurbishment/assembling testing.
Maintenance Supervisor
BHP Stainless Steel, Port Kembla
Henry Cieplucha - CV 11 / 11
REFEREES
EPC First Solar Australia.
Michael Law Construction Manager
(M) 0417369921
First Solar Nyngan NSW
Moran Stark Construction Manager
(M) 0438 208 581
AMEC
Paul Hewitt: Project Director
(M) 0418902699
AMEC Mining & Metals
Rod France –
(M) 0419864156
Programmed Construction ( PCM)
Joe Kaitani - Construction Manager
(M) 0458332778 0409206304
Jason Miles: Project Delivery Manager.
Clough Brisbane.

More Related Content

What's hot

James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-Stevie Nimmo
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3Moayad Qblawi
 
Rowel Dagondon_Commissioning Engineer_C&A CSU
Rowel Dagondon_Commissioning Engineer_C&A CSURowel Dagondon_Commissioning Engineer_C&A CSU
Rowel Dagondon_Commissioning Engineer_C&A CSURowel Dagondon
 
My CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMohammed ali
 
Completion &amp; integrity engineer achievements
Completion &amp; integrity engineer achievementsCompletion &amp; integrity engineer achievements
Completion &amp; integrity engineer achievements
Joseph Bracic
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Snyder
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CVvaithiya nathan
 
Resume Apr 2015
Resume Apr 2015Resume Apr 2015
Resume Apr 2015Jim Reaves
 
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin Baldelovar
 
Ward, George Resume
Ward, George ResumeWard, George Resume
Ward, George ResumeGeorge Ward
 
R. Gene Farley Cv 2010.Doc
R. Gene Farley Cv  2010.DocR. Gene Farley Cv  2010.Doc
R. Gene Farley Cv 2010.Docgenefarley
 

What's hot (20)

OJB Resume 2016
OJB Resume 2016OJB Resume 2016
OJB Resume 2016
 
Poornesha Shetty-QA QC
Poornesha Shetty-QA QCPoornesha Shetty-QA QC
Poornesha Shetty-QA QC
 
cv 2016
cv 2016cv 2016
cv 2016
 
Resident Engineer
Resident EngineerResident Engineer
Resident Engineer
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
cv 2016
cv 2016cv 2016
cv 2016
 
Rowel Dagondon_Commissioning Engineer_C&A CSU
Rowel Dagondon_Commissioning Engineer_C&A CSURowel Dagondon_Commissioning Engineer_C&A CSU
Rowel Dagondon_Commissioning Engineer_C&A CSU
 
My CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhin
 
Completion &amp; integrity engineer achievements
Completion &amp; integrity engineer achievementsCompletion &amp; integrity engineer achievements
Completion &amp; integrity engineer achievements
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resume
 
NY_ CV
NY_ CVNY_ CV
NY_ CV
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
 
Resume2016
Resume2016Resume2016
Resume2016
 
Resume Apr 2015
Resume Apr 2015Resume Apr 2015
Resume Apr 2015
 
uanraju inst cv 9 sep 2015
uanraju inst cv 9 sep 2015uanraju inst cv 9 sep 2015
uanraju inst cv 9 sep 2015
 
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resume
 
Ward, George Resume
Ward, George ResumeWard, George Resume
Ward, George Resume
 
R. Gene Farley Cv 2010.Doc
R. Gene Farley Cv  2010.DocR. Gene Farley Cv  2010.Doc
R. Gene Farley Cv 2010.Doc
 

Viewers also liked

Mohamed Yasser Resume - 2016
Mohamed Yasser Resume - 2016Mohamed Yasser Resume - 2016
Mohamed Yasser Resume - 2016Mohamed Yasser
 
Abdoul_original (1).doc- upated May'16
Abdoul_original (1).doc- upated May'16Abdoul_original (1).doc- upated May'16
Abdoul_original (1).doc- upated May'16Abdoul Madjid
 
Summary Keith Wall
Summary Keith WallSummary Keith Wall
Summary Keith WallWall Keith
 
Kuljit Singh SuerindententCV.docx 12
Kuljit Singh SuerindententCV.docx 12Kuljit Singh SuerindententCV.docx 12
Kuljit Singh SuerindententCV.docx 12Kuljit Singh
 
Rick Resume No. 14
Rick Resume No. 14Rick Resume No. 14
Rick Resume No. 14Rick August
 
Rodrigo+Rodriguez+Cover+letter
Rodrigo+Rodriguez+Cover+letterRodrigo+Rodriguez+Cover+letter
Rodrigo+Rodriguez+Cover+letterRodrigo Rodriguez
 
Raju Tiwari-Resume-8+
Raju Tiwari-Resume-8+Raju Tiwari-Resume-8+
Raju Tiwari-Resume-8+Raju Tiwari
 
Vo Tu Duc visual resume
Vo Tu Duc visual resumeVo Tu Duc visual resume
Vo Tu Duc visual resume
VO Tu Duc
 
Ivon James Resume
Ivon James ResumeIvon James Resume
Ivon James ResumeIvon James
 
Willbros Reference Letter
Willbros Reference LetterWillbros Reference Letter
Willbros Reference LetterLorrie Scott
 
Peter Bradley Construction Resume.
Peter Bradley Construction Resume.Peter Bradley Construction Resume.
Peter Bradley Construction Resume.Peter Bradley
 
CV JOSE JOVE 11-2014
CV  JOSE JOVE 11-2014CV  JOSE JOVE 11-2014
CV JOSE JOVE 11-2014jose jove
 
resume_shailesh_ MS_cover letter
resume_shailesh_ MS_cover letterresume_shailesh_ MS_cover letter
resume_shailesh_ MS_cover letterShailesh Tripathi
 
Resume for John Wilson 2015
Resume for John Wilson 2015Resume for John Wilson 2015
Resume for John Wilson 2015John Wilson
 

Viewers also liked (20)

Mohamed Yasser Resume - 2016
Mohamed Yasser Resume - 2016Mohamed Yasser Resume - 2016
Mohamed Yasser Resume - 2016
 
Abdoul_original (1).doc- upated May'16
Abdoul_original (1).doc- upated May'16Abdoul_original (1).doc- upated May'16
Abdoul_original (1).doc- upated May'16
 
Summary Keith Wall
Summary Keith WallSummary Keith Wall
Summary Keith Wall
 
Kuljit Singh SuerindententCV.docx 12
Kuljit Singh SuerindententCV.docx 12Kuljit Singh SuerindententCV.docx 12
Kuljit Singh SuerindententCV.docx 12
 
Edward Murphy - CV
Edward Murphy -  CVEdward Murphy -  CV
Edward Murphy - CV
 
Rick Resume No. 14
Rick Resume No. 14Rick Resume No. 14
Rick Resume No. 14
 
Ss gr 6_teacher_notes_australia_final_8-1-09
Ss gr 6_teacher_notes_australia_final_8-1-09Ss gr 6_teacher_notes_australia_final_8-1-09
Ss gr 6_teacher_notes_australia_final_8-1-09
 
My Portfolio
My PortfolioMy Portfolio
My Portfolio
 
Rodrigo+Rodriguez+Cover+letter
Rodrigo+Rodriguez+Cover+letterRodrigo+Rodriguez+Cover+letter
Rodrigo+Rodriguez+Cover+letter
 
Raju Tiwari-Resume-8+
Raju Tiwari-Resume-8+Raju Tiwari-Resume-8+
Raju Tiwari-Resume-8+
 
Vo Tu Duc visual resume
Vo Tu Duc visual resumeVo Tu Duc visual resume
Vo Tu Duc visual resume
 
Ivon James Resume
Ivon James ResumeIvon James Resume
Ivon James Resume
 
Willbros Reference Letter
Willbros Reference LetterWillbros Reference Letter
Willbros Reference Letter
 
Peter Bradley Construction Resume.
Peter Bradley Construction Resume.Peter Bradley Construction Resume.
Peter Bradley Construction Resume.
 
Cover Letter
Cover LetterCover Letter
Cover Letter
 
Johnny Resume
Johnny  ResumeJohnny  Resume
Johnny Resume
 
CV JOSE JOVE 11-2014
CV  JOSE JOVE 11-2014CV  JOSE JOVE 11-2014
CV JOSE JOVE 11-2014
 
resume_shailesh_ MS_cover letter
resume_shailesh_ MS_cover letterresume_shailesh_ MS_cover letter
resume_shailesh_ MS_cover letter
 
AMC5477 AMC corporate profile 6pp_v3
AMC5477 AMC corporate profile 6pp_v3AMC5477 AMC corporate profile 6pp_v3
AMC5477 AMC corporate profile 6pp_v3
 
Resume for John Wilson 2015
Resume for John Wilson 2015Resume for John Wilson 2015
Resume for John Wilson 2015
 

Similar to Henrys Resume 2016 Q3

Zeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh
 
Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projectsweshumba
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateMohamed Zawam
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnesto Costorio
 
James Angus Resume 02 2017revised
James Angus Resume 02 2017revisedJames Angus Resume 02 2017revised
James Angus Resume 02 2017revisedJames Angus
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
MOHAMAD ANWAR MALIK
 
Giridhar
GiridharGiridhar
Giridhar
Giridhar C
 

Similar to Henrys Resume 2016 Q3 (20)

Zeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh 4 page CV
Zeonn Koh 4 page CV
 
Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projects
 
Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012
 
Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012
 
Salman Resume 2016
Salman Resume  2016Salman Resume  2016
Salman Resume 2016
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last update
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - Updated
 
CV J McGowan
CV J McGowanCV J McGowan
CV J McGowan
 
James Angus Resume 02 2017revised
James Angus Resume 02 2017revisedJames Angus Resume 02 2017revised
James Angus Resume 02 2017revised
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017
 
R Boswell C.V Gas 2014
R Boswell C.V Gas 2014R Boswell C.V Gas 2014
R Boswell C.V Gas 2014
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Geoffrey Rowling CV
Geoffrey Rowling CVGeoffrey Rowling CV
Geoffrey Rowling CV
 
Res414
Res414Res414
Res414
 
Zaheer-CV- 2015
Zaheer-CV- 2015Zaheer-CV- 2015
Zaheer-CV- 2015
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
Giridhar
GiridharGiridhar
Giridhar
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 

Henrys Resume 2016 Q3

  • 1. Henry Cieplucha - CV 1 / 11 RESUME HENRY CIEPLUCHA Contact details Email henrycieplucha@hotmail.com Mobile 0400 332 524 Home 02 4257 0881 SUMMARY OF PERSONAL SKILLS AND ATTRIBUTES  Highly qualified Construction Manager / SMP Superintendent with experience in the Mining, Oil and Gas, Wastewater, Solar and Heavy Industry  Vast construction experience on green field and brown field sites  Coordinating and supervising turnarounds/shutdowns  Able to work independently, and enjoy working as part of the team.  Demonstrated excellent leadership skills including supervising and motivating teams  First-class analytical and problem solving skills  Dedicated to setting and maintaining high standards for quality  Committed to high safety standards SUMMARY OF PLANT AND EQUIPMENT AND INDUSTRYEXPERTISE  Conveyor Systems, Crushing ball and sag circuits, gantry systems, twin vibrating screens and screen houses  Sewage / Desalination plants.  Wastewater, Reverse Osmosis, Desalination Plants  RCU residue cracking and CDU crude distillation units  Black oil slurry systems and leaching processes, lime slurry and water filtration systems  L'Air Liquide 240TPD oxygen plant  Electric and hydrogen furnaces, calciner kilns, Dust suppression systems  Ammonia plants, coolant towers  Sinter machine emission  Acid handling systems including hydrofluoric, nitric and sulphuric acid and pickling systems  Gear box maintenance supervisor Falk Renew.  Maintenance supervisor BHP stainless.
  • 2. Henry Cieplucha - CV 2 / 11 EMPLOYMENT HISTORY October 2013 – Jan 2015 EPC First Solar Australia. Construction Superintendent. 102MW power station - Nyngan 52MW power station - Broken Hill Project Capital Expenditure > 250million  Accountable for the Projects Health, Safety and Environmental policy’s  Adhere to Company Safety Standards and promote safety culture among the ranks through out the Company  Conduct short, regular meetings to discuss and record milestones, accomplishments, successes and challenges as they occur  Give employees feedback during one-on-one meetings and informally as regularly as possible.  Commend your employee in front of their peers  Responsible for Civil and Structural supervisor direct reports  Conduct daily safety tool box meetings and safety briefs with site contractors  Responsible for Civil infrastructure and access roads.  Responsible for site Project work installing posting, brackets (PV) Photovoltaic screens. Further leadership roles include, but not limited to the following:  Responsible for Civil and Structural & Mechanical project leaders  Responsible for Contracting and Sub Contracting workforce  Extensive knowledge of Civil / Structural Codes, Standards and Practices  Advanced knowledge in Mechanical and Pipework Codes, Standards and Practices
  • 3. Henry Cieplucha - CV 3 / 11 Jun 2012 - March 2013 EPCM (MEIC) AMEC Mining & Metals Construction Manager. NCA1 CIL Refurbishment Project Newcrest Gold Mine - Lihir Island PMG NCA1 CIL Tank Refurbishment project Project Capital Expenditure > 100 million  Accountable for the Projects Health, Safety and Environmental policy’s  Adhere to Company Safety Standards and promote safety culture among the ranks through out the Company  Manage and oversee the day-to-day construction management of the project  Prepares, supervises and approves the construction schedule and its implementation  Ensure Lessons Learned are properly documented through out the life of the project including Project Close-out  Manage the construction effort and be the construction representative of our company with Client.  Oversee the plan, develop and organise the construction effort to formulate the most cost-effective plan  Timely completion within budget and to implement the execution of that plan Construction activities during the project include, but limited to the following:  Supervise Dismantling 5 tanks pipe work superstructure and electrical.  Fabricated 3 new tanks, refurbished 2 tanks & commissioned 5 tanks  Oversee the installation and commissioning of Superstructures, electrical and IT systems  Responsible for 2 Structural 2 Civil and 2 Mechanical Superintendents / supervisor direct reports  Key accountability for Papua Natives during project  Accountable for the dismantling of 5 tanks pipe work superstructure and electrical instrumentation.  Oversee the fabrication of 3 new tanks refurbishments, 2 tanks commissioned & 5 tanks new pipe / spool fit out and installation  Responsible for all project Superstructures, electrical and IT installations.
  • 4. Henry Cieplucha - CV 4 / 11 June 2011 - May 2012 SMP Construction Superintendent / Acting Construction Manager. Programmed Construction & Maintenance – Sino Iron Karratha. Programmed Construction & Maintenance – Karara KML Geraldton. Project Capital Expenditure > 50million  Accountable for the Projects Health, Safety and Environmental policy’s  Adhere to Company Safety Standards and promote safety culture among the ranks through out the Company  Monitor and report to Project Manager / Sr Construction Manager of project details, including progress, risks and opportunities in a timely manner. • Ensure all changes to specifications, work scope and drawings are documented • Clearly outline roles & responsibilities to deliver requirements in terms of both scope and schedule to all the team members. • Review man-hours and duration forecasts to completion for onshore construction and man-hours, duration and manning forecasts • Monitor construction productivity and schedule performance and investigate reasons for less than satisfactory performance  Provide recommendations and institute measures for improvement by modification to operating procedures/work instructions. • Responsible for 3 Structural & 2 Mechanical Superintendents • Manager of 250 Contracting and Sub Contracting workforce • Extensive knowledge of Civil / Structural Codes, Standards and Practices • Advanced knowledge in Mechanical / Pipework Codes, Standards and Practices The following activities were carried out on the project, but not limited to the following: Installation of the following equipment and systems  Conveyor systems including, gravity take up towers, transfer chutes, pulleys and conveyor tracking systems • Polysius ball mills • HP800 Secondary crushers • Schenck Twin Deck Vibrating Screens • Gyratory NT- 60 x 80 crusher • Gyratory KB- 63 x 89 crusher • Concentrate Thickeners • Conveyor Shuttle and Tripper systems
  • 5. Henry Cieplucha - CV 5 / 11 Jan 2011 - June 2011 SMP Construction Supervisor / Acting Construction Manager Proteus Engineers EPCM Engineers - FMG Cloudbreak Project Capital Expenditure >10million  Accountable for the Projects Health, Safety and Environmental policy’s  Adhere to Company Safety Standards and promote safety culture among the ranks through out the Company  Manage and oversee the day-to-day construction management of the project  Responsible for implementation of the scope of work as related to construction/ fabrication, pre-commissioning activities  Ensures all changes to specifications, work scope and drawings are documented  Installation of Conveyor systems including, gravity take up towers, transfer chutes, pulleys and conveyor tracking systems • Removal of redundant HPGR roll press RPRS 15.0 – 140/160, hydraulic lubrication cooling and structural equipment • Installation of new High Pressure Grinding Rolls “HPGR” RP-S 13-170/140B roll press including QA/QC inspection and sign-off on ITPs upon completion • Pre-commission and commission of new High Pressure Grinding Rolls “HPGR” unit and associated plant/equipment including hydraulic lubrication gear box oil and chilled- water-cooling system Jul 2010 - Oct 2010 SMP Construction Superintendent Sino Iron Project Cape Preston Project Capital Expenditure > 5million  Accountable for the Projects Health, Safety and Environmental policy’s  Adhere to Company Safety Standards and promote safety culture among the ranks through out the Company  Installation of pre-fabricated (China/India) modular desalination unit  Mobilisation of personal and equipment to site, preparation of work packs  NOTE: Letter of interest (LOI) not signed on due date, safety issues claims not met by client, project stopped, equipment and crew demobilized from site
  • 6. Henry Cieplucha - CV 6 / 11 May 2010 Mechanical Shutdown Supervisor - Rigging/Cranage UGL - RPG5 Port Hedland • Demonstrated excellent leadership skills including supervising and motivating teams • Give employees feedback during one-on-one meetings and informally as regularly as possible. • Commend your employee in front of their peers • Oversee the Installation of conveyor systems, gantries, shuttle and structural steel/modules • Coordination of cranes • Regularly check in with employees on their progress on goals; offer coaching or assistance, or revise goals as necessary • Lead shutdown Pre-start and safety restart meetings • Liaise with Senior management and Planning and Engineering teams for shutdown schedule progress updates Feb 2010 - Apr 2010 EPCM/SMP and QA/QC Supervisor Bovis Lend Lease, Mulwala Re-development Project - Munitions Plant  Propellant manufacture, chemical storage tanks, mixes, transfer conveyors and associated pipe work, propellant finishing, extrusion press product-cutters, hydraulic systems, including process ITPs, NCRs,  Hydro-testing inspection and commissioning assistance Dec 2009 - Jan 2010 EPCM/SM and QA/QC Construction / Refurbishment Superintendent Toka Tindung Nusaja Gold Project, North Sulawesi, Indonesia  Assess status of established plant for refunding to complete project  Inspect percentage of plant completed, ITPs and QA/QC documents, structural material on and off site, and verified consumable required  Refurbish sag and ball mills and associated equipment.
  • 7. Henry Cieplucha - CV 7 / 11 Aug 2008 - May 2009 SM Construction Superintendent Monadelphous - Boddington Copper/Gold Mine, Heap Leach Project, Dry Processing Plant - Fines Circuit  Management and coordination of 14 supervisors and 230 personnel  Oversee structural installation of primary and secondary Norberg crushers, conveyors, crushing circuits, gantry systems, Schenck screen house, twin deck vibrating screens, conveyor shuttles, and apron feeders.  Generate daily work schedules  Allocate resources  Conduct supervisor meetings  Sign-off on critical equipment  Implement OHS policies and procedures and ensured time lines were kept Feb 2008 - Jun 2008 SMP Construction Superintendent Aker Kvaerner / Solutions EPCM - BP Refinery, Bulwer Island  Coordinate project activities relating to the turn-around of the RCU (residue cracking unit) and the CDU1 (crude distillation unit) including re-work  Install new pipe work, valves (RCU flue gas system), pumps, vessels, relieve valves, new flare header, associated platforms, black oil slurry system replacement (process piping and pump replacements in the RCU)  Install new pump seal flush panels and pipe work in the RCU  Coordinate cranes, scaffolding and other resources  Generate and submit construction reports to BP, review work packs, sign-off and witness hydro-tests for process piping and vessels, sign-off mechanical completion of project related scope, sign and review construction contractor time sheets and equipment usage, conduct meetings, monitor JHAs
  • 8. Henry Cieplucha - CV 8 / 11 Jul 2007 - Nov 2007 EPCM SMP Construction Superintendent Ausenco - Dolores Gold + Silver Heap Leach Project - Mexico  Technical and QA/QC support for structural/mechanical works, field engineering, and the Merril Crowe leaching process  Resolve contractual problems  Oversee pipe work installation from diesel storage tanks to plant generator day tanks, fabrication and mechanical installation of mobile and fixed plant equipment including ore stackers, fine circuit conveyors, product reclaimers and trippers/shuttles  Install Nordberg C160 primary jaw crushers and Nordberg HP1000 secondary bowl mantle/cone crushers  Supervise construction screen house, dust suppression systems (bag house), Schenck twin deck vibrating screens, overhead shuttle and shuttle drive Jan 2007 - Jul 2007 EPCM SMP Supervisor Aker Kvaerner / Solution - Lihir Gold Flotation Project, PNG  Accelerate the project to return it to schedule  Front line supervision to major SMP contractor on the oxygen plant and other sections as per client request  Mechanical checks, blow through and pre-commissioning of the L'Air Liquide 240 TPD oxygen plant  Correct fabrication and installation errors including turbine pipe stresses  Supervise contractor quality and safety performance  Monitor equipment and materials requirements  Expedite critical parts and materials  Pre-commission and hand-over to commissioning completed flotation cells, ball and sag mill, thickener pre-oxidation tank and all associated pipe work.
  • 9. Henry Cieplucha - CV 9 / 11 Aug 2005 - Dec 2006 EPCM SMP Superintendent Multiplex Hatch JV - Yabulu Nickel Refinery Expansion Project Capital Expenditure > 650m  Plan work for contractors involved in erection of new electric furnace and 110x5.5m diameter calciner kiln, construction of final nickel building, sinter and reduction furnace  Construct dust suppression system, saw dust facility and installation of new fuel oil delivery pipelines to calciner furnace, new pumps and pipe work to existing steam plants powerhouse  Coordinate and supervise civil contractor night shifts  Supervise shut down and tie in of new fuel oil and steam line pipe work and connecting the bypass sawdust facility to calciner operating plant  Coordinate construction activity of calciner project to completion and final punch listing  Coordinate construction and commissioning of a WWTP (sewage plant)  Supervise and assist with utilities packages, ammonia plant, coolant towers, steam and powerhouse, and piping Jun 2005 - Aug 2005 Site Manager Veolia Water Systems - Pt Kembla and Bellambi Sewage Treatment Plant Upgrade Apr 2004 - May 2005 EPCM SMP Superintendent Veolia Water Systems - Desalination Plant Upgrade  Administer sub-contracts  Identify safety and environmental training needs of site crew  Inspect and verify sub-contractor works  Investigate causes of accidents and dangerous events  Coordinate hydro testing of pipe work  Final site inspections  Conduct safety and tool box talks, promote quality, environmental and safety awareness
  • 10. Henry Cieplucha - CV 10 / 11 Aug 2003 - Apr 2004 Site Construction and Mechanical Supervisor WGE Constructions - BlueScope BOS Water Filtration and Lime Slurry Pipe Line to Metserv Briquetting Plant < 2003 Site Supervisor Tolco Engineering and Construction SMERP Sinter Machine Emission Reduction Project for SHI Japans Company SMP Site Construction Supervisor Manildra Group - Ethanol Plant Maintenance Shift Supervisor Port Kembla Copper Shut Down Supervisor Transfield Services - Caltex Refinery Kurnell and Shell Clyde Refinery Parramatta Engineering Consultant - Site mechanical installation and commissioning Jindal Strips Ltd, India Specialist Gear Box Fitter Hands-onSupervisor Falk Renew/Gear box refurbishment/assembling testing. Maintenance Supervisor BHP Stainless Steel, Port Kembla
  • 11. Henry Cieplucha - CV 11 / 11 REFEREES EPC First Solar Australia. Michael Law Construction Manager (M) 0417369921 First Solar Nyngan NSW Moran Stark Construction Manager (M) 0438 208 581 AMEC Paul Hewitt: Project Director (M) 0418902699 AMEC Mining & Metals Rod France – (M) 0419864156 Programmed Construction ( PCM) Joe Kaitani - Construction Manager (M) 0458332778 0409206304 Jason Miles: Project Delivery Manager. Clough Brisbane.