QUALIFICATIONS:
SJIB Graded Electrical Technician
SJIB Graded Electrical Fitter
SJIB Graded Installation Electrician
SJIB Graded Electrical Winder
SJIB Graded Instrument Mechanic
City & Guilds in Electrical installation
City & Guilds in Electronics
City & Guilds in Communication
Craftsman Certificate
Achievement Measurement Certificate
SQA Tailored Award Design, Engineer & Verification of Electrical Installations
City & Guilds Certificate in Requirements for Electrical Installations 17th
Edition
SQA Customised Award in Requirements for Electrical installations (BS 7671), 2015
Comp-Ex Certificate of Core Competence for Explosive Atmospheres. (Hazardous Areas)
Recipient / Issuer Oil Refinery Permit Course (3 day Course –Conoco Phillips International Oil Refinery Registered)
Certificate of Appointment as Qualified Senior Authorized person (SAP) - Isolation Authority
Highway Electrical Qualified Supervisor Certificate for Highway Agency
BSB40807 Certificate IV in frontline Management
HM26 Managing Fatal Risks
HM01: Hazard & Risk Management
PTW02: Permit to Work for Work Team Leader
PTW01: Permit to Work for Permit User
MSR / IOSH Managers Safety Certificate’s
ECITB National Safety Passport No. 627862
MCSA – Managing confined space Award
ECS Health and Safety Course 2015
HSE Leadership Module 0, 1 & 2 No. 96467
Land Access & Land Owner Relations Course
Environmental Management Awareness
First Aid at work Certificate St Johns Ambulance
Security Clearance under Disclosure Scotland (Defense & Nuclear)
Australian Mine health Surveillance No. 440347 Expiry 11/11/2016
Apply First Aid (Senior First Aid) Certificate St John Ambulance
White Card.
Operate Elevating Work Platform + VOC Statement of Attainment
Work safely at heights + VOC Statement of Attainment
Operate Commercial Vehicle Statement of Attainment
Operate Light Vehicle in hazardous areas Statement of Attainment
Operate & Maintain 4WD RIIVEH305D no. CID0056569
License to perform High Risk Work. Class WP License No WL3312219 Expiry 25/01/2018
Western Australian Full ‘C’ Class Manual Drivers license 6488918
National Police Certificate X0116427
PROFILE:
A highly experienced E & I Senior Superintendent with extensive contractor administration & Construction Management
experience, who enjoys a challenging role, with good management, organization, leadership skills, and a comprehensive &
extensive knowledge of other disciplines, in particular Instrumentation, Instrument Piping, SMP and Civil Works.
Proven record of delivering projects from design to commissioning. Meeting milestone targets of quality workmanship within
budgetary objectives, in a safety conscience environment.
Comfortable reviewing the planning and design of the project in order to identify any scheduling, design, construction & HSE
conflicts and correcting them before significant delays and cost overruns occur as well as ensuring the technical specifications of
the project are met.
Page No: 1
Stevie Nimmo
Experienced in Design, Electrical Construction, Cabling Projects, Shut downs & Tie in’s, SMP construction, Civil works,
Underground Services, Instrumentation & Pipework, and Commissioning, throughout the Oil & Gas, Power & Utilities,
Pharmaceuticals, Petrochemical, Defense and Shipbuilding, Highway Agency’s and Nuclear Industries.
Experienced contractors manager directing various contract companies involved in the construction industry, E.g. Principle
contractors & Lower tier subcontractors, Cable Installation, HV Jointers, H.A Inspectors, Instrument tech, Piping, Civil engineering
works, surveys etc…
Personally dedicated to delivering a professional, proactive approach to HSE commitments. Comfortable implementing safety
initiatives and educating all operatives to the appropriate training to ensure a safe environment is maintained in all aspects of the
workplace.
RESPONSIBILITIES:
Responsible for the management of field construction / completions & commissioning operations. To ensure all
contractual deliverable are provided on time.
Reporting to the Project Manager; assist, inspect & Monitor activities of contractors / Sub-contractors / Supervisors & Site
Engineers to ensure compliance with specifications and schedules.
Prepare design constructability reports.
Review drawings / document and identify design faults, over runs, HSE concerns etc…
Provide engineering / technical advice to on-site engineers, supervisors and other project staff involved in the execution of works.
Review specifications and datasheets for supply, installation, testing & commissioning of equipment.
Review & approve all design changes prior to implementation and provide technical direction.
Evaluate & Authorize all change Order requests / contract amendments / out-of-scope work & variation requests for contractors
and provide advice and input into the negotiation or resolution of claims with contractors where required.
Ensure all Hazardous Area equipment is installed to spec compiling fully with safety systems & legislation.
Design steelwork & containment routes for cables, transits frame loading, equipment layouts, Earthing philosophies, lighting
design for process units, heat tracing circuits, Civil Duct routes, priority & practical cable installations, unit & equipment logistics
e.g. analyzer House etc..
Co-ordinate all underground services & trench work including pipework, ducting, cabling, and sanding interfacing with all involved
trades.
Electrical troubleshooting
Review of subcontractor packages, scopes, procurement schedules
Report on progress, schedule, conformances, non-conformances, HSSE and prepare and distribute periodic subcontractor
evaluation and performance reports as required.
Co-ordinate activities with other disciplines or areas.
Write Method Statements & Risk Assessments and review; amend against current site conditions.…
Authorizing permits to work, limitation of access etc… Isolation Authority
Monitor progress against work schedules to identify any issues or conflicts on the project.
Control and update the schedule database based on contractors Installation.
Compile punch lists and oversee the completions of works. Identify & authorize the priority of Sub-systems. Sign off on Systems
and Subsystems walk downs.
Prepare material requisitions for the purchase of equipment based on take offs of drawings & specifications or to site
requirements with attention for lead times
Review & respond to technical Queries issued by contactors.
Process field change documents for changes to design documentation.
Determine Work force requirements.
Monitor work activities and ensure quality of work performed.
Attend various meetings, such as daily pre-starts (Chair), co-ordination Meetings, SIMOPS meetings, Weekly Planning &
Progress meetings, Weekly NCR meetings, Weekly Internal Supervisor & staff meetings, HAZOP /CRAW workshops, Weekly
contactor meetings & monthly commercial meetings etc…
Prepare reports on construction progress & workforce forecasts
CAREER SUMMARY:
APLNG Project Phase 1 assets that will feed the Western HPGN include new Spring Gully Pipeline Compression Facility
(SGPCF). The SGPCF will be connected to the Fairview to Spring Gully Pipeline and to the APLNG HPGN via the Spring Gully to
Taloona Pipeline.
Work Scope – The SGPCF will consist of; Two Gas Compression Trains –Each of the Gas Compression Trains will comprise the
following components: Inlet filter coalescers. Gas Turbine Driven Compressors a Taurus 60 Turbine and C33 compressor.
Compressor after coolers. Compressor lube oil coolers. Dry gas seal system. Cold vent. Compressor Buildings. Metering and
Flow Control and a Seal gas conditioning system.
Page No: 2
April 2014 – Origin Energy
Current Origin Energy – Spring Gully Pipeline Compressor Facility – QLD FIFO – Oil & Gas
Site E & I Superintendent - Client rep
Stevie Nimmo
• Work with Principal contractors to aid & assist, inspect, & monitor activities to ensure compliance with specifications and
schedules. Authorisation, supervision and inspection of works include construction, commissioning & completions to
ensure an efficient, on schedule hand over to operations;
• Underground Services, - Power, Telecommunications & Earthing – Survey & Set out, installation of bedding; Backfill and
compaction of excavation, installation of services marker tape/wire and location directional markers, installation of
conduits (e.g. for electrical, communications, data, security, fire detection, instrumentation) and installation of earthing
cables and associated pits and covers.
• Installation of the entire above and below-ground earthing system. This includes, trenching, boring of holes, earth
electrodes, underground cad welds, earthing pits, inspection covers, soil earth bars, any conduits, cable route markers,
equipment labelling, to provide a complete earthing system following installation specifications. Witness of the testing of
the completed installation.
• Installation of all cables as per the electrical / instrument and systems cable schedule; including the Installation of all
ladder/trays, ducts, cable support systems and cable protection required. Including the Gland, terminate & Test all cables
installed.
• Installation of all lighting and power installations, including area lighting, street lighting, lighting and power inside the
workshop and the lube oil transfer area
• The Off-loading and installing of prefabricated Control Room, Switch room and Local Equipment Room
• Installing of all local control stations (LCS), light fixtures, emergency stop push buttons, junction boxes, field isolators and
other site equipment
• Installation of all heat tracing for the black start fuel gas line
• Routing of Cable support systems within the Compressor buildings and along the after coolers
• Installation and termination off all instruments and devices as per Instrument Index
• Position and instillation of the Video Surveillance System (VSS) equipment including the cameras listed in the Balance of
Plant Equipment List and Facility Security System (FSS)
• Equipotential bonding system of instruments and assets
• Installation of the access control system at access gates/switch rooms.
• Ensuring that all Hazardous area work is completed and certified for use in the particular classified area Build of the;
Hazardous Area Dossier containing relevant design information and certificates of conformity for all equipment.
• Sign off All FIC’s & HACS. FIC’s are used to verify correct installation and completion of all tagged items installed as part
of the project. HACS are detailed documents which record compliance with Australian Hazardous Area standards.
Australia Pacific LNG Pty Ltd (APLNG), a combined venture between Origin Energy, ConocoPhillips and Sinopec, to supply coal
seam gas (CSG) from the central Queensland area to a Liquefied Natural Gas (LNG) facility, located on Curtis Island in the Port
of Gladstone. Origin will construct and operate the upstream facilities
Work Scope - A Shutdown in order to upgrade of the Talinga Metering Station (TMS) - Monitor the activities and work
sequences of Principal contractors to ensure compliance with specifications and schedules and confirm construction
progress quantities submitted by subcontractors.
• Work with Principal contractors to ensure all relevant inspections, testing and quality documentation is completed for
system handover.
• Review and approve Principal contractor inspection and test plans for construction activities and perform necessary
inspections for hold points of construction activities.
• Assist in the build of the Principal contractor Hazardous Area Dossier.
• Attend construction meetings with Principal contractors to complete field designs and sketches to assist subcontractors
with construction activities.
• Review, respond and process Principal Contractor requests for information.
• Process field change documents for changes to design documentation and provide technical direction to instrumentation
and electrical technicians.
• Responsible for;
• electrical project costs and schedules
• inspection management system records and procedures
Page No: 3
April 2014 – Origin Energy
Current SHUT-DOWN Origin Energy – Talinga Metering Station – QLD FIFO – Oil & Gas
Site E & I Superintendent - Client rep
December 2013 – Leightons
April 2014 Chevron – Gorgon LNG Project – WA FIFO – Oil & Gas
E & I Supervisor
Stevie Nimmo
The Gorgon LNG Project involves the construction of a 15 million tonne per annum LNG plant on Barrow Island, and a
domestic gas plant with the capacity to provide 300 terajoules supply per day
Work Scope: Installation of all underground L.V and instrumentation cables associated with three L.N.G. trains, the jetty, the
underground H.V power infrastructure cabling to all substations from the project main power station and project wide fiber optic,
control and telecommunication systems.
• Directing large work force in cable installation
• Co-ordination of civil and electrical works
• Logistical issues with work face areas/locations within a large project
• Work with site engineers and client to resolve T.Q and daily construction issues
• Organization of site surveys, reports and Q.A inspections to allow the progress of trench backfills
• Assist in planning and execution of upcoming works as required for a productive and efficient completion.
The Gorgon LNG Project involves the construction of a 15 million tonne per annum LNG plant on Barrow Island, and a
domestic gas plant with the capacity to provide 300 terajoules supply per day
Work Scope: Works comprise construction of the on-site utilities infrastructure, including a new desalination plant, relocation of an
existing water treatment facility, new waste water treatment plant, new diesel power station and associated utility corridor and
connections. Involving; Permanent Waste Water Treatment Plant combined with associated equipment (tanks, pumps etc.)
Bridging Water Treatment Plant at the General Utilities Area (The existing facility is to be relocated from Town Point to the
General Utilities Area). Permanent Water Treatment Plant combined with associated equipment (tanks, pumps etc.). Temporary
Power Station combined with associated equipment (fuel conditioning, transformers etc.). Permanent Diesel Storage Facility
combined with associated equipment (dispensing bowsers, refueling area etc.). Temporary Diesel Storage Facility installed as an
adjunct to the above. Central Water Disposal Facility including Water Disposal Pumps and Disposal Water Tanks. Other
infrastructure including permanent electrical distribution (transformers, LV & MV cable, small power and area lighting etc.),
permanent buildings (FER, Substations) and temporary instrument air package. Utilities Corridor from the General Utilities Area to
the Construction Village, and. Waste Water Injection pipeline from General Utilities Area to the WA Oil PWD Facility.
• Directing 80 electricians, 23 TA’s, 6 Supervisors, 4 engineers, 2 Inst Pipefitters, 3 Boilers & 20 Civils
• Working on Cable installation / Glanding, terminating & testing / Electrical equipment installation / underground trench
work / Design for tray work and unistrut.
• Directing engineers on Design / constructability conflicts – Submitting TQ’s
• Subcontract Administrator for HV Jointers
• Structural & Mechanical coordinator
• Co-coordinating Scaffolds across all trades
• Procurement & logistics – Due to the challenges of working on a Class A nature reserve on an Island, attention to lead
times and correct quantities of Materials are vital to completing the project on schedule.
• Attend daily meetings with KGV & Chevron to discuss / determine progress & priorities.
• Attend Health & Safety Site inspections – Walk around with KGV & Chevron
• Attend Environmental Site Inspections - Walk around with KGV & Chevron
The Solomon Expansion Project to increase iron ore exports by Fortescue by 180%
Work Scope: The engineering design, supply, fabrication, procurement, construction and commissioning of the three Sizer
Hubs at the Fortescue Metals Group's Solomon Project. Including; Doubled sided ROM Bin, Concrete buttress and
reinforced earth wall, Apron feeder, Primary Sizer, Primary conveying system (Incl, weight meter, Tramp magnet and belt
splicing station), Firetail, The Secondary sizer and structure, Control building, switch rooms and associated process
infrastructure works. Electrical works including transformers and instrumentation works and Commissioning of 3 x sizer
hubs.
Page No: 4
October 2011 – DOWNER ENGINEERING
March 2012 BHP - Worsley Efficiency & Growth Expansion – Collie WA – Aluminum
Refinery
Electrical & Instrumentation Senior Superintendent
May 2012 – CIMECO
October Fortescue Metals Group – Solomon Expansion Project – WA FIFO – Mining
Site Senior Supervisor
October 2012 – Laing O’Rourke
October 2013 Chevron – Gorgon LNG Project – WA FIFO – Oil & Gas
Site E & I Superintendent
Stevie Nimmo
The Efficiency and Growth Expansion Project will increase Worley’s annual alumina production capacity from 3.5 to 4.6 million tonnes.
Work Scope: Upgrade & refurbishment on Live Aluminum Plant, Electrical, Instrumentation & Mechanical pipework package.
• Initially employed as a Superintendent & promoted to a Senior Superintendent after the Construction Manager was
transferred off the project.
• Directing 150 electricians, TA’s, Laborers & Apprentices & 8 Supervisors (running day/night shifts)
• Power & Control cabling, Glanding, Terminiating, Testing from new & existing EDC Substations
• Priority cabling for commissioning subsystems packages
• Attend daily meetings with Bechtel & BHP to discuss / determine progress & priorities.
• Liaise with other trades & contractors to ensure a smooth & efficient work plans.
• Oversee Safety initiative program.
• Direct punch list precedence
• Prepare progress reports & labour forecasts.
• Review design changes & new scope of work packages.
• Prepare electrical work scope procedures for planned shutdown maintenance.
New Low Level Waste Repository.
Work Scope: Procure, supply, install, test & Commission all electrical & Instrument Installation Works; including LV cabling, LV
Distribution Boards, Junction boxes, control stations, Lighting and Small Power including Emergency Lighting, Fire Alarms, CCTV
system, Data system, Access system, PA system, Lightning Protection, Earthing (above & underground) and bonding, Collection
of free issue pre-calibrated Instruments, Installation of free issue field instruments and junction boxes, Pneumatic piping and
tubing.
• Design & Supervising cable installation, contractors and systematizing all cabling and routing currently standing at 1216
cables.
• Co-ordinating the above work scope for the completion of a scheduled systems handover.
The largest UK road tunnel consisting of twin bore Dual carriageway tunnels 1.8km in length.
Work Scope: Ventilation, Fire Systems, electrical distribution & fully integrated traffic management system. CCTV, Lighting,
Communications, Radio & PA Systems.
• As Balfour Beatty is the duty holder for electrical systems on the project I was due to my qualifications the Senior
Authorized person (SAP) on the project for Electrical, Mechanical and Civils through to commissioning. Managing the
permit office and authorizing permits to work, limitation of access etc…
• Administrating and liaisoning with our contractors (Lochwynd) who are responsible for the traffic inductive loop
installation, traffic signal installation work and related civil engineering works. Ensuring that all works are completed on
schedule to the strict requirements of the highways Agency.
• Assisting the cable engineer with the installation of 6000 cables approx 420,000 meters of HV, LV Power and control
cables.
Page No: 5
September 2010 – BALFOUR BEATTY ENGINEERING SERVICES - FIFO
May 2011 A3 Hindhead Road Tunnel - London – Infrastructure
Permit to Work senior authorized Person (SAP)
May 2010 – BALFOUR BEATTY ENGINEERING SERVICES
September 2010 Urenco-Tails Management Facility Project - Capenhurst – Nuclear
Construction Manger
May 2011 – BALFOUR BEATTY ENGINEERING SERVICES
October 2011 Magnox- Hunterston A Power Station - Ayreshire – Nuclear
Cable Engineer / Sub-Contractors Administrator
Stevie Nimmo
A new Tails Management Facility to allow the client Urenco to deconvert the depleted uranium hexafluoride, known as Tails, back
to the naturally occurring form of uranium oxide. Consisting of 11 new builds.
Work Scope: The construction of a new 11kv infrastructure for the site and the full C, E & I Installation within each of the process
buildings, including building services, radiological protection, gas protection, access control, fire detections and CCTV.
• Reviewing Design drawings, related vendor drawings and installation specifications and instructions. Preparation of
material purchase requisitions including estimating quantities and material takeoffs. Prepare projections and schedules
for workforce, material and equipment requirements. Procurement of materials for the enabling works contract of the
Office and work shop refurbishment consisting of lighting / small power / Fire alarms / Data Equipment and Initially due to
start 4th Quarter 2010. Prepare cost estimates and review project design and engineering and surveying cable design
requirements for the main build consisting of 11 new building and storage facilities scheduled to start 2nd Quarter 2011.
Due to a major redesign of the Tails Management Facility, this project was placed under a
minimum 6 month construction hold.
The Installation of a new Hydrotreater Plant to reduce the sulphur, nitrogen and aromatic hydrocarbons to acceptable levels to
allow subsequent processing of the gas oil in a conventional refinery catalytic cracker or hydrocracker.
Work Scope: To provide the full electrical and instrument package required. Including transformer substation equipment and
Analyzer House for both OSBL & ISBL work scope.
• This new processing plant was built on a live refinery and consisted of extremely complex cabling installation in and
around the process plant. It was a heavily interfaced dependent project which required significant detailed planning
design input and extensive coordination with other contractors working on site and safety planning. .
• Initially engaged as the Project engineer responsible for the installation and termination of all HV / Power / Control /
Instrument cables (10585 cables measuring approx 400000 meters) Administrating the following contractor workforce;
contractor cable crew, contracted HV jointers and contracted underground earthing operatives.
• Design tray work and cable routes, co-ordinate with other trades for underground cable routing and installation and
prepare transit drawings
• Planned and co-ordinate installation works of transformers, transformer install and build, HV cable terminations and test.
11KV and 415KV switchboard installation, DCS panel installation and cable installation.
• Monitoring activities of all contractors to ensure compliance with drawings and specification.
• I worked to develop the operational objectives for the project. Prepare the specification of requirements and develop a
detailed schedule of works. Identify perceived risks and evaluate options for their control.
• Interpret design engineering drawings and prepare construction work packs for the use of supervisors including
preparing ‘as built’ drawings
• Monitor installation of materials and equipment to assure conformance with drawings and specification.
• Complying with regulatory and client requirements I co-ordinated, monitored and controlled the project schedules to
ensure the quality of the implementation of the project and to achieve target commissioning / completion dates within
budget objectives
• I am very proud to say that during my time as construction manager we completed the project with a zero harm policy,
initiated several safety training courses and with a work force which peaked at 18 supervisors and 220 operatives we
had no reportable accidents on site.
Construction of a low density polyethylene Plant (LDPE) processing approx 400,000 tonnes per year.
Work Scope: Supply and installation of electrical, control and instrumentation systems.
• Employed as the cable engineer responsible for the installation and termination of all HV / Power / Control / Instrument
cables including procurement and control over contractor installation with a contractor cable crew and additional direct
hire operatives to install steel work in advance.
• Monitoring activities of all contractors to ensure compliance with drawings and specification.
Page No: 6
June 2008 – BALFOUR BEATTY ENGINEERING SERVICES (Balfour Kilpatrick)
May 2010 Total- LOR HDS 3 Project ISBL & OSBL - Immingham – Oil & Gas
Construction Manager / Electrical & Instrumentation Project Engineer
June 2007 – BALFOUR BEATTY ENGINEERING SERVICES (Balfour Kilpatrick)
June 2008 Sabic - LDPE Project – Redcar – Petrochemical Plant
Electrical & Instrumentation Field Engineer- Superintendent / Sub-contracts Administrator
Stevie Nimmo
• Ensuring Installation programmes were met and liaised with the client on technical review of the design and its
successful implementation.
New Build LNG terminal consisting of jetty, storage tanks & regasification facilities. With the capacity to receive & unload up to
217,000 cubic meter capacity carriers in approximately 24 hours and a maximum gas send out rate to the NTS of 1,200,000
standard cubic metres per hour
Work Scope: Supply and installation of electrical distribution, instrumentation and control systems, lighting and small power, fire
and gas detection and alarms, trace heating, earthing and all containment.
• Responsible for the Cabling installation of some 8000 cables approx 600,000 meters for Fire & Gas, Instrumentation,
Control and Power Systems.
• Directly managing a diverse workforce of contractors, & direct hire electricians, apprentices and laborers to install
bracket supports and cable containment, route and install cables and gland, terminate and test all cables.
• I also coordinated the H.A Inspectors assigned.
Ines Chlor Boiler Plant.
Work Scope: Includes the installation of electrical switchgear & equipment and installation of instrumentation and electrical
systems associated with three boiler units and a water treatment plant. Much of the work undertaken was in a live chemical
operational environment and required hazardous area equipment installation.
• Directly responsible for contracted operatives to install, test and gland HV cables. Direct hire electricians to install cable
containment, gland and terminate LV and instrument cables and a further testing and inspecting squad for completions.
New Reformer and Heat Exchanger.
Work Scope: Includes the installation of all control and instrumentation systems, the entire electrical system installation (including
Substation) and the system commissioning and energisation. The control system included over 750 loops. Additional works
included the strip down and reinstallation of instrumentation systems on two air compressors.
• On this project I had the below workforce;
• Cabling contractors
• Testing Squad
• Civil contractors
• H.A Inspection contractors
760MW CHP plant, with two large scale refineries utilizing the steam output.
Work Scope: Included the installation of electrical, instrumentation, communications, Street Lighting, security, fire and gas, and
trace heating systems. Design and installation of HVAC systems. Major equipment, transformers, insulated phase bus duct and
associated structural steel installation.
Page No: 7
August 2006 – BALFOUR BEATTY ENGINEERING SERVICES (Balfour Kilpatrick)
June 2007 British Gas- Dragon L.N.G Import Project – Milford Haven – Oil & Gas
Electrical & Instrumentation Field Engineer- / Sub-contracts Administrator
January 2005 – BALFOUR BEATTY ENGINEERING SERVICES (Balfour Kilpatrick)
August 2006 Ines Chlor Boiler Plant – Runcorn, – Power Plant
Electrical & Instrumentation Supervisor
February 2004 – BALFOUR BEATTY ENGINEERING SERVICES (Balfour Kilpatrick)
December 2004 Conoco Phillips - No 3 Reformer Project – Immingham – Oil & Gas
Electrical & Instrumentation Field Engineer- sub-contracts Administrator
March 2003 – BALFOUR BEATTY ENGINEERING SERVICES (Balfour Kilpatrick)
February 2004 Conoco Phillips - (CHP) Combined Heating & Power Station Project – Power Plant
Electrical & Instrumentation Supervisor
Stevie Nimmo
• On this project I had a workforce of direct hire Electricians, TA’s & Apprentices working on the containment, gland and
terminate of cables, and of the balance of plant, H.R.S.G, firewater pump house, control stations and trace heating
circuits site wide
FURTHER CAREER SUMMARY:
Project Baglen Bay - Client Southern Electric - Cyclone Turbine Station - 1 year
Project Dalrey - Client Smith Kline Glaxio - Chemical Plant - 6 months
Project Kirkcudbright - Client Sofra Gas - Gas turbine Compressor Station - 1.5 year
Project Phiefzer - Client Phiefzer - Chemical Plant - 1 year
Project Royal Infirmary Edinburg Hospital – Client Scottish Government - Hospital New Build – 6 months
Project Bordum Power Station- Client Scottish power - Power Plant – 1 Year
Project Global Marine - Client Global Marine - Petrochemical - 1 year
Project Balder - Client ESSO - Petrochemical - 2.5 years
References:
Michael
Bremner
Lead E&I Eng
Origin
Tel:
0477724093
0433838623
Ian Dinh
Lead Site Eng
Origin
Tel
0411592259
Rod McMillan
Senior E & I
Leighton’s
Mob:
0448998869
Rod.mcmillan@l
eicon.com.au
Russell
Batcock
Project Leader
Laing O'Rourke
Mob: 0477 339
712
Tel: (08) 9362
7111
rbatcock@laing
orourke.com.au
Clinton Harvey-
Bridges
Superintendent
Cimeco
Mob:
0427548789
Don Rose
Senior Project
Manger
Balfour Beatty
Engineering
Service
Tel: +44
(0)1418801970
Mob: +44
(0)7501229562
Don.rose@bbes
l.com
Derek Harris
Construction
Manager
Balfour Beatty
Engineering
Service
Tel: +44 (0)
1707635322
Mob: +44 (0)
7818001152
Derek.harris@
bbesl.com
Additional references are available upon request.
Page No: 8

James Nimmo CV -2015-E&I-

  • 1.
    Stevie Nimmo * Tel: +61 0424 800 087 * * s_a_alana@hotmail.com * * DOB : 27-12-67 * *4/20 Sixth Ave, Maylands, WA, Australia* *119 Foresthall Dr, Glasgow, UK* J. Steven Nimmo QUALIFICATIONS: SJIB Graded Electrical Technician SJIB Graded Electrical Fitter SJIB Graded Installation Electrician SJIB Graded Electrical Winder SJIB Graded Instrument Mechanic City & Guilds in Electrical installation City & Guilds in Electronics City & Guilds in Communication Craftsman Certificate Achievement Measurement Certificate SQA Tailored Award Design, Engineer & Verification of Electrical Installations City & Guilds Certificate in Requirements for Electrical Installations 17th Edition SQA Customised Award in Requirements for Electrical installations (BS 7671), 2015 Comp-Ex Certificate of Core Competence for Explosive Atmospheres. (Hazardous Areas) Recipient / Issuer Oil Refinery Permit Course (3 day Course –Conoco Phillips International Oil Refinery Registered) Certificate of Appointment as Qualified Senior Authorized person (SAP) - Isolation Authority Highway Electrical Qualified Supervisor Certificate for Highway Agency BSB40807 Certificate IV in frontline Management HM26 Managing Fatal Risks HM01: Hazard & Risk Management PTW02: Permit to Work for Work Team Leader PTW01: Permit to Work for Permit User MSR / IOSH Managers Safety Certificate’s ECITB National Safety Passport No. 627862 MCSA – Managing confined space Award ECS Health and Safety Course 2015 HSE Leadership Module 0, 1 & 2 No. 96467 Land Access & Land Owner Relations Course Environmental Management Awareness First Aid at work Certificate St Johns Ambulance Security Clearance under Disclosure Scotland (Defense & Nuclear) Australian Mine health Surveillance No. 440347 Expiry 11/11/2016 Apply First Aid (Senior First Aid) Certificate St John Ambulance White Card. Operate Elevating Work Platform + VOC Statement of Attainment Work safely at heights + VOC Statement of Attainment Operate Commercial Vehicle Statement of Attainment Operate Light Vehicle in hazardous areas Statement of Attainment Operate & Maintain 4WD RIIVEH305D no. CID0056569 License to perform High Risk Work. Class WP License No WL3312219 Expiry 25/01/2018 Western Australian Full ‘C’ Class Manual Drivers license 6488918 National Police Certificate X0116427 PROFILE: A highly experienced E & I Senior Superintendent with extensive contractor administration & Construction Management experience, who enjoys a challenging role, with good management, organization, leadership skills, and a comprehensive & extensive knowledge of other disciplines, in particular Instrumentation, Instrument Piping, SMP and Civil Works. Proven record of delivering projects from design to commissioning. Meeting milestone targets of quality workmanship within budgetary objectives, in a safety conscience environment. Comfortable reviewing the planning and design of the project in order to identify any scheduling, design, construction & HSE conflicts and correcting them before significant delays and cost overruns occur as well as ensuring the technical specifications of the project are met. Page No: 1
  • 2.
    Stevie Nimmo Experienced inDesign, Electrical Construction, Cabling Projects, Shut downs & Tie in’s, SMP construction, Civil works, Underground Services, Instrumentation & Pipework, and Commissioning, throughout the Oil & Gas, Power & Utilities, Pharmaceuticals, Petrochemical, Defense and Shipbuilding, Highway Agency’s and Nuclear Industries. Experienced contractors manager directing various contract companies involved in the construction industry, E.g. Principle contractors & Lower tier subcontractors, Cable Installation, HV Jointers, H.A Inspectors, Instrument tech, Piping, Civil engineering works, surveys etc… Personally dedicated to delivering a professional, proactive approach to HSE commitments. Comfortable implementing safety initiatives and educating all operatives to the appropriate training to ensure a safe environment is maintained in all aspects of the workplace. RESPONSIBILITIES: Responsible for the management of field construction / completions & commissioning operations. To ensure all contractual deliverable are provided on time. Reporting to the Project Manager; assist, inspect & Monitor activities of contractors / Sub-contractors / Supervisors & Site Engineers to ensure compliance with specifications and schedules. Prepare design constructability reports. Review drawings / document and identify design faults, over runs, HSE concerns etc… Provide engineering / technical advice to on-site engineers, supervisors and other project staff involved in the execution of works. Review specifications and datasheets for supply, installation, testing & commissioning of equipment. Review & approve all design changes prior to implementation and provide technical direction. Evaluate & Authorize all change Order requests / contract amendments / out-of-scope work & variation requests for contractors and provide advice and input into the negotiation or resolution of claims with contractors where required. Ensure all Hazardous Area equipment is installed to spec compiling fully with safety systems & legislation. Design steelwork & containment routes for cables, transits frame loading, equipment layouts, Earthing philosophies, lighting design for process units, heat tracing circuits, Civil Duct routes, priority & practical cable installations, unit & equipment logistics e.g. analyzer House etc.. Co-ordinate all underground services & trench work including pipework, ducting, cabling, and sanding interfacing with all involved trades. Electrical troubleshooting Review of subcontractor packages, scopes, procurement schedules Report on progress, schedule, conformances, non-conformances, HSSE and prepare and distribute periodic subcontractor evaluation and performance reports as required. Co-ordinate activities with other disciplines or areas. Write Method Statements & Risk Assessments and review; amend against current site conditions.… Authorizing permits to work, limitation of access etc… Isolation Authority Monitor progress against work schedules to identify any issues or conflicts on the project. Control and update the schedule database based on contractors Installation. Compile punch lists and oversee the completions of works. Identify & authorize the priority of Sub-systems. Sign off on Systems and Subsystems walk downs. Prepare material requisitions for the purchase of equipment based on take offs of drawings & specifications or to site requirements with attention for lead times Review & respond to technical Queries issued by contactors. Process field change documents for changes to design documentation. Determine Work force requirements. Monitor work activities and ensure quality of work performed. Attend various meetings, such as daily pre-starts (Chair), co-ordination Meetings, SIMOPS meetings, Weekly Planning & Progress meetings, Weekly NCR meetings, Weekly Internal Supervisor & staff meetings, HAZOP /CRAW workshops, Weekly contactor meetings & monthly commercial meetings etc… Prepare reports on construction progress & workforce forecasts CAREER SUMMARY: APLNG Project Phase 1 assets that will feed the Western HPGN include new Spring Gully Pipeline Compression Facility (SGPCF). The SGPCF will be connected to the Fairview to Spring Gully Pipeline and to the APLNG HPGN via the Spring Gully to Taloona Pipeline. Work Scope – The SGPCF will consist of; Two Gas Compression Trains –Each of the Gas Compression Trains will comprise the following components: Inlet filter coalescers. Gas Turbine Driven Compressors a Taurus 60 Turbine and C33 compressor. Compressor after coolers. Compressor lube oil coolers. Dry gas seal system. Cold vent. Compressor Buildings. Metering and Flow Control and a Seal gas conditioning system. Page No: 2 April 2014 – Origin Energy Current Origin Energy – Spring Gully Pipeline Compressor Facility – QLD FIFO – Oil & Gas Site E & I Superintendent - Client rep
  • 3.
    Stevie Nimmo • Workwith Principal contractors to aid & assist, inspect, & monitor activities to ensure compliance with specifications and schedules. Authorisation, supervision and inspection of works include construction, commissioning & completions to ensure an efficient, on schedule hand over to operations; • Underground Services, - Power, Telecommunications & Earthing – Survey & Set out, installation of bedding; Backfill and compaction of excavation, installation of services marker tape/wire and location directional markers, installation of conduits (e.g. for electrical, communications, data, security, fire detection, instrumentation) and installation of earthing cables and associated pits and covers. • Installation of the entire above and below-ground earthing system. This includes, trenching, boring of holes, earth electrodes, underground cad welds, earthing pits, inspection covers, soil earth bars, any conduits, cable route markers, equipment labelling, to provide a complete earthing system following installation specifications. Witness of the testing of the completed installation. • Installation of all cables as per the electrical / instrument and systems cable schedule; including the Installation of all ladder/trays, ducts, cable support systems and cable protection required. Including the Gland, terminate & Test all cables installed. • Installation of all lighting and power installations, including area lighting, street lighting, lighting and power inside the workshop and the lube oil transfer area • The Off-loading and installing of prefabricated Control Room, Switch room and Local Equipment Room • Installing of all local control stations (LCS), light fixtures, emergency stop push buttons, junction boxes, field isolators and other site equipment • Installation of all heat tracing for the black start fuel gas line • Routing of Cable support systems within the Compressor buildings and along the after coolers • Installation and termination off all instruments and devices as per Instrument Index • Position and instillation of the Video Surveillance System (VSS) equipment including the cameras listed in the Balance of Plant Equipment List and Facility Security System (FSS) • Equipotential bonding system of instruments and assets • Installation of the access control system at access gates/switch rooms. • Ensuring that all Hazardous area work is completed and certified for use in the particular classified area Build of the; Hazardous Area Dossier containing relevant design information and certificates of conformity for all equipment. • Sign off All FIC’s & HACS. FIC’s are used to verify correct installation and completion of all tagged items installed as part of the project. HACS are detailed documents which record compliance with Australian Hazardous Area standards. Australia Pacific LNG Pty Ltd (APLNG), a combined venture between Origin Energy, ConocoPhillips and Sinopec, to supply coal seam gas (CSG) from the central Queensland area to a Liquefied Natural Gas (LNG) facility, located on Curtis Island in the Port of Gladstone. Origin will construct and operate the upstream facilities Work Scope - A Shutdown in order to upgrade of the Talinga Metering Station (TMS) - Monitor the activities and work sequences of Principal contractors to ensure compliance with specifications and schedules and confirm construction progress quantities submitted by subcontractors. • Work with Principal contractors to ensure all relevant inspections, testing and quality documentation is completed for system handover. • Review and approve Principal contractor inspection and test plans for construction activities and perform necessary inspections for hold points of construction activities. • Assist in the build of the Principal contractor Hazardous Area Dossier. • Attend construction meetings with Principal contractors to complete field designs and sketches to assist subcontractors with construction activities. • Review, respond and process Principal Contractor requests for information. • Process field change documents for changes to design documentation and provide technical direction to instrumentation and electrical technicians. • Responsible for; • electrical project costs and schedules • inspection management system records and procedures Page No: 3 April 2014 – Origin Energy Current SHUT-DOWN Origin Energy – Talinga Metering Station – QLD FIFO – Oil & Gas Site E & I Superintendent - Client rep December 2013 – Leightons April 2014 Chevron – Gorgon LNG Project – WA FIFO – Oil & Gas E & I Supervisor
  • 4.
    Stevie Nimmo The GorgonLNG Project involves the construction of a 15 million tonne per annum LNG plant on Barrow Island, and a domestic gas plant with the capacity to provide 300 terajoules supply per day Work Scope: Installation of all underground L.V and instrumentation cables associated with three L.N.G. trains, the jetty, the underground H.V power infrastructure cabling to all substations from the project main power station and project wide fiber optic, control and telecommunication systems. • Directing large work force in cable installation • Co-ordination of civil and electrical works • Logistical issues with work face areas/locations within a large project • Work with site engineers and client to resolve T.Q and daily construction issues • Organization of site surveys, reports and Q.A inspections to allow the progress of trench backfills • Assist in planning and execution of upcoming works as required for a productive and efficient completion. The Gorgon LNG Project involves the construction of a 15 million tonne per annum LNG plant on Barrow Island, and a domestic gas plant with the capacity to provide 300 terajoules supply per day Work Scope: Works comprise construction of the on-site utilities infrastructure, including a new desalination plant, relocation of an existing water treatment facility, new waste water treatment plant, new diesel power station and associated utility corridor and connections. Involving; Permanent Waste Water Treatment Plant combined with associated equipment (tanks, pumps etc.) Bridging Water Treatment Plant at the General Utilities Area (The existing facility is to be relocated from Town Point to the General Utilities Area). Permanent Water Treatment Plant combined with associated equipment (tanks, pumps etc.). Temporary Power Station combined with associated equipment (fuel conditioning, transformers etc.). Permanent Diesel Storage Facility combined with associated equipment (dispensing bowsers, refueling area etc.). Temporary Diesel Storage Facility installed as an adjunct to the above. Central Water Disposal Facility including Water Disposal Pumps and Disposal Water Tanks. Other infrastructure including permanent electrical distribution (transformers, LV & MV cable, small power and area lighting etc.), permanent buildings (FER, Substations) and temporary instrument air package. Utilities Corridor from the General Utilities Area to the Construction Village, and. Waste Water Injection pipeline from General Utilities Area to the WA Oil PWD Facility. • Directing 80 electricians, 23 TA’s, 6 Supervisors, 4 engineers, 2 Inst Pipefitters, 3 Boilers & 20 Civils • Working on Cable installation / Glanding, terminating & testing / Electrical equipment installation / underground trench work / Design for tray work and unistrut. • Directing engineers on Design / constructability conflicts – Submitting TQ’s • Subcontract Administrator for HV Jointers • Structural & Mechanical coordinator • Co-coordinating Scaffolds across all trades • Procurement & logistics – Due to the challenges of working on a Class A nature reserve on an Island, attention to lead times and correct quantities of Materials are vital to completing the project on schedule. • Attend daily meetings with KGV & Chevron to discuss / determine progress & priorities. • Attend Health & Safety Site inspections – Walk around with KGV & Chevron • Attend Environmental Site Inspections - Walk around with KGV & Chevron The Solomon Expansion Project to increase iron ore exports by Fortescue by 180% Work Scope: The engineering design, supply, fabrication, procurement, construction and commissioning of the three Sizer Hubs at the Fortescue Metals Group's Solomon Project. Including; Doubled sided ROM Bin, Concrete buttress and reinforced earth wall, Apron feeder, Primary Sizer, Primary conveying system (Incl, weight meter, Tramp magnet and belt splicing station), Firetail, The Secondary sizer and structure, Control building, switch rooms and associated process infrastructure works. Electrical works including transformers and instrumentation works and Commissioning of 3 x sizer hubs. Page No: 4 October 2011 – DOWNER ENGINEERING March 2012 BHP - Worsley Efficiency & Growth Expansion – Collie WA – Aluminum Refinery Electrical & Instrumentation Senior Superintendent May 2012 – CIMECO October Fortescue Metals Group – Solomon Expansion Project – WA FIFO – Mining Site Senior Supervisor October 2012 – Laing O’Rourke October 2013 Chevron – Gorgon LNG Project – WA FIFO – Oil & Gas Site E & I Superintendent
  • 5.
    Stevie Nimmo The Efficiencyand Growth Expansion Project will increase Worley’s annual alumina production capacity from 3.5 to 4.6 million tonnes. Work Scope: Upgrade & refurbishment on Live Aluminum Plant, Electrical, Instrumentation & Mechanical pipework package. • Initially employed as a Superintendent & promoted to a Senior Superintendent after the Construction Manager was transferred off the project. • Directing 150 electricians, TA’s, Laborers & Apprentices & 8 Supervisors (running day/night shifts) • Power & Control cabling, Glanding, Terminiating, Testing from new & existing EDC Substations • Priority cabling for commissioning subsystems packages • Attend daily meetings with Bechtel & BHP to discuss / determine progress & priorities. • Liaise with other trades & contractors to ensure a smooth & efficient work plans. • Oversee Safety initiative program. • Direct punch list precedence • Prepare progress reports & labour forecasts. • Review design changes & new scope of work packages. • Prepare electrical work scope procedures for planned shutdown maintenance. New Low Level Waste Repository. Work Scope: Procure, supply, install, test & Commission all electrical & Instrument Installation Works; including LV cabling, LV Distribution Boards, Junction boxes, control stations, Lighting and Small Power including Emergency Lighting, Fire Alarms, CCTV system, Data system, Access system, PA system, Lightning Protection, Earthing (above & underground) and bonding, Collection of free issue pre-calibrated Instruments, Installation of free issue field instruments and junction boxes, Pneumatic piping and tubing. • Design & Supervising cable installation, contractors and systematizing all cabling and routing currently standing at 1216 cables. • Co-ordinating the above work scope for the completion of a scheduled systems handover. The largest UK road tunnel consisting of twin bore Dual carriageway tunnels 1.8km in length. Work Scope: Ventilation, Fire Systems, electrical distribution & fully integrated traffic management system. CCTV, Lighting, Communications, Radio & PA Systems. • As Balfour Beatty is the duty holder for electrical systems on the project I was due to my qualifications the Senior Authorized person (SAP) on the project for Electrical, Mechanical and Civils through to commissioning. Managing the permit office and authorizing permits to work, limitation of access etc… • Administrating and liaisoning with our contractors (Lochwynd) who are responsible for the traffic inductive loop installation, traffic signal installation work and related civil engineering works. Ensuring that all works are completed on schedule to the strict requirements of the highways Agency. • Assisting the cable engineer with the installation of 6000 cables approx 420,000 meters of HV, LV Power and control cables. Page No: 5 September 2010 – BALFOUR BEATTY ENGINEERING SERVICES - FIFO May 2011 A3 Hindhead Road Tunnel - London – Infrastructure Permit to Work senior authorized Person (SAP) May 2010 – BALFOUR BEATTY ENGINEERING SERVICES September 2010 Urenco-Tails Management Facility Project - Capenhurst – Nuclear Construction Manger May 2011 – BALFOUR BEATTY ENGINEERING SERVICES October 2011 Magnox- Hunterston A Power Station - Ayreshire – Nuclear Cable Engineer / Sub-Contractors Administrator
  • 6.
    Stevie Nimmo A newTails Management Facility to allow the client Urenco to deconvert the depleted uranium hexafluoride, known as Tails, back to the naturally occurring form of uranium oxide. Consisting of 11 new builds. Work Scope: The construction of a new 11kv infrastructure for the site and the full C, E & I Installation within each of the process buildings, including building services, radiological protection, gas protection, access control, fire detections and CCTV. • Reviewing Design drawings, related vendor drawings and installation specifications and instructions. Preparation of material purchase requisitions including estimating quantities and material takeoffs. Prepare projections and schedules for workforce, material and equipment requirements. Procurement of materials for the enabling works contract of the Office and work shop refurbishment consisting of lighting / small power / Fire alarms / Data Equipment and Initially due to start 4th Quarter 2010. Prepare cost estimates and review project design and engineering and surveying cable design requirements for the main build consisting of 11 new building and storage facilities scheduled to start 2nd Quarter 2011. Due to a major redesign of the Tails Management Facility, this project was placed under a minimum 6 month construction hold. The Installation of a new Hydrotreater Plant to reduce the sulphur, nitrogen and aromatic hydrocarbons to acceptable levels to allow subsequent processing of the gas oil in a conventional refinery catalytic cracker or hydrocracker. Work Scope: To provide the full electrical and instrument package required. Including transformer substation equipment and Analyzer House for both OSBL & ISBL work scope. • This new processing plant was built on a live refinery and consisted of extremely complex cabling installation in and around the process plant. It was a heavily interfaced dependent project which required significant detailed planning design input and extensive coordination with other contractors working on site and safety planning. . • Initially engaged as the Project engineer responsible for the installation and termination of all HV / Power / Control / Instrument cables (10585 cables measuring approx 400000 meters) Administrating the following contractor workforce; contractor cable crew, contracted HV jointers and contracted underground earthing operatives. • Design tray work and cable routes, co-ordinate with other trades for underground cable routing and installation and prepare transit drawings • Planned and co-ordinate installation works of transformers, transformer install and build, HV cable terminations and test. 11KV and 415KV switchboard installation, DCS panel installation and cable installation. • Monitoring activities of all contractors to ensure compliance with drawings and specification. • I worked to develop the operational objectives for the project. Prepare the specification of requirements and develop a detailed schedule of works. Identify perceived risks and evaluate options for their control. • Interpret design engineering drawings and prepare construction work packs for the use of supervisors including preparing ‘as built’ drawings • Monitor installation of materials and equipment to assure conformance with drawings and specification. • Complying with regulatory and client requirements I co-ordinated, monitored and controlled the project schedules to ensure the quality of the implementation of the project and to achieve target commissioning / completion dates within budget objectives • I am very proud to say that during my time as construction manager we completed the project with a zero harm policy, initiated several safety training courses and with a work force which peaked at 18 supervisors and 220 operatives we had no reportable accidents on site. Construction of a low density polyethylene Plant (LDPE) processing approx 400,000 tonnes per year. Work Scope: Supply and installation of electrical, control and instrumentation systems. • Employed as the cable engineer responsible for the installation and termination of all HV / Power / Control / Instrument cables including procurement and control over contractor installation with a contractor cable crew and additional direct hire operatives to install steel work in advance. • Monitoring activities of all contractors to ensure compliance with drawings and specification. Page No: 6 June 2008 – BALFOUR BEATTY ENGINEERING SERVICES (Balfour Kilpatrick) May 2010 Total- LOR HDS 3 Project ISBL & OSBL - Immingham – Oil & Gas Construction Manager / Electrical & Instrumentation Project Engineer June 2007 – BALFOUR BEATTY ENGINEERING SERVICES (Balfour Kilpatrick) June 2008 Sabic - LDPE Project – Redcar – Petrochemical Plant Electrical & Instrumentation Field Engineer- Superintendent / Sub-contracts Administrator
  • 7.
    Stevie Nimmo • EnsuringInstallation programmes were met and liaised with the client on technical review of the design and its successful implementation. New Build LNG terminal consisting of jetty, storage tanks & regasification facilities. With the capacity to receive & unload up to 217,000 cubic meter capacity carriers in approximately 24 hours and a maximum gas send out rate to the NTS of 1,200,000 standard cubic metres per hour Work Scope: Supply and installation of electrical distribution, instrumentation and control systems, lighting and small power, fire and gas detection and alarms, trace heating, earthing and all containment. • Responsible for the Cabling installation of some 8000 cables approx 600,000 meters for Fire & Gas, Instrumentation, Control and Power Systems. • Directly managing a diverse workforce of contractors, & direct hire electricians, apprentices and laborers to install bracket supports and cable containment, route and install cables and gland, terminate and test all cables. • I also coordinated the H.A Inspectors assigned. Ines Chlor Boiler Plant. Work Scope: Includes the installation of electrical switchgear & equipment and installation of instrumentation and electrical systems associated with three boiler units and a water treatment plant. Much of the work undertaken was in a live chemical operational environment and required hazardous area equipment installation. • Directly responsible for contracted operatives to install, test and gland HV cables. Direct hire electricians to install cable containment, gland and terminate LV and instrument cables and a further testing and inspecting squad for completions. New Reformer and Heat Exchanger. Work Scope: Includes the installation of all control and instrumentation systems, the entire electrical system installation (including Substation) and the system commissioning and energisation. The control system included over 750 loops. Additional works included the strip down and reinstallation of instrumentation systems on two air compressors. • On this project I had the below workforce; • Cabling contractors • Testing Squad • Civil contractors • H.A Inspection contractors 760MW CHP plant, with two large scale refineries utilizing the steam output. Work Scope: Included the installation of electrical, instrumentation, communications, Street Lighting, security, fire and gas, and trace heating systems. Design and installation of HVAC systems. Major equipment, transformers, insulated phase bus duct and associated structural steel installation. Page No: 7 August 2006 – BALFOUR BEATTY ENGINEERING SERVICES (Balfour Kilpatrick) June 2007 British Gas- Dragon L.N.G Import Project – Milford Haven – Oil & Gas Electrical & Instrumentation Field Engineer- / Sub-contracts Administrator January 2005 – BALFOUR BEATTY ENGINEERING SERVICES (Balfour Kilpatrick) August 2006 Ines Chlor Boiler Plant – Runcorn, – Power Plant Electrical & Instrumentation Supervisor February 2004 – BALFOUR BEATTY ENGINEERING SERVICES (Balfour Kilpatrick) December 2004 Conoco Phillips - No 3 Reformer Project – Immingham – Oil & Gas Electrical & Instrumentation Field Engineer- sub-contracts Administrator March 2003 – BALFOUR BEATTY ENGINEERING SERVICES (Balfour Kilpatrick) February 2004 Conoco Phillips - (CHP) Combined Heating & Power Station Project – Power Plant Electrical & Instrumentation Supervisor
  • 8.
    Stevie Nimmo • Onthis project I had a workforce of direct hire Electricians, TA’s & Apprentices working on the containment, gland and terminate of cables, and of the balance of plant, H.R.S.G, firewater pump house, control stations and trace heating circuits site wide FURTHER CAREER SUMMARY: Project Baglen Bay - Client Southern Electric - Cyclone Turbine Station - 1 year Project Dalrey - Client Smith Kline Glaxio - Chemical Plant - 6 months Project Kirkcudbright - Client Sofra Gas - Gas turbine Compressor Station - 1.5 year Project Phiefzer - Client Phiefzer - Chemical Plant - 1 year Project Royal Infirmary Edinburg Hospital – Client Scottish Government - Hospital New Build – 6 months Project Bordum Power Station- Client Scottish power - Power Plant – 1 Year Project Global Marine - Client Global Marine - Petrochemical - 1 year Project Balder - Client ESSO - Petrochemical - 2.5 years References: Michael Bremner Lead E&I Eng Origin Tel: 0477724093 0433838623 Ian Dinh Lead Site Eng Origin Tel 0411592259 Rod McMillan Senior E & I Leighton’s Mob: 0448998869 Rod.mcmillan@l eicon.com.au Russell Batcock Project Leader Laing O'Rourke Mob: 0477 339 712 Tel: (08) 9362 7111 rbatcock@laing orourke.com.au Clinton Harvey- Bridges Superintendent Cimeco Mob: 0427548789 Don Rose Senior Project Manger Balfour Beatty Engineering Service Tel: +44 (0)1418801970 Mob: +44 (0)7501229562 Don.rose@bbes l.com Derek Harris Construction Manager Balfour Beatty Engineering Service Tel: +44 (0) 1707635322 Mob: +44 (0) 7818001152 Derek.harris@ bbesl.com Additional references are available upon request. Page No: 8