Thin-layer chromatography (TLC) is a technique used to separate non-volatile mixtures. It works by applying samples as spots on a thin layer of adsorbent material like silica gel coated on a sheet, then developing it using a mobile phase solvent. As the solvent travels up the plate, different analytes move at different rates based on their interactions with the stationary and mobile phases, achieving separation. After development, spots are visualized and their retention factors (Rf) measured to identify compounds. TLC is useful for analyzing and purifying mixtures and monitoring reactions.