Supply Chain Management of Rig &
FPSO- Floating Production, Storage
and Offloading systems
Presented By: Tochukwu Ben Anozie
4th Annual Logistics in oil, gas & petrochemicals Summit
15th April,2015
 Oil & gas supply chain network & analysis
 Rig supply chain network & process
 FPSO Supply Chain Network
 Rig and FPSO relationship
 Lack of clarity relating to contract responsibilities leads to unwanted
surprises
 The unwanted surprises in rig and FPSO supply chain
 Reasons behind the ailing FPSO supply chain
 Role of companies , development complexity, regulations and conflict of
interest within the value chain
OUTLINE
OIL & GAS SUPPLY CHAIN NETWORK & ANALYSIS
Upstream
Midstream Downstream
OEM
OEM Operators
3PL Rig location
Raw Material
Raw Material
Tier 1 supplierTier 2 supplierTier 3 supplier
Warehouse
RIG SUPPLY CHAIN NETWORK & PROCESS
3PL
•Planning
•Vendor selection
•PO creation and
approval
•Engineering
•Production
•Material handling
•Logistics
•QC and QA
•Inventory
management
•Material handling
•Logistics
Manufactured Transported Stored DeliveredOrdered
Rig Supply Chain Process
Rig Supply Chain Network
Material & Product Flow
Information Flow &Cash Flow
OEM- Original equipment manufacturers
3PL- Third Party Logistics
EPC contractors
FPSO SUPPLY CHAIN NETWORK
Raw Material
Raw Material
Raw Material
FPSO builder
FPSO
Contractors
Operator
FPSO Location
Material & Product Flow
Information Flow &Cash Flow
Typical FPSO Supply chain consist:
•Raw Materials Suppliers, FPSO Builders
•Oil Companies(operators), FPSO Contractors & EPC contractors
•FPSO location
Tier 1 supplierTier 2 supplierTier 3 supplier
RIG & FPSO RELATIONSHIP
LACK OF CLARITY RELATING TO CONTRACT RESPONSIBILITIES LEAD TO UNWANTED
SURPRISES
GUIDELINES FROM OPERATORS: There are many standards and requirements to
build one-off design that substantially increase the cost.
CONTRACTING CHALLENGE: EPC contractor don’t sign a long time contract any more
due to fluctuation in day rate.
POOR PRESENTATION OF SPECIFICATION BY OPERATOR: Standard & requirements
are presented in stacks of documents and it is very difficult for contractors to deal with
and makes the process side of the business much more expensive
SCOPE CREEP: This usually occur in every FPSO project. This may be important but it
will always delay the building process
ENGINEERING SPECIFICATION CHANGES: review in specifications as a result of
technological changes or need to add special features.
THE UNWANTED SURPRISES IN RIG AND FPSO SUPPLY CHAIN
QUANTIFY DELAYS
These are disruptions within the rig and FPSO supply chain that can be measured in
figures either by (Days Weeks &Months)
Rig & FPSO SC quantify delays analysis in months
Source: Douglas wood 2014
THE UNWANTED SURPRISES IN RIG AND FPSO SUPPLY CHAIN
OVERRUN COST
The Amount by which the total cost of ownership for rig and FPSO project exceeds the
budgeted, or target cost.
Months
Adapted: Douglas wood 2014
•Forecasting Error (price, project
timeline)
•Uncertainty (Natural disaster)
•Inadequate planning process
•Unclear scope of work
•Inadequate material and information flow
•Inadequate resources
•Inefficient financing
•Inefficient use of resources
•Inefficient contract management
Technical factors Economical factors
Rig and FPSO SC overrun cost Analysis in months
Causes of Rig and FPSO SC overrun cost
REASONS BEHIND THE AILING RIG & FPSO SUPPLY CHAIN
Governing conditions
Project complexity
Regulation Challenges
Local content
Floating industry suppliers
challenges
Supply chain complexity
Organisational learning
Nature and size of project
Shipping industry
influence
Industries Comparison
Comparison of drilling
industry
Rig & FPSO SC Issues
•Overrun Cost
•Risks
•Quantify delays (disruptions)
The reasons behind ailing rig & FPSO supply chain are grouped into 3 categories:
ROLE OF OIL COMPANIES , DEVELOPMENT COMPLEXITY, REGULATIONS
AND CONFLICT OF INTEREST WITHIN THE VALUE CHAIN
OIL COMPANIES
Regular cost examination: This encourage change in rig and FPSO procurement
procedures.
supply chain development: Continuous improvement in the SC will result in achieving
resilient and robust SC at lowest cost and reduction in delays.
DEVELOPMENT COMPLEXITY
Execution quality and efficiency is enhanced: due to project development that builds
on industry experience.
Repeatability: helps the supply significantly in area of right material selection in
terms of quality vendor selection and lead time management
REGULATION
Changes in the regulatory framework: This may bring about meaningful impact on
the SC to meet future demand.
Complexity and underdevelopment of FPSOs regulation: this have affect FPSOs
relocation and other mobilisation as well as treating each FPSOs as a separate entity.
CONFLICT OF INTEREST
Increase the project complexity: it make the project execution cumbersome which
adversely affect the suppliers and the projects efficiency.
RECOMMENDATIONS TO AILING RIG AND FPSO SUPPLY CHAIN
 Collaboration among stakeholders along the value chain-executive support
 Adopt lean Six Sigma methodologies in Supply Chain for process improvement.
 Institutionalise Supply Chain best practice
 Commitment to procurement resources management
 Develop performance metrics for monitoring Supply Chain
Thank You

More Related Content

What's hot

Global logistics
Global logisticsGlobal logistics
Global logistics
Ravi Teja Gupta
 
ExxonMobil
ExxonMobilExxonMobil
Fed ex
Fed exFed ex
Fed ex
Anshu Nair
 
Strategic analysis on telecom industries
Strategic analysis on telecom industriesStrategic analysis on telecom industries
Strategic analysis on telecom industries
Institute Of Professional Education And Research
 
Telecommunication in the united arab emirates
Telecommunication in the united arab emiratesTelecommunication in the united arab emirates
Telecommunication in the united arab emirates
Rohit Sharma
 
Trouble at tessei
Trouble at tesseiTrouble at tessei
Trouble at tessei
Ankit Sha
 
FedEx
FedExFedEx
Technology Exports and Joint Ventures
Technology Exports and Joint VenturesTechnology Exports and Joint Ventures
Technology Exports and Joint Ventures
Vaibhav Verma
 
Chaos at uber case study
Chaos at uber case study Chaos at uber case study
Chaos at uber case study
Amishagupta50
 
Yell - A cross border acquisition
Yell - A cross border acquisitionYell - A cross border acquisition
Yell - A cross border acquisition
Eleonora Martignoni
 
Presentation on Boeing
Presentation on BoeingPresentation on Boeing
Presentation on Boeing
Nabeel Ahmed Khan
 
Shell company
Shell companyShell company
Shell company
ihab tarek
 
STRATEGIC OUTSOURCING
STRATEGIC OUTSOURCINGSTRATEGIC OUTSOURCING
STRATEGIC OUTSOURCING
Zamri Yahya
 
Air Asia Marketing Analysis
Air Asia Marketing AnalysisAir Asia Marketing Analysis
Air Asia Marketing Analysis
Vanitcha Wankawisant
 
FedEx Corp. Review & Analysis
FedEx Corp. Review & AnalysisFedEx Corp. Review & Analysis
FedEx Corp. Review & Analysis
Embry-Riddle Aeronautical University
 
Blue Ocean Strategy – Air Asia Innovation & Blue Ocean strategy targeted non ...
Blue Ocean Strategy – Air Asia Innovation & Blue Ocean strategy targeted non ...Blue Ocean Strategy – Air Asia Innovation & Blue Ocean strategy targeted non ...
Blue Ocean Strategy – Air Asia Innovation & Blue Ocean strategy targeted non ...
Rajesh Prabhakar
 
Total project
Total projectTotal project
Total project
Savino BARTOLOMEO
 
MBA 622 - Strategy I - Growth by Acquisition Strategy
MBA 622 - Strategy I - Growth by Acquisition StrategyMBA 622 - Strategy I - Growth by Acquisition Strategy
MBA 622 - Strategy I - Growth by Acquisition Strategy
marhenbun
 
Mobilink Services Marketing
Mobilink Services Marketing Mobilink Services Marketing
Mobilink Services Marketing
Muhammad Zakaria
 
Industry 4.0 at Kuehne + Nagel
Industry 4.0 at Kuehne + NagelIndustry 4.0 at Kuehne + Nagel
Industry 4.0 at Kuehne + Nagel
Srpska Logistička Asocijacija
 

What's hot (20)

Global logistics
Global logisticsGlobal logistics
Global logistics
 
ExxonMobil
ExxonMobilExxonMobil
ExxonMobil
 
Fed ex
Fed exFed ex
Fed ex
 
Strategic analysis on telecom industries
Strategic analysis on telecom industriesStrategic analysis on telecom industries
Strategic analysis on telecom industries
 
Telecommunication in the united arab emirates
Telecommunication in the united arab emiratesTelecommunication in the united arab emirates
Telecommunication in the united arab emirates
 
Trouble at tessei
Trouble at tesseiTrouble at tessei
Trouble at tessei
 
FedEx
FedExFedEx
FedEx
 
Technology Exports and Joint Ventures
Technology Exports and Joint VenturesTechnology Exports and Joint Ventures
Technology Exports and Joint Ventures
 
Chaos at uber case study
Chaos at uber case study Chaos at uber case study
Chaos at uber case study
 
Yell - A cross border acquisition
Yell - A cross border acquisitionYell - A cross border acquisition
Yell - A cross border acquisition
 
Presentation on Boeing
Presentation on BoeingPresentation on Boeing
Presentation on Boeing
 
Shell company
Shell companyShell company
Shell company
 
STRATEGIC OUTSOURCING
STRATEGIC OUTSOURCINGSTRATEGIC OUTSOURCING
STRATEGIC OUTSOURCING
 
Air Asia Marketing Analysis
Air Asia Marketing AnalysisAir Asia Marketing Analysis
Air Asia Marketing Analysis
 
FedEx Corp. Review & Analysis
FedEx Corp. Review & AnalysisFedEx Corp. Review & Analysis
FedEx Corp. Review & Analysis
 
Blue Ocean Strategy – Air Asia Innovation & Blue Ocean strategy targeted non ...
Blue Ocean Strategy – Air Asia Innovation & Blue Ocean strategy targeted non ...Blue Ocean Strategy – Air Asia Innovation & Blue Ocean strategy targeted non ...
Blue Ocean Strategy – Air Asia Innovation & Blue Ocean strategy targeted non ...
 
Total project
Total projectTotal project
Total project
 
MBA 622 - Strategy I - Growth by Acquisition Strategy
MBA 622 - Strategy I - Growth by Acquisition StrategyMBA 622 - Strategy I - Growth by Acquisition Strategy
MBA 622 - Strategy I - Growth by Acquisition Strategy
 
Mobilink Services Marketing
Mobilink Services Marketing Mobilink Services Marketing
Mobilink Services Marketing
 
Industry 4.0 at Kuehne + Nagel
Industry 4.0 at Kuehne + NagelIndustry 4.0 at Kuehne + Nagel
Industry 4.0 at Kuehne + Nagel
 

Similar to Supply chain management of rig & fpso- floating production,storage and offloading systems

General_ENTRION_Presentation_December2015
General_ENTRION_Presentation_December2015General_ENTRION_Presentation_December2015
General_ENTRION_Presentation_December2015
Arun Jothilingam
 
Kh2518061809
Kh2518061809Kh2518061809
Kh2518061809
IJERA Editor
 
Kh2518061809
Kh2518061809Kh2518061809
Kh2518061809
IJERA Editor
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
Nitin Sethi
 
PE Pipes Manufacturing Plant Project Report 2023
PE Pipes Manufacturing Plant Project Report 2023PE Pipes Manufacturing Plant Project Report 2023
PE Pipes Manufacturing Plant Project Report 2023
AlinaEllis1
 
Supplier Management Service
Supplier Management ServiceSupplier Management Service
Supplier Management Service
Jorge Torres
 
QC_Supplier Management_ALL En
QC_Supplier Management_ALL EnQC_Supplier Management_ALL En
QC_Supplier Management_ALL En
Jorge Torres
 
CNC Parts Sourcing Case Study
CNC Parts Sourcing Case StudyCNC Parts Sourcing Case Study
CNC Parts Sourcing Case Study
John William
 
MRM-16 (2020).pptx
MRM-16 (2020).pptxMRM-16 (2020).pptx
MRM-16 (2020).pptx
xego1
 
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo
 
PVC Pipes Manufacturing Plant Project Report 2024.pdf
PVC Pipes Manufacturing Plant Project Report 2024.pdfPVC Pipes Manufacturing Plant Project Report 2024.pdf
PVC Pipes Manufacturing Plant Project Report 2024.pdf
AlinaEllis1
 
Solar Power Plant Procurements
Solar Power Plant ProcurementsSolar Power Plant Procurements
Solar Power Plant Procurements
Sunrator Technologies LLP
 
Plg robinson petrochemical engineering & contstruction 2015 final
Plg robinson   petrochemical engineering & contstruction 2015 finalPlg robinson   petrochemical engineering & contstruction 2015 final
Plg robinson petrochemical engineering & contstruction 2015 final
PLG Consulting
 
White papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendorsWhite papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendors
Kaizenlogcom
 
White papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendorsWhite papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendors
Kaizenlogcom
 
Webinar - Innovatie en Asset Management in de tankopslag
Webinar - Innovatie en Asset Management in de tankopslagWebinar - Innovatie en Asset Management in de tankopslag
Webinar - Innovatie en Asset Management in de tankopslag
Stork
 
Thriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van DomelenThriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van Domelen
Society of Petroleum Engineers
 
API 610 pumps .pdf
API 610 pumps .pdfAPI 610 pumps .pdf
API 610 pumps .pdf
JuanMolina846779
 
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
yusuf699644
 
Article Petroleum Economist Feb 2015
Article Petroleum Economist Feb 2015Article Petroleum Economist Feb 2015
Article Petroleum Economist Feb 2015
Eric Janvier
 

Similar to Supply chain management of rig & fpso- floating production,storage and offloading systems (20)

General_ENTRION_Presentation_December2015
General_ENTRION_Presentation_December2015General_ENTRION_Presentation_December2015
General_ENTRION_Presentation_December2015
 
Kh2518061809
Kh2518061809Kh2518061809
Kh2518061809
 
Kh2518061809
Kh2518061809Kh2518061809
Kh2518061809
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
 
PE Pipes Manufacturing Plant Project Report 2023
PE Pipes Manufacturing Plant Project Report 2023PE Pipes Manufacturing Plant Project Report 2023
PE Pipes Manufacturing Plant Project Report 2023
 
Supplier Management Service
Supplier Management ServiceSupplier Management Service
Supplier Management Service
 
QC_Supplier Management_ALL En
QC_Supplier Management_ALL EnQC_Supplier Management_ALL En
QC_Supplier Management_ALL En
 
CNC Parts Sourcing Case Study
CNC Parts Sourcing Case StudyCNC Parts Sourcing Case Study
CNC Parts Sourcing Case Study
 
MRM-16 (2020).pptx
MRM-16 (2020).pptxMRM-16 (2020).pptx
MRM-16 (2020).pptx
 
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
 
PVC Pipes Manufacturing Plant Project Report 2024.pdf
PVC Pipes Manufacturing Plant Project Report 2024.pdfPVC Pipes Manufacturing Plant Project Report 2024.pdf
PVC Pipes Manufacturing Plant Project Report 2024.pdf
 
Solar Power Plant Procurements
Solar Power Plant ProcurementsSolar Power Plant Procurements
Solar Power Plant Procurements
 
Plg robinson petrochemical engineering & contstruction 2015 final
Plg robinson   petrochemical engineering & contstruction 2015 finalPlg robinson   petrochemical engineering & contstruction 2015 final
Plg robinson petrochemical engineering & contstruction 2015 final
 
White papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendorsWhite papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendors
 
White papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendorsWhite papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendors
 
Webinar - Innovatie en Asset Management in de tankopslag
Webinar - Innovatie en Asset Management in de tankopslagWebinar - Innovatie en Asset Management in de tankopslag
Webinar - Innovatie en Asset Management in de tankopslag
 
Thriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van DomelenThriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van Domelen
 
API 610 pumps .pdf
API 610 pumps .pdfAPI 610 pumps .pdf
API 610 pumps .pdf
 
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
 
Article Petroleum Economist Feb 2015
Article Petroleum Economist Feb 2015Article Petroleum Economist Feb 2015
Article Petroleum Economist Feb 2015
 

Recently uploaded

An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
snaprevwdev
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
Dwarkadas J Sanghvi College of Engineering
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
Kamal Acharya
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
Paris Salesforce Developer Group
 
Presentation on Food Delivery Systems
Presentation on Food Delivery SystemsPresentation on Food Delivery Systems
Presentation on Food Delivery Systems
Abdullah Al Noman
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
Kamal Acharya
 
Height and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdfHeight and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdf
q30122000
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
Kamal Acharya
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
pvpriya2
 
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptxEV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
nikshimanasa
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
felixwold
 
FULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back EndFULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back End
PreethaV16
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Massimo Talia
 

Recently uploaded (20)

An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
 
Presentation on Food Delivery Systems
Presentation on Food Delivery SystemsPresentation on Food Delivery Systems
Presentation on Food Delivery Systems
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
 
Height and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdfHeight and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdf
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
 
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptxEV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
 
FULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back EndFULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back End
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
 

Supply chain management of rig & fpso- floating production,storage and offloading systems

  • 1. Supply Chain Management of Rig & FPSO- Floating Production, Storage and Offloading systems Presented By: Tochukwu Ben Anozie 4th Annual Logistics in oil, gas & petrochemicals Summit 15th April,2015
  • 2.  Oil & gas supply chain network & analysis  Rig supply chain network & process  FPSO Supply Chain Network  Rig and FPSO relationship  Lack of clarity relating to contract responsibilities leads to unwanted surprises  The unwanted surprises in rig and FPSO supply chain  Reasons behind the ailing FPSO supply chain  Role of companies , development complexity, regulations and conflict of interest within the value chain OUTLINE
  • 3. OIL & GAS SUPPLY CHAIN NETWORK & ANALYSIS Upstream Midstream Downstream
  • 4. OEM OEM Operators 3PL Rig location Raw Material Raw Material Tier 1 supplierTier 2 supplierTier 3 supplier Warehouse RIG SUPPLY CHAIN NETWORK & PROCESS 3PL •Planning •Vendor selection •PO creation and approval •Engineering •Production •Material handling •Logistics •QC and QA •Inventory management •Material handling •Logistics Manufactured Transported Stored DeliveredOrdered Rig Supply Chain Process Rig Supply Chain Network Material & Product Flow Information Flow &Cash Flow OEM- Original equipment manufacturers 3PL- Third Party Logistics EPC contractors
  • 5. FPSO SUPPLY CHAIN NETWORK Raw Material Raw Material Raw Material FPSO builder FPSO Contractors Operator FPSO Location Material & Product Flow Information Flow &Cash Flow Typical FPSO Supply chain consist: •Raw Materials Suppliers, FPSO Builders •Oil Companies(operators), FPSO Contractors & EPC contractors •FPSO location Tier 1 supplierTier 2 supplierTier 3 supplier
  • 6. RIG & FPSO RELATIONSHIP
  • 7. LACK OF CLARITY RELATING TO CONTRACT RESPONSIBILITIES LEAD TO UNWANTED SURPRISES GUIDELINES FROM OPERATORS: There are many standards and requirements to build one-off design that substantially increase the cost. CONTRACTING CHALLENGE: EPC contractor don’t sign a long time contract any more due to fluctuation in day rate. POOR PRESENTATION OF SPECIFICATION BY OPERATOR: Standard & requirements are presented in stacks of documents and it is very difficult for contractors to deal with and makes the process side of the business much more expensive SCOPE CREEP: This usually occur in every FPSO project. This may be important but it will always delay the building process ENGINEERING SPECIFICATION CHANGES: review in specifications as a result of technological changes or need to add special features.
  • 8. THE UNWANTED SURPRISES IN RIG AND FPSO SUPPLY CHAIN QUANTIFY DELAYS These are disruptions within the rig and FPSO supply chain that can be measured in figures either by (Days Weeks &Months) Rig & FPSO SC quantify delays analysis in months Source: Douglas wood 2014
  • 9. THE UNWANTED SURPRISES IN RIG AND FPSO SUPPLY CHAIN OVERRUN COST The Amount by which the total cost of ownership for rig and FPSO project exceeds the budgeted, or target cost. Months Adapted: Douglas wood 2014 •Forecasting Error (price, project timeline) •Uncertainty (Natural disaster) •Inadequate planning process •Unclear scope of work •Inadequate material and information flow •Inadequate resources •Inefficient financing •Inefficient use of resources •Inefficient contract management Technical factors Economical factors Rig and FPSO SC overrun cost Analysis in months Causes of Rig and FPSO SC overrun cost
  • 10. REASONS BEHIND THE AILING RIG & FPSO SUPPLY CHAIN Governing conditions Project complexity Regulation Challenges Local content Floating industry suppliers challenges Supply chain complexity Organisational learning Nature and size of project Shipping industry influence Industries Comparison Comparison of drilling industry Rig & FPSO SC Issues •Overrun Cost •Risks •Quantify delays (disruptions) The reasons behind ailing rig & FPSO supply chain are grouped into 3 categories:
  • 11. ROLE OF OIL COMPANIES , DEVELOPMENT COMPLEXITY, REGULATIONS AND CONFLICT OF INTEREST WITHIN THE VALUE CHAIN OIL COMPANIES Regular cost examination: This encourage change in rig and FPSO procurement procedures. supply chain development: Continuous improvement in the SC will result in achieving resilient and robust SC at lowest cost and reduction in delays. DEVELOPMENT COMPLEXITY Execution quality and efficiency is enhanced: due to project development that builds on industry experience. Repeatability: helps the supply significantly in area of right material selection in terms of quality vendor selection and lead time management REGULATION Changes in the regulatory framework: This may bring about meaningful impact on the SC to meet future demand. Complexity and underdevelopment of FPSOs regulation: this have affect FPSOs relocation and other mobilisation as well as treating each FPSOs as a separate entity. CONFLICT OF INTEREST Increase the project complexity: it make the project execution cumbersome which adversely affect the suppliers and the projects efficiency.
  • 12. RECOMMENDATIONS TO AILING RIG AND FPSO SUPPLY CHAIN  Collaboration among stakeholders along the value chain-executive support  Adopt lean Six Sigma methodologies in Supply Chain for process improvement.  Institutionalise Supply Chain best practice  Commitment to procurement resources management  Develop performance metrics for monitoring Supply Chain