This document summarizes key logistical challenges that could impact petrochemical engineering project timelines. It notes that logistics capacity constraints will increase over the next decade due to rail, trucking, and marine congestion. Both project and operational logistics require expertise to navigate these challenges. The document recommends integrating logistics experts throughout the project life cycle to provide flexibility and avoid cost overruns from unforeseen logistical issues.