SOFTWARE TESTING PROCESS Byungwook Cho C. (bwcho75@gmail.com) Sr Consultant  2008.08.08
ICE BREAK
AGENDA Test model Test process Static testing
Test model
Test oriented development process model V-Model Enhanced traditional waterfall model Verification & Validation < V-Model > < Verification & Validation > Dynamic  testing Static  testing Testing with  system Review & Inspection with  artifacts  from each development step Valid & estimate the system To verify the artifacts that has been produced in each development cycle. Validation Verification
Test Level ※  Integration strategies Lead by QA Team or Customer Lead by QA Team (Specialized for system test) Lead by Dev Team Lead by Dev Team Responsibility Alpha Test Beta Test Use Mock Object (Test Stub ,Driver) Use Code coverage Black box test Black box test White box test White box test Testing Type Verify customer’s requirement (End User) Verify customer’s Legal issue (Legal) Verify customer’s maintanance issue (SM) Acceptance Test Test system over production environment to verify system itself and  production environment Include  Functional & Non Functional  Test (Availibility, Stablity, Extendability, Performance etc) System Test Verify integration between component. Verify software flow ,interface & interaction Integration Test Verify software component Unit Test Description Level Small project SOA svc BPM Ex. Short time Can test implementation logic easily find architectural defect Adv Most important & high risk component first Integrate all in time Integrate from bottom (use test driver) Integrate from top (use test stub) Desc Backbone Big-bang Bottom up Top down
Test Cycle Each test is consists of test cycle Test cycle Pre test  - check up testability Main test   Conformation test - check up the  defect found in previous  “Main test” Regression test - check up the  impact from change TEST CYCLE Pre Test Main Test Conformation Test Regression Test
Test Process
Test Process Master Test Plan Organization Policy Strategy Mgmt sub tests Acceptance Test Plan System Test Plan Integration Test Plan Unit Test Plan Test plan Define objective of Test  and scope Define Test strategy Test estimation Set up test organization Test analysis and design Evaluation test object & basis Designing and prioritizing test case Identify test Identify & prepare test data Designing test env & identify required infra & tools  Make test procedure Test Implementation & Execution Implement TC Implement test script Set up test environment Pre Test Run Test Logging Test Result Test Closure activity Store test-ware into repository Analyzing lesson learned for future test maturity Evaluating exit criteria and reporting Write a test summary report for stakeholders. Assessing if more test are needed Test control Test mgmt & control Test monitoring & reporting Test plan Define objective of Test  and scope Define Test strategy Test estimation Set up test organization Test analysis and design Evaluation test object & basis Designing and prioritizing test case Identify test Identify & prepare test data Designing test env & identify required infra & tools  Make test procedure Test Implementation & Execution Implement TC Implement test script Set up test environment Pre Test Run Test Logging Test Result Test Closure activity Store test-ware into repository Analyzing lesson learned for future test maturity Evaluating exit criteria and reporting Write a test summary report for stakeholders. Assessing if more test are needed Test control Test mgmt & control Test monitoring & reporting Test plan Define objective of Test  and scope Define Test strategy Test estimation Set up test organization Test analysis and design Evaluation test object & basis Designing and prioritizing test case Identify test Identify & prepare test data Designing test env & identify required infra & tools  Make test procedure Test Implementation & Execution Implement TC Implement test script Set up test environment Pre Test Run Test Logging Test Result Test Closure activity Store test-ware into repository Analyzing lesson learned for future test maturity Evaluating exit criteria and reporting Write a test summary report for stakeholders. Assessing if more test are needed Test control Test mgmt & control Test monitoring & reporting Test plan Define objective of Test  and scope Define Test strategy Test estimation Set up test organization Test analysis and design Evaluation test object & basis Designing and prioritizing test case Identify test Identify & prepare test data Designing test env & identify required infra & tools  Make test procedure Test Implementation & Execution Implement TC Implement test script Set up test environment Pre Test Run Test Logging Test Result Test Closure activity Store test-ware into repository Analyzing lesson learned for future test maturity Evaluating exit criteria and reporting Write a test summary report for stakeholders. Assessing if more test are needed Test control Test mgmt & control Test monitoring & reporting
Test Plan Test planning & control Define activity of each testing level Define milestone ,resource ,schedule. Make a  plan  based on analyzed risk factor Define test  strategy  based on risk Define approach & techniques for testing  (testing techniques, coverage, test item, test ware) Must include time & resource for preparing testware Define completion condition Define test scope objective Risk anal Set up strategy Estimate resource & time Planning PRE TEST TEST Monitoring Report
Test Plan Risk analysis Risk = Likelihood * impact Risk identification Recommend <  36 identification . Likelihood : Complexity, Implementation technical Level, Size,Developer skill Impact : Biz impact Erik van neneendaal, Risk Based Testing, STAREAST,2006 factor Risk item Risk item factor factor factor Impact Likelihood Likelihood Impact STA (Severe Test Area) SSTA (Strong Test Area) FTA (Fundamental Test Area) ITA (Intensive Test Area)
Test Plan Risk based test strategy Other strategies Analytical approaches Model based approaches Methodical approaches Dynamic and heuristic approaches ( Low Level Test) ( High Level Test) - Unit Test - Integration Test - System Test - Acceptance Test Likelihood Impact STA (Severe Test Area) SSTA (Strong Test Area) FTA (Fundamental Test Area) ITA (Intensive Test Area) Likelihood Impact STA (Severe Test Area) SSTA (Strong Test Area) FTA (Fundamental Test Area) ITA (Intensive Test Area)
Test Analysis and Design Test analysis Review - test basis, testability Identify test requirement & test data Identify test infra & tools Test design Identify test condition Test case specification Define test procedure
Test Analysis and Design Design technique Specification based Equivalence partitioning, Boundary value analysis Pairwise, Decision table testing State transition testing, Usecase testing Structure based Control Flow Test Basic Path Test – Based on  Cyclomatic complexity  (Edge – Node + 2P) P = number of connected component Elementary comparision test – Based on MC/DC Coverage * Coverage : Statement, Condition, Decision, Condition Decision Coverage,  Modified Condition/Descision Coverage(MC/DC) ,  Multiple Condition Coverage Experience based Exploratory Testing  – Adhoc testing, based on test charter, define timezone Classification Tree method CheckList
Test Execution Execution Define serverity & priority Develop TC,Test data,Test stub & driver,Test script,Test suite Reporting Logging expected result, real result Current status Time & resource usage Defect tracking Use Bug(Issue) tracking system ( Mantis,Bugzilla,JIRA,Trac) Define tracking workflow Test Execution Test Report Defects Issue Tracking  System Progress Report Test logs TEST DRIVER TEST STUB TARGET SYSTEM TEST CASE TESTING TOOL TEST DATA MODULE MODULE MODULE MODULE TEST SCRIPT TEST SUITE1 TEST SUITE2 TEST  SIMULATOR
Evaluating exit criteria and reporting Test exit criteria Coverage, Duration, number of unresolved defects Test result report Progress report Release advice Final report per Level Matrix Defects per KLOC, Days test effort per requirement, Unresolved defect impact analysis, Defects / Hour ,Cumulative defects / Day ,Test coverage / Day , Risk vs number of TC
Test closure activities Test closure activities Evaluating Evaluate test target Evaluate test process for maturing next text Final reporting Store test-ware
Static Testing
Static testing techniques Performed in Verification phase Test with artifacts not a runtime software Test by human
Manual Review Inspection Objective : To find defects Inspect artifacts Lead by moderator Walkthrough Objective : Knowledge sharing Knowledge transfer by author Code review Objective : Find defects and share knowledge Lead by Programming Leader Pair programming XP  Lead by mentor or coworker Share just “ONE” keyboard Formal action Informal action
Static Analysis Static Analysis Test code or diagram with “static analysis tool” Analysis Can find  syntax error  or  well known bugs Validate naming rules Can find  dead code  or missing parameter Can analysis code  complexity & dependency Quality? Not so smart It need a rule and need a maturing Easy to appeal your manager Tools Open source – PMD, Find Bugs Commercial – Klockworks, Jtest etc.

Testing process

  • 1.
    SOFTWARE TESTING PROCESSByungwook Cho C. (bwcho75@gmail.com) Sr Consultant 2008.08.08
  • 2.
  • 3.
    AGENDA Test modelTest process Static testing
  • 4.
  • 5.
    Test oriented developmentprocess model V-Model Enhanced traditional waterfall model Verification & Validation < V-Model > < Verification & Validation > Dynamic testing Static testing Testing with system Review & Inspection with artifacts from each development step Valid & estimate the system To verify the artifacts that has been produced in each development cycle. Validation Verification
  • 6.
    Test Level ※ Integration strategies Lead by QA Team or Customer Lead by QA Team (Specialized for system test) Lead by Dev Team Lead by Dev Team Responsibility Alpha Test Beta Test Use Mock Object (Test Stub ,Driver) Use Code coverage Black box test Black box test White box test White box test Testing Type Verify customer’s requirement (End User) Verify customer’s Legal issue (Legal) Verify customer’s maintanance issue (SM) Acceptance Test Test system over production environment to verify system itself and production environment Include Functional & Non Functional Test (Availibility, Stablity, Extendability, Performance etc) System Test Verify integration between component. Verify software flow ,interface & interaction Integration Test Verify software component Unit Test Description Level Small project SOA svc BPM Ex. Short time Can test implementation logic easily find architectural defect Adv Most important & high risk component first Integrate all in time Integrate from bottom (use test driver) Integrate from top (use test stub) Desc Backbone Big-bang Bottom up Top down
  • 7.
    Test Cycle Eachtest is consists of test cycle Test cycle Pre test - check up testability Main test Conformation test - check up the defect found in previous “Main test” Regression test - check up the impact from change TEST CYCLE Pre Test Main Test Conformation Test Regression Test
  • 8.
  • 9.
    Test Process MasterTest Plan Organization Policy Strategy Mgmt sub tests Acceptance Test Plan System Test Plan Integration Test Plan Unit Test Plan Test plan Define objective of Test and scope Define Test strategy Test estimation Set up test organization Test analysis and design Evaluation test object & basis Designing and prioritizing test case Identify test Identify & prepare test data Designing test env & identify required infra & tools Make test procedure Test Implementation & Execution Implement TC Implement test script Set up test environment Pre Test Run Test Logging Test Result Test Closure activity Store test-ware into repository Analyzing lesson learned for future test maturity Evaluating exit criteria and reporting Write a test summary report for stakeholders. Assessing if more test are needed Test control Test mgmt & control Test monitoring & reporting Test plan Define objective of Test and scope Define Test strategy Test estimation Set up test organization Test analysis and design Evaluation test object & basis Designing and prioritizing test case Identify test Identify & prepare test data Designing test env & identify required infra & tools Make test procedure Test Implementation & Execution Implement TC Implement test script Set up test environment Pre Test Run Test Logging Test Result Test Closure activity Store test-ware into repository Analyzing lesson learned for future test maturity Evaluating exit criteria and reporting Write a test summary report for stakeholders. Assessing if more test are needed Test control Test mgmt & control Test monitoring & reporting Test plan Define objective of Test and scope Define Test strategy Test estimation Set up test organization Test analysis and design Evaluation test object & basis Designing and prioritizing test case Identify test Identify & prepare test data Designing test env & identify required infra & tools Make test procedure Test Implementation & Execution Implement TC Implement test script Set up test environment Pre Test Run Test Logging Test Result Test Closure activity Store test-ware into repository Analyzing lesson learned for future test maturity Evaluating exit criteria and reporting Write a test summary report for stakeholders. Assessing if more test are needed Test control Test mgmt & control Test monitoring & reporting Test plan Define objective of Test and scope Define Test strategy Test estimation Set up test organization Test analysis and design Evaluation test object & basis Designing and prioritizing test case Identify test Identify & prepare test data Designing test env & identify required infra & tools Make test procedure Test Implementation & Execution Implement TC Implement test script Set up test environment Pre Test Run Test Logging Test Result Test Closure activity Store test-ware into repository Analyzing lesson learned for future test maturity Evaluating exit criteria and reporting Write a test summary report for stakeholders. Assessing if more test are needed Test control Test mgmt & control Test monitoring & reporting
  • 10.
    Test Plan Testplanning & control Define activity of each testing level Define milestone ,resource ,schedule. Make a plan based on analyzed risk factor Define test strategy based on risk Define approach & techniques for testing (testing techniques, coverage, test item, test ware) Must include time & resource for preparing testware Define completion condition Define test scope objective Risk anal Set up strategy Estimate resource & time Planning PRE TEST TEST Monitoring Report
  • 11.
    Test Plan Riskanalysis Risk = Likelihood * impact Risk identification Recommend < 36 identification . Likelihood : Complexity, Implementation technical Level, Size,Developer skill Impact : Biz impact Erik van neneendaal, Risk Based Testing, STAREAST,2006 factor Risk item Risk item factor factor factor Impact Likelihood Likelihood Impact STA (Severe Test Area) SSTA (Strong Test Area) FTA (Fundamental Test Area) ITA (Intensive Test Area)
  • 12.
    Test Plan Riskbased test strategy Other strategies Analytical approaches Model based approaches Methodical approaches Dynamic and heuristic approaches ( Low Level Test) ( High Level Test) - Unit Test - Integration Test - System Test - Acceptance Test Likelihood Impact STA (Severe Test Area) SSTA (Strong Test Area) FTA (Fundamental Test Area) ITA (Intensive Test Area) Likelihood Impact STA (Severe Test Area) SSTA (Strong Test Area) FTA (Fundamental Test Area) ITA (Intensive Test Area)
  • 13.
    Test Analysis andDesign Test analysis Review - test basis, testability Identify test requirement & test data Identify test infra & tools Test design Identify test condition Test case specification Define test procedure
  • 14.
    Test Analysis andDesign Design technique Specification based Equivalence partitioning, Boundary value analysis Pairwise, Decision table testing State transition testing, Usecase testing Structure based Control Flow Test Basic Path Test – Based on Cyclomatic complexity (Edge – Node + 2P) P = number of connected component Elementary comparision test – Based on MC/DC Coverage * Coverage : Statement, Condition, Decision, Condition Decision Coverage, Modified Condition/Descision Coverage(MC/DC) , Multiple Condition Coverage Experience based Exploratory Testing – Adhoc testing, based on test charter, define timezone Classification Tree method CheckList
  • 15.
    Test Execution ExecutionDefine serverity & priority Develop TC,Test data,Test stub & driver,Test script,Test suite Reporting Logging expected result, real result Current status Time & resource usage Defect tracking Use Bug(Issue) tracking system ( Mantis,Bugzilla,JIRA,Trac) Define tracking workflow Test Execution Test Report Defects Issue Tracking System Progress Report Test logs TEST DRIVER TEST STUB TARGET SYSTEM TEST CASE TESTING TOOL TEST DATA MODULE MODULE MODULE MODULE TEST SCRIPT TEST SUITE1 TEST SUITE2 TEST SIMULATOR
  • 16.
    Evaluating exit criteriaand reporting Test exit criteria Coverage, Duration, number of unresolved defects Test result report Progress report Release advice Final report per Level Matrix Defects per KLOC, Days test effort per requirement, Unresolved defect impact analysis, Defects / Hour ,Cumulative defects / Day ,Test coverage / Day , Risk vs number of TC
  • 17.
    Test closure activitiesTest closure activities Evaluating Evaluate test target Evaluate test process for maturing next text Final reporting Store test-ware
  • 18.
  • 19.
    Static testing techniquesPerformed in Verification phase Test with artifacts not a runtime software Test by human
  • 20.
    Manual Review InspectionObjective : To find defects Inspect artifacts Lead by moderator Walkthrough Objective : Knowledge sharing Knowledge transfer by author Code review Objective : Find defects and share knowledge Lead by Programming Leader Pair programming XP Lead by mentor or coworker Share just “ONE” keyboard Formal action Informal action
  • 21.
    Static Analysis StaticAnalysis Test code or diagram with “static analysis tool” Analysis Can find syntax error or well known bugs Validate naming rules Can find dead code or missing parameter Can analysis code complexity & dependency Quality? Not so smart It need a rule and need a maturing Easy to appeal your manager Tools Open source – PMD, Find Bugs Commercial – Klockworks, Jtest etc.