FOUNDATION
SOFTWARE TESTING
Video 1
WHAT IS TESTING
Google says: “a procedure intended to establish
the quality, performance, or reliability of
something, especially before it is taken into
widespread use.”
“Software testing is a process of executing a
system or system component in order to find
bugs and errors.”
Or
“Software testing is process of Verification and
Validation (v&v), performed on Application
under Test (AUT) with an intention of finding
bugs and errors.”
SOFTWARE TESTING IS:
SOFTWARE TESTING LIFE CYCLE
STLC
“STLC stand for Software Testing Lifecycle. STLC is a
set of process which is executed in a systematic
manner to achieve the testing goal”
STLC
STLC PHASES:
TEST PLANNING
TEST DESIGNING
TEST ENVIRONMENT
TEST EXECUTION
BUG REPORTING &
MANAGMENT
RTM (REQUIREMENT
TRACEABILITY
MATRIX)
TEST REPORTING
PLANNING
● Test Objective
● Test Strategy
● Resources
● Schedules & timelines
● Risks
● Entry & Exit Criteria
TESTING PHASES
TESTING PHASES
DESIGNING
● Test Scenarios
● Test Cases
● Test scripts
ENVIRONMENT
● QA Environment
● Test Data
● Tools and Technologies or Software and
hardwares
TESTING PHASES
BUG MANAGEMENT
● How to raise a bug
● Bug components
● Bug lifecycle
TESTING PHASES
TEST REPORTING
● Test results
● Bug report
● Test coverage
● Lesson learnt
TESTING PHASES
TESTING IMPORTANCE
Testing is important, to make sure:
• All business requirements are implemented
• Functionalities are behaving as expected
• Application is secure enough
• Does not break under working circumstances
• Does not harm the business reputation
• Performs its functions within an acceptable time
• Works well on all supported OS, devices and screens
• To make sure that customer can trust and rely on your
product
A CLASSIC EXAMPLE
“NASA’s climate orbiter
was lost due to the two
agencies NASA and
Lockheed Martin used
two different
measurement units and
that was not tested or
was left during the
testing.”
Thankyou!
KNOW THE DIFFERENCE
QA, QC & TESTING
Video 2
“A product’s degree of excellence is quality.
Quality can be judged by how product
matches with requirement and how
accurately and/or efficiently the work can be
done”
QUALITY
“QA is a systematic and scientific approach of
monitoring and improving the software
development process.”
It’s a verification activity and the idea behind this is to
prevent the errors occurring in software development
process.
QA
Walkthrough
QA Activities:
Inspection
QA Methods:
Review
QA Methods:
“QC is a validation activity where the quality
of the developed product is evaluated with a
benchmark or any competitive program’s set
standard to make sure that the software
quality is adhering the defined or expected
quality.”
QC
TESTING
QC Methods:
The difference:
QUALITY ASSURANCE QUALITY CONTROL
QA is a verification process QC is a validation activity
QA is process oriented QC is product oriented
QA prevents the defect QC finds the defect
It improves the development
process
It improves the developed
product quality
Requirement document, design
review and code reviews are
done as part of this
Product testing is done as part
of this activity
Performed without the program
execution
Performed by executing the
program
“Testing is a validation activity so it comes
under QC. Wherein the developed program is
executed with an intention of finding bugs”
TESTING
Thankyou!
SOFTWARE DEVELOPMENT LIFE CYCLE
SDLC
Video 3
“SDLC stands for Software Development Life
Cycle. SDLC defines the standard phases
involved throughout the software
development.”
SDLC
SDLC PHASES
Deployment
Requirement Analysis
Project planning
Maintenance
Project Designing
Testing
Development
▶ Waterfall Model
▶ Spiral model
▶ Prototype Model
▶ Iterative and Incremental Model
▶ V -Model
▶ W-Model
▶ Agile Mode
SDLC MODELS
“Waterfall model is a sequential development model
where each phase of SDLC is executed one after
another in a linear way so its also called linear
sequential model”
Waterfall Model:
REQUIREMENT
DESIGN
DEVELOPMENT
TESTING
DEPLOYMENT
MAINTENANCE
“The spiral model is a risk-driven process model
generator for software projects. Based on the unique
risk patterns of a given project, the spiral model
guides a team to adopt elements of one or more
process models, such as incremental, waterfall, or
evolutionary prototyping.”
Spiral Model:
“In this model a software prototype will be created to
understand that whether it satisfies the stakeholder’s
requirements.”
Prototype Model:
Prototyping is used to allow the users evaluate
developer proposals and try them out before
implementation
“In incremental model the whole requirement is
divided into various builds. Multiple development
cycles uses waterfall model. Cycles are divided up
into smaller, more easily managed modules.”
Incremental Model:
“In V model of SDLC the real development phases
and testing plans goes side by side as It can be
interpreted as in a 'V’ shape”
V Model:
REQUIREMENT
ANALYSIS
UAT (USER ACCEPTANCE
TESTING)
HIGH LEVEL DESIGN SYSTEM TESTING
LOW LEVEL DESIGN
or SPECIFICATION
INTEGRATION
TESTING
CODING UNIT TESTING
“In V model of SDLC the real development phases
and testing plans goes side by side as It can be
interpreted as in a 'V’ shape”
W Model:
REQUIREMENT ANALYSIS UAT (USER ACCEPTANCE
TESTING)
HIGH LEVEL
DESIGN
SYSTEM TESTING
LOW LEVEL DESIGN or
SPECIFICATION
INTEGRATION TESTING
CODING UNIT TESTING
REQUIREMENT REVIEW
HLD Review
SPECIFICATION
Review
Code Review
DEPLOYMENT
BUILD
CODE MERGE
“Agile is a software development model that gives the
flexibility to develop, test and deploy the things
quickly and easily.”
or
“Agile is software development model that implements
the continuous iteration approach to develop and
deploy a product where requirement changes very
frequently”.
AGILE MODEL:
Thankyou!
TEST PLANNING
Video 4
“A test plan is a document that describes that what
and how to achieve something in AUT (Application
Under Test).”
TEST PLANNING:
Making of a test plan is very first step in software
testing lifecycle and it defines the rule, covers the
scope, analyzes the available resources, timeline and
risks associated with the testing of a project.
Follow the below mentioned steps to make a good test
plan document:
▶ Analyze the business requirement
▶ Find the test objective
▶ Define a Test Strategy
▶ Analyze the risks (Tools, Resources and Time)
▶ Test Environment and Test Data preparation
▶ Define Entry & Exit Criteria
▶ Define a Traceability Matrix
▶ Schedule and Timeline
▶ Deliverable
TEST PLAN DOCUMENT:
▶ Understand the requirement by going through the
requirement document
▶ Note down and resolve your queries
▶ Get a product or document reviewed
ANALYZE BUSINESS
REQUIREMENT:
The objective of the testing is finding as many valid
defects as possible and ensure that the software
under test is bug free before release.
In this phase you need to find out the core motive of
your product. You should need to know
▶ Bug Free features
▶ Smooth performance
▶ No security threats
FIND TEST OBJECTIVE:
“Test strategy defines the software testing approach
to achieve the testing goal. Usually the test strategy
document is created by Test Manager and It says
what type of technique to follow and which module
(scope) to test” Test strategy can be defined that:
▶ How to get maximum requirements under testing
umbrella by putting minimal effort
▶ What sort of testing you need to perform
▶ What tools will be required
DEFINE TEST STRATEGY:
▶ Find out that do you have available tools required
for testing
▶ Find out that do you have required skills to test
▶ Find out if you have enough resources to complete
the task in the given time frame
▶ Find out that you have sufficient time to complete
the testing
ANALYZE THE RISKS:
“Test Environment is also called Test Bed setup, it
means laying down all the needed softwares or
hardwares required for a tester to execute the test
scripts.”
“In order to work on something or to process any
request a tester need some data which they can place
as an input and that’s called a test data”
TEST ENVIRONMENT & TEST
DATA PREPARATION:
“Entry criteria is the prerequisites that
must needs to be fulfilled before test team
can begin the testing.”
In most of the places smoke/sanity testing is defined
and the cases of smoke sanity must be passed as
condition of Entry criteria.
DEFINE ENTRY CRITERIA:
“Exit criteria are some conditions that must be
fulfilled by test team before they can conclude their
testing activities” like the test coverage should reach
100% of traceability matrix, all the test deliverable
are shared and many other things.
▶ Verify that all business requirements are covered
as part of testing
▶ No critical bugs are in open state
DEFINE EXIT CRITERIA:
The Requirement Traceability Matrix or RTM is a
document that maps the business requirement and
test cases to trace the coverage of testing at any given
point of time and to ensure that no requirement is
missed as part of the testing.
The main purpose of Requirement Traceability Matrix
is to see that all test cases are covered so that no
functionality should miss while testing.
DEFINE TRACEABILITY MATRIX:
DEFINE SCHEDULE& TIMELINE:
Planning Designing Execution
X Days Y Days Z Days
DEFINE DELIVERABLES:
Test deliverable are the documents, scenarios, test
cases, test scripts, test data, screenshots and bug
reports that is shared during or after the testing life
cycle.
Thankyou!
TEST DESIGNING
TEST SCENARIOS, TEST CASES & TEST SCRIPTING
Video 5
TEST SCENARIOS:
Test scenario meaning finding out that ‘what to be
tested’ in any given requirement. This is to make
sure that end 2 end functionality is covered.
or
“Test scenarios are the high level classification of test
requirement grouped depending on the functionality
of a module”
TEST SCENARIO EXAMPLE:
Requirement: ‘Login the website, select and play your
favourite music’
Scenario 1: Test the login function
Scenario 2: Search for the music based on different
genres and play
Scenario 3: Create your music playlist
Scenario 4: Play the songs from your playlist
TEST CASE:
“ A test case, in software testing, is a set of conditions
under which a tester will determine whether an
application, software system or one of its features is
working as it was developed and expected to do.”
TEST CASE EXAMPLE:
Let’s pick 2 scenario from scenario example:
Scenario 1: Test the login function
TC 1: Test the login function with valid credentials
TC 2: Test the login function with invalid credentials and verify the
result
TC 3: Check and validate the error msgs for login errors
Scenario 2: Search for the music based on different
genres and play
TC1: Search for specific genre songs and play them
TC2: Check the player functionalities (play, pause, stop, forward, ..)
TC3: Check that the songs can be added in your playlist
TEST SCRIPTING
“In order to execute test cases a detailed procedure
needs to be written where the writer will mention all
the steps to be performed and what should be the
expected result for each activity”
Thankyou!
BLACK BOX TECHNIQUES
BVA, ECP, DECISION TABLE & USE CASE TESTING
Video 7
TECHNIQUES
“Test Case designing technique is needed to get the
maximum coverage by using an optimal number of
test cases.
▶ Equivalence Class Partitioning
▶ Boundary Value Analysis
▶ Decision Table
▶ Use Case Testing
Equivalence Class Partitioning
“ECP is a testing technique that divides the input test
data into partitions of equivalent classes and from
each class minimum one data must be tested at least
once.”
BVA Example
Scenario: Assume that there is an input field for age
and it accepts the values from 1-100. So, if we follow
the ECP concept then:
Valid Class
values from
1 -100
Invalid Class
values below 1
(0- anything)
Invalid Class
values above 100
(101- anything)
Class A : Any value from valid input data domain : 1-100
Class B : Any value which is lower than lowest : 0,-1,-2..
Class C : Any value which is higher than Highest : 0,-1,-2..
Class D: Any alphanumeric : A1, B1, C1
Class E: Any decimal values: 1.1,1.2,1.3
Boundary Value Analysis
“More application errors occur at the boundaries of
input domain. ‘Boundary value analysis’ testing
technique is used to identify errors at boundaries
instead of finding errors in center of input domain.”
BVA Example
Scenario: Assume that there is an input field for age
and it accepts the values from 1-100. So, if we follow
the ECP concept then:
Valid Boundary
values 1 & 100
one lower than
lowest = 0
one higher than
highest = 101
Boundary Value: 1 & 100
Invalid values for negative test cases: 0 & 101
Decision Table
“Decision table technique is used in complex
business scenarios where the input data will be
determined based on some conditions.”
Ex:
Conditions 1 2 2
Cash Yes No No
Coupon N/A Yes No
Actions
Order Placed Yes Yes No
USE CASE Testing
▶ Use Cases capture the interactions between
'actors' and the 'system'.
▶ A use case is a description of a particular use of
the system by an actor. Each use case describes
the interactions the actor has with the system in
order to achieve a specific task.
Thankyou!
SOFTWARE TESTING TYPES
TESTING TREE
Video 6
TESTING TYPES
.. A SIGNUP FORM EXAMPLE
Thankyou!
WHITE BOX, BLACK BOX &
GRAY BOX TESTING
Video 8
WHITE BOX TESTING or
Structural Testing or Glass Box
Testing
▶ Testing the code and internal structure comes
under white box testing.
▶ Code’s internal structure, design and
implementation is tested as part of white box
testing.
▶ It is also known as ‘glass box testing’ or ‘Open
box testing’ or ‘Structural Testing’.
WHITE BOX TESTING TYPE
UNIT TESTING:
Once the developer develops their piece of segment,
each individual component is tested independently in
this testing for their expected outcomes.
INTEGRATION TESTING:
When two independent units of codes merged then
checking that whether they functioning together is
called integration testing.
WHITE BOX TESTING
TECHNIQUES- CODE COVERAGE
STATEMENT COVERAGE
This technique requires every possible statement in
the code to be tested at least once during the testing
process
BRANCH COVERAGE
This technique checks every possible path like if-else
and other conditional loops of a software application
WHITE BOX TESTING IS
PERFORMED TO FIND
CODE COVERAGE
▶ Poorly structured codes
▶ Output of the code
▶ Conditional loops
▶ Internal security holes
▶ Cover branch and statement
BLACK BOX TESTING
“ Black Box Testing is the testing method where
Functional and nonfunctional aspects of the
application is tested without looking into the code.”
Also known as Behavioural Testing or close box
testing.
Black Box Test is performed to
check
▶ Missing on incorrect features
▶ Performance errors
▶ Security errors
▶ Database connection
▶ APIs
▶ ...
BLACK BOX TESTING TYPES
▶ FUNCTIONAL TEST
◦ Smoke/Sanity
◦ Feature testing
◦ Regression testing
◦ System Testing
◦ UAT
▶ NONFUNCTIONAL TEST
◦ Performance (Load/stress/soak)
◦ Compatibility testing
◦ Usability testing
◦ GUI testing
GARY BOX TESTING
“Gray Box Testing is a combination of White box
testing and black box testing. The idea is to find the :
Improper structure and/or
Improper usage of application”
▶ It is based on functional specification, UML
Diagrams, Database Diagrams or architectural
view
▶ Grey-box tester handles can design complex test
scenario more intelligently
Thankyou!
FUNCTIONAL TESTING
TYPES EXPLAINED on next level
Video 9
UNIT TESTING
Once the developer develops their piece of segment,
each individual component is tested independently in
this testing for their expected outcomes.
INTEGRATION TESTING
When two independent units of codes merged then
checking that whether they functioning together is
called integration testing.
Integration Testing STUBS & DRIVERS
Stubs and drivers are the dummy piece of code called
in to create an integrated environment where some
work is not completed yet or not available for testing.
▶ Stubs are used during top down integration
approach
▶ Drivers are used In bottom up integration
approach
SMOKE & SANITY
SMOKE/SANITY TESTING
▶ Smoke/sanity testing is also called Build
verification testing or confidence testing
▶ The motive of this testing is to ensure that the
major & critical functions are working as expected
▶ So that the test team can get enough level of
confidence about the application’s stability and
can execute the other testings.
SMOKE/SANITY TESTING Example:
Smoke testing is collection of test cases that covers
the most crucial functions of AUT (Application Under
Test).
An example of smoke/sanity test cases for a website:
▶ URL is accessible
▶ User is able to login
▶ The payment is being successful
SMOKE/SANITY TESTING Difference:
Functionality, Regression
Retesting
Functionality TESTING
“For any new release of the product, testing the
added or modified requirement is called functional
testing.”
Functional testing is done to check that all the
business functionalities are working ok as expected
and it will fulfill the end user’s requirement.
Regression TESTING
When a new functions is added or an existing
application function is modified then checking the
existing features is called regression testing as the
newly added/modified feature may create some side
effects for other features.
▶ This testing is done after every release
▶ Regression test suite shall be updated after every
new release.
Functionality & Regression Difference
Retesting
Once a bug is fixed then checking the same
functionality again to ensure that the bug fix is ok is
called retesting. This testing is done to ensure that
bug fix is working ok and based on that the bug
status will be updated as fixed or reopened.
SYSTEM TESTING
▶ System testing is testing the whole system in
integrated environment with all necessary
software and hardwares.
▶ Usually performed in E2E (End 2 End)
environment
In complex business scenarios one system work with
collaboration of so many other systems, so testing
your application when it is integrated with all other
applications is called system testing.
EXPLORATORY TESTING
When there is a requirement or an application to test
but with no relevant document or details provided to
tester the tester explores the application and keep
checking the features to figure out the issues is
known as Exploratory Testing.
It’s a format of unstructured testing.
UAT
▶ UAT stands for User Acceptance Testing
▶ Where the product is evaluated as per the end
user’s requirement
▶ Performed by the end users or stakeholders
▶ Product is evaluated that whether it matches with
business requirement or not and whether to
accept or reject the product
▶ Usually the last type of testing
▶ UAT has 2 types Alpha testing and Beta Testing
Alpha & Beta Testing
Alpha Testing Beta Testing
Performed by testers in testing
environment
Performed by real end users in live
environment
Alpha Testing performed at
developer's site
Beta testing is performed at client
location or end user of the product
Alpha testing comes before beta
testing
Beta testing is performed after alpha
testing
Alpha testing involves both the white
box and black box techniques
Beta Testing typically uses black box
testing
Alpha testing is conducted within the
organization and tested by
representative group of end users
Beta testing is conducted by the end
users
Thankyou!
NON-FUNCTIONAL
TESTING TYPES EXPLAINED
on next level
Video 10
PERFORMANCE TESTING
Performance testing is a test done to determine how a
system performs in terms of speed, load and stability
under a particular workload
Performed to check the reliability of the application.
Performance testing types are:
▶ Load Testing
▶ Stress Testing
▶ Soak Testing
PERFORMANCE TESTING TYPES
Load Testing
Load testing is done to determine how the application
behaves under a specific load. Example - Check that
what is the page load time if 10 concurrent users
access the same page at a time
PERFORMANCE TESTING TYPES
Stress Testing
This testing is performed to check the breakpoint of
the application so that the team can plan for load
balancer.
PERFORMANCE TESTING TYPES
Soak Testing
Soak testing is done to check that how the
application behaves when the app gone through
under a specific load for a specific time.
SECURITYTESTING
Security testing is a testing process intended to
reveal flaws in the security mechanisms of an
application to protect data, sensitive information.
▶ This testing is done to check the vulnerabilities in
the application and fix it.
▶ To ensure that the sensitive data travels in
encrypted format
▶ To insure that no unauthorized access can be
made
COMPATIBILITY TESTING 1/2
▶ Compatibility Testing is done to check the
application’s responsiveness across various OS,
Devices & browsers.
▶ This testing is done to check the applications
rendering and usability
▶ This testing is done to make sure that all target
devices are covered
COMPATIBILITY TESTING 2/2
Use cloud service to perform compatibility testing
Saucelabs
Browserstack
Or, use google chrome developer mode to check the
responsiveness
COMPATIBILITY TESTING
A snippet of Browserstack.com responsive test page
Thankyou!
SOFTWARE BUGS
Video 11
SOFTWARE BUG/DEFECT
In general software testing language “During an
application testing any deviation in actual result and
expected result is called a bug.”
whereas Bug and Defects has slightly difference:
BUG:
DEFECT:
FAILURE:
BUG, DEFECT & FAILURE
BUG:
A bug is the result of a coding error. Bug is the
general term used for all issues caught in testing
environment.
DEFECT:
A defect is a deviation from the requirements. Defect
word is used by the business persons or stakeholder.
FAILURE:
Any issue which is passed to live users and impacting
the applications motive is called a product failure.
How to raise a Bug?
Consider the below mentioned 10 point as a must to
raise an effective bug
1) Summary
2) Description
3) Component or Assigned to
4) Steps to reproduce with Test Data and URLs
5) Logs & screenshot
6) Requirement reference
7) Release Name /Build Number / Sprint name
8) Environment
9) Priority
10)Severity
PRIORITY & SEVERITY
Priority
The impact of the bug or function on business level
is called priority.
Priorities are defined as : P1, P2 & P3
Severity
The impact of the bug or function on Application
level is called priority.
Severities are defined as : Major, minor, critical,
blocker
BUG LIFECYCLE?
BUG MANAGEMENT TOOLS AND
IMPORTANCE
▶ BugZilla
▶ Mantis
▶ Hp-QC or HP-ALM
▶ Zira
NON REPRODUCIBLE BUGS
When a tester reports a valid bug but the same bug
can not be reproduced by others due to any reason is
called a non-reproducible bug.
The reason could be :
1) Test Environment
2) Test locations
3) Test Data
4) System configuration
5) System of server cache memory
How to deal with NON REPRODUCIBLE
BUGS
▶ Provide proper story and not just steps
▶ Record a video or capture a screenshot for proof
▶ Provide the system log, application log and server
logs
▶ Provide the time of execution
▶ Provide the location of test execution
Try to reproduce the bug by clearing the system
cache memory
Try to clear the server side cache (to clear the server
side cache put ?nocache=1 at the end of the URL
and hit enter)
Thankyou!
TEST MANAGEMENT TOOLS
Video 12
TEST MANAGEMENT TOOL
“Test Management tools are the tools required to
manage whole testing activity and reporting in an
organized manner.”
TEST MANAGEMENT TOOL
Feature
1: Manage the build and versioning for test
2: To manage the Test scenarios, Test Case and Test
scripts
3: To map the requirements and test scenarios, test
cases
4: To update the test case status while executing
5: To update the test cases with a defect
6: To track the test progress
7: To generate the test report
8: To maintain the test history
TEST MANAGEMENT TOOLs
▶ HP ALM (Application lifecycle management) or HP-
QC (Quality centre, is the older version of ALM)
▶ JIRA
▶ q-Test
▶ Testlink
▶ Zephyr
Thankyou!
A DETAILED EXPLANATION OF SCRUM METHOD
AGILE MODEL
Video 13
What is Agile?
• A SDLC model to build an application fast in very
short span of time
• Delivers workable modules after each release
• Development and Testing goes side by side
• A combination of iterative and incremental
approach
Agile is:
Agile is:
“SDLC stands for Software Development Life
Cycle. SDLC defines the standard phases
involved throughout the software
development.”
SDLC
SDLC PHASES
Deployment
Requirement Analysis
Project planning
Maintenance
Project Designing
Testing
Development
▶ Waterfall Model
▶ Spiral model
▶ Prototype Model
▶ Iterative and Incremental Model
▶ V -Model
▶ W-Model
▶ Agile Mode
SDLC MODELS
“Waterfall model is a sequential development model
where each phase of SDLC is executed one after
another in a linear way so its also called linear
sequesntial model”
Waterfall Model:
REQUIREMENT
DESIGN
DEVELOPMENT
TESTING
DEPLOYMENT
MAINTENANCE
Agile vs Waterfall model
Waterfall Agile
A sequential process; once a step
has been completed, developers
can’t go back to a previous step.
Agile came about as a “solution” to the
disadvantages of the waterfall. Quick and
easy develop and deploy
Waterfall methodology relies
heavily on initial requirements. NO
further changes allowed.
The Agile methodology allows for changes to
be made after the initial planning.
If a requirement error is found, or
a change needs to be made, the
project has to start from the
beginning
It’s easier to add features that will keep you
up to date
The whole product is only tested at
the end so bugs caused by very
initial phases will be detected at
later stage
The requirements are tested from the very
beginning so early detection of bugs is an
advantage.
• Sprint & Scrum
• Lean & Kanban
• XP (Extreme Programming)
• RAD (Rapid Application Development)
Agile Methods
• Scrum is an Agile development method
• Simple way to implement agile in product
development
• Its Management and control process for development
and testing
• The product is developed in an incremental order
Scrum
Roles
Product Owner Scrum Master Scrum Team Members
A person from business
end
Facilitator for PO and
Team
Cross-functional group of
people
Managing product
Backlogs
To clear the hurdles
faced by team
Estimates the size and
complexity of the work
Prioritizes and refines the
backlog
Makes sure team is
following the agile
practices
The core technical team that
works on requirements
person to add the tasks in
sprint and approve the
demo in product review
Set up sprint planning,
scrum meeting , review
and retrospective
Design, develop and test the
business requirements
Scrum Lifecycle in Agile
1. Product
Backlog
2. Sprint
Meeting
Sprint
1-4
weeks
4. Daily Scrum meets or
stand-ups
6. Sprint
Retrospective
5. Sprint Review (Demo
product)
3. Task
Burndown
Shippable
product
Agile – scrum lifecycle
(Source: wiki)
sprint planning
• Sprint Window : 1 week (5 days)
• Per day workable hours : 6 hrs
• Resources (2 developer & 2 tester) : 4
Total time : 5*6*4 = 120 hrs
Task1 - Estimated time = 10hrs
Task2 - Estimated time = 5 hrs
Product Backlog
“A product backlog is a prioritized list of
business requirements”
A typical Scrum backlog comprises the following different types of
items:
• Features
• Bugs
• Non-functional features
• or any other technical stuff
Sprint planning
“In scrum methodology each work
iteration is called a Sprint.”
• Every Scrum begins with the sprint planning meeting.
• In which the Product Owner and the team(s) discuss which stories will
be moved from the Product Backlog into the sprint backlog.
• It is the responsibility of the Product Owner to determine what work
the team will do.
• Once the team commits to the work, the Product Owner cannot add
more work or micromanage.
• The Product Owner can cancel a Sprint, which shouldn’t happen often,
and would usually occur due to a sudden change in business needs.
Scrum Meeting or stand-ups
“Standup meetings are the daily 15
minutes catch up among all team
members and scrum master, where they
update each other about
• what they did the previous day
• what they will do today and
• what are the road blockers.”
Burndown
“A burndown chart is a graphical
representation of work left to do versus
time”
The daily analysis of task remaining and time remaining to complete the
sprint and assess whether we are on time or behind the schedule.
“Sprint review meet is held at the end of each
sprint and a demonstration of developed work
will be done to stakeholders”
The meeting itself should be strictly time boxed to no more
than an hour per week of Sprint. So a two-week Sprint would
have a two-hour review and a one-week sprint a one-hour
review.
▶ Reviews the work that was completed and the planned work
that was not completed
▶ Presents the completed work to the stakeholders
Sprint Review
Sprint Retrospective
“At the end of the sprint whole team gathers to reflect
how things went and what they’d like to change. This
meeting is called the Sprint Retrospective meeting.”
Take away:
1: What worked well
2: What didn’t work well
3: Actions to improve
Jira
● Jira is a tool developed by
Atlassian an australian
company
● It’s a project management
and bug management tool
● Jira is a truncation of
Gojira, the Japanese name
for Godzilla
Jira
Epic: An epic captures a large body of work. It is
essentially a large user story that can be broken
down into a number of smaller stories. It may take
several sprints to complete an epic.
Story: A story or user story is a software system
requirement that is expressed in a few short
sentences, ideally using non-technical language.
Task: A task is a unit of work contained within a
story. In JIRA Agile
Sub-task: A individual task within a task in called a
sub task
Thankyou!
INTRODUCTION TO
AUTOMATION TESTING
& CONTINUOUS INTEGRATION TESTING
Video 14
INTRODUCTION
● Automating the manual testing process by using
any tool is automation testing.
● Using a tool to execute the test cases is
automation testing.
● Test automation requires the significant amount
of Money and skills.
● Significant amount of time can be saved by
automation
● Not everything can be automated
MANUAL vs AUTOMATION
Manual Automation
Manual Testing is done manually by
humans
Automation testing is done with the help
of a tool
To test the same thing it takes much
time
It takes less time in execution but
writing automation script may take
longer time
More resource required Less resource required
New features are usually tested
manually first
regression test cases are executed with
automation
Executing same test cases on multiple
environment is very time consuming
Same automation script can be run on
multiple machines
Manual testing is not accurate at all Automated testing is more reliable, as it
When to automate
● High Priority - Business Critical features
● Test cases that are executed repeatedly
● Test Cases that are very tedious or difficult to
perform manually
● Test Cases which are time consuming
a sample Automation Model
When not to automate
● Exploratory Testing
● Ad-hoc Testing
● Usability Testing
Continuous integration
Continuous Integration (CI) is a development practice
that requires developers to integrate code into a
shared repository several times a day. Each check-in
is then verified by an automated build, allowing
teams to detect problems early.
By integrating regularly, you can detect errors
quickly, and locate them more easily.
Continuous integration Testing (CIT)
Architecture - in Agile model
Benefits
● Faster than the manual execution
● Reliable and accurate test results
● Saves time and cost
● Reusable test scripts
● Increased efficiency
● Tests can be triggered automatically based on
some conditions
● Early Testing can be obtained
Tools
Testing Type Automation Tool
Functional & Regression Testing ● Selenium WebDriver
● HP UFT (QTP)
● WATIR
● Silktest
● Rational Functional Tester
Client side performance testing ● JMeter
● Load Runner
● Neo Load
Server side performance
testing
New Relic
API Testing ● JMeter
● ReadyAPI
● POST MAN
Thankyou!
WHAT TO TEST IN A
WEBSITE & A MOBILE APP
Video 15
What to test in a Website
INTRODUCTION
Two broad testing types
● Functional Testing
● Non Functional Testing
What to test in website
Functional Test
● Smoke or sanity testing
● Functional Test
○ Check the newly added / modified
features for latest release
○ Check all internal/External links
○ Check the form/field validations
○ Check the submit actions for forms
○ Check the database connection and
integrity
● Regression Test
What to test in website
Non-Functional Test
● Performance Testing
○ Check the Page load times on different net speeds
○ Test the page response times on different loads
○ Check the server response time
○ Check that whether your application assets are optimized or
not
○ Test with: https://testmysite.thinkwithgoogle.com/ gives
very useful details about your website
● Security Testing
● Compatibility Testing
○ Test to check the application's responsiveness on different
different devices, Oss, browsers and browser versions
● Usability Testing
○ Test for Navigations
○ Test for look and feel (no overlapping, Website
instructions,Error msgs)
What to test in a Mobile app
INTRODUCTION
● Device specific Tests
● Network specific Test
● App Functional-NonFunctional Tests
What to test in Mobile app
DEVICE SPECIFIC TESTS
1 Check the App installation/uninstallation in device
2 Check the launching of the app in device(verify splash screens, load time,
presentation)
3 Connect/Disconnect the charger, check that the running app is not impacted
4 Lock/unlock the screen and check that running app has no impact
5 Go to home and come back to your app (sleep the app)
Check that you can switch to other apps in device smoothly
6 Tilt and shake to check the impact on your running app
7 Check the device notifications are not impacting the running app
8 Check that no data network connection is displayed if your app needs a data
connection
9 Check that app interacts with device hardware (like GPS)
10 All device buttons have associated action for your app
What to test in Mobile app
NETWORK SPECIFIC TESTS
1 Check the App behavior on 2G, 3G and WiFi internet connections
2 Check the App behavior in no network condition
3 What happens if user switch from one data network to another
4 Lock/unlock the screen and check that running app has no impact
5 Interruption Testing : Does the app resumes when a call comes
6 Interruption Testing : Does the app resumes when a message comes
7 Check the device notifications are not impacting the running app
8 If app has a transaction system then how the transaction behaves during
network fluctuations
9 Check the app’s background data connections can be changed
10 How app behaves in Flight Mode
What to test in Mobile app
Functional/NonFunctional
Functional - During this testing tester has to focus on the business requirements
that the application must deliver or perform
Non-Functional -
Check the application’s heap memory
Check the application’s RAM memory usage
Check the application’s CPU usage
Compatibility: On different OS versions and on different Devices
Usability: Check that user has no issue with the usability of the app
Check that the cache memory can be cleaned
Check the app’s performance on different sets of configurations
Thankyou!
International Software Testing Qualification Board
TIPS TO CLEAR ISTQB-
FOUNDATION LEVEL
CERTIFICATION
Video 16
INTRODUCTION
● International Software Testing Qualification Board
● Is a software testing qualification certification
organisation that operates internationally
● Founded in Edinburgh in November 2002
● ISTQB is a non-profit association legally registered
in Belgium
● The ISTQB® is a software testing qualification
certification organization having over 350,000
certifications issued.
● The ISTQB® consists of 49 member boards
worldwide representing 72 countries
● Official site http://www.istqb.org/
ISTQB CERTIFICATION
There are three levels of certification:
● ISTQB Certified Tester Foundation Level (CTFL)
● ISTQB Certified Tester Advanced Level (CTAL)
Test Manager
Test Analyst
Technical Test Analyst
Advanced Level (CTAL) - Full Advanced Level (after passing the above
exams of Advanced Level)
● Expert Level
Improving the Test Process
Test Management
Test Automation
Security Testing
ISTQB CERTIFICATIONS
FOUNDATION LEVEL
CERTIFICATION
The Foundation level offers the following exams:
★ Foundation level core (1 syllabus )
★ Foundation level specialist(4 syllabi, two of them
currently available, two of them undergoing
development)
★ Agile Tester
★ Model-Based Tester
★ Usability Tester (in development)
★ Automotive Tester (in development)
QUESTIONS and TIME
PASSING SCORE
● Total 40 questions (at least 26 questions should
be right)
● Time: 1hr (15 minutes Extra for non-native
language person)
● Passing Score 65%
● Fees - 4500 INR
if reappearing - 2800 INR
...and No Negative marking :)
How to clear ISTQB tip 1
Go through the ISTQB syllabus
Find the updated syllabus here (official ISTQB site):
Link: http://www.istqb.org/downloads/syllabi/foundation-level-
syllabus.html
How to clear ISTQB tip 2
Go through the ISTQB book at least once
Download the e-books from here (official ISTQB site)
Link: http://www.istqb.org/downloads/e-books.html
How to clear ISTQB tip 3
Go through the ISTQB Exam documents
Exam Document here:
Link: http://www.istqb.org/downloads/exam-documents.html
How to clear ISTQB tip 4
Practice the mock questions
Search for the sample papers and keep practicing the exercises.
A good collection is here:
http://istqbexamcertification.com/istqb-dumps-download-mock-tests-
and-sample-question-papers/
This will help you out to find your weak areas, practice more on
that.
But never rely completely on sample questions as these are not
the one that will show up in exam.
How to clear ISTQB tip 5
Make a list of terminologies and keep checking
that.
How to clear ISTQB tip 6
Almost all the answer options will look similar so
always read carefully and understand properly.
so read questions carefully
and read the options too… double check!
Thankyou!

Software testing course - Manual

  • 1.
  • 2.
    WHAT IS TESTING Googlesays: “a procedure intended to establish the quality, performance, or reliability of something, especially before it is taken into widespread use.”
  • 3.
    “Software testing isa process of executing a system or system component in order to find bugs and errors.” Or “Software testing is process of Verification and Validation (v&v), performed on Application under Test (AUT) with an intention of finding bugs and errors.” SOFTWARE TESTING IS:
  • 4.
  • 5.
    “STLC stand forSoftware Testing Lifecycle. STLC is a set of process which is executed in a systematic manner to achieve the testing goal” STLC
  • 6.
    STLC PHASES: TEST PLANNING TESTDESIGNING TEST ENVIRONMENT TEST EXECUTION BUG REPORTING & MANAGMENT RTM (REQUIREMENT TRACEABILITY MATRIX) TEST REPORTING
  • 7.
    PLANNING ● Test Objective ●Test Strategy ● Resources ● Schedules & timelines ● Risks ● Entry & Exit Criteria TESTING PHASES
  • 8.
    TESTING PHASES DESIGNING ● TestScenarios ● Test Cases ● Test scripts
  • 9.
    ENVIRONMENT ● QA Environment ●Test Data ● Tools and Technologies or Software and hardwares TESTING PHASES
  • 10.
    BUG MANAGEMENT ● Howto raise a bug ● Bug components ● Bug lifecycle TESTING PHASES
  • 11.
    TEST REPORTING ● Testresults ● Bug report ● Test coverage ● Lesson learnt TESTING PHASES
  • 12.
    TESTING IMPORTANCE Testing isimportant, to make sure: • All business requirements are implemented • Functionalities are behaving as expected • Application is secure enough • Does not break under working circumstances • Does not harm the business reputation • Performs its functions within an acceptable time • Works well on all supported OS, devices and screens • To make sure that customer can trust and rely on your product
  • 13.
    A CLASSIC EXAMPLE “NASA’sclimate orbiter was lost due to the two agencies NASA and Lockheed Martin used two different measurement units and that was not tested or was left during the testing.”
  • 14.
  • 15.
    KNOW THE DIFFERENCE QA,QC & TESTING Video 2
  • 16.
    “A product’s degreeof excellence is quality. Quality can be judged by how product matches with requirement and how accurately and/or efficiently the work can be done” QUALITY
  • 17.
    “QA is asystematic and scientific approach of monitoring and improving the software development process.” It’s a verification activity and the idea behind this is to prevent the errors occurring in software development process. QA
  • 18.
  • 19.
  • 20.
  • 21.
    “QC is avalidation activity where the quality of the developed product is evaluated with a benchmark or any competitive program’s set standard to make sure that the software quality is adhering the defined or expected quality.” QC
  • 22.
  • 23.
    The difference: QUALITY ASSURANCEQUALITY CONTROL QA is a verification process QC is a validation activity QA is process oriented QC is product oriented QA prevents the defect QC finds the defect It improves the development process It improves the developed product quality Requirement document, design review and code reviews are done as part of this Product testing is done as part of this activity Performed without the program execution Performed by executing the program
  • 24.
    “Testing is avalidation activity so it comes under QC. Wherein the developed program is executed with an intention of finding bugs” TESTING
  • 25.
  • 26.
    SOFTWARE DEVELOPMENT LIFECYCLE SDLC Video 3
  • 27.
    “SDLC stands forSoftware Development Life Cycle. SDLC defines the standard phases involved throughout the software development.” SDLC
  • 28.
    SDLC PHASES Deployment Requirement Analysis Projectplanning Maintenance Project Designing Testing Development
  • 29.
    ▶ Waterfall Model ▶Spiral model ▶ Prototype Model ▶ Iterative and Incremental Model ▶ V -Model ▶ W-Model ▶ Agile Mode SDLC MODELS
  • 30.
    “Waterfall model isa sequential development model where each phase of SDLC is executed one after another in a linear way so its also called linear sequential model” Waterfall Model: REQUIREMENT DESIGN DEVELOPMENT TESTING DEPLOYMENT MAINTENANCE
  • 31.
    “The spiral modelis a risk-driven process model generator for software projects. Based on the unique risk patterns of a given project, the spiral model guides a team to adopt elements of one or more process models, such as incremental, waterfall, or evolutionary prototyping.” Spiral Model:
  • 32.
    “In this modela software prototype will be created to understand that whether it satisfies the stakeholder’s requirements.” Prototype Model: Prototyping is used to allow the users evaluate developer proposals and try them out before implementation
  • 33.
    “In incremental modelthe whole requirement is divided into various builds. Multiple development cycles uses waterfall model. Cycles are divided up into smaller, more easily managed modules.” Incremental Model:
  • 34.
    “In V modelof SDLC the real development phases and testing plans goes side by side as It can be interpreted as in a 'V’ shape” V Model: REQUIREMENT ANALYSIS UAT (USER ACCEPTANCE TESTING) HIGH LEVEL DESIGN SYSTEM TESTING LOW LEVEL DESIGN or SPECIFICATION INTEGRATION TESTING CODING UNIT TESTING
  • 35.
    “In V modelof SDLC the real development phases and testing plans goes side by side as It can be interpreted as in a 'V’ shape” W Model: REQUIREMENT ANALYSIS UAT (USER ACCEPTANCE TESTING) HIGH LEVEL DESIGN SYSTEM TESTING LOW LEVEL DESIGN or SPECIFICATION INTEGRATION TESTING CODING UNIT TESTING REQUIREMENT REVIEW HLD Review SPECIFICATION Review Code Review DEPLOYMENT BUILD CODE MERGE
  • 36.
    “Agile is asoftware development model that gives the flexibility to develop, test and deploy the things quickly and easily.” or “Agile is software development model that implements the continuous iteration approach to develop and deploy a product where requirement changes very frequently”. AGILE MODEL:
  • 37.
  • 38.
  • 39.
    “A test planis a document that describes that what and how to achieve something in AUT (Application Under Test).” TEST PLANNING: Making of a test plan is very first step in software testing lifecycle and it defines the rule, covers the scope, analyzes the available resources, timeline and risks associated with the testing of a project.
  • 40.
    Follow the belowmentioned steps to make a good test plan document: ▶ Analyze the business requirement ▶ Find the test objective ▶ Define a Test Strategy ▶ Analyze the risks (Tools, Resources and Time) ▶ Test Environment and Test Data preparation ▶ Define Entry & Exit Criteria ▶ Define a Traceability Matrix ▶ Schedule and Timeline ▶ Deliverable TEST PLAN DOCUMENT:
  • 41.
    ▶ Understand therequirement by going through the requirement document ▶ Note down and resolve your queries ▶ Get a product or document reviewed ANALYZE BUSINESS REQUIREMENT:
  • 42.
    The objective ofthe testing is finding as many valid defects as possible and ensure that the software under test is bug free before release. In this phase you need to find out the core motive of your product. You should need to know ▶ Bug Free features ▶ Smooth performance ▶ No security threats FIND TEST OBJECTIVE:
  • 43.
    “Test strategy definesthe software testing approach to achieve the testing goal. Usually the test strategy document is created by Test Manager and It says what type of technique to follow and which module (scope) to test” Test strategy can be defined that: ▶ How to get maximum requirements under testing umbrella by putting minimal effort ▶ What sort of testing you need to perform ▶ What tools will be required DEFINE TEST STRATEGY:
  • 44.
    ▶ Find outthat do you have available tools required for testing ▶ Find out that do you have required skills to test ▶ Find out if you have enough resources to complete the task in the given time frame ▶ Find out that you have sufficient time to complete the testing ANALYZE THE RISKS:
  • 45.
    “Test Environment isalso called Test Bed setup, it means laying down all the needed softwares or hardwares required for a tester to execute the test scripts.” “In order to work on something or to process any request a tester need some data which they can place as an input and that’s called a test data” TEST ENVIRONMENT & TEST DATA PREPARATION:
  • 46.
    “Entry criteria isthe prerequisites that must needs to be fulfilled before test team can begin the testing.” In most of the places smoke/sanity testing is defined and the cases of smoke sanity must be passed as condition of Entry criteria. DEFINE ENTRY CRITERIA:
  • 47.
    “Exit criteria aresome conditions that must be fulfilled by test team before they can conclude their testing activities” like the test coverage should reach 100% of traceability matrix, all the test deliverable are shared and many other things. ▶ Verify that all business requirements are covered as part of testing ▶ No critical bugs are in open state DEFINE EXIT CRITERIA:
  • 48.
    The Requirement TraceabilityMatrix or RTM is a document that maps the business requirement and test cases to trace the coverage of testing at any given point of time and to ensure that no requirement is missed as part of the testing. The main purpose of Requirement Traceability Matrix is to see that all test cases are covered so that no functionality should miss while testing. DEFINE TRACEABILITY MATRIX:
  • 49.
    DEFINE SCHEDULE& TIMELINE: PlanningDesigning Execution X Days Y Days Z Days
  • 50.
    DEFINE DELIVERABLES: Test deliverableare the documents, scenarios, test cases, test scripts, test data, screenshots and bug reports that is shared during or after the testing life cycle.
  • 51.
  • 52.
    TEST DESIGNING TEST SCENARIOS,TEST CASES & TEST SCRIPTING Video 5
  • 53.
    TEST SCENARIOS: Test scenariomeaning finding out that ‘what to be tested’ in any given requirement. This is to make sure that end 2 end functionality is covered. or “Test scenarios are the high level classification of test requirement grouped depending on the functionality of a module”
  • 54.
    TEST SCENARIO EXAMPLE: Requirement:‘Login the website, select and play your favourite music’ Scenario 1: Test the login function Scenario 2: Search for the music based on different genres and play Scenario 3: Create your music playlist Scenario 4: Play the songs from your playlist
  • 55.
    TEST CASE: “ Atest case, in software testing, is a set of conditions under which a tester will determine whether an application, software system or one of its features is working as it was developed and expected to do.”
  • 56.
    TEST CASE EXAMPLE: Let’spick 2 scenario from scenario example: Scenario 1: Test the login function TC 1: Test the login function with valid credentials TC 2: Test the login function with invalid credentials and verify the result TC 3: Check and validate the error msgs for login errors Scenario 2: Search for the music based on different genres and play TC1: Search for specific genre songs and play them TC2: Check the player functionalities (play, pause, stop, forward, ..) TC3: Check that the songs can be added in your playlist
  • 57.
    TEST SCRIPTING “In orderto execute test cases a detailed procedure needs to be written where the writer will mention all the steps to be performed and what should be the expected result for each activity”
  • 58.
  • 59.
    BLACK BOX TECHNIQUES BVA,ECP, DECISION TABLE & USE CASE TESTING Video 7
  • 60.
    TECHNIQUES “Test Case designingtechnique is needed to get the maximum coverage by using an optimal number of test cases. ▶ Equivalence Class Partitioning ▶ Boundary Value Analysis ▶ Decision Table ▶ Use Case Testing
  • 61.
    Equivalence Class Partitioning “ECPis a testing technique that divides the input test data into partitions of equivalent classes and from each class minimum one data must be tested at least once.”
  • 62.
    BVA Example Scenario: Assumethat there is an input field for age and it accepts the values from 1-100. So, if we follow the ECP concept then: Valid Class values from 1 -100 Invalid Class values below 1 (0- anything) Invalid Class values above 100 (101- anything) Class A : Any value from valid input data domain : 1-100 Class B : Any value which is lower than lowest : 0,-1,-2.. Class C : Any value which is higher than Highest : 0,-1,-2.. Class D: Any alphanumeric : A1, B1, C1 Class E: Any decimal values: 1.1,1.2,1.3
  • 63.
    Boundary Value Analysis “Moreapplication errors occur at the boundaries of input domain. ‘Boundary value analysis’ testing technique is used to identify errors at boundaries instead of finding errors in center of input domain.”
  • 64.
    BVA Example Scenario: Assumethat there is an input field for age and it accepts the values from 1-100. So, if we follow the ECP concept then: Valid Boundary values 1 & 100 one lower than lowest = 0 one higher than highest = 101 Boundary Value: 1 & 100 Invalid values for negative test cases: 0 & 101
  • 65.
    Decision Table “Decision tabletechnique is used in complex business scenarios where the input data will be determined based on some conditions.” Ex: Conditions 1 2 2 Cash Yes No No Coupon N/A Yes No Actions Order Placed Yes Yes No
  • 66.
    USE CASE Testing ▶Use Cases capture the interactions between 'actors' and the 'system'. ▶ A use case is a description of a particular use of the system by an actor. Each use case describes the interactions the actor has with the system in order to achieve a specific task.
  • 67.
  • 68.
  • 69.
  • 70.
    .. A SIGNUPFORM EXAMPLE
  • 71.
  • 72.
    WHITE BOX, BLACKBOX & GRAY BOX TESTING Video 8
  • 73.
    WHITE BOX TESTINGor Structural Testing or Glass Box Testing ▶ Testing the code and internal structure comes under white box testing. ▶ Code’s internal structure, design and implementation is tested as part of white box testing. ▶ It is also known as ‘glass box testing’ or ‘Open box testing’ or ‘Structural Testing’.
  • 74.
    WHITE BOX TESTINGTYPE UNIT TESTING: Once the developer develops their piece of segment, each individual component is tested independently in this testing for their expected outcomes. INTEGRATION TESTING: When two independent units of codes merged then checking that whether they functioning together is called integration testing.
  • 75.
    WHITE BOX TESTING TECHNIQUES-CODE COVERAGE STATEMENT COVERAGE This technique requires every possible statement in the code to be tested at least once during the testing process BRANCH COVERAGE This technique checks every possible path like if-else and other conditional loops of a software application
  • 76.
    WHITE BOX TESTINGIS PERFORMED TO FIND CODE COVERAGE ▶ Poorly structured codes ▶ Output of the code ▶ Conditional loops ▶ Internal security holes ▶ Cover branch and statement
  • 77.
    BLACK BOX TESTING “Black Box Testing is the testing method where Functional and nonfunctional aspects of the application is tested without looking into the code.” Also known as Behavioural Testing or close box testing.
  • 78.
    Black Box Testis performed to check ▶ Missing on incorrect features ▶ Performance errors ▶ Security errors ▶ Database connection ▶ APIs ▶ ...
  • 79.
    BLACK BOX TESTINGTYPES ▶ FUNCTIONAL TEST ◦ Smoke/Sanity ◦ Feature testing ◦ Regression testing ◦ System Testing ◦ UAT ▶ NONFUNCTIONAL TEST ◦ Performance (Load/stress/soak) ◦ Compatibility testing ◦ Usability testing ◦ GUI testing
  • 80.
    GARY BOX TESTING “GrayBox Testing is a combination of White box testing and black box testing. The idea is to find the : Improper structure and/or Improper usage of application” ▶ It is based on functional specification, UML Diagrams, Database Diagrams or architectural view ▶ Grey-box tester handles can design complex test scenario more intelligently
  • 81.
  • 82.
  • 83.
    UNIT TESTING Once thedeveloper develops their piece of segment, each individual component is tested independently in this testing for their expected outcomes.
  • 84.
    INTEGRATION TESTING When twoindependent units of codes merged then checking that whether they functioning together is called integration testing.
  • 85.
    Integration Testing STUBS& DRIVERS Stubs and drivers are the dummy piece of code called in to create an integrated environment where some work is not completed yet or not available for testing. ▶ Stubs are used during top down integration approach ▶ Drivers are used In bottom up integration approach
  • 86.
  • 87.
    SMOKE/SANITY TESTING ▶ Smoke/sanitytesting is also called Build verification testing or confidence testing ▶ The motive of this testing is to ensure that the major & critical functions are working as expected ▶ So that the test team can get enough level of confidence about the application’s stability and can execute the other testings.
  • 88.
    SMOKE/SANITY TESTING Example: Smoketesting is collection of test cases that covers the most crucial functions of AUT (Application Under Test). An example of smoke/sanity test cases for a website: ▶ URL is accessible ▶ User is able to login ▶ The payment is being successful
  • 89.
  • 90.
  • 91.
    Functionality TESTING “For anynew release of the product, testing the added or modified requirement is called functional testing.” Functional testing is done to check that all the business functionalities are working ok as expected and it will fulfill the end user’s requirement.
  • 92.
    Regression TESTING When anew functions is added or an existing application function is modified then checking the existing features is called regression testing as the newly added/modified feature may create some side effects for other features. ▶ This testing is done after every release ▶ Regression test suite shall be updated after every new release.
  • 93.
  • 94.
    Retesting Once a bugis fixed then checking the same functionality again to ensure that the bug fix is ok is called retesting. This testing is done to ensure that bug fix is working ok and based on that the bug status will be updated as fixed or reopened.
  • 95.
    SYSTEM TESTING ▶ Systemtesting is testing the whole system in integrated environment with all necessary software and hardwares. ▶ Usually performed in E2E (End 2 End) environment In complex business scenarios one system work with collaboration of so many other systems, so testing your application when it is integrated with all other applications is called system testing.
  • 96.
    EXPLORATORY TESTING When thereis a requirement or an application to test but with no relevant document or details provided to tester the tester explores the application and keep checking the features to figure out the issues is known as Exploratory Testing. It’s a format of unstructured testing.
  • 97.
    UAT ▶ UAT standsfor User Acceptance Testing ▶ Where the product is evaluated as per the end user’s requirement ▶ Performed by the end users or stakeholders ▶ Product is evaluated that whether it matches with business requirement or not and whether to accept or reject the product ▶ Usually the last type of testing ▶ UAT has 2 types Alpha testing and Beta Testing
  • 98.
    Alpha & BetaTesting Alpha Testing Beta Testing Performed by testers in testing environment Performed by real end users in live environment Alpha Testing performed at developer's site Beta testing is performed at client location or end user of the product Alpha testing comes before beta testing Beta testing is performed after alpha testing Alpha testing involves both the white box and black box techniques Beta Testing typically uses black box testing Alpha testing is conducted within the organization and tested by representative group of end users Beta testing is conducted by the end users
  • 99.
  • 100.
  • 101.
    PERFORMANCE TESTING Performance testingis a test done to determine how a system performs in terms of speed, load and stability under a particular workload Performed to check the reliability of the application. Performance testing types are: ▶ Load Testing ▶ Stress Testing ▶ Soak Testing
  • 102.
    PERFORMANCE TESTING TYPES LoadTesting Load testing is done to determine how the application behaves under a specific load. Example - Check that what is the page load time if 10 concurrent users access the same page at a time
  • 103.
    PERFORMANCE TESTING TYPES StressTesting This testing is performed to check the breakpoint of the application so that the team can plan for load balancer.
  • 104.
    PERFORMANCE TESTING TYPES SoakTesting Soak testing is done to check that how the application behaves when the app gone through under a specific load for a specific time.
  • 105.
    SECURITYTESTING Security testing isa testing process intended to reveal flaws in the security mechanisms of an application to protect data, sensitive information. ▶ This testing is done to check the vulnerabilities in the application and fix it. ▶ To ensure that the sensitive data travels in encrypted format ▶ To insure that no unauthorized access can be made
  • 106.
    COMPATIBILITY TESTING 1/2 ▶Compatibility Testing is done to check the application’s responsiveness across various OS, Devices & browsers. ▶ This testing is done to check the applications rendering and usability ▶ This testing is done to make sure that all target devices are covered
  • 107.
    COMPATIBILITY TESTING 2/2 Usecloud service to perform compatibility testing Saucelabs Browserstack Or, use google chrome developer mode to check the responsiveness
  • 108.
    COMPATIBILITY TESTING A snippetof Browserstack.com responsive test page
  • 109.
  • 110.
  • 111.
    SOFTWARE BUG/DEFECT In generalsoftware testing language “During an application testing any deviation in actual result and expected result is called a bug.” whereas Bug and Defects has slightly difference: BUG: DEFECT: FAILURE:
  • 112.
    BUG, DEFECT &FAILURE BUG: A bug is the result of a coding error. Bug is the general term used for all issues caught in testing environment. DEFECT: A defect is a deviation from the requirements. Defect word is used by the business persons or stakeholder. FAILURE: Any issue which is passed to live users and impacting the applications motive is called a product failure.
  • 113.
    How to raisea Bug? Consider the below mentioned 10 point as a must to raise an effective bug 1) Summary 2) Description 3) Component or Assigned to 4) Steps to reproduce with Test Data and URLs 5) Logs & screenshot 6) Requirement reference 7) Release Name /Build Number / Sprint name 8) Environment 9) Priority 10)Severity
  • 114.
    PRIORITY & SEVERITY Priority Theimpact of the bug or function on business level is called priority. Priorities are defined as : P1, P2 & P3 Severity The impact of the bug or function on Application level is called priority. Severities are defined as : Major, minor, critical, blocker
  • 115.
  • 116.
    BUG MANAGEMENT TOOLSAND IMPORTANCE ▶ BugZilla ▶ Mantis ▶ Hp-QC or HP-ALM ▶ Zira
  • 117.
    NON REPRODUCIBLE BUGS Whena tester reports a valid bug but the same bug can not be reproduced by others due to any reason is called a non-reproducible bug. The reason could be : 1) Test Environment 2) Test locations 3) Test Data 4) System configuration 5) System of server cache memory
  • 118.
    How to dealwith NON REPRODUCIBLE BUGS ▶ Provide proper story and not just steps ▶ Record a video or capture a screenshot for proof ▶ Provide the system log, application log and server logs ▶ Provide the time of execution ▶ Provide the location of test execution Try to reproduce the bug by clearing the system cache memory Try to clear the server side cache (to clear the server side cache put ?nocache=1 at the end of the URL and hit enter)
  • 119.
  • 120.
  • 121.
    TEST MANAGEMENT TOOL “TestManagement tools are the tools required to manage whole testing activity and reporting in an organized manner.”
  • 122.
    TEST MANAGEMENT TOOL Feature 1:Manage the build and versioning for test 2: To manage the Test scenarios, Test Case and Test scripts 3: To map the requirements and test scenarios, test cases 4: To update the test case status while executing 5: To update the test cases with a defect 6: To track the test progress 7: To generate the test report 8: To maintain the test history
  • 123.
    TEST MANAGEMENT TOOLs ▶HP ALM (Application lifecycle management) or HP- QC (Quality centre, is the older version of ALM) ▶ JIRA ▶ q-Test ▶ Testlink ▶ Zephyr
  • 124.
  • 125.
    A DETAILED EXPLANATIONOF SCRUM METHOD AGILE MODEL Video 13
  • 126.
  • 127.
    • A SDLCmodel to build an application fast in very short span of time • Delivers workable modules after each release • Development and Testing goes side by side • A combination of iterative and incremental approach Agile is:
  • 128.
  • 129.
    “SDLC stands forSoftware Development Life Cycle. SDLC defines the standard phases involved throughout the software development.” SDLC
  • 130.
    SDLC PHASES Deployment Requirement Analysis Projectplanning Maintenance Project Designing Testing Development
  • 131.
    ▶ Waterfall Model ▶Spiral model ▶ Prototype Model ▶ Iterative and Incremental Model ▶ V -Model ▶ W-Model ▶ Agile Mode SDLC MODELS
  • 132.
    “Waterfall model isa sequential development model where each phase of SDLC is executed one after another in a linear way so its also called linear sequesntial model” Waterfall Model: REQUIREMENT DESIGN DEVELOPMENT TESTING DEPLOYMENT MAINTENANCE
  • 133.
    Agile vs Waterfallmodel Waterfall Agile A sequential process; once a step has been completed, developers can’t go back to a previous step. Agile came about as a “solution” to the disadvantages of the waterfall. Quick and easy develop and deploy Waterfall methodology relies heavily on initial requirements. NO further changes allowed. The Agile methodology allows for changes to be made after the initial planning. If a requirement error is found, or a change needs to be made, the project has to start from the beginning It’s easier to add features that will keep you up to date The whole product is only tested at the end so bugs caused by very initial phases will be detected at later stage The requirements are tested from the very beginning so early detection of bugs is an advantage.
  • 134.
    • Sprint &Scrum • Lean & Kanban • XP (Extreme Programming) • RAD (Rapid Application Development) Agile Methods
  • 135.
    • Scrum isan Agile development method • Simple way to implement agile in product development • Its Management and control process for development and testing • The product is developed in an incremental order Scrum
  • 136.
    Roles Product Owner ScrumMaster Scrum Team Members A person from business end Facilitator for PO and Team Cross-functional group of people Managing product Backlogs To clear the hurdles faced by team Estimates the size and complexity of the work Prioritizes and refines the backlog Makes sure team is following the agile practices The core technical team that works on requirements person to add the tasks in sprint and approve the demo in product review Set up sprint planning, scrum meeting , review and retrospective Design, develop and test the business requirements
  • 137.
    Scrum Lifecycle inAgile 1. Product Backlog 2. Sprint Meeting Sprint 1-4 weeks 4. Daily Scrum meets or stand-ups 6. Sprint Retrospective 5. Sprint Review (Demo product) 3. Task Burndown Shippable product Agile – scrum lifecycle (Source: wiki)
  • 138.
    sprint planning • SprintWindow : 1 week (5 days) • Per day workable hours : 6 hrs • Resources (2 developer & 2 tester) : 4 Total time : 5*6*4 = 120 hrs Task1 - Estimated time = 10hrs Task2 - Estimated time = 5 hrs
  • 139.
    Product Backlog “A productbacklog is a prioritized list of business requirements” A typical Scrum backlog comprises the following different types of items: • Features • Bugs • Non-functional features • or any other technical stuff
  • 140.
    Sprint planning “In scrummethodology each work iteration is called a Sprint.” • Every Scrum begins with the sprint planning meeting. • In which the Product Owner and the team(s) discuss which stories will be moved from the Product Backlog into the sprint backlog. • It is the responsibility of the Product Owner to determine what work the team will do. • Once the team commits to the work, the Product Owner cannot add more work or micromanage. • The Product Owner can cancel a Sprint, which shouldn’t happen often, and would usually occur due to a sudden change in business needs.
  • 141.
    Scrum Meeting orstand-ups “Standup meetings are the daily 15 minutes catch up among all team members and scrum master, where they update each other about • what they did the previous day • what they will do today and • what are the road blockers.”
  • 142.
    Burndown “A burndown chartis a graphical representation of work left to do versus time” The daily analysis of task remaining and time remaining to complete the sprint and assess whether we are on time or behind the schedule.
  • 143.
    “Sprint review meetis held at the end of each sprint and a demonstration of developed work will be done to stakeholders” The meeting itself should be strictly time boxed to no more than an hour per week of Sprint. So a two-week Sprint would have a two-hour review and a one-week sprint a one-hour review. ▶ Reviews the work that was completed and the planned work that was not completed ▶ Presents the completed work to the stakeholders Sprint Review
  • 144.
    Sprint Retrospective “At theend of the sprint whole team gathers to reflect how things went and what they’d like to change. This meeting is called the Sprint Retrospective meeting.” Take away: 1: What worked well 2: What didn’t work well 3: Actions to improve
  • 145.
    Jira ● Jira isa tool developed by Atlassian an australian company ● It’s a project management and bug management tool ● Jira is a truncation of Gojira, the Japanese name for Godzilla
  • 146.
    Jira Epic: An epiccaptures a large body of work. It is essentially a large user story that can be broken down into a number of smaller stories. It may take several sprints to complete an epic. Story: A story or user story is a software system requirement that is expressed in a few short sentences, ideally using non-technical language. Task: A task is a unit of work contained within a story. In JIRA Agile Sub-task: A individual task within a task in called a sub task
  • 147.
  • 148.
    INTRODUCTION TO AUTOMATION TESTING &CONTINUOUS INTEGRATION TESTING Video 14
  • 149.
    INTRODUCTION ● Automating themanual testing process by using any tool is automation testing. ● Using a tool to execute the test cases is automation testing. ● Test automation requires the significant amount of Money and skills. ● Significant amount of time can be saved by automation ● Not everything can be automated
  • 150.
    MANUAL vs AUTOMATION ManualAutomation Manual Testing is done manually by humans Automation testing is done with the help of a tool To test the same thing it takes much time It takes less time in execution but writing automation script may take longer time More resource required Less resource required New features are usually tested manually first regression test cases are executed with automation Executing same test cases on multiple environment is very time consuming Same automation script can be run on multiple machines Manual testing is not accurate at all Automated testing is more reliable, as it
  • 151.
    When to automate ●High Priority - Business Critical features ● Test cases that are executed repeatedly ● Test Cases that are very tedious or difficult to perform manually ● Test Cases which are time consuming
  • 152.
  • 153.
    When not toautomate ● Exploratory Testing ● Ad-hoc Testing ● Usability Testing
  • 154.
    Continuous integration Continuous Integration(CI) is a development practice that requires developers to integrate code into a shared repository several times a day. Each check-in is then verified by an automated build, allowing teams to detect problems early. By integrating regularly, you can detect errors quickly, and locate them more easily.
  • 155.
    Continuous integration Testing(CIT) Architecture - in Agile model
  • 156.
    Benefits ● Faster thanthe manual execution ● Reliable and accurate test results ● Saves time and cost ● Reusable test scripts ● Increased efficiency ● Tests can be triggered automatically based on some conditions ● Early Testing can be obtained
  • 157.
    Tools Testing Type AutomationTool Functional & Regression Testing ● Selenium WebDriver ● HP UFT (QTP) ● WATIR ● Silktest ● Rational Functional Tester Client side performance testing ● JMeter ● Load Runner ● Neo Load Server side performance testing New Relic API Testing ● JMeter ● ReadyAPI ● POST MAN
  • 158.
  • 159.
    WHAT TO TESTIN A WEBSITE & A MOBILE APP Video 15
  • 160.
    What to testin a Website INTRODUCTION Two broad testing types ● Functional Testing ● Non Functional Testing
  • 161.
    What to testin website Functional Test ● Smoke or sanity testing ● Functional Test ○ Check the newly added / modified features for latest release ○ Check all internal/External links ○ Check the form/field validations ○ Check the submit actions for forms ○ Check the database connection and integrity ● Regression Test
  • 162.
    What to testin website Non-Functional Test ● Performance Testing ○ Check the Page load times on different net speeds ○ Test the page response times on different loads ○ Check the server response time ○ Check that whether your application assets are optimized or not ○ Test with: https://testmysite.thinkwithgoogle.com/ gives very useful details about your website ● Security Testing ● Compatibility Testing ○ Test to check the application's responsiveness on different different devices, Oss, browsers and browser versions ● Usability Testing ○ Test for Navigations ○ Test for look and feel (no overlapping, Website instructions,Error msgs)
  • 163.
    What to testin a Mobile app INTRODUCTION ● Device specific Tests ● Network specific Test ● App Functional-NonFunctional Tests
  • 164.
    What to testin Mobile app DEVICE SPECIFIC TESTS 1 Check the App installation/uninstallation in device 2 Check the launching of the app in device(verify splash screens, load time, presentation) 3 Connect/Disconnect the charger, check that the running app is not impacted 4 Lock/unlock the screen and check that running app has no impact 5 Go to home and come back to your app (sleep the app) Check that you can switch to other apps in device smoothly 6 Tilt and shake to check the impact on your running app 7 Check the device notifications are not impacting the running app 8 Check that no data network connection is displayed if your app needs a data connection 9 Check that app interacts with device hardware (like GPS) 10 All device buttons have associated action for your app
  • 165.
    What to testin Mobile app NETWORK SPECIFIC TESTS 1 Check the App behavior on 2G, 3G and WiFi internet connections 2 Check the App behavior in no network condition 3 What happens if user switch from one data network to another 4 Lock/unlock the screen and check that running app has no impact 5 Interruption Testing : Does the app resumes when a call comes 6 Interruption Testing : Does the app resumes when a message comes 7 Check the device notifications are not impacting the running app 8 If app has a transaction system then how the transaction behaves during network fluctuations 9 Check the app’s background data connections can be changed 10 How app behaves in Flight Mode
  • 166.
    What to testin Mobile app Functional/NonFunctional Functional - During this testing tester has to focus on the business requirements that the application must deliver or perform Non-Functional - Check the application’s heap memory Check the application’s RAM memory usage Check the application’s CPU usage Compatibility: On different OS versions and on different Devices Usability: Check that user has no issue with the usability of the app Check that the cache memory can be cleaned Check the app’s performance on different sets of configurations
  • 167.
  • 168.
    International Software TestingQualification Board TIPS TO CLEAR ISTQB- FOUNDATION LEVEL CERTIFICATION Video 16
  • 169.
    INTRODUCTION ● International SoftwareTesting Qualification Board ● Is a software testing qualification certification organisation that operates internationally ● Founded in Edinburgh in November 2002 ● ISTQB is a non-profit association legally registered in Belgium ● The ISTQB® is a software testing qualification certification organization having over 350,000 certifications issued. ● The ISTQB® consists of 49 member boards worldwide representing 72 countries ● Official site http://www.istqb.org/
  • 170.
    ISTQB CERTIFICATION There arethree levels of certification: ● ISTQB Certified Tester Foundation Level (CTFL) ● ISTQB Certified Tester Advanced Level (CTAL) Test Manager Test Analyst Technical Test Analyst Advanced Level (CTAL) - Full Advanced Level (after passing the above exams of Advanced Level) ● Expert Level Improving the Test Process Test Management Test Automation Security Testing
  • 171.
  • 172.
    FOUNDATION LEVEL CERTIFICATION The Foundationlevel offers the following exams: ★ Foundation level core (1 syllabus ) ★ Foundation level specialist(4 syllabi, two of them currently available, two of them undergoing development) ★ Agile Tester ★ Model-Based Tester ★ Usability Tester (in development) ★ Automotive Tester (in development)
  • 173.
  • 174.
    PASSING SCORE ● Total40 questions (at least 26 questions should be right) ● Time: 1hr (15 minutes Extra for non-native language person) ● Passing Score 65% ● Fees - 4500 INR if reappearing - 2800 INR ...and No Negative marking :)
  • 175.
    How to clearISTQB tip 1 Go through the ISTQB syllabus Find the updated syllabus here (official ISTQB site): Link: http://www.istqb.org/downloads/syllabi/foundation-level- syllabus.html
  • 176.
    How to clearISTQB tip 2 Go through the ISTQB book at least once Download the e-books from here (official ISTQB site) Link: http://www.istqb.org/downloads/e-books.html
  • 177.
    How to clearISTQB tip 3 Go through the ISTQB Exam documents Exam Document here: Link: http://www.istqb.org/downloads/exam-documents.html
  • 178.
    How to clearISTQB tip 4 Practice the mock questions Search for the sample papers and keep practicing the exercises. A good collection is here: http://istqbexamcertification.com/istqb-dumps-download-mock-tests- and-sample-question-papers/ This will help you out to find your weak areas, practice more on that. But never rely completely on sample questions as these are not the one that will show up in exam.
  • 179.
    How to clearISTQB tip 5 Make a list of terminologies and keep checking that.
  • 180.
    How to clearISTQB tip 6 Almost all the answer options will look similar so always read carefully and understand properly. so read questions carefully and read the options too… double check!
  • 181.