SlideShare a Scribd company logo
Project Procurement Management
Sections of this presentation were adapted from A Guide to the Project Management Body of
Knowledge 5th Edition, Project Management Institute Inc., © 2013
Project Quality Management -Definition
“The processes to purchase or acquire the products, services, or
results needed from outside the project team to perform the work”
Why Procurement Management?
Most all projects will need to acquire some resources from outside
If project manager does not understand the different ways to
contract, this could result in unnecessary risk for the project
How Do We Manage Procurement?
There are four process of procurement.
• Plan Procurements
• Conduct Procurements
• Administer Procurements
• Close Procurements
Conduct
Procurements
Administer
Procurements
Plan
Procurements
Close
Procurements
Plan Procurements
Scope Baseline
Requirements
Documentation
Teaming Agreements
Risk Register
Risk-Related Contract
Decisions
Activity Resource
Requirements
Project Schedule
Activity Cost Estimates
Cost Performance Baseline
Enterprise Environmental
Factors
Organizational Process
Assets
 Make or Buy Analysis
 Expert Judgment
 Contract Types
Inputs Outputs
Tools & Techniques Procurement
Management Plan
Procurement
Statements of Work
Procurement
Documents
Source Selection
Criteria
Change Requests
Make or Buy
Decisions
Conduct
Procurements
Administer
Procurements
Plan
Procurements
Close
Procurements
Contract Types
Fixed Price (Lump Sum) Contracts
Cost-Reimbursable Contracts
• Cost Plus Fee (CPF)
– Cost Plus Percentage of Cost (CPPC)
• Cost Plus Fixed Fee (CPFF)
• Cost Plus Incentive Fee (CPIF)
Time and Material (T&M) Contracts
Which type of contract is the highest risk for the Buyer? Seller?
Conduct Procurements
Project
Management Plan
Procurement
Documents
Source Selection
Criteria
Qualified Sellers List
Seller Proposals
Project Documents
Make-or-Buy Decisions
Teaming Agreements
Organizational Process
Assets
 Bidder Conference
 Proposal Evaluation
Techniques
 Independent Estimates
 Expert Judgment
 Advertising
 Internet Search
 Procurement Negotiations
Inputs Outputs
Tools & Techniques
Selected Seller
Procurement
Contract Award
Resource Calendars
Change Requests
Project Management
Plan Updates
Project Document
Updates
Conduct
Procurements
Administer
Procurements
Plan
Procurements
Close
Procurements
Types of Scopes of Work
Performance
• What the project wants, how accomplished and project needs
defined by seller
Functional or Detailed
• Defines what end product should be as well as minimum
requirements
Design
• Defines exactly what is required and how to accomplish it
Procurement Documents
Request for Proposal (RFP)
• Asks for the price and how/who will do the work
Invitation for Bid (IFB)
• One simple price to do the work
Request for Quotation (RFQ)
• Price per unit quote
Negotiating Tactics
Attacks – Argue a point
Personal Insults – Attack other
sides negotiator
Good Guy/Bad Guy
Deadline – The offer stands
until…
Lying
Limited Authority – I need to
check with ____
Missing Man – She is out today,
I will have to get back tomorrow
Fair and Reasonable
Delay – Tabling issues important
to the other side
Extreme Demands
Withdrawal – Feigning interest
Fait Accompli – Done Deal, this
is how we have to do it….
These are all tactics, but not necessarily good tactics!
Administer Procurements
Procurement
Documents
Project
Management Plan
Contract
Performance
Reports
Approved Change
Requests
Work Performance
Information
 Contract change control
system
 Procurement performance
review
 Inspections and audits
 Performance reporting
 Payment systems
 Claims administration
 Records management
system
Inputs Outputs
Tools & Techniques
Procurement
Documentation
Organizational
Process Assets
Updates
Change Requests
Project Management
Plan Updates
Conduct
Procurements
Administer
Procurements
Plan
Procurements
Close
Procurements
Contract Closure Procurements
Project
Management Plan
Procurement
Documentation
 Procurement audits
 Negotiated Settlements
 Records management
systemInputs
Outputs
Tools & Techniques
Closed Procurments
Organizational
Process Assets
Updates
Conduct
Procurements
Administer
Procurements
Plan
Procurements
Close
Procurements
Procurement Terms -Continued
Acts of God -Force Majeure – Riots, wars,
weather.
Arbitration – Third party dispute resolution
Breach/Default – When a contract provision is not
met
Liquidated Damages – Estimated damages for
specific types of defaults as defined in the contract
Material Breach – A violation of the contract of
sufficient magnitude that the contract cannot be
completed
Procurement Terms
Retainage – Monies withheld to ensure performance at the
end of the contract
Work for Hire – At the end of the contract the work product
generated will be owned by the buyer
Termination – Stopping the work before it is completed
Indemnification – Who is liable
Waiver – Statements in the contract that indicate that rights
cannot be ignored or modified without written agreement
between the two parties
Time is of the essence – Seller is placed on notice that
delivery agreements are strictly binding

More Related Content

What's hot

Introduction to procurement
Introduction to procurementIntroduction to procurement
Introduction to procurement
Vj NiroSh
 
Procurement Plan
Procurement PlanProcurement Plan
Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Project Cost Management - PMBOK6
Project Cost Management - PMBOK6
Agus Suhanto
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
Mohamed Loey
 
PMP_Project Procurement Management
PMP_Project Procurement ManagementPMP_Project Procurement Management
PMP_Project Procurement Management
Hisham Haridy MBA, PMP®, RMP®, SP®
 
Contract management
Contract managementContract management
Contract management
Nishant Rai
 
Project procurement management PMBOK Sixth Edition
Project procurement management PMBOK Sixth EditionProject procurement management PMBOK Sixth Edition
Project procurement management PMBOK Sixth Edition
Dr. Pankaj Sharma PgMP,PMP,PMI-ACP, LSSMBB
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areas
Mazen Zbib
 
Types of contract in Project management
Types of contract in Project managementTypes of contract in Project management
Types of contract in Project management
Ali Heydari
 
Contract management general
Contract management generalContract management general
Contract management general
Vasudevan Deivasigamani
 
Project Management
Project ManagementProject Management
Project Management
Hamdard University
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager
ProofHub
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
Mohamed Amin
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost Management
BhuWan Khadka
 
Project Initiation
Project InitiationProject Initiation
Project Initiation
Martin Sillaots
 
Procurement management
Procurement managementProcurement management
Procurement management
Mostafa Elgamala
 
Procurement best practices
Procurement best practicesProcurement best practices
Procurement best practices
remoeneltigre
 
project management
project managementproject management
project management
Patrick McPartland, E.I.T.
 
Procurement Methods
Procurement MethodsProcurement Methods
Procurement Methods
Vj NiroSh
 
Project audit
Project auditProject audit
Project audit
Sajna Fathima
 

What's hot (20)

Introduction to procurement
Introduction to procurementIntroduction to procurement
Introduction to procurement
 
Procurement Plan
Procurement PlanProcurement Plan
Procurement Plan
 
Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Project Cost Management - PMBOK6
Project Cost Management - PMBOK6
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
 
PMP_Project Procurement Management
PMP_Project Procurement ManagementPMP_Project Procurement Management
PMP_Project Procurement Management
 
Contract management
Contract managementContract management
Contract management
 
Project procurement management PMBOK Sixth Edition
Project procurement management PMBOK Sixth EditionProject procurement management PMBOK Sixth Edition
Project procurement management PMBOK Sixth Edition
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areas
 
Types of contract in Project management
Types of contract in Project managementTypes of contract in Project management
Types of contract in Project management
 
Contract management general
Contract management generalContract management general
Contract management general
 
Project Management
Project ManagementProject Management
Project Management
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost Management
 
Project Initiation
Project InitiationProject Initiation
Project Initiation
 
Procurement management
Procurement managementProcurement management
Procurement management
 
Procurement best practices
Procurement best practicesProcurement best practices
Procurement best practices
 
project management
project managementproject management
project management
 
Procurement Methods
Procurement MethodsProcurement Methods
Procurement Methods
 
Project audit
Project auditProject audit
Project audit
 

Similar to Project Procurement Management

13. Project Procurement Management
13. Project Procurement Management13. Project Procurement Management
13. Project Procurement Management
BhuWan Khadka
 
Lecture 2 project procurement and contract management .pdf
Lecture 2  project procurement and contract management .pdfLecture 2  project procurement and contract management .pdf
Lecture 2 project procurement and contract management .pdf
axmedbaasaay
 
PMP CAPM Study Guide Procurement Management
PMP CAPM Study Guide Procurement ManagementPMP CAPM Study Guide Procurement Management
PMP CAPM Study Guide Procurement Management
Ahmed Higazi, PMP CSM
 
Pradeep Resume 30 March 2015
Pradeep Resume 30 March 2015Pradeep Resume 30 March 2015
Pradeep Resume 30 March 2015
Pradeep M P
 
Procurementmanagementslides
ProcurementmanagementslidesProcurementmanagementslides
Procurementmanagementslides
Muhlis Çevik
 
Project Procurement Management - PMP preparation course
Project Procurement Management - PMP preparation courseProject Procurement Management - PMP preparation course
Project Procurement Management - PMP preparation course
Vladimir Vujovic
 
#Procurement Strategies & strategic Sourcing : Cost Reduction - By SN Panigrahi
#Procurement Strategies & strategic Sourcing : Cost Reduction - By SN Panigrahi#Procurement Strategies & strategic Sourcing : Cost Reduction - By SN Panigrahi
#Procurement Strategies & strategic Sourcing : Cost Reduction - By SN Panigrahi
SN Panigrahi, PMP
 
Kamel Badawy- Exploring e-tendering Arab HEUG Conference
Kamel Badawy- Exploring e-tendering Arab HEUG ConferenceKamel Badawy- Exploring e-tendering Arab HEUG Conference
Kamel Badawy- Exploring e-tendering Arab HEUG Conference
Kamel Emad
 
Project Management For Good Procurement Practices
Project Management For Good Procurement PracticesProject Management For Good Procurement Practices
Project Management For Good Procurement Practices
tjcornish
 
Eprocurement sourcing mro environment
Eprocurement  sourcing   mro environmentEprocurement  sourcing   mro environment
Eprocurement sourcing mro environment
Utomo Prawiro
 
Chapter 2 procurment process
Chapter 2 procurment processChapter 2 procurment process
Chapter 2 procurment process
YonasSisayAragie
 
5 Reasons Why the RFP Process is Essential for Improving Sourcing ROI
5 Reasons Why the RFP Process is Essential for Improving Sourcing ROI5 Reasons Why the RFP Process is Essential for Improving Sourcing ROI
5 Reasons Why the RFP Process is Essential for Improving Sourcing ROI
Aavenir
 
An EPIC Transformation of Purchasing Processes at the University of Manitoba
An EPIC Transformation of Purchasing Processes at the University of ManitobaAn EPIC Transformation of Purchasing Processes at the University of Manitoba
An EPIC Transformation of Purchasing Processes at the University of Manitoba
SAP Ariba
 
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docxCONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
aidaclewer
 
Pmp session 6
Pmp session 6Pmp session 6
Pmp session 6
Wendy Feryanto
 
06 ATS Procurement Services
06 ATS Procurement Services06 ATS Procurement Services
06 ATS Procurement Services
David Ma, MBA
 
RFP Selection Process
RFP Selection ProcessRFP Selection Process
RFP Selection Process
Joann Martin
 
Vendor_Mgmt_101_IIMC_v2
Vendor_Mgmt_101_IIMC_v2Vendor_Mgmt_101_IIMC_v2
Vendor_Mgmt_101_IIMC_v2
Steve Markey
 
FAID DAOUD Updated Rsume FEB 2023.docx
FAID DAOUD Updated Rsume FEB 2023.docxFAID DAOUD Updated Rsume FEB 2023.docx
FAID DAOUD Updated Rsume FEB 2023.docx
FAIDDAOUD1
 
Strategic Sourcing & E Procurement
Strategic Sourcing & E ProcurementStrategic Sourcing & E Procurement
Strategic Sourcing & E Procurement
Anand Subramaniam
 

Similar to Project Procurement Management (20)

13. Project Procurement Management
13. Project Procurement Management13. Project Procurement Management
13. Project Procurement Management
 
Lecture 2 project procurement and contract management .pdf
Lecture 2  project procurement and contract management .pdfLecture 2  project procurement and contract management .pdf
Lecture 2 project procurement and contract management .pdf
 
PMP CAPM Study Guide Procurement Management
PMP CAPM Study Guide Procurement ManagementPMP CAPM Study Guide Procurement Management
PMP CAPM Study Guide Procurement Management
 
Pradeep Resume 30 March 2015
Pradeep Resume 30 March 2015Pradeep Resume 30 March 2015
Pradeep Resume 30 March 2015
 
Procurementmanagementslides
ProcurementmanagementslidesProcurementmanagementslides
Procurementmanagementslides
 
Project Procurement Management - PMP preparation course
Project Procurement Management - PMP preparation courseProject Procurement Management - PMP preparation course
Project Procurement Management - PMP preparation course
 
#Procurement Strategies & strategic Sourcing : Cost Reduction - By SN Panigrahi
#Procurement Strategies & strategic Sourcing : Cost Reduction - By SN Panigrahi#Procurement Strategies & strategic Sourcing : Cost Reduction - By SN Panigrahi
#Procurement Strategies & strategic Sourcing : Cost Reduction - By SN Panigrahi
 
Kamel Badawy- Exploring e-tendering Arab HEUG Conference
Kamel Badawy- Exploring e-tendering Arab HEUG ConferenceKamel Badawy- Exploring e-tendering Arab HEUG Conference
Kamel Badawy- Exploring e-tendering Arab HEUG Conference
 
Project Management For Good Procurement Practices
Project Management For Good Procurement PracticesProject Management For Good Procurement Practices
Project Management For Good Procurement Practices
 
Eprocurement sourcing mro environment
Eprocurement  sourcing   mro environmentEprocurement  sourcing   mro environment
Eprocurement sourcing mro environment
 
Chapter 2 procurment process
Chapter 2 procurment processChapter 2 procurment process
Chapter 2 procurment process
 
5 Reasons Why the RFP Process is Essential for Improving Sourcing ROI
5 Reasons Why the RFP Process is Essential for Improving Sourcing ROI5 Reasons Why the RFP Process is Essential for Improving Sourcing ROI
5 Reasons Why the RFP Process is Essential for Improving Sourcing ROI
 
An EPIC Transformation of Purchasing Processes at the University of Manitoba
An EPIC Transformation of Purchasing Processes at the University of ManitobaAn EPIC Transformation of Purchasing Processes at the University of Manitoba
An EPIC Transformation of Purchasing Processes at the University of Manitoba
 
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docxCONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
 
Pmp session 6
Pmp session 6Pmp session 6
Pmp session 6
 
06 ATS Procurement Services
06 ATS Procurement Services06 ATS Procurement Services
06 ATS Procurement Services
 
RFP Selection Process
RFP Selection ProcessRFP Selection Process
RFP Selection Process
 
Vendor_Mgmt_101_IIMC_v2
Vendor_Mgmt_101_IIMC_v2Vendor_Mgmt_101_IIMC_v2
Vendor_Mgmt_101_IIMC_v2
 
FAID DAOUD Updated Rsume FEB 2023.docx
FAID DAOUD Updated Rsume FEB 2023.docxFAID DAOUD Updated Rsume FEB 2023.docx
FAID DAOUD Updated Rsume FEB 2023.docx
 
Strategic Sourcing & E Procurement
Strategic Sourcing & E ProcurementStrategic Sourcing & E Procurement
Strategic Sourcing & E Procurement
 

More from Serdar Temiz

Introduction to OPEN INNOVATION
Introduction to OPEN INNOVATIONIntroduction to OPEN INNOVATION
Introduction to OPEN INNOVATION
Serdar Temiz
 
Busıness Model Innovation Business Model Canvas Toolbox 2016
Busıness Model Innovation Business Model Canvas Toolbox 2016Busıness Model Innovation Business Model Canvas Toolbox 2016
Busıness Model Innovation Business Model Canvas Toolbox 2016
Serdar Temiz
 
Data Privacy, Corporates and States
Data Privacy, Corporates and StatesData Privacy, Corporates and States
Data Privacy, Corporates and States
Serdar Temiz
 
Business Model Canvas 2015
Business Model Canvas 2015Business Model Canvas 2015
Business Model Canvas 2015
Serdar Temiz
 
Customer Development Fast Protyping
Customer Development Fast ProtypingCustomer Development Fast Protyping
Customer Development Fast Protyping
Serdar Temiz
 
Introduction to Entepreneurship ME2603 KTH
Introduction to Entepreneurship ME2603 KTHIntroduction to Entepreneurship ME2603 KTH
Introduction to Entepreneurship ME2603 KTH
Serdar Temiz
 
How Open Data Changes Our Life?
How Open Data Changes Our Life?How Open Data Changes Our Life?
How Open Data Changes Our Life?
Serdar Temiz
 
Open Data Innovation from GEO DATA Perspective
Open Data Innovation from GEO DATA  PerspectiveOpen Data Innovation from GEO DATA  Perspective
Open Data Innovation from GEO DATA Perspective
Serdar Temiz
 
Start up finance & venture capital
Start up finance & venture capitalStart up finance & venture capital
Start up finance & venture capital
Serdar Temiz
 
Fast Prototyping Customer Development Mock Ups 2014
Fast Prototyping Customer Development Mock Ups 2014Fast Prototyping Customer Development Mock Ups 2014
Fast Prototyping Customer Development Mock Ups 2014
Serdar Temiz
 
Innovation & Business Model & Business Model Canvas 2014
Innovation & Business Model & Business Model Canvas 2014Innovation & Business Model & Business Model Canvas 2014
Innovation & Business Model & Business Model Canvas 2014
Serdar Temiz
 
Introduction to Entrepreneurship , Entrepreneurship in Action, KTH
Introduction to  Entrepreneurship , Entrepreneurship in Action, KTHIntroduction to  Entrepreneurship , Entrepreneurship in Action, KTH
Introduction to Entrepreneurship , Entrepreneurship in Action, KTH
Serdar Temiz
 
Project Risk Management (10)
 Project Risk Management (10) Project Risk Management (10)
Project Risk Management (10)
Serdar Temiz
 
Organization Structure - stake holder -human resources management during proj...
Organization Structure - stake holder -human resources management during proj...Organization Structure - stake holder -human resources management during proj...
Organization Structure - stake holder -human resources management during proj...
Serdar Temiz
 
Project Quality Management
 Project Quality Management Project Quality Management
Project Quality Management
Serdar Temiz
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
Serdar Temiz
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
Serdar Temiz
 
Project Scope Management
Project Scope ManagementProject Scope Management
Project Scope Management
Serdar Temiz
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Management
Serdar Temiz
 
UML Basics
UML BasicsUML Basics
UML Basics
Serdar Temiz
 

More from Serdar Temiz (20)

Introduction to OPEN INNOVATION
Introduction to OPEN INNOVATIONIntroduction to OPEN INNOVATION
Introduction to OPEN INNOVATION
 
Busıness Model Innovation Business Model Canvas Toolbox 2016
Busıness Model Innovation Business Model Canvas Toolbox 2016Busıness Model Innovation Business Model Canvas Toolbox 2016
Busıness Model Innovation Business Model Canvas Toolbox 2016
 
Data Privacy, Corporates and States
Data Privacy, Corporates and StatesData Privacy, Corporates and States
Data Privacy, Corporates and States
 
Business Model Canvas 2015
Business Model Canvas 2015Business Model Canvas 2015
Business Model Canvas 2015
 
Customer Development Fast Protyping
Customer Development Fast ProtypingCustomer Development Fast Protyping
Customer Development Fast Protyping
 
Introduction to Entepreneurship ME2603 KTH
Introduction to Entepreneurship ME2603 KTHIntroduction to Entepreneurship ME2603 KTH
Introduction to Entepreneurship ME2603 KTH
 
How Open Data Changes Our Life?
How Open Data Changes Our Life?How Open Data Changes Our Life?
How Open Data Changes Our Life?
 
Open Data Innovation from GEO DATA Perspective
Open Data Innovation from GEO DATA  PerspectiveOpen Data Innovation from GEO DATA  Perspective
Open Data Innovation from GEO DATA Perspective
 
Start up finance & venture capital
Start up finance & venture capitalStart up finance & venture capital
Start up finance & venture capital
 
Fast Prototyping Customer Development Mock Ups 2014
Fast Prototyping Customer Development Mock Ups 2014Fast Prototyping Customer Development Mock Ups 2014
Fast Prototyping Customer Development Mock Ups 2014
 
Innovation & Business Model & Business Model Canvas 2014
Innovation & Business Model & Business Model Canvas 2014Innovation & Business Model & Business Model Canvas 2014
Innovation & Business Model & Business Model Canvas 2014
 
Introduction to Entrepreneurship , Entrepreneurship in Action, KTH
Introduction to  Entrepreneurship , Entrepreneurship in Action, KTHIntroduction to  Entrepreneurship , Entrepreneurship in Action, KTH
Introduction to Entrepreneurship , Entrepreneurship in Action, KTH
 
Project Risk Management (10)
 Project Risk Management (10) Project Risk Management (10)
Project Risk Management (10)
 
Organization Structure - stake holder -human resources management during proj...
Organization Structure - stake holder -human resources management during proj...Organization Structure - stake holder -human resources management during proj...
Organization Structure - stake holder -human resources management during proj...
 
Project Quality Management
 Project Quality Management Project Quality Management
Project Quality Management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
Project Scope Management
Project Scope ManagementProject Scope Management
Project Scope Management
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Management
 
UML Basics
UML BasicsUML Basics
UML Basics
 

Recently uploaded

ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
Ratnakar Mikkili
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
Madhumitha Jayaram
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
PuktoonEngr
 

Recently uploaded (20)

ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
 

Project Procurement Management

  • 1. Project Procurement Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 5th Edition, Project Management Institute Inc., © 2013
  • 2. Project Quality Management -Definition “The processes to purchase or acquire the products, services, or results needed from outside the project team to perform the work”
  • 3. Why Procurement Management? Most all projects will need to acquire some resources from outside If project manager does not understand the different ways to contract, this could result in unnecessary risk for the project
  • 4. How Do We Manage Procurement? There are four process of procurement. • Plan Procurements • Conduct Procurements • Administer Procurements • Close Procurements Conduct Procurements Administer Procurements Plan Procurements Close Procurements
  • 5. Plan Procurements Scope Baseline Requirements Documentation Teaming Agreements Risk Register Risk-Related Contract Decisions Activity Resource Requirements Project Schedule Activity Cost Estimates Cost Performance Baseline Enterprise Environmental Factors Organizational Process Assets  Make or Buy Analysis  Expert Judgment  Contract Types Inputs Outputs Tools & Techniques Procurement Management Plan Procurement Statements of Work Procurement Documents Source Selection Criteria Change Requests Make or Buy Decisions Conduct Procurements Administer Procurements Plan Procurements Close Procurements
  • 6. Contract Types Fixed Price (Lump Sum) Contracts Cost-Reimbursable Contracts • Cost Plus Fee (CPF) – Cost Plus Percentage of Cost (CPPC) • Cost Plus Fixed Fee (CPFF) • Cost Plus Incentive Fee (CPIF) Time and Material (T&M) Contracts Which type of contract is the highest risk for the Buyer? Seller?
  • 7. Conduct Procurements Project Management Plan Procurement Documents Source Selection Criteria Qualified Sellers List Seller Proposals Project Documents Make-or-Buy Decisions Teaming Agreements Organizational Process Assets  Bidder Conference  Proposal Evaluation Techniques  Independent Estimates  Expert Judgment  Advertising  Internet Search  Procurement Negotiations Inputs Outputs Tools & Techniques Selected Seller Procurement Contract Award Resource Calendars Change Requests Project Management Plan Updates Project Document Updates Conduct Procurements Administer Procurements Plan Procurements Close Procurements
  • 8. Types of Scopes of Work Performance • What the project wants, how accomplished and project needs defined by seller Functional or Detailed • Defines what end product should be as well as minimum requirements Design • Defines exactly what is required and how to accomplish it
  • 9. Procurement Documents Request for Proposal (RFP) • Asks for the price and how/who will do the work Invitation for Bid (IFB) • One simple price to do the work Request for Quotation (RFQ) • Price per unit quote
  • 10. Negotiating Tactics Attacks – Argue a point Personal Insults – Attack other sides negotiator Good Guy/Bad Guy Deadline – The offer stands until… Lying Limited Authority – I need to check with ____ Missing Man – She is out today, I will have to get back tomorrow Fair and Reasonable Delay – Tabling issues important to the other side Extreme Demands Withdrawal – Feigning interest Fait Accompli – Done Deal, this is how we have to do it…. These are all tactics, but not necessarily good tactics!
  • 11. Administer Procurements Procurement Documents Project Management Plan Contract Performance Reports Approved Change Requests Work Performance Information  Contract change control system  Procurement performance review  Inspections and audits  Performance reporting  Payment systems  Claims administration  Records management system Inputs Outputs Tools & Techniques Procurement Documentation Organizational Process Assets Updates Change Requests Project Management Plan Updates Conduct Procurements Administer Procurements Plan Procurements Close Procurements
  • 12. Contract Closure Procurements Project Management Plan Procurement Documentation  Procurement audits  Negotiated Settlements  Records management systemInputs Outputs Tools & Techniques Closed Procurments Organizational Process Assets Updates Conduct Procurements Administer Procurements Plan Procurements Close Procurements
  • 13. Procurement Terms -Continued Acts of God -Force Majeure – Riots, wars, weather. Arbitration – Third party dispute resolution Breach/Default – When a contract provision is not met Liquidated Damages – Estimated damages for specific types of defaults as defined in the contract Material Breach – A violation of the contract of sufficient magnitude that the contract cannot be completed
  • 14. Procurement Terms Retainage – Monies withheld to ensure performance at the end of the contract Work for Hire – At the end of the contract the work product generated will be owned by the buyer Termination – Stopping the work before it is completed Indemnification – Who is liable Waiver – Statements in the contract that indicate that rights cannot be ignored or modified without written agreement between the two parties Time is of the essence – Seller is placed on notice that delivery agreements are strictly binding