Task 4-Investigate Digital Animation


Vector animation

Vector graphics is the use of points, lines, curves and shapes (also known as geometrical primitives)
to represent images in computer graphics.

A vector image is made up of paths and nodes so it doesn’t matter how much the image is stretched
or shrunk it will maintain its quality 100%.

Adobe Illustrator, QuarkXPress, CorelDraw are the main examples of programmes that are used for
vector art, but some things on Photoshop can also be used for vector art such as Text, Shapes and
the pen tool.

Raster animation

Raster graphic images also known as bitmaps are data structures representing a rectangular grid of
pixels.

Raster images are stored in image files with varying formats.

If a raster image is stretched the image becomes more and more pixelated and blurry as the image is
stretched.

Raster images are normally photographs or images that are not made up of paths or nodes.

Raster came from the Latin word “rastrum” which means rake.

Compression

Lossy data compression compresses data by losing some of the data which is then lost and can never
be restored.

The aim of doing this is to make files and data smaller so it is easier to hold and takes up less space.

Lossy compression is used mainly to store images, audio and videos.

When videos are lossy compressed there is a little visible quality loss.

When audio is lossy compressed there is a loss of quality in the sound.

When an image is lossy compressed the quality is a lot more noticeable to have dropped then audio
and video.

MP3 and JPEG are the main file types/programmes that use lossy compression for easier storage.

The more times an image, video or audio is saved the more they get compressed which makes the
quality of the image, video or audio worse and worse each time it is saved.
Lossless data compression allows the exact original data can be reconstructed from the compressed
file.

Lossless formats such as tiff, bitmap and png save the image with maximum image quality but the
compression ratios are smaller than lossy files so the file will be larger but with higher quality.

Images that will be printed are usually saved with lossless compression because the quality is much
more important than the quality of an image that will be on a website.


File size

The file size is how big a computer file is.

Files are usually measured in bytes with a prefix.

Files are usually measured in kilobytes, megabytes and gigabytes.

Download speed

Download speed is how fast a file can be downloaded from the internet.

Scalability

Scalability is where files, videos or images can be made bigger or stretched, vector graphics can be
stretched since they are made from formulas but raster cannot since they will pixelate when
stretched.

.fla

The .Fla is also known as a Flash file, flash software is used to edit .Fla files and compile them into
.swf files, it can also be used to add animations and videos to websites and can also make the web
page intractable.

The files in this are compressed.

.swf

A .swf is a shockwave file, this is the final version of the created media and therefore cannot be
edited.

.gif

The GIF file format is also known as a graphics interchange format, this format supports up to 8 bits
per pixel, this format also supports animations and separate palettes for each frame.

This format is unsuitable for reproducing images and photographs with continuous colours.

The files in this are compressed.

Designed specifically for web use.

This file type is designed specifically for web use.
This file type was created in 1987 by CompuServe to provide a colour image format.



.mng

An .mng file is similar to a .png, it is used as a graphic file for animated images

.svg

An .svg file is an XML based file which is used for 2D vector graphics.

Task 4 investigate digital animation

  • 1.
    Task 4-Investigate DigitalAnimation Vector animation Vector graphics is the use of points, lines, curves and shapes (also known as geometrical primitives) to represent images in computer graphics. A vector image is made up of paths and nodes so it doesn’t matter how much the image is stretched or shrunk it will maintain its quality 100%. Adobe Illustrator, QuarkXPress, CorelDraw are the main examples of programmes that are used for vector art, but some things on Photoshop can also be used for vector art such as Text, Shapes and the pen tool. Raster animation Raster graphic images also known as bitmaps are data structures representing a rectangular grid of pixels. Raster images are stored in image files with varying formats. If a raster image is stretched the image becomes more and more pixelated and blurry as the image is stretched. Raster images are normally photographs or images that are not made up of paths or nodes. Raster came from the Latin word “rastrum” which means rake. Compression Lossy data compression compresses data by losing some of the data which is then lost and can never be restored. The aim of doing this is to make files and data smaller so it is easier to hold and takes up less space. Lossy compression is used mainly to store images, audio and videos. When videos are lossy compressed there is a little visible quality loss. When audio is lossy compressed there is a loss of quality in the sound. When an image is lossy compressed the quality is a lot more noticeable to have dropped then audio and video. MP3 and JPEG are the main file types/programmes that use lossy compression for easier storage. The more times an image, video or audio is saved the more they get compressed which makes the quality of the image, video or audio worse and worse each time it is saved.
  • 2.
    Lossless data compressionallows the exact original data can be reconstructed from the compressed file. Lossless formats such as tiff, bitmap and png save the image with maximum image quality but the compression ratios are smaller than lossy files so the file will be larger but with higher quality. Images that will be printed are usually saved with lossless compression because the quality is much more important than the quality of an image that will be on a website. File size The file size is how big a computer file is. Files are usually measured in bytes with a prefix. Files are usually measured in kilobytes, megabytes and gigabytes. Download speed Download speed is how fast a file can be downloaded from the internet. Scalability Scalability is where files, videos or images can be made bigger or stretched, vector graphics can be stretched since they are made from formulas but raster cannot since they will pixelate when stretched. .fla The .Fla is also known as a Flash file, flash software is used to edit .Fla files and compile them into .swf files, it can also be used to add animations and videos to websites and can also make the web page intractable. The files in this are compressed. .swf A .swf is a shockwave file, this is the final version of the created media and therefore cannot be edited. .gif The GIF file format is also known as a graphics interchange format, this format supports up to 8 bits per pixel, this format also supports animations and separate palettes for each frame. This format is unsuitable for reproducing images and photographs with continuous colours. The files in this are compressed. Designed specifically for web use. This file type is designed specifically for web use.
  • 3.
    This file typewas created in 1987 by CompuServe to provide a colour image format. .mng An .mng file is similar to a .png, it is used as a graphic file for animated images .svg An .svg file is an XML based file which is used for 2D vector graphics.