A tap changer is a device fitted to power
transformers for regulation of the output
voltage to required levels.
On-load tap-changers (OLTCs) are
indispensable in regulating power
transformers used in electrical energy
networks and industrial applications
 Tap changer alters the turn
ratios of the transformer on the
system by altering the number
of turns in one winding of the
appropriate transformer.
 Tap changers offer variable
control to keep the supply
voltage within these limits.
 Tap changers are of two types
◦ Off load
◦ On load
However since the offload tap
changer causes interruption in
the supply on load tap
changers are more preferred
in in today power system.
 By the transformation
ratio
V1/V2= N1/N2
V2=N2/N1×V1
From the above equation
by altering the turn ratio
to suitable values the
secondary voltage can be
adjusted desired level.
 Lets – N1=2750,
N2=100, turn ratio=
N1/N2=2750/100=27.5
why we choose this turn
ratio - V1=11 KV,
V2= 400Volt
Transformation ratio
V1/V2=
11000/400=27.5
 Each tap corresponds to different
transformation ratio. For Initial
installation we need to choose a
suitable tap as per our voltage levels.
 Tap changers provides 5 to 20 %
voltage range for voltage regulation.
 An on load tap changer
has 3 major steps
a. Tap selector- it selects
the appropriate tap
b. Fixed contact- These
contacts hold a fixed
position
c. Moving contact- This
contact moves to open/
close the appropriate
taps.
 Based on the AVR
feedback the suitable
tap is selected fig (a) to
(c)
 After the tap is selected
the moving contact
moves and it closes both
taps for a while. It
moves further and finally
completely opens to
earlier tap and closes to
the next tap fig (d) to (i)
 The moving contact closes two taps
for a while during the tap changing,
due to which a circulating current
starts to flow. This current needs to
be minimized. For limiting this
current resistor or reactors are used.
 The moving contact is operated by
charged spring tension and it
completes the process within 30 to
70ms. The spring is charged by
motor drives.
 While opening and closing the
contacts sparks are produced due to
arising recovery voltage. The
contacts are kept in oil or SF6 gas ,
which work as insulation medium as
well as arc quenching.
Tap
selector
Diverter
switch / Oil
compartment
MDU
 Motor drive unit (MDU)- This unit has got a
motor diver and other necessary controls.
Motor charges the spring to rapidly perform
the switching. Power is transferred via shaft &
gear mechanism.
 Diverter switch /Oil compartment- This has
the diverter switch, which has moving and
fixed contacts. It is filled with oil or SF6 gas
to avoid the sparking & quenching during
opening and closing of the contacts.
 Tap selector- It has different tap
combinations as specified by the customer
requirements and different standards.
 Due to opening closing of contacts the sparks
produce and the oil degrades over the time. The oil
test & analysis needs to be done in lab at regular
interval
 The contacts wear over the time after number of
operations.
 The oil seals damage over the time and leakage
happens. Maintaining the oil level is must. For
condition monitoring its must to check for oil leak
and level regularly.
 Oil dripping is dangerous for environment as well.
 OLTC includes a lot of gear, spring and mechanical
parts which have a usual wear and tear, that need to
be taken care as an when required.
 Vacuum type OLTC use the vacuum interrupters
which has some advantages over oil / SF6.
 It is hermetically sealed and has no interaction
with surrounding medium despite the arc.
 Contacts wear is lower than OIL/SF6.
 No aging or quenching medium is required.
 Its more environment friendly.
 Vacuum interrupters perform up to 600000
operation with out replacement.
 Has low maintenance cost and greater reliability.
Vacuum OLTC Vacuum interrupter
 A dual voltage transformer can be defined as
the one which is capable of providing two
types of voltage.
 A dual voltage transformer has two windings
in primary and two other windings in
secondary.
 By connecting the both windings either of
primary or secondary in series or parallel two
different voltages are produced.
 From the figure two
primary windings and
two secondary
windings are
connected in series
resulting in 240 volt
input and 24 volt out
put voltage.
 From the adjacent
figure the primary and
secondary windings are
connected in parallel,
resulting 120 volt
input and 12 volt out
put voltage.
 There can be either
type of arrangements
as per requirement.
 The details in the
adjacent figure shows
the winding arrangement
of a dual transformer. It
produces 33/7.1 and
33/11 kV voltages
according to
arrangement of winding.
 The unit produces
different outputs, based
on the connections as
advised in the name plate
details.
 Upon simplifying the
connection diagrams
they turn out to be series
connected winding for
33/11 kv output and
combination of series
and parallel for 33/7.1
kv output.
Tap Changer
Tap Changer

More Related Content

What's hot

Transformer Parts and functions
Transformer Parts and functionsTransformer Parts and functions
Transformer Parts and functions
Sourabh sharma
 
Types of relay
Types of relayTypes of relay
Types of relay
Abdur rehman
 
Measurement of high_voltage_and_high_currentunit_iv_full_version
Measurement of high_voltage_and_high_currentunit_iv_full_versionMeasurement of high_voltage_and_high_currentunit_iv_full_version
Measurement of high_voltage_and_high_currentunit_iv_full_version
Aman Ansari
 
Automatic Generation Control
Automatic Generation ControlAutomatic Generation Control
Automatic Generation Control
Birju Besra
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relays
PremanandDesai
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHShankar Singh
 
Inverter
InverterInverter
3 reactive power and voltage control
3 reactive power and voltage control3 reactive power and voltage control
3 reactive power and voltage control
8141245710
 
Resonant Inverters
Resonant InvertersResonant Inverters
Resonant Inverters
raviarmugam
 
Transformer
Transformer Transformer
Transformer
Hari Shiyam Prakash T
 
surge diverters
surge diverterssurge diverters
surge diverters
nehakardam
 
DC DC Converter
DC DC ConverterDC DC Converter
DC DC Converter
Mengstu Fentaw
 
Methods of Voltage Control
Methods of Voltage ControlMethods of Voltage Control
Methods of Voltage Control
Yashvi Mehta
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
Hemendra Kumar Rajput
 
Tcsc ppt
Tcsc pptTcsc ppt
Tcsc ppt
Prabhu R
 
Lightning Arrester Working Principle & Types
Lightning Arrester Working Principle & TypesLightning Arrester Working Principle & Types
Lightning Arrester Working Principle & Types
Power System Operation
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
Nikhil Kachare
 
Synchronous motor
Synchronous motorSynchronous motor
Synchronous motor
Sirat Mahmood
 
On load tap changer
On load tap changerOn load tap changer
On load tap changer
Sourabh sharma
 
parts of transformer
parts of transformerparts of transformer
parts of transformer
AbhishekLalkiya
 

What's hot (20)

Transformer Parts and functions
Transformer Parts and functionsTransformer Parts and functions
Transformer Parts and functions
 
Types of relay
Types of relayTypes of relay
Types of relay
 
Measurement of high_voltage_and_high_currentunit_iv_full_version
Measurement of high_voltage_and_high_currentunit_iv_full_versionMeasurement of high_voltage_and_high_currentunit_iv_full_version
Measurement of high_voltage_and_high_currentunit_iv_full_version
 
Automatic Generation Control
Automatic Generation ControlAutomatic Generation Control
Automatic Generation Control
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relays
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 
Inverter
InverterInverter
Inverter
 
3 reactive power and voltage control
3 reactive power and voltage control3 reactive power and voltage control
3 reactive power and voltage control
 
Resonant Inverters
Resonant InvertersResonant Inverters
Resonant Inverters
 
Transformer
Transformer Transformer
Transformer
 
surge diverters
surge diverterssurge diverters
surge diverters
 
DC DC Converter
DC DC ConverterDC DC Converter
DC DC Converter
 
Methods of Voltage Control
Methods of Voltage ControlMethods of Voltage Control
Methods of Voltage Control
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
 
Tcsc ppt
Tcsc pptTcsc ppt
Tcsc ppt
 
Lightning Arrester Working Principle & Types
Lightning Arrester Working Principle & TypesLightning Arrester Working Principle & Types
Lightning Arrester Working Principle & Types
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Synchronous motor
Synchronous motorSynchronous motor
Synchronous motor
 
On load tap changer
On load tap changerOn load tap changer
On load tap changer
 
parts of transformer
parts of transformerparts of transformer
parts of transformer
 

Similar to Tap Changer

Chokeless welding transformer with load series motor
Chokeless welding transformer with load series motorChokeless welding transformer with load series motor
Chokeless welding transformer with load series motor
eSAT Journals
 
Kanti Thermal Power Station
Kanti Thermal Power StationKanti Thermal Power Station
Kanti Thermal Power Station
neeraj prasad
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Sudhir Cement Industries Pvt. Ltd. Meerut
 
Presentation training
Presentation trainingPresentation training
Presentation trainingSrajan Raj
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
virat217995
 
Transformers in NTPC
Transformers in NTPCTransformers in NTPC
Transformers in NTPC
Sagnik Saha
 
Inspection and Testing of various electrical equipment
Inspection and Testing of various electrical equipmentInspection and Testing of various electrical equipment
Inspection and Testing of various electrical equipment
AkankshaSharma570781
 
Presentation 2014
Presentation 2014Presentation 2014
Presentation 2014
pinki199319
 
34866616-Relay.ppt
34866616-Relay.ppt34866616-Relay.ppt
34866616-Relay.ppt
MozammelHossain31
 
PDFen (1).pdf
PDFen (1).pdfPDFen (1).pdf
PDFen (1).pdf
AdityaJaiswal900342
 
Transformer
TransformerTransformer
Transformer
karthickaashi
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
Himansu Pradhan
 
Automatic voltage regulator(avr)/voltage booster
Automatic voltage regulator(avr)/voltage boosterAutomatic voltage regulator(avr)/voltage booster
Automatic voltage regulator(avr)/voltage booster
Jestem Zhou
 
Automatic voltage regulator(avr)
Automatic voltage regulator(avr)Automatic voltage regulator(avr)
Automatic voltage regulator(avr)
JoeChueng
 
Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE]
Nik Sharma
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khojaASHOK KHOJA
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
imkanhaiyalal
 

Similar to Tap Changer (20)

ntpc ppt
ntpc pptntpc ppt
ntpc ppt
 
Chokeless welding transformer with load series motor
Chokeless welding transformer with load series motorChokeless welding transformer with load series motor
Chokeless welding transformer with load series motor
 
Kanti Thermal Power Station
Kanti Thermal Power StationKanti Thermal Power Station
Kanti Thermal Power Station
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
 
Presentation training
Presentation trainingPresentation training
Presentation training
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
 
Transformers in NTPC
Transformers in NTPCTransformers in NTPC
Transformers in NTPC
 
Inspection and Testing of various electrical equipment
Inspection and Testing of various electrical equipmentInspection and Testing of various electrical equipment
Inspection and Testing of various electrical equipment
 
Presentation 2014
Presentation 2014Presentation 2014
Presentation 2014
 
ntpc
ntpcntpc
ntpc
 
34866616-Relay.ppt
34866616-Relay.ppt34866616-Relay.ppt
34866616-Relay.ppt
 
PDFen (1).pdf
PDFen (1).pdfPDFen (1).pdf
PDFen (1).pdf
 
Transformer
TransformerTransformer
Transformer
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Automatic voltage regulator(avr)/voltage booster
Automatic voltage regulator(avr)/voltage boosterAutomatic voltage regulator(avr)/voltage booster
Automatic voltage regulator(avr)/voltage booster
 
Automatic voltage regulator(avr)
Automatic voltage regulator(avr)Automatic voltage regulator(avr)
Automatic voltage regulator(avr)
 
Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE]
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
Voltage Regulation
Voltage RegulationVoltage Regulation
Voltage Regulation
 

Tap Changer

  • 1. A tap changer is a device fitted to power transformers for regulation of the output voltage to required levels. On-load tap-changers (OLTCs) are indispensable in regulating power transformers used in electrical energy networks and industrial applications
  • 2.  Tap changer alters the turn ratios of the transformer on the system by altering the number of turns in one winding of the appropriate transformer.  Tap changers offer variable control to keep the supply voltage within these limits.  Tap changers are of two types ◦ Off load ◦ On load However since the offload tap changer causes interruption in the supply on load tap changers are more preferred in in today power system.
  • 3.  By the transformation ratio V1/V2= N1/N2 V2=N2/N1×V1 From the above equation by altering the turn ratio to suitable values the secondary voltage can be adjusted desired level.  Lets – N1=2750, N2=100, turn ratio= N1/N2=2750/100=27.5 why we choose this turn ratio - V1=11 KV, V2= 400Volt Transformation ratio V1/V2= 11000/400=27.5
  • 4.  Each tap corresponds to different transformation ratio. For Initial installation we need to choose a suitable tap as per our voltage levels.  Tap changers provides 5 to 20 % voltage range for voltage regulation.
  • 5.
  • 6.  An on load tap changer has 3 major steps a. Tap selector- it selects the appropriate tap b. Fixed contact- These contacts hold a fixed position c. Moving contact- This contact moves to open/ close the appropriate taps.
  • 7.  Based on the AVR feedback the suitable tap is selected fig (a) to (c)  After the tap is selected the moving contact moves and it closes both taps for a while. It moves further and finally completely opens to earlier tap and closes to the next tap fig (d) to (i)
  • 8.  The moving contact closes two taps for a while during the tap changing, due to which a circulating current starts to flow. This current needs to be minimized. For limiting this current resistor or reactors are used.  The moving contact is operated by charged spring tension and it completes the process within 30 to 70ms. The spring is charged by motor drives.  While opening and closing the contacts sparks are produced due to arising recovery voltage. The contacts are kept in oil or SF6 gas , which work as insulation medium as well as arc quenching.
  • 10.  Motor drive unit (MDU)- This unit has got a motor diver and other necessary controls. Motor charges the spring to rapidly perform the switching. Power is transferred via shaft & gear mechanism.  Diverter switch /Oil compartment- This has the diverter switch, which has moving and fixed contacts. It is filled with oil or SF6 gas to avoid the sparking & quenching during opening and closing of the contacts.  Tap selector- It has different tap combinations as specified by the customer requirements and different standards.
  • 11.
  • 12.  Due to opening closing of contacts the sparks produce and the oil degrades over the time. The oil test & analysis needs to be done in lab at regular interval  The contacts wear over the time after number of operations.  The oil seals damage over the time and leakage happens. Maintaining the oil level is must. For condition monitoring its must to check for oil leak and level regularly.  Oil dripping is dangerous for environment as well.  OLTC includes a lot of gear, spring and mechanical parts which have a usual wear and tear, that need to be taken care as an when required.
  • 13.  Vacuum type OLTC use the vacuum interrupters which has some advantages over oil / SF6.  It is hermetically sealed and has no interaction with surrounding medium despite the arc.  Contacts wear is lower than OIL/SF6.  No aging or quenching medium is required.  Its more environment friendly.  Vacuum interrupters perform up to 600000 operation with out replacement.  Has low maintenance cost and greater reliability.
  • 14. Vacuum OLTC Vacuum interrupter
  • 15.  A dual voltage transformer can be defined as the one which is capable of providing two types of voltage.  A dual voltage transformer has two windings in primary and two other windings in secondary.  By connecting the both windings either of primary or secondary in series or parallel two different voltages are produced.
  • 16.  From the figure two primary windings and two secondary windings are connected in series resulting in 240 volt input and 24 volt out put voltage.
  • 17.  From the adjacent figure the primary and secondary windings are connected in parallel, resulting 120 volt input and 12 volt out put voltage.  There can be either type of arrangements as per requirement.
  • 18.  The details in the adjacent figure shows the winding arrangement of a dual transformer. It produces 33/7.1 and 33/11 kV voltages according to arrangement of winding.  The unit produces different outputs, based on the connections as advised in the name plate details.  Upon simplifying the connection diagrams they turn out to be series connected winding for 33/11 kv output and combination of series and parallel for 33/7.1 kv output.