POWER TRANSMISSION CORPORATION OF
UTTARAKHAND LIMITED
(132KV SUBSTATION PITCUL SRINAGAR GARHWAL)
UNDER GAIDENCE OF SHISHUPAL SINGH A.E OF PITCUL
POWER TRANSMISSION CORPORATION OF UTTARAKHAND (PITCUL)
 Power Transmission Corporation of Uttarakhand Ltd. is the power
transmission utility of the state of Uttarakhand formerly known as
Uttaranchal. On 9 November 2000, this 27th state of the Republic of India
was carved out of the Himalayan and adjoining northwestern districts of
Uttar Pradesh per the Uttar Pradesh State Re-Organization Act, 2000.
 The State of Uttaranchal in exercise of the power granted to it under
Section 63(4) .
 State Re-Organization Act, 2000, formed two separate companies in
power sector Uttaranchal Jal Vidyut Nigam Ltd. for generation of hydro-
electricity in the state and Uttaranchal Power Corporation Ltd. for
transmission & distribution of electricity in the state.
 Single line diagram is a simplified notation for
representing a three-phase power system.
Electrical elements such as circuit breakers,
transformers, bus bars, and conductors are
shown by standardized schematic symbols.
Instead of representing each of three phases
with a separate line or terminal, only one
conductor is represented. It is a form of block
diagram graphically depicting the paths for
power flow between entities of the system.
 JAL SANSTHAN
 RUDRA PARYAG
 DEV PARYAG
 PAURI GARHWAL
 BAGWAN
 SRINAGAR
 Transformer is a static
electromagnetic device
used to change the either
voltage or current level
keeping the total VA
constant.
 A 3-phase step down
transformer of rating
132kv/33kv is installed at
the sub-station.
 Transformers are static
devices, totally enclosed
and generally oil
immersed. Therefore,
chances of faults occurring
on them are very rare.
 A capacitor voltage
transformer (CVT or
CCVT), is a
transformer used in
power systems to step
down extra high
voltage signals and
provide a low voltage
signal, for metering or
operating a protective
relay.
 A line trap (HIGH-
FREQUENCY STOPPER)
is a maintenance-free
parallel resonant circuit,
mounted inline on high-
voltage(HV) AC
transmission power lines
to prevent the
transmission of high
frequency (40KHZ to
1000KHZ) carrier signals
of power line
communication to
unwanted destinations.
 A current transformer is a
type of transformer that is
used to measure AC current.
It produces an alternating
current in its secondary
which is proportional to AC
current in its primary.
Current Transformer are the
current sensing units of the
power system. The output of
the current transformers are
used in electronic equipment
and are widely used for
metering and protective
relays in the electrical power
industry.
 An Isolator is a circuit
breaking switch which
can only be operated
(either open or close) no
load. There are three
types of isolators used
in this particular sub-
station depending upon
their names
 TRANSFER ISOLATOR
 LIEN ISOLATOR
 BUS ISOLATOR
 The circuit breaker is one
of the most important unit
of electrical power system.
Circuit breaker is a
mechanical switching
device capable of making,
carrying and breaking
currents under normal
circuit conditions and also
making , carrying for a
specified time, and
automatically breaking
currents under specified
abnormal circuit
conditions such as those
of short-circuits(faults).
 This is same as that of
other circuit breakers (at
both 132kv and
 33kv sides) in both
construction and
operating mechanism
but used when some
 maintenance work is to
be done at any other
main circuit breaker
thus also known as
auxiliary circuit
breaker.
Overhead line insulators are used to separate line
conductors from each other and from the
supporting structures electrically.
 The insulators should have high permittivity so it
can withstand high electrical stresses.
 It should possess high mechanical strength to bear
the conductor load under worst loading
conditions.
 It should possess high mechanical strength to bear
the conductor load under worst loading
conditions.
 PIN ISOLATOR:-
Pin insulator is
earliest developed
overhead line
insulator, but still
popularly used in
power network up to
33kV system.
 The suspension
insulator separates the
line conductors and
supports them
electrically.
 Each unit operates the
voltage of about 11kV
and hence depending
upon the voltage the
appropriate number of
discs are connected in
series with the string.
Tanuj sharma on industrial training 2.pptx

More Related Content

Similar to Tanuj sharma on industrial training 2.pptx

33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI  NAGAR, LUCKNOW33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI  NAGAR, LUCKNOW
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
Satya Prakash Chaurasia
 
Ashish.pptx
Ashish.pptxAshish.pptx
Ashish.pptx
AkhilKanyal1
 
industrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradunindustrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradun
surendra rawat
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
Kamal Mittal
 
Internship doc 33 11 kv substation
Internship doc 33 11 kv substation  Internship doc 33 11 kv substation
Internship doc 33 11 kv substation
Madeen Kumar
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
virat217995
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
Ashwani Kumar
 
132kv Gss report of sitapura jaipur
132kv Gss report of sitapura jaipur132kv Gss report of sitapura jaipur
132kv Gss report of sitapura jaipur
kishankky
 
presentation for 132/33 kv gss RRVPNL .pdf
presentation for 132/33 kv gss RRVPNL .pdfpresentation for 132/33 kv gss RRVPNL .pdf
presentation for 132/33 kv gss RRVPNL .pdf
VishavBrar2
 
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
Sogendra Rajput
 
132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur
monga786
 
switchyard-151103200304-lva1-app6891-1.pptx
switchyard-151103200304-lva1-app6891-1.pptxswitchyard-151103200304-lva1-app6891-1.pptx
switchyard-151103200304-lva1-app6891-1.pptx
20269vinay
 
PPT ON SUMMER VOCATIONAL TRAINING ON 132/33 KV AT MOHADDIPUR, SUB-STATION, GO...
PPT ON SUMMER VOCATIONAL TRAINING ON 132/33 KV AT MOHADDIPUR, SUB-STATION, GO...PPT ON SUMMER VOCATIONAL TRAINING ON 132/33 KV AT MOHADDIPUR, SUB-STATION, GO...
PPT ON SUMMER VOCATIONAL TRAINING ON 132/33 KV AT MOHADDIPUR, SUB-STATION, GO...
Abrar Ahmad
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEF
jang041
 
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Gangwal
 
Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving station
H.C.Naveen Kumar
 
PPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONPPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATION
Ravi Phadtare
 
pptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdfpptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdf
Hariomgupta90
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
Shubham Patel
 
INTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptx
INTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptxINTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptx
INTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptx
Srujan99
 

Similar to Tanuj sharma on industrial training 2.pptx (20)

33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI  NAGAR, LUCKNOW33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI  NAGAR, LUCKNOW
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
 
Ashish.pptx
Ashish.pptxAshish.pptx
Ashish.pptx
 
industrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradunindustrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradun
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
Internship doc 33 11 kv substation
Internship doc 33 11 kv substation  Internship doc 33 11 kv substation
Internship doc 33 11 kv substation
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
132kv Gss report of sitapura jaipur
132kv Gss report of sitapura jaipur132kv Gss report of sitapura jaipur
132kv Gss report of sitapura jaipur
 
presentation for 132/33 kv gss RRVPNL .pdf
presentation for 132/33 kv gss RRVPNL .pdfpresentation for 132/33 kv gss RRVPNL .pdf
presentation for 132/33 kv gss RRVPNL .pdf
 
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
 
132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur
 
switchyard-151103200304-lva1-app6891-1.pptx
switchyard-151103200304-lva1-app6891-1.pptxswitchyard-151103200304-lva1-app6891-1.pptx
switchyard-151103200304-lva1-app6891-1.pptx
 
PPT ON SUMMER VOCATIONAL TRAINING ON 132/33 KV AT MOHADDIPUR, SUB-STATION, GO...
PPT ON SUMMER VOCATIONAL TRAINING ON 132/33 KV AT MOHADDIPUR, SUB-STATION, GO...PPT ON SUMMER VOCATIONAL TRAINING ON 132/33 KV AT MOHADDIPUR, SUB-STATION, GO...
PPT ON SUMMER VOCATIONAL TRAINING ON 132/33 KV AT MOHADDIPUR, SUB-STATION, GO...
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEF
 
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptx
 
Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving station
 
PPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONPPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATION
 
pptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdfpptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdf
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
INTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptx
INTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptxINTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptx
INTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptx
 

Recently uploaded

学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
Aditya Rajan Patra
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
HODECEDSIET
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 

Recently uploaded (20)

学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 

Tanuj sharma on industrial training 2.pptx

  • 1. POWER TRANSMISSION CORPORATION OF UTTARAKHAND LIMITED (132KV SUBSTATION PITCUL SRINAGAR GARHWAL) UNDER GAIDENCE OF SHISHUPAL SINGH A.E OF PITCUL
  • 2. POWER TRANSMISSION CORPORATION OF UTTARAKHAND (PITCUL)  Power Transmission Corporation of Uttarakhand Ltd. is the power transmission utility of the state of Uttarakhand formerly known as Uttaranchal. On 9 November 2000, this 27th state of the Republic of India was carved out of the Himalayan and adjoining northwestern districts of Uttar Pradesh per the Uttar Pradesh State Re-Organization Act, 2000.  The State of Uttaranchal in exercise of the power granted to it under Section 63(4) .  State Re-Organization Act, 2000, formed two separate companies in power sector Uttaranchal Jal Vidyut Nigam Ltd. for generation of hydro- electricity in the state and Uttaranchal Power Corporation Ltd. for transmission & distribution of electricity in the state.
  • 3.
  • 4.
  • 5.  Single line diagram is a simplified notation for representing a three-phase power system. Electrical elements such as circuit breakers, transformers, bus bars, and conductors are shown by standardized schematic symbols. Instead of representing each of three phases with a separate line or terminal, only one conductor is represented. It is a form of block diagram graphically depicting the paths for power flow between entities of the system.
  • 6.
  • 7.  JAL SANSTHAN  RUDRA PARYAG  DEV PARYAG  PAURI GARHWAL  BAGWAN  SRINAGAR
  • 8.  Transformer is a static electromagnetic device used to change the either voltage or current level keeping the total VA constant.  A 3-phase step down transformer of rating 132kv/33kv is installed at the sub-station.  Transformers are static devices, totally enclosed and generally oil immersed. Therefore, chances of faults occurring on them are very rare.
  • 9.
  • 10.  A capacitor voltage transformer (CVT or CCVT), is a transformer used in power systems to step down extra high voltage signals and provide a low voltage signal, for metering or operating a protective relay.
  • 11.
  • 12.  A line trap (HIGH- FREQUENCY STOPPER) is a maintenance-free parallel resonant circuit, mounted inline on high- voltage(HV) AC transmission power lines to prevent the transmission of high frequency (40KHZ to 1000KHZ) carrier signals of power line communication to unwanted destinations.
  • 13.  A current transformer is a type of transformer that is used to measure AC current. It produces an alternating current in its secondary which is proportional to AC current in its primary. Current Transformer are the current sensing units of the power system. The output of the current transformers are used in electronic equipment and are widely used for metering and protective relays in the electrical power industry.
  • 14.  An Isolator is a circuit breaking switch which can only be operated (either open or close) no load. There are three types of isolators used in this particular sub- station depending upon their names  TRANSFER ISOLATOR  LIEN ISOLATOR  BUS ISOLATOR
  • 15.  The circuit breaker is one of the most important unit of electrical power system. Circuit breaker is a mechanical switching device capable of making, carrying and breaking currents under normal circuit conditions and also making , carrying for a specified time, and automatically breaking currents under specified abnormal circuit conditions such as those of short-circuits(faults).
  • 16.  This is same as that of other circuit breakers (at both 132kv and  33kv sides) in both construction and operating mechanism but used when some  maintenance work is to be done at any other main circuit breaker thus also known as auxiliary circuit breaker.
  • 17. Overhead line insulators are used to separate line conductors from each other and from the supporting structures electrically.  The insulators should have high permittivity so it can withstand high electrical stresses.  It should possess high mechanical strength to bear the conductor load under worst loading conditions.  It should possess high mechanical strength to bear the conductor load under worst loading conditions.
  • 18.  PIN ISOLATOR:- Pin insulator is earliest developed overhead line insulator, but still popularly used in power network up to 33kV system.
  • 19.  The suspension insulator separates the line conductors and supports them electrically.  Each unit operates the voltage of about 11kV and hence depending upon the voltage the appropriate number of discs are connected in series with the string.