Agenda
 Background
 Tracing Proposal
 Tracing Architecture
 Tracing Data Model
 Tracing Analysis Tools
 Reference
Background
• Swift is a large scale distributed object store span thousands of nodes
across multiple zones and different regions.
– End to end performance is critical to success of Swift.
– Tools that aid in understanding the behavior and reasoning about performance issue are
invaluable.
• Motivation
– For a particular client request X, what is the actual route when it is being served by
different services? Is there any difference b/w actual route and expected route even we
know the access patterns?
– What is the performance behavior of the server components and third-party services?
Which part is slower than expected?
– How can we quickly diagnose the problem when it breaks at some points ?
e.g. PUT request X: Client(1) X Proxy-Server (1) Container-Server (1) X1” Account-Server (1)
X ’ Container-Server (2) X2” Account-Server (2)
Container-Server (3) X3” Account-Server (3)
Which part is slow? Looking at your logs?
When a request is made to Swift, it is given an unique transaction id. This id should be
in every log line that has to do with that request. This can be useful when looking at all
the services that are hit by a single request. But….is it efficient or handy to do?
Correlate the logs
Proxy server log @ node-P
Container server log @ node-C
Account server log @ node-A
Object server log @ node-O
Correlate the information pieces by transaction id and client IP from all logs of related hashed nodes!
• Counters + Counter_rate(sampling)
– Proxy-Server.{ACO}.{METHOD}.{CODE}
– {ACO}-server.{METHOD}.{CODE}
• Timers + Timer_data
– {ACO}-{DAEMON}.timing
– {ACO}-{DAEMON}.error.timing
– {ACO}-server.{METHOD}.timing
StatsD Metrics
StatsD logging options:
# access_log_statsd_host = localhost
# access_log_statsd_port = 8125
# access_log_statsd_default_sample_rate = 1.0
# access_log_statsd_sample_rate_factor = 1.0
# access_log_statsd_metric_prefix =
# access_log_headers = false
# log_statsd_valid_http_methods =
GET,HEAD,POST,PUT,DELETE,COPY,OPTIONS
Pros and cons of current implt.
• ReThink it
Can we provide a real time end to end performance tracing/tracking tool in Swift
infrastructure for developers and users to facilitate their analysis in development and
operation environment?
statsD logging
Pros • Real time performance metrics to monitor the
health of Swift cluster
• Performance impact is low by sending metrics
data via UDP protocol, no hit on local disk I/O
• Supported by different backend to report and
visualization
• Light-weighted
• Simple to use
• Rich logging tools
cons • Designed for cluster level healthy, not for end to
end performance.
• Can not provide metrics data for a specific set of
requests.
• No relationship between different set of metrics
for specific transactions or requests.
• Not designed for real time
• Require more efforts to collect and
analysis
• No representation for individual span
• Message size limitation
Our Proposal
• Goal
– Target for researchers, developers and admins, provide a method of traceability to
understand end to end performance issue and identify the bottlenecks.
• Scope
 Add WSGI middleware and hooks into swift components to collect trace data
 The middleware to control the activation and generation of trace
 Generate trace and span ids, collect the data and tired them together
 Send traced data to aggregator and saved into repository
 Minor fix of current Swift implementation to allow the path to include complete hops.
 Similar to trans-id, the trace-id and span-id need to be propagated through HTTP headers correctly b/w
services and components.
 Analysis tools of report and visualization
 Query the traced data by tiered trace ids
 Reconstruct span tree for each trace
Swift Messaging Route
Swift
Client
Proxy
Server
Container
Server
Container
Server
Container
Server
Account
Server
Auth
Account
Server
Account
Server
Request-XPUT Response-XPUT
Request-X’’PUT
Request-X”’PUT Response-
X’”PUT
Response-X’’PUT
Create a new container: PUT /account/container
• Swift components talks via HTTP request
and response messages.
• It is easy to use HTTP headers as the clue to
trace down the route.
Request-X’GET
Response-X’GET
Span Tree of Trace
Swift
Client
Proxy
Server
Container
Server
Container
Server
Container
Server
Account
Server
Auth
Account
Server
Account
Server
Request-XPUT
X-Trace-Id: 1234
Response-XPUT
Request-X’’PUT
X-Trace_Id: 1234
X-Span-Id: 1
Request-X”’PUT
X-Trace-Id: 1234
X-Span-Id: 2
Response-
X’”PUT
Response-X’’PUT
• X-Trace-Id: identification of each
trace
 Use X-Trans-Id to support
different cluster?
 Or generate new id for this
purpose?
• X-Span-Id: identification of each
span to represent individual
HTTP RESTful call and WSGI call.
 Generate new span id for
this purpose
(notes: UUID can be used for implementation)
Create a new container: PUT /account/container
Request-X’GET
Response-X’GET
X-trace Middleware Architecture
1. Generate trace ids based on configuration.
2. Create spans and collect trace data
3. Propagate trace ids to next hop
4. Send trace data into a repository via
separate transport protocol/channel
Swift
Client
Proxy
Server
Container
Server
Container
Server
Container
Server
Account
Server
Auth
Account
Server
Account
Server
x-trace
x-trace
x-
trace
Tracedatarepository
x-trace
Patches to fix the request path
• The trace id is passed along by proxy
server in HTTP headers, but will be lost
at some points because of recreating a
new request for next hops.
• Patches are needed to fix this problem
to form a complete tracing path for
container server, object server, etc.
Swift
Client
Proxy
Server
Container
Server
Container
Server
Container
Server
Account
Server
Auth
Account
Server
Account
Server
x-trace
x-trace
x-
trace
Tracedatarepository
x-tracepropagate
trace id in next
new request
Tie together tracing data
Reconstruct causal and temporal relationship view for PUT container call
Proxy-Server.PUT parent-span-id=0, span-id=1
timeline
Container-Server.PUT parent-span-id=1, span-id=2
Container-Server.PUT parent-span-id=1, span-id=3
Container-Server.PUT parent-span-id=1, span-id=4
Account-Server.PUT
parent-span-id=2, span-id=5
Account-Server.PUT
parent-span-id=3, span-id=6
Account-Server.PUT
parent-span-id=4, span-id=7
0 ms 200 ms50 ms 150 ms100 ms
Swift-Client.PUT parent-span-id=none, span-id=0
201
201
201
201
201
201 201
Another example: upload an object
Proxy-Server.PUT parent-span-id=0, span-id=1
timeline
Object-Server.PUT parent-span-id=1, span-id=2
Object-Server.PUT parent-span-id=1, span-id=3
Object-Server.PUT parent-span-id=1, span-id=4
Container-Server.PUT
parent-span-id=2, span-id=5
Container-Server.PUT
parent-span-id=3, span-id=6
Container-Server.PUT
parent-span-id=4, span-id=7
0 ms 200 ms50 ms 150 ms100 ms
Swift-Client.PUT parent-span-id=none, span-id=0
201
201
201
201
201
201 201
pipeline:main
Trace into middleware of the pipeline
• Expand the trace path into
WSGI call b/w middleware to
get more complete trace data.
• Possible choices
– Decorators for __call__
@trace_here()
def __call__(self, environ, start_response)
– Hack paste deployment package
– Profile with filters
Swift
Client
Proxy
Server
x-trace
Tracedatarepository
tempauth
cache
tempurl
dlo
Pipeline = catch_errors gatekeeper healthcheck proxy-logging cache container_sync bulk slo dlo ratelimit crossdomain tempauth tempurl formpost
staticweb container-quotas account-quotas proxy-logging proxy-serve
slo
…
Backend trace data model
{
"_id" : "14a467a402904aee87de4028a8595493",
"endpoint" : {
"port" : "6031",
"type" : "server",
"name" : "container.server",
"ipv4" : "127.0.0.1"
},
"name" : "GET",
"parent" : "57fbd3ec12fe4912ba89e7a8eb97f2e7",
"start_time" : 1400146616.554865,
"trace_id" : "d7ff028674c5471e94b964ec37d35546",
"end_time" : 1400146616.559608,
"annotations" : [
{
"type" : "string",
"value" :
"/sdb1/347/TEMPAUTH_test/summit",
"key" : "request_path",
"event" : "sr"
},
{
"type" : "string",
"value" : "200 OK",
"key" : "return_code",
"event" : "ss"
}
]
}
{
"_id" : "57fbd3ec12fe4912ba89e7a8eb97f2e7",
"endpoint" : {
"port" : "8080",
"type" : "server",
"name" : "proxy.server",
"ipv4" : "127.0.0.1"
},
"name" : "GET",
"parent" : "5602ca4010fe420c9fa56528faf711ab",
"start_time" : 1400146616.490691,
"trace_id" : "d7ff028674c5471e94b964ec37d35546",
"end_time" : 1400146616.58012,
"annotations" : [
{
"type" : "string",
"value" : "/v1/TEMPAUTH_test/summit",
"key" : "request_path",
"event" : "sr"
},
{
"type" : "string",
"value" : "200 OK",
"key" : "return_code",
"event" : "ss"
}
]
}
Query and analysis tools
• Query
– Query trace data by trace_id, span_id, order or range by time, group by nodes,
annotation keys
• Trace timeline
– Plot the spans on the timeline with causal relationships
• Diagnose
– Analyze the critical path for a success response
– Identify the failure point of in the path
• Simulation
– Replay the recorded processing of the requests
• Data Mining
Reference
• Google Dapper – a large-scale distributed systems tracing infrastructure
• Twitter Zipkin - a distributed tracing system that helps us gather timing
data for all the disparate services at Twitter.
• Berkeley XTrace : a pervasive network tracing framework
Demo
Q&A

More Related Content

What's hot

Spark (Structured) Streaming vs. Kafka Streams
Spark (Structured) Streaming vs. Kafka StreamsSpark (Structured) Streaming vs. Kafka Streams
Spark (Structured) Streaming vs. Kafka StreamsGuido Schmutz
 
Spark (Structured) Streaming vs. Kafka Streams - two stream processing platfo...
Spark (Structured) Streaming vs. Kafka Streams - two stream processing platfo...Spark (Structured) Streaming vs. Kafka Streams - two stream processing platfo...
Spark (Structured) Streaming vs. Kafka Streams - two stream processing platfo...Guido Schmutz
 
Solutions for bi-directional integration between Oracle RDBMS & Apache Kafka
Solutions for bi-directional integration between Oracle RDBMS & Apache KafkaSolutions for bi-directional integration between Oracle RDBMS & Apache Kafka
Solutions for bi-directional integration between Oracle RDBMS & Apache KafkaGuido Schmutz
 
Solutions for bi-directional Integration between Oracle RDMBS & Apache Kafka
Solutions for bi-directional Integration between Oracle RDMBS & Apache KafkaSolutions for bi-directional Integration between Oracle RDMBS & Apache Kafka
Solutions for bi-directional Integration between Oracle RDMBS & Apache KafkaGuido Schmutz
 
Deep dive into stateful stream processing in structured streaming by Tathaga...
Deep dive into stateful stream processing in structured streaming  by Tathaga...Deep dive into stateful stream processing in structured streaming  by Tathaga...
Deep dive into stateful stream processing in structured streaming by Tathaga...Databricks
 
Continuous SQL with Apache Streaming (FLaNK and FLiP)
Continuous SQL with Apache Streaming (FLaNK and FLiP)Continuous SQL with Apache Streaming (FLaNK and FLiP)
Continuous SQL with Apache Streaming (FLaNK and FLiP)Timothy Spann
 
Apache flume by Swapnil Dubey
Apache flume by Swapnil DubeyApache flume by Swapnil Dubey
Apache flume by Swapnil DubeySwapnil Dubey
 
Unified Big Data Processing with Apache Spark
Unified Big Data Processing with Apache SparkUnified Big Data Processing with Apache Spark
Unified Big Data Processing with Apache SparkC4Media
 
Real Time Data Processing Using Spark Streaming
Real Time Data Processing Using Spark StreamingReal Time Data Processing Using Spark Streaming
Real Time Data Processing Using Spark StreamingHari Shreedharan
 
Ultimate journey towards realtime data platform with 2.5M events per sec
Ultimate journey towards realtime data platform with 2.5M events per secUltimate journey towards realtime data platform with 2.5M events per sec
Ultimate journey towards realtime data platform with 2.5M events per secb0ris_1
 
Location Analytics - Real-Time Geofencing using Kafka
Location Analytics - Real-Time Geofencing using Kafka Location Analytics - Real-Time Geofencing using Kafka
Location Analytics - Real-Time Geofencing using Kafka Guido Schmutz
 
Deep Dive into Stateful Stream Processing in Structured Streaming with Tathag...
Deep Dive into Stateful Stream Processing in Structured Streaming with Tathag...Deep Dive into Stateful Stream Processing in Structured Streaming with Tathag...
Deep Dive into Stateful Stream Processing in Structured Streaming with Tathag...Databricks
 
Deep Dive with Spark Streaming - Tathagata Das - Spark Meetup 2013-06-17
Deep Dive with Spark Streaming - Tathagata  Das - Spark Meetup 2013-06-17Deep Dive with Spark Streaming - Tathagata  Das - Spark Meetup 2013-06-17
Deep Dive with Spark Streaming - Tathagata Das - Spark Meetup 2013-06-17spark-project
 
Location Analytics - Real Time Geofencing using Apache Kafka
Location Analytics - Real Time Geofencing using Apache KafkaLocation Analytics - Real Time Geofencing using Apache Kafka
Location Analytics - Real Time Geofencing using Apache KafkaGuido Schmutz
 
Cowboy dating with big data
Cowboy dating with big data Cowboy dating with big data
Cowboy dating with big data b0ris_1
 
KSQL - Stream Processing simplified!
KSQL - Stream Processing simplified!KSQL - Stream Processing simplified!
KSQL - Stream Processing simplified!Guido Schmutz
 
Spark Streaming Recipes and "Exactly Once" Semantics Revised
Spark Streaming Recipes and "Exactly Once" Semantics RevisedSpark Streaming Recipes and "Exactly Once" Semantics Revised
Spark Streaming Recipes and "Exactly Once" Semantics RevisedMichael Spector
 
Modus operandi of Spark Streaming - Recipes for Running your Streaming Applic...
Modus operandi of Spark Streaming - Recipes for Running your Streaming Applic...Modus operandi of Spark Streaming - Recipes for Running your Streaming Applic...
Modus operandi of Spark Streaming - Recipes for Running your Streaming Applic...DataWorks Summit
 
Session 09 - Flume
Session 09 - FlumeSession 09 - Flume
Session 09 - FlumeAnandMHadoop
 
Querying the Internet of Things: Streaming SQL on Kafka/Samza and Storm/Trident
Querying the Internet of Things: Streaming SQL on Kafka/Samza and Storm/TridentQuerying the Internet of Things: Streaming SQL on Kafka/Samza and Storm/Trident
Querying the Internet of Things: Streaming SQL on Kafka/Samza and Storm/TridentDataWorks Summit/Hadoop Summit
 

What's hot (20)

Spark (Structured) Streaming vs. Kafka Streams
Spark (Structured) Streaming vs. Kafka StreamsSpark (Structured) Streaming vs. Kafka Streams
Spark (Structured) Streaming vs. Kafka Streams
 
Spark (Structured) Streaming vs. Kafka Streams - two stream processing platfo...
Spark (Structured) Streaming vs. Kafka Streams - two stream processing platfo...Spark (Structured) Streaming vs. Kafka Streams - two stream processing platfo...
Spark (Structured) Streaming vs. Kafka Streams - two stream processing platfo...
 
Solutions for bi-directional integration between Oracle RDBMS & Apache Kafka
Solutions for bi-directional integration between Oracle RDBMS & Apache KafkaSolutions for bi-directional integration between Oracle RDBMS & Apache Kafka
Solutions for bi-directional integration between Oracle RDBMS & Apache Kafka
 
Solutions for bi-directional Integration between Oracle RDMBS & Apache Kafka
Solutions for bi-directional Integration between Oracle RDMBS & Apache KafkaSolutions for bi-directional Integration between Oracle RDMBS & Apache Kafka
Solutions for bi-directional Integration between Oracle RDMBS & Apache Kafka
 
Deep dive into stateful stream processing in structured streaming by Tathaga...
Deep dive into stateful stream processing in structured streaming  by Tathaga...Deep dive into stateful stream processing in structured streaming  by Tathaga...
Deep dive into stateful stream processing in structured streaming by Tathaga...
 
Continuous SQL with Apache Streaming (FLaNK and FLiP)
Continuous SQL with Apache Streaming (FLaNK and FLiP)Continuous SQL with Apache Streaming (FLaNK and FLiP)
Continuous SQL with Apache Streaming (FLaNK and FLiP)
 
Apache flume by Swapnil Dubey
Apache flume by Swapnil DubeyApache flume by Swapnil Dubey
Apache flume by Swapnil Dubey
 
Unified Big Data Processing with Apache Spark
Unified Big Data Processing with Apache SparkUnified Big Data Processing with Apache Spark
Unified Big Data Processing with Apache Spark
 
Real Time Data Processing Using Spark Streaming
Real Time Data Processing Using Spark StreamingReal Time Data Processing Using Spark Streaming
Real Time Data Processing Using Spark Streaming
 
Ultimate journey towards realtime data platform with 2.5M events per sec
Ultimate journey towards realtime data platform with 2.5M events per secUltimate journey towards realtime data platform with 2.5M events per sec
Ultimate journey towards realtime data platform with 2.5M events per sec
 
Location Analytics - Real-Time Geofencing using Kafka
Location Analytics - Real-Time Geofencing using Kafka Location Analytics - Real-Time Geofencing using Kafka
Location Analytics - Real-Time Geofencing using Kafka
 
Deep Dive into Stateful Stream Processing in Structured Streaming with Tathag...
Deep Dive into Stateful Stream Processing in Structured Streaming with Tathag...Deep Dive into Stateful Stream Processing in Structured Streaming with Tathag...
Deep Dive into Stateful Stream Processing in Structured Streaming with Tathag...
 
Deep Dive with Spark Streaming - Tathagata Das - Spark Meetup 2013-06-17
Deep Dive with Spark Streaming - Tathagata  Das - Spark Meetup 2013-06-17Deep Dive with Spark Streaming - Tathagata  Das - Spark Meetup 2013-06-17
Deep Dive with Spark Streaming - Tathagata Das - Spark Meetup 2013-06-17
 
Location Analytics - Real Time Geofencing using Apache Kafka
Location Analytics - Real Time Geofencing using Apache KafkaLocation Analytics - Real Time Geofencing using Apache Kafka
Location Analytics - Real Time Geofencing using Apache Kafka
 
Cowboy dating with big data
Cowboy dating with big data Cowboy dating with big data
Cowboy dating with big data
 
KSQL - Stream Processing simplified!
KSQL - Stream Processing simplified!KSQL - Stream Processing simplified!
KSQL - Stream Processing simplified!
 
Spark Streaming Recipes and "Exactly Once" Semantics Revised
Spark Streaming Recipes and "Exactly Once" Semantics RevisedSpark Streaming Recipes and "Exactly Once" Semantics Revised
Spark Streaming Recipes and "Exactly Once" Semantics Revised
 
Modus operandi of Spark Streaming - Recipes for Running your Streaming Applic...
Modus operandi of Spark Streaming - Recipes for Running your Streaming Applic...Modus operandi of Spark Streaming - Recipes for Running your Streaming Applic...
Modus operandi of Spark Streaming - Recipes for Running your Streaming Applic...
 
Session 09 - Flume
Session 09 - FlumeSession 09 - Flume
Session 09 - Flume
 
Querying the Internet of Things: Streaming SQL on Kafka/Samza and Storm/Trident
Querying the Internet of Things: Streaming SQL on Kafka/Samza and Storm/TridentQuerying the Internet of Things: Streaming SQL on Kafka/Samza and Storm/Trident
Querying the Internet of Things: Streaming SQL on Kafka/Samza and Storm/Trident
 

Viewers also liked

Control review for iOS
Control review for iOSControl review for iOS
Control review for iOSWilliam Price
 
Action Controller Overview, Season 1
Action Controller Overview, Season 1Action Controller Overview, Season 1
Action Controller Overview, Season 1RORLAB
 
Let's Learn Ruby - Basic
Let's Learn Ruby - BasicLet's Learn Ruby - Basic
Let's Learn Ruby - BasicEddie Kao
 
Ruby on Rails testing with Rspec
Ruby on Rails testing with RspecRuby on Rails testing with Rspec
Ruby on Rails testing with RspecBunlong Van
 
jQuery For Beginners - jQuery Conference 2009
jQuery For Beginners - jQuery Conference 2009jQuery For Beginners - jQuery Conference 2009
jQuery For Beginners - jQuery Conference 2009Ralph Whitbeck
 
Learning jQuery in 30 minutes
Learning jQuery in 30 minutesLearning jQuery in 30 minutes
Learning jQuery in 30 minutesSimon Willison
 
A swift introduction to Swift
A swift introduction to SwiftA swift introduction to Swift
A swift introduction to SwiftGiordano Scalzo
 
Introduction to html
Introduction to htmlIntroduction to html
Introduction to htmlvikasgaur31
 
Infinum iOS Talks #1 - Swift under the hood: Method Dispatching by Vlaho Poluta
Infinum iOS Talks #1 - Swift under the hood: Method Dispatching by Vlaho PolutaInfinum iOS Talks #1 - Swift under the hood: Method Dispatching by Vlaho Poluta
Infinum iOS Talks #1 - Swift under the hood: Method Dispatching by Vlaho PolutaInfinum
 
Introduction to Web Architecture
Introduction to Web ArchitectureIntroduction to Web Architecture
Introduction to Web ArchitectureChamnap Chhorn
 
jQuery and Rails: Best Friends Forever
jQuery and Rails: Best Friends ForeverjQuery and Rails: Best Friends Forever
jQuery and Rails: Best Friends Foreverstephskardal
 
Swift Programming Language
Swift Programming LanguageSwift Programming Language
Swift Programming LanguageGiuseppe Arici
 

Viewers also liked (14)

Control review for iOS
Control review for iOSControl review for iOS
Control review for iOS
 
Action Controller Overview, Season 1
Action Controller Overview, Season 1Action Controller Overview, Season 1
Action Controller Overview, Season 1
 
Let's Learn Ruby - Basic
Let's Learn Ruby - BasicLet's Learn Ruby - Basic
Let's Learn Ruby - Basic
 
September2011aftma
September2011aftmaSeptember2011aftma
September2011aftma
 
Ruby on Rails testing with Rspec
Ruby on Rails testing with RspecRuby on Rails testing with Rspec
Ruby on Rails testing with Rspec
 
jQuery For Beginners - jQuery Conference 2009
jQuery For Beginners - jQuery Conference 2009jQuery For Beginners - jQuery Conference 2009
jQuery For Beginners - jQuery Conference 2009
 
Learning jQuery in 30 minutes
Learning jQuery in 30 minutesLearning jQuery in 30 minutes
Learning jQuery in 30 minutes
 
A swift introduction to Swift
A swift introduction to SwiftA swift introduction to Swift
A swift introduction to Swift
 
Web application architecture
Web application architectureWeb application architecture
Web application architecture
 
Introduction to html
Introduction to htmlIntroduction to html
Introduction to html
 
Infinum iOS Talks #1 - Swift under the hood: Method Dispatching by Vlaho Poluta
Infinum iOS Talks #1 - Swift under the hood: Method Dispatching by Vlaho PolutaInfinum iOS Talks #1 - Swift under the hood: Method Dispatching by Vlaho Poluta
Infinum iOS Talks #1 - Swift under the hood: Method Dispatching by Vlaho Poluta
 
Introduction to Web Architecture
Introduction to Web ArchitectureIntroduction to Web Architecture
Introduction to Web Architecture
 
jQuery and Rails: Best Friends Forever
jQuery and Rails: Best Friends ForeverjQuery and Rails: Best Friends Forever
jQuery and Rails: Best Friends Forever
 
Swift Programming Language
Swift Programming LanguageSwift Programming Language
Swift Programming Language
 

Similar to Swift distributed tracing method and tools v2

A Practical Deep Dive into Observability of Streaming Applications with Kosta...
A Practical Deep Dive into Observability of Streaming Applications with Kosta...A Practical Deep Dive into Observability of Streaming Applications with Kosta...
A Practical Deep Dive into Observability of Streaming Applications with Kosta...HostedbyConfluent
 
Introduction to WSO2 Data Analytics Platform
Introduction to  WSO2 Data Analytics PlatformIntroduction to  WSO2 Data Analytics Platform
Introduction to WSO2 Data Analytics PlatformSrinath Perera
 
Kafka summit SF 2019 - the art of the event-streaming app
Kafka summit SF 2019 - the art of the event-streaming appKafka summit SF 2019 - the art of the event-streaming app
Kafka summit SF 2019 - the art of the event-streaming appNeil Avery
 
The art of the event streaming application: streams, stream processors and sc...
The art of the event streaming application: streams, stream processors and sc...The art of the event streaming application: streams, stream processors and sc...
The art of the event streaming application: streams, stream processors and sc...confluent
 
Api Statistics- The Scalable Way
Api Statistics- The Scalable WayApi Statistics- The Scalable Way
Api Statistics- The Scalable WayWSO2
 
Applied Detection and Analysis Using Flow Data - MIRCon 2014
Applied Detection and Analysis Using Flow Data - MIRCon 2014Applied Detection and Analysis Using Flow Data - MIRCon 2014
Applied Detection and Analysis Using Flow Data - MIRCon 2014chrissanders88
 
[DSC Europe 23] Pramod Immaneni - Real-time analytics at IoT scale
[DSC Europe 23] Pramod Immaneni - Real-time analytics at IoT scale[DSC Europe 23] Pramod Immaneni - Real-time analytics at IoT scale
[DSC Europe 23] Pramod Immaneni - Real-time analytics at IoT scaleDataScienceConferenc1
 
Micro-service architectures with Gilmour
Micro-service architectures with GilmourMicro-service architectures with Gilmour
Micro-service architectures with GilmourAditya Godbole
 
Tracing Micro Services with OpenTracing
Tracing Micro Services with OpenTracingTracing Micro Services with OpenTracing
Tracing Micro Services with OpenTracingHemant Kumar
 
Awesome Banking API's
Awesome Banking API'sAwesome Banking API's
Awesome Banking API'sNatalino Busa
 
DBA Fundamentals Group: Continuous SQL with Kafka and Flink
DBA Fundamentals Group: Continuous SQL with Kafka and FlinkDBA Fundamentals Group: Continuous SQL with Kafka and Flink
DBA Fundamentals Group: Continuous SQL with Kafka and FlinkTimothy Spann
 
GraphConnect 2014 SF: From Zero to Graph in 120: Scale
GraphConnect 2014 SF: From Zero to Graph in 120: ScaleGraphConnect 2014 SF: From Zero to Graph in 120: Scale
GraphConnect 2014 SF: From Zero to Graph in 120: ScaleNeo4j
 
Building an Observability Platform in 389 Difficult Steps
Building an Observability Platform in 389 Difficult StepsBuilding an Observability Platform in 389 Difficult Steps
Building an Observability Platform in 389 Difficult StepsDigitalOcean
 
Timely Year Two: Lessons Learned Building a Scalable Metrics Analytic System
Timely Year Two: Lessons Learned Building a Scalable Metrics Analytic SystemTimely Year Two: Lessons Learned Building a Scalable Metrics Analytic System
Timely Year Two: Lessons Learned Building a Scalable Metrics Analytic SystemAccumulo Summit
 
[WSO2Con EU 2017] Streaming Analytics Patterns for Your Digital Enterprise
[WSO2Con EU 2017] Streaming Analytics Patterns for Your Digital Enterprise[WSO2Con EU 2017] Streaming Analytics Patterns for Your Digital Enterprise
[WSO2Con EU 2017] Streaming Analytics Patterns for Your Digital EnterpriseWSO2
 
Sumo Logic QuickStart Webinar - Jan 2016
Sumo Logic QuickStart Webinar - Jan 2016Sumo Logic QuickStart Webinar - Jan 2016
Sumo Logic QuickStart Webinar - Jan 2016Sumo Logic
 
Realtime Detection of DDOS attacks using Apache Spark and MLLib
Realtime Detection of DDOS attacks using Apache Spark and MLLibRealtime Detection of DDOS attacks using Apache Spark and MLLib
Realtime Detection of DDOS attacks using Apache Spark and MLLibRyan Bosshart
 
Data science for infrastructure dev week 2022
Data science for infrastructure   dev week 2022Data science for infrastructure   dev week 2022
Data science for infrastructure dev week 2022ZainAsgar1
 
The missing signalling layer for WebRTC
The missing signalling layer for WebRTCThe missing signalling layer for WebRTC
The missing signalling layer for WebRTCWebRTCConferenceJapan
 
Resilient Predictive Data Pipelines (QCon London 2016)
Resilient Predictive Data Pipelines (QCon London 2016)Resilient Predictive Data Pipelines (QCon London 2016)
Resilient Predictive Data Pipelines (QCon London 2016)Sid Anand
 

Similar to Swift distributed tracing method and tools v2 (20)

A Practical Deep Dive into Observability of Streaming Applications with Kosta...
A Practical Deep Dive into Observability of Streaming Applications with Kosta...A Practical Deep Dive into Observability of Streaming Applications with Kosta...
A Practical Deep Dive into Observability of Streaming Applications with Kosta...
 
Introduction to WSO2 Data Analytics Platform
Introduction to  WSO2 Data Analytics PlatformIntroduction to  WSO2 Data Analytics Platform
Introduction to WSO2 Data Analytics Platform
 
Kafka summit SF 2019 - the art of the event-streaming app
Kafka summit SF 2019 - the art of the event-streaming appKafka summit SF 2019 - the art of the event-streaming app
Kafka summit SF 2019 - the art of the event-streaming app
 
The art of the event streaming application: streams, stream processors and sc...
The art of the event streaming application: streams, stream processors and sc...The art of the event streaming application: streams, stream processors and sc...
The art of the event streaming application: streams, stream processors and sc...
 
Api Statistics- The Scalable Way
Api Statistics- The Scalable WayApi Statistics- The Scalable Way
Api Statistics- The Scalable Way
 
Applied Detection and Analysis Using Flow Data - MIRCon 2014
Applied Detection and Analysis Using Flow Data - MIRCon 2014Applied Detection and Analysis Using Flow Data - MIRCon 2014
Applied Detection and Analysis Using Flow Data - MIRCon 2014
 
[DSC Europe 23] Pramod Immaneni - Real-time analytics at IoT scale
[DSC Europe 23] Pramod Immaneni - Real-time analytics at IoT scale[DSC Europe 23] Pramod Immaneni - Real-time analytics at IoT scale
[DSC Europe 23] Pramod Immaneni - Real-time analytics at IoT scale
 
Micro-service architectures with Gilmour
Micro-service architectures with GilmourMicro-service architectures with Gilmour
Micro-service architectures with Gilmour
 
Tracing Micro Services with OpenTracing
Tracing Micro Services with OpenTracingTracing Micro Services with OpenTracing
Tracing Micro Services with OpenTracing
 
Awesome Banking API's
Awesome Banking API'sAwesome Banking API's
Awesome Banking API's
 
DBA Fundamentals Group: Continuous SQL with Kafka and Flink
DBA Fundamentals Group: Continuous SQL with Kafka and FlinkDBA Fundamentals Group: Continuous SQL with Kafka and Flink
DBA Fundamentals Group: Continuous SQL with Kafka and Flink
 
GraphConnect 2014 SF: From Zero to Graph in 120: Scale
GraphConnect 2014 SF: From Zero to Graph in 120: ScaleGraphConnect 2014 SF: From Zero to Graph in 120: Scale
GraphConnect 2014 SF: From Zero to Graph in 120: Scale
 
Building an Observability Platform in 389 Difficult Steps
Building an Observability Platform in 389 Difficult StepsBuilding an Observability Platform in 389 Difficult Steps
Building an Observability Platform in 389 Difficult Steps
 
Timely Year Two: Lessons Learned Building a Scalable Metrics Analytic System
Timely Year Two: Lessons Learned Building a Scalable Metrics Analytic SystemTimely Year Two: Lessons Learned Building a Scalable Metrics Analytic System
Timely Year Two: Lessons Learned Building a Scalable Metrics Analytic System
 
[WSO2Con EU 2017] Streaming Analytics Patterns for Your Digital Enterprise
[WSO2Con EU 2017] Streaming Analytics Patterns for Your Digital Enterprise[WSO2Con EU 2017] Streaming Analytics Patterns for Your Digital Enterprise
[WSO2Con EU 2017] Streaming Analytics Patterns for Your Digital Enterprise
 
Sumo Logic QuickStart Webinar - Jan 2016
Sumo Logic QuickStart Webinar - Jan 2016Sumo Logic QuickStart Webinar - Jan 2016
Sumo Logic QuickStart Webinar - Jan 2016
 
Realtime Detection of DDOS attacks using Apache Spark and MLLib
Realtime Detection of DDOS attacks using Apache Spark and MLLibRealtime Detection of DDOS attacks using Apache Spark and MLLib
Realtime Detection of DDOS attacks using Apache Spark and MLLib
 
Data science for infrastructure dev week 2022
Data science for infrastructure   dev week 2022Data science for infrastructure   dev week 2022
Data science for infrastructure dev week 2022
 
The missing signalling layer for WebRTC
The missing signalling layer for WebRTCThe missing signalling layer for WebRTC
The missing signalling layer for WebRTC
 
Resilient Predictive Data Pipelines (QCon London 2016)
Resilient Predictive Data Pipelines (QCon London 2016)Resilient Predictive Data Pipelines (QCon London 2016)
Resilient Predictive Data Pipelines (QCon London 2016)
 

Recently uploaded

ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityVictorSzoltysek
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
Decarbonising Commercial Real Estate: The Role of Operational Performance
Decarbonising Commercial Real Estate: The Role of Operational PerformanceDecarbonising Commercial Real Estate: The Role of Operational Performance
Decarbonising Commercial Real Estate: The Role of Operational PerformanceIES VE
 
Simplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptxSimplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptxMarkSteadman7
 
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...WSO2
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
API Governance and Monetization - The evolution of API governance
API Governance and Monetization -  The evolution of API governanceAPI Governance and Monetization -  The evolution of API governance
API Governance and Monetization - The evolution of API governanceWSO2
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMKumar Satyam
 
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....rightmanforbloodline
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxRemote DBA Services
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 

Recently uploaded (20)

ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps Productivity
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Decarbonising Commercial Real Estate: The Role of Operational Performance
Decarbonising Commercial Real Estate: The Role of Operational PerformanceDecarbonising Commercial Real Estate: The Role of Operational Performance
Decarbonising Commercial Real Estate: The Role of Operational Performance
 
Simplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptxSimplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptx
 
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
API Governance and Monetization - The evolution of API governance
API Governance and Monetization -  The evolution of API governanceAPI Governance and Monetization -  The evolution of API governance
API Governance and Monetization - The evolution of API governance
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDM
 
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 

Swift distributed tracing method and tools v2

  • 1. Swift Distributed Tracing Method and Tools by Zhang Hua (Edward) Standards Team/ETI/CDL/IBM
  • 2. Agenda  Background  Tracing Proposal  Tracing Architecture  Tracing Data Model  Tracing Analysis Tools  Reference
  • 3. Background • Swift is a large scale distributed object store span thousands of nodes across multiple zones and different regions. – End to end performance is critical to success of Swift. – Tools that aid in understanding the behavior and reasoning about performance issue are invaluable. • Motivation – For a particular client request X, what is the actual route when it is being served by different services? Is there any difference b/w actual route and expected route even we know the access patterns? – What is the performance behavior of the server components and third-party services? Which part is slower than expected? – How can we quickly diagnose the problem when it breaks at some points ? e.g. PUT request X: Client(1) X Proxy-Server (1) Container-Server (1) X1” Account-Server (1) X ’ Container-Server (2) X2” Account-Server (2) Container-Server (3) X3” Account-Server (3)
  • 4. Which part is slow? Looking at your logs? When a request is made to Swift, it is given an unique transaction id. This id should be in every log line that has to do with that request. This can be useful when looking at all the services that are hit by a single request. But….is it efficient or handy to do?
  • 5. Correlate the logs Proxy server log @ node-P Container server log @ node-C Account server log @ node-A Object server log @ node-O Correlate the information pieces by transaction id and client IP from all logs of related hashed nodes!
  • 6. • Counters + Counter_rate(sampling) – Proxy-Server.{ACO}.{METHOD}.{CODE} – {ACO}-server.{METHOD}.{CODE} • Timers + Timer_data – {ACO}-{DAEMON}.timing – {ACO}-{DAEMON}.error.timing – {ACO}-server.{METHOD}.timing StatsD Metrics StatsD logging options: # access_log_statsd_host = localhost # access_log_statsd_port = 8125 # access_log_statsd_default_sample_rate = 1.0 # access_log_statsd_sample_rate_factor = 1.0 # access_log_statsd_metric_prefix = # access_log_headers = false # log_statsd_valid_http_methods = GET,HEAD,POST,PUT,DELETE,COPY,OPTIONS
  • 7. Pros and cons of current implt. • ReThink it Can we provide a real time end to end performance tracing/tracking tool in Swift infrastructure for developers and users to facilitate their analysis in development and operation environment? statsD logging Pros • Real time performance metrics to monitor the health of Swift cluster • Performance impact is low by sending metrics data via UDP protocol, no hit on local disk I/O • Supported by different backend to report and visualization • Light-weighted • Simple to use • Rich logging tools cons • Designed for cluster level healthy, not for end to end performance. • Can not provide metrics data for a specific set of requests. • No relationship between different set of metrics for specific transactions or requests. • Not designed for real time • Require more efforts to collect and analysis • No representation for individual span • Message size limitation
  • 8. Our Proposal • Goal – Target for researchers, developers and admins, provide a method of traceability to understand end to end performance issue and identify the bottlenecks. • Scope  Add WSGI middleware and hooks into swift components to collect trace data  The middleware to control the activation and generation of trace  Generate trace and span ids, collect the data and tired them together  Send traced data to aggregator and saved into repository  Minor fix of current Swift implementation to allow the path to include complete hops.  Similar to trans-id, the trace-id and span-id need to be propagated through HTTP headers correctly b/w services and components.  Analysis tools of report and visualization  Query the traced data by tiered trace ids  Reconstruct span tree for each trace
  • 9. Swift Messaging Route Swift Client Proxy Server Container Server Container Server Container Server Account Server Auth Account Server Account Server Request-XPUT Response-XPUT Request-X’’PUT Request-X”’PUT Response- X’”PUT Response-X’’PUT Create a new container: PUT /account/container • Swift components talks via HTTP request and response messages. • It is easy to use HTTP headers as the clue to trace down the route. Request-X’GET Response-X’GET
  • 10. Span Tree of Trace Swift Client Proxy Server Container Server Container Server Container Server Account Server Auth Account Server Account Server Request-XPUT X-Trace-Id: 1234 Response-XPUT Request-X’’PUT X-Trace_Id: 1234 X-Span-Id: 1 Request-X”’PUT X-Trace-Id: 1234 X-Span-Id: 2 Response- X’”PUT Response-X’’PUT • X-Trace-Id: identification of each trace  Use X-Trans-Id to support different cluster?  Or generate new id for this purpose? • X-Span-Id: identification of each span to represent individual HTTP RESTful call and WSGI call.  Generate new span id for this purpose (notes: UUID can be used for implementation) Create a new container: PUT /account/container Request-X’GET Response-X’GET
  • 11. X-trace Middleware Architecture 1. Generate trace ids based on configuration. 2. Create spans and collect trace data 3. Propagate trace ids to next hop 4. Send trace data into a repository via separate transport protocol/channel Swift Client Proxy Server Container Server Container Server Container Server Account Server Auth Account Server Account Server x-trace x-trace x- trace Tracedatarepository x-trace
  • 12. Patches to fix the request path • The trace id is passed along by proxy server in HTTP headers, but will be lost at some points because of recreating a new request for next hops. • Patches are needed to fix this problem to form a complete tracing path for container server, object server, etc. Swift Client Proxy Server Container Server Container Server Container Server Account Server Auth Account Server Account Server x-trace x-trace x- trace Tracedatarepository x-tracepropagate trace id in next new request
  • 13. Tie together tracing data Reconstruct causal and temporal relationship view for PUT container call Proxy-Server.PUT parent-span-id=0, span-id=1 timeline Container-Server.PUT parent-span-id=1, span-id=2 Container-Server.PUT parent-span-id=1, span-id=3 Container-Server.PUT parent-span-id=1, span-id=4 Account-Server.PUT parent-span-id=2, span-id=5 Account-Server.PUT parent-span-id=3, span-id=6 Account-Server.PUT parent-span-id=4, span-id=7 0 ms 200 ms50 ms 150 ms100 ms Swift-Client.PUT parent-span-id=none, span-id=0 201 201 201 201 201 201 201
  • 14. Another example: upload an object Proxy-Server.PUT parent-span-id=0, span-id=1 timeline Object-Server.PUT parent-span-id=1, span-id=2 Object-Server.PUT parent-span-id=1, span-id=3 Object-Server.PUT parent-span-id=1, span-id=4 Container-Server.PUT parent-span-id=2, span-id=5 Container-Server.PUT parent-span-id=3, span-id=6 Container-Server.PUT parent-span-id=4, span-id=7 0 ms 200 ms50 ms 150 ms100 ms Swift-Client.PUT parent-span-id=none, span-id=0 201 201 201 201 201 201 201
  • 15. pipeline:main Trace into middleware of the pipeline • Expand the trace path into WSGI call b/w middleware to get more complete trace data. • Possible choices – Decorators for __call__ @trace_here() def __call__(self, environ, start_response) – Hack paste deployment package – Profile with filters Swift Client Proxy Server x-trace Tracedatarepository tempauth cache tempurl dlo Pipeline = catch_errors gatekeeper healthcheck proxy-logging cache container_sync bulk slo dlo ratelimit crossdomain tempauth tempurl formpost staticweb container-quotas account-quotas proxy-logging proxy-serve slo …
  • 16. Backend trace data model { "_id" : "14a467a402904aee87de4028a8595493", "endpoint" : { "port" : "6031", "type" : "server", "name" : "container.server", "ipv4" : "127.0.0.1" }, "name" : "GET", "parent" : "57fbd3ec12fe4912ba89e7a8eb97f2e7", "start_time" : 1400146616.554865, "trace_id" : "d7ff028674c5471e94b964ec37d35546", "end_time" : 1400146616.559608, "annotations" : [ { "type" : "string", "value" : "/sdb1/347/TEMPAUTH_test/summit", "key" : "request_path", "event" : "sr" }, { "type" : "string", "value" : "200 OK", "key" : "return_code", "event" : "ss" } ] } { "_id" : "57fbd3ec12fe4912ba89e7a8eb97f2e7", "endpoint" : { "port" : "8080", "type" : "server", "name" : "proxy.server", "ipv4" : "127.0.0.1" }, "name" : "GET", "parent" : "5602ca4010fe420c9fa56528faf711ab", "start_time" : 1400146616.490691, "trace_id" : "d7ff028674c5471e94b964ec37d35546", "end_time" : 1400146616.58012, "annotations" : [ { "type" : "string", "value" : "/v1/TEMPAUTH_test/summit", "key" : "request_path", "event" : "sr" }, { "type" : "string", "value" : "200 OK", "key" : "return_code", "event" : "ss" } ] }
  • 17. Query and analysis tools • Query – Query trace data by trace_id, span_id, order or range by time, group by nodes, annotation keys • Trace timeline – Plot the spans on the timeline with causal relationships • Diagnose – Analyze the critical path for a success response – Identify the failure point of in the path • Simulation – Replay the recorded processing of the requests • Data Mining
  • 18. Reference • Google Dapper – a large-scale distributed systems tracing infrastructure • Twitter Zipkin - a distributed tracing system that helps us gather timing data for all the disparate services at Twitter. • Berkeley XTrace : a pervasive network tracing framework
  • 19. Demo
  • 20. Q&A