• Employment Level: 375+
• Contract Relationships: 300+
• Midwest Operations: 4 States (IA, IL, OK, CO)
• Sow Inventory: 60,000+
• Finish Inventory: 750,000+
• Animals Marketed: 1,400,000 hd
• Feed – Manufacturing: 405,000Tons
• Feed –Tolled: 225,000Tons
• Grain Facilities: 4 Communities (IA)
• Insurance claims process
• Business interruption computations and
involvement of outside expertise by carrier
Reference (Forensic Accountant):
Dave Schlader
Buchanan Clarke Schlader, LLP
Overland Park, KS
• SafetyTraining Programs
• Facility inspections
•Thermography program
• Licensed electrical inspections
• OSHA mock inspections
• Facility design – new construction
• Modifications to existing facilities
• Impact of claims on insurance renewal
•Farrowing rooms 1–14 have one common attic
space.
•Farrowing rooms 15–19 are separated by a
walkway.The door going into these rooms is metal
and has concrete around the door.
•Farrowing rooms 20–21 have a metal divider
between the attic air space.
•Installed fire escape windows in all of the farrowing
rooms.
•Installed curtain and cool cell evacuation equipment
in hallways and gestation barn.
•Installed new generator – outside building.
Generator Details:
•11 gallons/hour
•350 gallons of diesel
•1.3 days of fuel
EscapeWindows
were added
at Fall Creek
•Installed fire door between existing farrowing and
new farrowing that extends the length of old
farrowing (approximately 89 feet). 40/20 APA
rating and D-Blaze Rating.
•Separate attic between existing and new farrowing.
•Installed fire doors between nursery and existing
GDU barn. Attics are separated.
•Installed fire escape windows in all of the farrowing
rooms.
•Installed curtain and cool cell evacuation
equipment in hallways and gestation barn.
Generator Details:
•12 gallons/hour
•400 gallons of diesel
•1.39 days of fuel
•Have installed 8 fire doors in farrowing to separate
farrowing rooms. 4 ft. on each side and up over the
ceiling. Every hallway, from the concrete stub walls
up to the ceiling are fire retarding. 40/20 APA
rating and D-Blaze Rating.
•1 attic firewall in the old gestation barn.
•3 attic firewalls in the new gestation barn.
•New farrowing has an attic firewall separating
3 new rooms from the existing 5 rooms.
•254 crates have been direct wired.
•All connecting hallways in the new construction
have 3/4” fire retarding board on walls and ceiling.
Generator Details:
•14 gallons/hour
•300 gallons of diesel
•0.89 days of fuel
Direct wire heat
mats were added
at MIPA in
254 crates
MIPA fire
door in
farrowing
hallway
•Have installed new fire doors separating existing farrowing
from new farrowing. 6 ft. fire retarding wall on old farrowing
and 10 ft. on new farrowing side. 40/20 APA rating and
D-Blaze Rating.
•Have an attic firewall in the middle of new farrowing.
•Have a fire door separating existing gestation and new pen
gestation. (8 ft. on each side)
•Have 2 cisterns with approximately 21,000 and 44,000
gallons of water on site.
•Installed new generator which is located outside the building.
•Installed fire escape windows in all of the farrowing rooms.
•New gestation barn has 4 attic firewalls.
•Old gestation barn has 3 attic firewalls.
Generator Details:
•15 gallons/hour
•1000 gallons of diesel
•2.8 days of fuel
Two
escape
windows
in new
farrowing
room
New Outdoor Generator and 2 cisterns with
approximately 21,000 and 44,000 gallons of
water on site.
Fire door
and
retarding
wall
to new
farrowing
room
Generator Details:
•10 gallons/hour
•300 gallons of diesel
•1.3 days of fuel
Scheetz
•Have approximately 66% of the 672
crates at facility heat lamps hard wired.
Oak Grove
•Have approximately 42% of the 1240
crates at facility heat lamps hard wired.
Generator Details :
•14 gallons/hour
•500 gallons of diesel
•1.5 days of fuel
Direct wired lamps and direct wired heat lamps
added to approximately 66% of the 672 crates.
Supplies for cutting curtains.
Farm
Manual
/Auto
transfer
Genera
tor KW Brand
Type of
Fuel
Fuel
Storage
primary
Fuel Storage
Secondary
Total
Fuel
Storage
Fuel
Used /
HR
Total hrs of
fuel
Total
days of
fuel
Farm 1 Breeding Manual 80KW Kohler Diesel 250 500 750 10 75 3.1
Farm 1
Nursery/grower destroyed by fire July 2014 250 250 10 25 1.0
Farm 2 Breeding Manual 80KW Kohler Diesel 250 250 10 25 1.0
Staging Manual 25KW Kohler Diesel 250 250 10 25 1.0
Farm 3 Breeding Manual 61KW Kohler Diesel 250 250 10 25 1.0
GDU#1 Manual 25KW Kohler Diesel 250 250 10 25 1.0
Farm 4 Breeding Manual 80KW Kohler Diesel 250 500 750 10 75 3.1
GDU#2 Manual 25KW Kohler Diesel 250 250 10 25 1.0
Farm 5 Breeding Manual 125KW Detroit Diesel Diesel 500 500 1000 10 100 4.1
Farm 6 Farrowing Manual 55KW Kohler Diesel 500 500 10 50 2.1
Farm 6 Breeding
Automati
c 125KW Kohler Diesel 500 500 10 50 2.1
Bridenstine Manual GM Diesel 500 500 10 50 2.1
•There are two 6 inch thick concrete fire walls extending
from the concrete floor (foundation) through the ceiling at
8 feet and extending 38 inches outside of the outside
wall of the building.
•In the attic, there is a wood frame above the concrete wall
extending 32 inches above the roof.
•The wood frame is covered withThermo Ply sheeting with
a 1 hour fire rating
•Steel siding covers theThermo Ply completely, inside and
outside of the attic.
•Feed lines and a water line are the only lines through the
concrete walls. No lines penetrate the walls in the attic.
•Electric and natural gas services are brought into each
section from the outside through the attic.
•Gas furnaces for the hallway are mounted outside of
the building.
•The two fire walls divide the building into sections with
two farrowing rooms on each end and three rooms in
the center. Each room is approximately 44 feet by
76.5 feet.
•The hallway, which connects the rooms to the unit has
a fire door at each fire wall.
•New fire alarms will be installed this winter that will tell
us whether it is a fire or other issue and which building
or room the alarm is coming from.
New Fire walls at Mult 1
New Fire walls and construction at Mult 1
Electrical service coming into the barn from outside
and one of the furnaces that heat the hallway.
Shielding: Replacement of wooden supports for
the generator mufflers at Mult 1.
Electrical grounding of all farrowing crates
in new farrowing rooms. (Inspector driven)
Replacement of wooden supports for
the generator mufflers at Mult 2.
Please note:
Local fire
departments
have been to
sites and are
familiar with
location’s
layout and
specific access
points.
Surviving Disaster on the Farm
Surviving Disaster on the Farm
Surviving Disaster on the Farm

More Related Content

What's hot

Services & Equipment to Help You Reduce Energy and Emissions
Services & Equipment to Help You Reduce Energy and EmissionsServices & Equipment to Help You Reduce Energy and Emissions
Services & Equipment to Help You Reduce Energy and Emissions
Stelter & Brinck
 
NZEB: Ventilation in dwellings
NZEB: Ventilation in dwellingsNZEB: Ventilation in dwellings
NZEB: Ventilation in dwellings
SustainableEnergyAut
 
Part l dwellings - nzeb and major renovations
Part l dwellings - nzeb and major renovationsPart l dwellings - nzeb and major renovations
Part l dwellings - nzeb and major renovations
SustainableEnergyAut
 
Leading Market LED High Bay of Shenzhen Betop Co.,Ltd
Leading Market LED High Bay of Shenzhen Betop Co.,LtdLeading Market LED High Bay of Shenzhen Betop Co.,Ltd
Leading Market LED High Bay of Shenzhen Betop Co.,Ltd
Jack Lao
 
Vertical Muffle Furnace (1250 °C) by ACMAS Technologies Pvt Ltd.
Vertical Muffle Furnace (1250 °C) by ACMAS Technologies Pvt Ltd.Vertical Muffle Furnace (1250 °C) by ACMAS Technologies Pvt Ltd.
Vertical Muffle Furnace (1250 °C) by ACMAS Technologies Pvt Ltd.
Acmas Technologies Pvt. Ltd.
 
Passivhaus; health, comfort & EnerPHit
Passivhaus; health, comfort & EnerPHitPassivhaus; health, comfort & EnerPHit
Passivhaus; health, comfort & EnerPHit
Andy Marlow
 
Lab Scale Muffle Furnace
Lab Scale Muffle FurnaceLab Scale Muffle Furnace
Lab Scale Muffle Furnace
Fareed ul Haq
 
Near Zero Energy Commercial Buildings
Near Zero Energy Commercial BuildingsNear Zero Energy Commercial Buildings
Near Zero Energy Commercial Buildings
SustainableEnergyAut
 
NZEB: Regulatory impact assessment for part l dwellings
NZEB:  Regulatory impact assessment for part l dwellingsNZEB:  Regulatory impact assessment for part l dwellings
NZEB: Regulatory impact assessment for part l dwellings
SustainableEnergyAut
 
Getec Industrial Turnkey Heat Sink Thermal Solution Division
Getec Industrial Turnkey Heat Sink Thermal Solution DivisionGetec Industrial Turnkey Heat Sink Thermal Solution Division
Getec Industrial Turnkey Heat Sink Thermal Solution Division
Getec Industrial
 
Zmr radiators
Zmr radiatorsZmr radiators
Zmr radiators
ZMERLY & CO
 
dan palmer
dan palmerdan palmer
dan palmer
Dan Palmer
 
Instantaneous 3 Phase Electric Water Heater
Instantaneous 3 Phase Electric Water HeaterInstantaneous 3 Phase Electric Water Heater
Instantaneous 3 Phase Electric Water Heater
Stiebel Eltron (Aust) Pty Ltd
 
Natural or propane gas fireplaces
Natural or propane gas fireplacesNatural or propane gas fireplaces
Natural or propane gas fireplaces
Wilshire Fireplace Shops
 
Grainair Aeration Presentation
Grainair Aeration PresentationGrainair Aeration Presentation
Grainair Aeration Presentationwayne Paddison
 
Induction cooking
Induction cookingInduction cooking
Induction cookingChef Kumar
 

What's hot (20)

Services & Equipment to Help You Reduce Energy and Emissions
Services & Equipment to Help You Reduce Energy and EmissionsServices & Equipment to Help You Reduce Energy and Emissions
Services & Equipment to Help You Reduce Energy and Emissions
 
Cliffbergin
CliffberginCliffbergin
Cliffbergin
 
NZEB: Ventilation in dwellings
NZEB: Ventilation in dwellingsNZEB: Ventilation in dwellings
NZEB: Ventilation in dwellings
 
Part l dwellings - nzeb and major renovations
Part l dwellings - nzeb and major renovationsPart l dwellings - nzeb and major renovations
Part l dwellings - nzeb and major renovations
 
Leading Market LED High Bay of Shenzhen Betop Co.,Ltd
Leading Market LED High Bay of Shenzhen Betop Co.,LtdLeading Market LED High Bay of Shenzhen Betop Co.,Ltd
Leading Market LED High Bay of Shenzhen Betop Co.,Ltd
 
Vertical Muffle Furnace (1250 °C) by ACMAS Technologies Pvt Ltd.
Vertical Muffle Furnace (1250 °C) by ACMAS Technologies Pvt Ltd.Vertical Muffle Furnace (1250 °C) by ACMAS Technologies Pvt Ltd.
Vertical Muffle Furnace (1250 °C) by ACMAS Technologies Pvt Ltd.
 
Passivhaus; health, comfort & EnerPHit
Passivhaus; health, comfort & EnerPHitPassivhaus; health, comfort & EnerPHit
Passivhaus; health, comfort & EnerPHit
 
Lab Scale Muffle Furnace
Lab Scale Muffle FurnaceLab Scale Muffle Furnace
Lab Scale Muffle Furnace
 
Near Zero Energy Commercial Buildings
Near Zero Energy Commercial BuildingsNear Zero Energy Commercial Buildings
Near Zero Energy Commercial Buildings
 
NZEB: Regulatory impact assessment for part l dwellings
NZEB:  Regulatory impact assessment for part l dwellingsNZEB:  Regulatory impact assessment for part l dwellings
NZEB: Regulatory impact assessment for part l dwellings
 
Getec Industrial Turnkey Heat Sink Thermal Solution Division
Getec Industrial Turnkey Heat Sink Thermal Solution DivisionGetec Industrial Turnkey Heat Sink Thermal Solution Division
Getec Industrial Turnkey Heat Sink Thermal Solution Division
 
TT_BlueBook
TT_BlueBookTT_BlueBook
TT_BlueBook
 
Zmr radiators
Zmr radiatorsZmr radiators
Zmr radiators
 
dan palmer
dan palmerdan palmer
dan palmer
 
Instantaneous 3 Phase Electric Water Heater
Instantaneous 3 Phase Electric Water HeaterInstantaneous 3 Phase Electric Water Heater
Instantaneous 3 Phase Electric Water Heater
 
line card 2
line card 2line card 2
line card 2
 
GLen LA Catalogue_2014
GLen LA Catalogue_2014GLen LA Catalogue_2014
GLen LA Catalogue_2014
 
Natural or propane gas fireplaces
Natural or propane gas fireplacesNatural or propane gas fireplaces
Natural or propane gas fireplaces
 
Grainair Aeration Presentation
Grainair Aeration PresentationGrainair Aeration Presentation
Grainair Aeration Presentation
 
Induction cooking
Induction cookingInduction cooking
Induction cooking
 

Similar to Surviving Disaster on the Farm

Building services-i (2)
Building services-i (2)Building services-i (2)
Building services-i (2)
Lwj Welson
 
Introduction to Furnace
Introduction to FurnaceIntroduction to Furnace
Introduction to Furnace
Hasnaın Sheıkh
 
General Industry Fire Safety SIOSH 2014
General Industry Fire Safety SIOSH 2014General Industry Fire Safety SIOSH 2014
General Industry Fire Safety SIOSH 2014
John Newquist
 
Goodwin Healthy Homes Presentation
Goodwin Healthy Homes PresentationGoodwin Healthy Homes Presentation
Goodwin Healthy Homes Presentation
David Faulkner
 
Gi 2014 fire siosh
Gi 2014 fire sioshGi 2014 fire siosh
Gi 2014 fire siosh
vtsiri
 
Renewable Energy - An Introduction to Everything you Need to Know
Renewable Energy - An Introduction to Everything you Need to KnowRenewable Energy - An Introduction to Everything you Need to Know
Renewable Energy - An Introduction to Everything you Need to Know
Castlewellan
 
Ovens and Furnaces
Ovens and Furnaces Ovens and Furnaces
Ovens and Furnaces
Warren Forensics
 
Presentation boilers UK
Presentation boilers UKPresentation boilers UK
Presentation boilers UK
CRobson55
 
Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10
SmarterHomeGuide
 
Gi 2018 fire safety 10 hour
Gi 2018 fire safety 10 hourGi 2018 fire safety 10 hour
Gi 2018 fire safety 10 hour
John Newquist
 
Ec eau cylinder-brochure
Ec eau cylinder-brochureEc eau cylinder-brochure
Ec eau cylinder-brochure
BBAPIFeeds
 
Scope Of Work Allison Ave
Scope Of Work   Allison AveScope Of Work   Allison Ave
Scope Of Work Allison Ave
luckyaproperties
 
Healthy Homes Standards Webinar
Healthy Homes Standards WebinarHealthy Homes Standards Webinar
Healthy Homes Standards Webinar
David Faulkner
 
Combustion Safety - Step 7 of The Seven Steps of Building a Synergy Home
Combustion Safety - Step 7 of The Seven Steps of Building a Synergy HomeCombustion Safety - Step 7 of The Seven Steps of Building a Synergy Home
Combustion Safety - Step 7 of The Seven Steps of Building a Synergy Home
Synergy Airflow and Ventilation
 
April Forum: The Hit List - The Top Tips to Green NYC Buildings Part 1 of 3 E...
April Forum: The Hit List - The Top Tips to Green NYC Buildings Part 1 of 3 E...April Forum: The Hit List - The Top Tips to Green NYC Buildings Part 1 of 3 E...
April Forum: The Hit List - The Top Tips to Green NYC Buildings Part 1 of 3 E...
GreenHomeNYC
 
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC SystemsStep 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Synergy Airflow and Ventilation
 
Boiler and steam system seminar short version 05 29-13
Boiler and steam system seminar short version 05 29-13Boiler and steam system seminar short version 05 29-13
Boiler and steam system seminar short version 05 29-13Payden Sewell
 
Airtherm flue portfolio
Airtherm flue portfolioAirtherm flue portfolio
Airtherm flue portfolio
Airtherm Engineering
 
Therma-Tek Range Corporation
Therma-Tek Range CorporationTherma-Tek Range Corporation
Therma-Tek Range Corporation
Mark Moreno
 
Calorex. What We do, We Do Well
Calorex. What We do, We Do WellCalorex. What We do, We Do Well
Calorex. What We do, We Do Well
Tony Sweet
 

Similar to Surviving Disaster on the Farm (20)

Building services-i (2)
Building services-i (2)Building services-i (2)
Building services-i (2)
 
Introduction to Furnace
Introduction to FurnaceIntroduction to Furnace
Introduction to Furnace
 
General Industry Fire Safety SIOSH 2014
General Industry Fire Safety SIOSH 2014General Industry Fire Safety SIOSH 2014
General Industry Fire Safety SIOSH 2014
 
Goodwin Healthy Homes Presentation
Goodwin Healthy Homes PresentationGoodwin Healthy Homes Presentation
Goodwin Healthy Homes Presentation
 
Gi 2014 fire siosh
Gi 2014 fire sioshGi 2014 fire siosh
Gi 2014 fire siosh
 
Renewable Energy - An Introduction to Everything you Need to Know
Renewable Energy - An Introduction to Everything you Need to KnowRenewable Energy - An Introduction to Everything you Need to Know
Renewable Energy - An Introduction to Everything you Need to Know
 
Ovens and Furnaces
Ovens and Furnaces Ovens and Furnaces
Ovens and Furnaces
 
Presentation boilers UK
Presentation boilers UKPresentation boilers UK
Presentation boilers UK
 
Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10
 
Gi 2018 fire safety 10 hour
Gi 2018 fire safety 10 hourGi 2018 fire safety 10 hour
Gi 2018 fire safety 10 hour
 
Ec eau cylinder-brochure
Ec eau cylinder-brochureEc eau cylinder-brochure
Ec eau cylinder-brochure
 
Scope Of Work Allison Ave
Scope Of Work   Allison AveScope Of Work   Allison Ave
Scope Of Work Allison Ave
 
Healthy Homes Standards Webinar
Healthy Homes Standards WebinarHealthy Homes Standards Webinar
Healthy Homes Standards Webinar
 
Combustion Safety - Step 7 of The Seven Steps of Building a Synergy Home
Combustion Safety - Step 7 of The Seven Steps of Building a Synergy HomeCombustion Safety - Step 7 of The Seven Steps of Building a Synergy Home
Combustion Safety - Step 7 of The Seven Steps of Building a Synergy Home
 
April Forum: The Hit List - The Top Tips to Green NYC Buildings Part 1 of 3 E...
April Forum: The Hit List - The Top Tips to Green NYC Buildings Part 1 of 3 E...April Forum: The Hit List - The Top Tips to Green NYC Buildings Part 1 of 3 E...
April Forum: The Hit List - The Top Tips to Green NYC Buildings Part 1 of 3 E...
 
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC SystemsStep 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
 
Boiler and steam system seminar short version 05 29-13
Boiler and steam system seminar short version 05 29-13Boiler and steam system seminar short version 05 29-13
Boiler and steam system seminar short version 05 29-13
 
Airtherm flue portfolio
Airtherm flue portfolioAirtherm flue portfolio
Airtherm flue portfolio
 
Therma-Tek Range Corporation
Therma-Tek Range CorporationTherma-Tek Range Corporation
Therma-Tek Range Corporation
 
Calorex. What We do, We Do Well
Calorex. What We do, We Do WellCalorex. What We do, We Do Well
Calorex. What We do, We Do Well
 

More from National Pork Board

Hiring and Firing Employees
Hiring and Firing EmployeesHiring and Firing Employees
Hiring and Firing Employees
National Pork Board
 
Worker Safety / OSHA
Worker Safety / OSHAWorker Safety / OSHA
Worker Safety / OSHA
National Pork Board
 
Credit Analysis - Assessing the Risk Profile of a Pork Production Company
Credit Analysis - Assessing the Risk Profile of a Pork Production CompanyCredit Analysis - Assessing the Risk Profile of a Pork Production Company
Credit Analysis - Assessing the Risk Profile of a Pork Production Company
National Pork Board
 
Internal Controls
Internal ControlsInternal Controls
Internal Controls
National Pork Board
 
Electronic Sow Feeding at Tosh Farms
Electronic Sow Feeding at Tosh FarmsElectronic Sow Feeding at Tosh Farms
Electronic Sow Feeding at Tosh Farms
National Pork Board
 
Taking Advantage of Balance Sheet Mining
Taking Advantage of Balance Sheet MiningTaking Advantage of Balance Sheet Mining
Taking Advantage of Balance Sheet Mining
National Pork Board
 
Income & Estate Tax Update - 2010
Income & Estate Tax Update - 2010Income & Estate Tax Update - 2010
Income & Estate Tax Update - 2010
National Pork Board
 
Analytics that Work - Tools for Creating Value and Focusing Performance
Analytics that Work - Tools for Creating Value and Focusing PerformanceAnalytics that Work - Tools for Creating Value and Focusing Performance
Analytics that Work - Tools for Creating Value and Focusing Performance
National Pork Board
 
Animal Welfare Initiatives
Animal Welfare InitiativesAnimal Welfare Initiatives
Animal Welfare Initiatives
National Pork Board
 
Reorganization in the Pork Industry - The Coharie Hog Farm Story
Reorganization in the Pork Industry - The Coharie Hog Farm StoryReorganization in the Pork Industry - The Coharie Hog Farm Story
Reorganization in the Pork Industry - The Coharie Hog Farm Story
National Pork Board
 
Integrating “We Care” Into Your Operation’s Culture
Integrating “We Care” Into Your Operation’s CultureIntegrating “We Care” Into Your Operation’s Culture
Integrating “We Care” Into Your Operation’s Culture
National Pork Board
 
Integrating “We Care” Into Your Operation’s Culture
Integrating “We Care” Into Your Operation’s CultureIntegrating “We Care” Into Your Operation’s Culture
Integrating “We Care” Into Your Operation’s Culture
National Pork Board
 
Integrating “We Care” Into Your Operation’s Culture
Integrating “We Care” Into Your Operation’s CultureIntegrating “We Care” Into Your Operation’s Culture
Integrating “We Care” Into Your Operation’s Culture
National Pork Board
 
Managing Your Profit Margin Despite Unpredictable Hog Prices and Feed Costs
Managing Your Profit Margin Despite Unpredictable Hog Prices and Feed CostsManaging Your Profit Margin Despite Unpredictable Hog Prices and Feed Costs
Managing Your Profit Margin Despite Unpredictable Hog Prices and Feed Costs
National Pork Board
 
Packer Contracts and Perspective
Packer Contracts and PerspectivePacker Contracts and Perspective
Packer Contracts and Perspective
National Pork Board
 
Legislative and Regulatory Update
Legislative and Regulatory UpdateLegislative and Regulatory Update
Legislative and Regulatory Update
National Pork Board
 
Market Outlook - 2010
Market Outlook - 2010Market Outlook - 2010
Market Outlook - 2010
National Pork Board
 
U.S. Global Position (imports/exports)
U.S. Global Position (imports/exports)U.S. Global Position (imports/exports)
U.S. Global Position (imports/exports)
National Pork Board
 
National Pork Board Update - 2010
National Pork Board Update - 2010National Pork Board Update - 2010
National Pork Board Update - 2010
National Pork Board
 
Grain Outlook - 2011
Grain Outlook - 2011Grain Outlook - 2011
Grain Outlook - 2011
National Pork Board
 

More from National Pork Board (20)

Hiring and Firing Employees
Hiring and Firing EmployeesHiring and Firing Employees
Hiring and Firing Employees
 
Worker Safety / OSHA
Worker Safety / OSHAWorker Safety / OSHA
Worker Safety / OSHA
 
Credit Analysis - Assessing the Risk Profile of a Pork Production Company
Credit Analysis - Assessing the Risk Profile of a Pork Production CompanyCredit Analysis - Assessing the Risk Profile of a Pork Production Company
Credit Analysis - Assessing the Risk Profile of a Pork Production Company
 
Internal Controls
Internal ControlsInternal Controls
Internal Controls
 
Electronic Sow Feeding at Tosh Farms
Electronic Sow Feeding at Tosh FarmsElectronic Sow Feeding at Tosh Farms
Electronic Sow Feeding at Tosh Farms
 
Taking Advantage of Balance Sheet Mining
Taking Advantage of Balance Sheet MiningTaking Advantage of Balance Sheet Mining
Taking Advantage of Balance Sheet Mining
 
Income & Estate Tax Update - 2010
Income & Estate Tax Update - 2010Income & Estate Tax Update - 2010
Income & Estate Tax Update - 2010
 
Analytics that Work - Tools for Creating Value and Focusing Performance
Analytics that Work - Tools for Creating Value and Focusing PerformanceAnalytics that Work - Tools for Creating Value and Focusing Performance
Analytics that Work - Tools for Creating Value and Focusing Performance
 
Animal Welfare Initiatives
Animal Welfare InitiativesAnimal Welfare Initiatives
Animal Welfare Initiatives
 
Reorganization in the Pork Industry - The Coharie Hog Farm Story
Reorganization in the Pork Industry - The Coharie Hog Farm StoryReorganization in the Pork Industry - The Coharie Hog Farm Story
Reorganization in the Pork Industry - The Coharie Hog Farm Story
 
Integrating “We Care” Into Your Operation’s Culture
Integrating “We Care” Into Your Operation’s CultureIntegrating “We Care” Into Your Operation’s Culture
Integrating “We Care” Into Your Operation’s Culture
 
Integrating “We Care” Into Your Operation’s Culture
Integrating “We Care” Into Your Operation’s CultureIntegrating “We Care” Into Your Operation’s Culture
Integrating “We Care” Into Your Operation’s Culture
 
Integrating “We Care” Into Your Operation’s Culture
Integrating “We Care” Into Your Operation’s CultureIntegrating “We Care” Into Your Operation’s Culture
Integrating “We Care” Into Your Operation’s Culture
 
Managing Your Profit Margin Despite Unpredictable Hog Prices and Feed Costs
Managing Your Profit Margin Despite Unpredictable Hog Prices and Feed CostsManaging Your Profit Margin Despite Unpredictable Hog Prices and Feed Costs
Managing Your Profit Margin Despite Unpredictable Hog Prices and Feed Costs
 
Packer Contracts and Perspective
Packer Contracts and PerspectivePacker Contracts and Perspective
Packer Contracts and Perspective
 
Legislative and Regulatory Update
Legislative and Regulatory UpdateLegislative and Regulatory Update
Legislative and Regulatory Update
 
Market Outlook - 2010
Market Outlook - 2010Market Outlook - 2010
Market Outlook - 2010
 
U.S. Global Position (imports/exports)
U.S. Global Position (imports/exports)U.S. Global Position (imports/exports)
U.S. Global Position (imports/exports)
 
National Pork Board Update - 2010
National Pork Board Update - 2010National Pork Board Update - 2010
National Pork Board Update - 2010
 
Grain Outlook - 2011
Grain Outlook - 2011Grain Outlook - 2011
Grain Outlook - 2011
 

Recently uploaded

Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
SERUDS INDIA
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
SERUDS INDIA
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
ehbuaw
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
oklahomajudicialproc1
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
ILC- UK
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
Antti Rautiainen
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
JSchaus & Associates
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
kupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptxkupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptx
viderakai
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
JSchaus & Associates
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
ResolutionFoundation
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
Cuyahoga County Planning Commission
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
Get Government Grants
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
JSchaus & Associates
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
ARCResearch
 

Recently uploaded (20)

Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
kupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptxkupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptx
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
 

Surviving Disaster on the Farm

  • 1.
  • 2.
  • 3.
  • 4.
  • 5. • Employment Level: 375+ • Contract Relationships: 300+ • Midwest Operations: 4 States (IA, IL, OK, CO) • Sow Inventory: 60,000+ • Finish Inventory: 750,000+ • Animals Marketed: 1,400,000 hd • Feed – Manufacturing: 405,000Tons • Feed –Tolled: 225,000Tons • Grain Facilities: 4 Communities (IA)
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13. • Insurance claims process • Business interruption computations and involvement of outside expertise by carrier Reference (Forensic Accountant): Dave Schlader Buchanan Clarke Schlader, LLP Overland Park, KS
  • 14. • SafetyTraining Programs • Facility inspections •Thermography program • Licensed electrical inspections
  • 15. • OSHA mock inspections • Facility design – new construction • Modifications to existing facilities • Impact of claims on insurance renewal
  • 16.
  • 17. •Farrowing rooms 1–14 have one common attic space. •Farrowing rooms 15–19 are separated by a walkway.The door going into these rooms is metal and has concrete around the door. •Farrowing rooms 20–21 have a metal divider between the attic air space. •Installed fire escape windows in all of the farrowing rooms. •Installed curtain and cool cell evacuation equipment in hallways and gestation barn. •Installed new generator – outside building.
  • 18. Generator Details: •11 gallons/hour •350 gallons of diesel •1.3 days of fuel
  • 20. •Installed fire door between existing farrowing and new farrowing that extends the length of old farrowing (approximately 89 feet). 40/20 APA rating and D-Blaze Rating. •Separate attic between existing and new farrowing. •Installed fire doors between nursery and existing GDU barn. Attics are separated. •Installed fire escape windows in all of the farrowing rooms. •Installed curtain and cool cell evacuation equipment in hallways and gestation barn.
  • 21. Generator Details: •12 gallons/hour •400 gallons of diesel •1.39 days of fuel
  • 22. •Have installed 8 fire doors in farrowing to separate farrowing rooms. 4 ft. on each side and up over the ceiling. Every hallway, from the concrete stub walls up to the ceiling are fire retarding. 40/20 APA rating and D-Blaze Rating. •1 attic firewall in the old gestation barn. •3 attic firewalls in the new gestation barn. •New farrowing has an attic firewall separating 3 new rooms from the existing 5 rooms. •254 crates have been direct wired. •All connecting hallways in the new construction have 3/4” fire retarding board on walls and ceiling.
  • 23. Generator Details: •14 gallons/hour •300 gallons of diesel •0.89 days of fuel
  • 24. Direct wire heat mats were added at MIPA in 254 crates
  • 26. •Have installed new fire doors separating existing farrowing from new farrowing. 6 ft. fire retarding wall on old farrowing and 10 ft. on new farrowing side. 40/20 APA rating and D-Blaze Rating. •Have an attic firewall in the middle of new farrowing. •Have a fire door separating existing gestation and new pen gestation. (8 ft. on each side) •Have 2 cisterns with approximately 21,000 and 44,000 gallons of water on site. •Installed new generator which is located outside the building. •Installed fire escape windows in all of the farrowing rooms. •New gestation barn has 4 attic firewalls. •Old gestation barn has 3 attic firewalls.
  • 27. Generator Details: •15 gallons/hour •1000 gallons of diesel •2.8 days of fuel
  • 29. New Outdoor Generator and 2 cisterns with approximately 21,000 and 44,000 gallons of water on site.
  • 31. Generator Details: •10 gallons/hour •300 gallons of diesel •1.3 days of fuel
  • 32. Scheetz •Have approximately 66% of the 672 crates at facility heat lamps hard wired. Oak Grove •Have approximately 42% of the 1240 crates at facility heat lamps hard wired.
  • 33. Generator Details : •14 gallons/hour •500 gallons of diesel •1.5 days of fuel
  • 34. Direct wired lamps and direct wired heat lamps added to approximately 66% of the 672 crates.
  • 35. Supplies for cutting curtains.
  • 36. Farm Manual /Auto transfer Genera tor KW Brand Type of Fuel Fuel Storage primary Fuel Storage Secondary Total Fuel Storage Fuel Used / HR Total hrs of fuel Total days of fuel Farm 1 Breeding Manual 80KW Kohler Diesel 250 500 750 10 75 3.1 Farm 1 Nursery/grower destroyed by fire July 2014 250 250 10 25 1.0 Farm 2 Breeding Manual 80KW Kohler Diesel 250 250 10 25 1.0 Staging Manual 25KW Kohler Diesel 250 250 10 25 1.0 Farm 3 Breeding Manual 61KW Kohler Diesel 250 250 10 25 1.0 GDU#1 Manual 25KW Kohler Diesel 250 250 10 25 1.0 Farm 4 Breeding Manual 80KW Kohler Diesel 250 500 750 10 75 3.1 GDU#2 Manual 25KW Kohler Diesel 250 250 10 25 1.0 Farm 5 Breeding Manual 125KW Detroit Diesel Diesel 500 500 1000 10 100 4.1 Farm 6 Farrowing Manual 55KW Kohler Diesel 500 500 10 50 2.1 Farm 6 Breeding Automati c 125KW Kohler Diesel 500 500 10 50 2.1 Bridenstine Manual GM Diesel 500 500 10 50 2.1
  • 37. •There are two 6 inch thick concrete fire walls extending from the concrete floor (foundation) through the ceiling at 8 feet and extending 38 inches outside of the outside wall of the building. •In the attic, there is a wood frame above the concrete wall extending 32 inches above the roof. •The wood frame is covered withThermo Ply sheeting with a 1 hour fire rating •Steel siding covers theThermo Ply completely, inside and outside of the attic. •Feed lines and a water line are the only lines through the concrete walls. No lines penetrate the walls in the attic.
  • 38. •Electric and natural gas services are brought into each section from the outside through the attic. •Gas furnaces for the hallway are mounted outside of the building. •The two fire walls divide the building into sections with two farrowing rooms on each end and three rooms in the center. Each room is approximately 44 feet by 76.5 feet. •The hallway, which connects the rooms to the unit has a fire door at each fire wall. •New fire alarms will be installed this winter that will tell us whether it is a fire or other issue and which building or room the alarm is coming from.
  • 39. New Fire walls at Mult 1
  • 40. New Fire walls and construction at Mult 1
  • 41. Electrical service coming into the barn from outside and one of the furnaces that heat the hallway.
  • 42. Shielding: Replacement of wooden supports for the generator mufflers at Mult 1.
  • 43. Electrical grounding of all farrowing crates in new farrowing rooms. (Inspector driven)
  • 44. Replacement of wooden supports for the generator mufflers at Mult 2.
  • 45. Please note: Local fire departments have been to sites and are familiar with location’s layout and specific access points.