Overview of ISO 14001
5
Lecture 5
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 1
ISO 14001 Support,
Operation, Performance
Evaluation and Improvement
Elements
Overview of ISO 14001
5
Clause 7. Support
7. Support
7.5
7.3
7.4
7.1
Resources
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 2
Competence
7.2
Awareness
Documented
Information
Communication
Overview of ISO 14001
5
7.1 Resources
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 3
Determine and provide the resources needed for the
establishment, implementation, maintenance and
continual improvement of the EMS.
Consider :
> capabilities
 constraints, existing internal resources;
 what needs to be obtained from external providers:
Overview of ISO 14001
5
7.2 Competence
a) determine the necessary competence of person(s) doing work under its
control that affects the performance and effectiveness of the EMS;
b) ensure that these persons are competent on the basis of appropriate
education, training, or experience;
c) Determine training needs- environmental aspects and EMS
d) where applicable, take actions to acquire the necessary competence,
and evaluate the effectiveness of the actions taken
Retain appropriate documented information as evidence of competence
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 4
Overview of ISO 14001
5
7.3 Awareness
Ensure persons doing work under it’s control are aware of:
a) the environmental policy;
b) significant environmental aspects and related actual or potential
environmental impacts associated with their work
c) their contribution to the effectiveness of the EMS;, including the
benefits of environmental improved performance;
d) implications of not conforming with the EMS; requirements
including not fulfilling compliance obligations
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 5
Overview of ISO 14001
5
7.4 Communication
Establish, implement and maintain the process(es) needed for
internal and external communications relevant to the EMS:
a) what it will communicate;
b) when to communicate;
c) with whom to communicate;
d) how to communicate;
e) who communicates.
 Take into account its compliance obligations, Ensure information
generated is reliable. respond to relevant communication on EMS, and
retain documented information as evidence of its communication
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 6
Overview of ISO 14001
5
7.4.1 Internal Communication
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 7
a) relevant EMS among various levels and functions, including
changes to the EMS as appropriate
b) Ensure its communication process(es), enable(s) persons
doing work under its control contribute to continual
improvement
c) externally communicate information relevant to EMS .
Overview of ISO 14001
5
7.5 Documented Information
7.5
General
Creating &
Updating
Control of
Documented
Information
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 8
Overview of ISO 14001
5
7.5 EMS Documented informatio
n
a) required by this International Standard;
b) determined by the organization as being necessary for the
effectiveness of the EMS
Creating and updating documented information, ensure
appropriate:
 identification and description (e.g. a title, date, author,or
reference number);
 format (e.g. language, software version, graphics) and media
(e.g. paper, electronic);
 review and approval for suitability and adequacy
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 9
Overview of ISO 14001
5
7.5.3 Control of documented information
7.5.3 Ensure:
a) it is available and suitable for use, where and when it is needed;
b) it is adequately protected (e.g. from loss of confidentiality,
improper use, or loss of integrity
c) distribution, access, retrieval and use;
d) storage and preservation, including preservation of legibility;
e) control of changes (e.g. version control);
f) retention and disposition.
External origin on EMS identified, as appropriate and controlled
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 10
Overview of ISO 14001
5
Clause 8. Operation
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 11
1. Operational Planning & Control
2. Emergency preparedness and response
Overview of ISO 14001
5
8.1 Operational planning and control
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 12
Establish , implement and control the processes needed to meet the
requirements and to implement the action by
a) establishing criteria
b) Implementing control of the process(es) in accordance with operating
criteria
Control planned changes and review the consequences of unintended
changes, taking action to mitigate any adverse effects, as necessary
Ensure that outsourced processes are controlled or influenced. The type
and extent of control or influence to be applied to the process(es) shall be
defined within the EMS
Overview of ISO 14001
5
8.1 Operational planning and control
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 13
a) Establish controls, to ensure environmental requirement(s) are
addressed in the design and development process for the product or
service, considering each lifecycle stage;
b) Determine its environmental requirements(s) for the procurement of
products and services
c) Communicate relevant environmental requirements of products and
services, as appropriate;
d) Consider information about potential significant environmental
impacts associated with transportation or delivery, use end-of-life
treatment and final disposal of its products and services
Maintain documented information to extent necessary to
have confidence that the process have been carried out as
planned
Overview of ISO 14001
5
8.2 Emergency preparedness and response
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 14
Establish, implement and maintain process (es) needed to prepare for and
respond to potential emergency situations:
a) planning actions to prevent or mitigate adverse environmental impacts;
b) respond to actual emergency situations;
c) prevent or mitigate the consequences of emergency situation,
appropriate to the magnitude of emergency and potential environmental
impacts;
d) Periodically test the planned response actions, where practicable
e) Periodically review and revise the process (es) and planned response
actions in particular after the occurrence of emergency situation or tests
f) Provide relevant information and training related to emergency
preparedness and response as appropriate, to relevant interested parties,
including person’s working under its control
 Retain documented information
Overview of ISO 14001
5
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 15
Overview of ISO 14001
5
Clause 9. Performance Evaluation
9.1.
9.2.
9.3.
1.Monitoring, measurement ,
analysis and evaluation,
1. General, 9.1.2.Evaluation of compliance
Internal Audit- General, internal Audit
programme
Management Review
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 16
Overview of ISO 14001
5
9.1 Monitoring, Measurement, Analysis And
Evaluation
 Determine:
a) what needs to be monitored and measured;
b) the methods for monitoring, measurement, analysis and evaluation
needed to ensure valid results;
c) The criteria against which the organization will evaluate its
environmental performance and appropriate indictors;
d) when the monitoring and measuring shall be performed;
e) when the results from monitoring and measurement shall be
analyzed and evaluated.
Ensure that calibrated or verified monitoring and measurement
equipment's is used and maintained, as appropriate
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 17
Overview of ISO 14001
5
9.1 Monitoring, Measurement, Analysis And Evaluation-
 Evaluate its environmental performance and the effectiveness o
f
the EMS
 Communicate relevant performance information both internally
and externally, as identified in its communication processes(es)
and as required by its compliance obligations
 Retain appropriate documented information as evidence of
monitoring and measurement, analysis and evaluation results
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 18
Overview of ISO 14001
5
9.1.2 Evaluation Of Compliance
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 19
Establish, implement and maintain process(es) needed to evaluate
fulfillment of its compliance obligation
a) Determine the frequency that compliance will be evaluated;
b) Evaluate compliance and take action if needed;
c) Maintain knowledge and understanding of its compliance status
Retain documented information as evidence of the compliance
evaluation result(s)
Overview of ISO 14001
5
9.2 Internal Audit
Conduct internal audits at planned intervals to provide information on
whether the EMS;
a) conforms to:
• the organization’s own requirements for its Environmental
management system;;
• the requirements of this International Standard;
b) is effectively implemented and maintained.
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 20
Overview of ISO 14001
5
9.2.2 Internal Audit Programme
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 21
Establish, implement maintain(an) internal audit programme(s) including the
frequency, methods, responsibilities, planning requirements and reporting
of its internal audits. Consider environmental importance of the process
concerned, changes, results of previous audits
a) define the audit criteria and scope for each audit;
b) select auditors and conduct audits to ensure objectivity and the
impartiality of the audit process;
c) ensure that the results of the audits are reported to relevant
management;
Retain documented information as evidence of the implementation of the
audit programme and the audit results.
AUDITOR CHECKS?
Overview of ISO 14001
5
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 22
Overview of ISO 14001
5
9.3 Management Review
 Top management shall review the EMS, at planned intervals, to
ensure its continuing suitability, adequacy, effectiveness
and alignment with the strategic direction of the
organization.
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 23
Overview of ISO 14001
5
9.3.2 Management Review Inputs
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 24
a) the status of actions from previous management reviews;
b) changes in
1. external and internal issues that are relevant to the
environmental management system;;
2. Need and expectation of interested parties, including
compliance obligation;
3. Its significant environmental aspects
4. risks and opportunities (see 6.1);
c) Extent to which environmental objectives have been achieved
Overview of ISO 14001
5
9.3.2 Management Review Inputs (Cont’d)
d) information on environmental performance, including trends in:
1) nonconformities and corrective actions;
2) monitoring and measurement results;
3) fulfilment of its compliance obligations;
4) audit results;
e) adequacy of resources
f) relevant communication (s) from interested parties
including complaints;
g) opportunities for continual improvement
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 25
Overview of ISO 14001
5
9.3.3 Management Review Outputs
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 26
 The outputs :
a) Conclusion on the continuing suitability, adequacy and effectiveness
of the EMS
b) Decision related to continual improvement opportunities
c) Decisions related to any need for changes to the EMS system,
including resources
d) Actions, if needed, when environmental objectives have not been
achieved
e) opportunities to improve integration of the EMS with other business
processes, if needed
f) Any implication for the strategic direction of the organization
 Retain documented information as evidence of the results of management
reviews.
Overview of ISO 14001
5
Clause 10. Improvement
10.1 GENERAL
1. Nonconformity and
Corrective Action
2. Improvement
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 27
Overview of ISO 14001
5
10.1 Improvement
 Determine and select opportunities for improvement(9.1, 9.2,9.3)
and implement any necessary actions to meet the intended
outcomes of its EMS.
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 28
Overview of ISO 14001
5
10.2 Nonconformity And Corrective Action
a) react to the nonconformity and, as applicable:
take action to control and correct it;
deal with the consequences;
b)evaluate the need for action to eliminate the
cause(s) of the nonconformity, in order that
recur or occur elsewhere, by:
 reviewing and analysing the nonconformity;
 determining the causes of the nonconformity;
 determining if similar nonconformities exist, or could potentia
it does not
lly occur;
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 29
Overview of ISO 14001
5 10.2 Nonconformity And
Corrective Action
c) implement any action needed;
d) review the effectiveness of any corrective action taken;
e)make changes to the EMS, if necessary.
Corrective action shall be appropriate to the significance of the
effects of the nonconformities encountered, including environmental
impacts
Retain documented information as evidence of:
 the nature of the nonconformities and any subsequent actions
taken;
 the results of any corrective action
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 30
Overview of ISO 14001
5
10.3 Continual Improvement
The organisation shall continually improve the suitability, adequacy
and effectiveness of the environmental management system to
enhance environmental performance.
Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 31

Support, Operation, Performance Evaluation and Improvement Elements

  • 1.
    Overview of ISO14001 5 Lecture 5 Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 1 ISO 14001 Support, Operation, Performance Evaluation and Improvement Elements
  • 2.
    Overview of ISO14001 5 Clause 7. Support 7. Support 7.5 7.3 7.4 7.1 Resources Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 2 Competence 7.2 Awareness Documented Information Communication
  • 3.
    Overview of ISO14001 5 7.1 Resources Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 3 Determine and provide the resources needed for the establishment, implementation, maintenance and continual improvement of the EMS. Consider : > capabilities  constraints, existing internal resources;  what needs to be obtained from external providers:
  • 4.
    Overview of ISO14001 5 7.2 Competence a) determine the necessary competence of person(s) doing work under its control that affects the performance and effectiveness of the EMS; b) ensure that these persons are competent on the basis of appropriate education, training, or experience; c) Determine training needs- environmental aspects and EMS d) where applicable, take actions to acquire the necessary competence, and evaluate the effectiveness of the actions taken Retain appropriate documented information as evidence of competence Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 4
  • 5.
    Overview of ISO14001 5 7.3 Awareness Ensure persons doing work under it’s control are aware of: a) the environmental policy; b) significant environmental aspects and related actual or potential environmental impacts associated with their work c) their contribution to the effectiveness of the EMS;, including the benefits of environmental improved performance; d) implications of not conforming with the EMS; requirements including not fulfilling compliance obligations Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 5
  • 6.
    Overview of ISO14001 5 7.4 Communication Establish, implement and maintain the process(es) needed for internal and external communications relevant to the EMS: a) what it will communicate; b) when to communicate; c) with whom to communicate; d) how to communicate; e) who communicates.  Take into account its compliance obligations, Ensure information generated is reliable. respond to relevant communication on EMS, and retain documented information as evidence of its communication Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 6
  • 7.
    Overview of ISO14001 5 7.4.1 Internal Communication Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 7 a) relevant EMS among various levels and functions, including changes to the EMS as appropriate b) Ensure its communication process(es), enable(s) persons doing work under its control contribute to continual improvement c) externally communicate information relevant to EMS .
  • 8.
    Overview of ISO14001 5 7.5 Documented Information 7.5 General Creating & Updating Control of Documented Information Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 8
  • 9.
    Overview of ISO14001 5 7.5 EMS Documented informatio n a) required by this International Standard; b) determined by the organization as being necessary for the effectiveness of the EMS Creating and updating documented information, ensure appropriate:  identification and description (e.g. a title, date, author,or reference number);  format (e.g. language, software version, graphics) and media (e.g. paper, electronic);  review and approval for suitability and adequacy Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 9
  • 10.
    Overview of ISO14001 5 7.5.3 Control of documented information 7.5.3 Ensure: a) it is available and suitable for use, where and when it is needed; b) it is adequately protected (e.g. from loss of confidentiality, improper use, or loss of integrity c) distribution, access, retrieval and use; d) storage and preservation, including preservation of legibility; e) control of changes (e.g. version control); f) retention and disposition. External origin on EMS identified, as appropriate and controlled Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 10
  • 11.
    Overview of ISO14001 5 Clause 8. Operation Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 11 1. Operational Planning & Control 2. Emergency preparedness and response
  • 12.
    Overview of ISO14001 5 8.1 Operational planning and control Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 12 Establish , implement and control the processes needed to meet the requirements and to implement the action by a) establishing criteria b) Implementing control of the process(es) in accordance with operating criteria Control planned changes and review the consequences of unintended changes, taking action to mitigate any adverse effects, as necessary Ensure that outsourced processes are controlled or influenced. The type and extent of control or influence to be applied to the process(es) shall be defined within the EMS
  • 13.
    Overview of ISO14001 5 8.1 Operational planning and control Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 13 a) Establish controls, to ensure environmental requirement(s) are addressed in the design and development process for the product or service, considering each lifecycle stage; b) Determine its environmental requirements(s) for the procurement of products and services c) Communicate relevant environmental requirements of products and services, as appropriate; d) Consider information about potential significant environmental impacts associated with transportation or delivery, use end-of-life treatment and final disposal of its products and services Maintain documented information to extent necessary to have confidence that the process have been carried out as planned
  • 14.
    Overview of ISO14001 5 8.2 Emergency preparedness and response Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 14 Establish, implement and maintain process (es) needed to prepare for and respond to potential emergency situations: a) planning actions to prevent or mitigate adverse environmental impacts; b) respond to actual emergency situations; c) prevent or mitigate the consequences of emergency situation, appropriate to the magnitude of emergency and potential environmental impacts; d) Periodically test the planned response actions, where practicable e) Periodically review and revise the process (es) and planned response actions in particular after the occurrence of emergency situation or tests f) Provide relevant information and training related to emergency preparedness and response as appropriate, to relevant interested parties, including person’s working under its control  Retain documented information
  • 15.
    Overview of ISO14001 5 Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 15
  • 16.
    Overview of ISO14001 5 Clause 9. Performance Evaluation 9.1. 9.2. 9.3. 1.Monitoring, measurement , analysis and evaluation, 1. General, 9.1.2.Evaluation of compliance Internal Audit- General, internal Audit programme Management Review Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 16
  • 17.
    Overview of ISO14001 5 9.1 Monitoring, Measurement, Analysis And Evaluation  Determine: a) what needs to be monitored and measured; b) the methods for monitoring, measurement, analysis and evaluation needed to ensure valid results; c) The criteria against which the organization will evaluate its environmental performance and appropriate indictors; d) when the monitoring and measuring shall be performed; e) when the results from monitoring and measurement shall be analyzed and evaluated. Ensure that calibrated or verified monitoring and measurement equipment's is used and maintained, as appropriate Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 17
  • 18.
    Overview of ISO14001 5 9.1 Monitoring, Measurement, Analysis And Evaluation-  Evaluate its environmental performance and the effectiveness o f the EMS  Communicate relevant performance information both internally and externally, as identified in its communication processes(es) and as required by its compliance obligations  Retain appropriate documented information as evidence of monitoring and measurement, analysis and evaluation results Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 18
  • 19.
    Overview of ISO14001 5 9.1.2 Evaluation Of Compliance Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 19 Establish, implement and maintain process(es) needed to evaluate fulfillment of its compliance obligation a) Determine the frequency that compliance will be evaluated; b) Evaluate compliance and take action if needed; c) Maintain knowledge and understanding of its compliance status Retain documented information as evidence of the compliance evaluation result(s)
  • 20.
    Overview of ISO14001 5 9.2 Internal Audit Conduct internal audits at planned intervals to provide information on whether the EMS; a) conforms to: • the organization’s own requirements for its Environmental management system;; • the requirements of this International Standard; b) is effectively implemented and maintained. Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 20
  • 21.
    Overview of ISO14001 5 9.2.2 Internal Audit Programme Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 21 Establish, implement maintain(an) internal audit programme(s) including the frequency, methods, responsibilities, planning requirements and reporting of its internal audits. Consider environmental importance of the process concerned, changes, results of previous audits a) define the audit criteria and scope for each audit; b) select auditors and conduct audits to ensure objectivity and the impartiality of the audit process; c) ensure that the results of the audits are reported to relevant management; Retain documented information as evidence of the implementation of the audit programme and the audit results. AUDITOR CHECKS?
  • 22.
    Overview of ISO14001 5 Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 22
  • 23.
    Overview of ISO14001 5 9.3 Management Review  Top management shall review the EMS, at planned intervals, to ensure its continuing suitability, adequacy, effectiveness and alignment with the strategic direction of the organization. Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 23
  • 24.
    Overview of ISO14001 5 9.3.2 Management Review Inputs Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 24 a) the status of actions from previous management reviews; b) changes in 1. external and internal issues that are relevant to the environmental management system;; 2. Need and expectation of interested parties, including compliance obligation; 3. Its significant environmental aspects 4. risks and opportunities (see 6.1); c) Extent to which environmental objectives have been achieved
  • 25.
    Overview of ISO14001 5 9.3.2 Management Review Inputs (Cont’d) d) information on environmental performance, including trends in: 1) nonconformities and corrective actions; 2) monitoring and measurement results; 3) fulfilment of its compliance obligations; 4) audit results; e) adequacy of resources f) relevant communication (s) from interested parties including complaints; g) opportunities for continual improvement Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 25
  • 26.
    Overview of ISO14001 5 9.3.3 Management Review Outputs Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 26  The outputs : a) Conclusion on the continuing suitability, adequacy and effectiveness of the EMS b) Decision related to continual improvement opportunities c) Decisions related to any need for changes to the EMS system, including resources d) Actions, if needed, when environmental objectives have not been achieved e) opportunities to improve integration of the EMS with other business processes, if needed f) Any implication for the strategic direction of the organization  Retain documented information as evidence of the results of management reviews.
  • 27.
    Overview of ISO14001 5 Clause 10. Improvement 10.1 GENERAL 1. Nonconformity and Corrective Action 2. Improvement Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 27
  • 28.
    Overview of ISO14001 5 10.1 Improvement  Determine and select opportunities for improvement(9.1, 9.2,9.3) and implement any necessary actions to meet the intended outcomes of its EMS. Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 28
  • 29.
    Overview of ISO14001 5 10.2 Nonconformity And Corrective Action a) react to the nonconformity and, as applicable: take action to control and correct it; deal with the consequences; b)evaluate the need for action to eliminate the cause(s) of the nonconformity, in order that recur or occur elsewhere, by:  reviewing and analysing the nonconformity;  determining the causes of the nonconformity;  determining if similar nonconformities exist, or could potentia it does not lly occur; Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 29
  • 30.
    Overview of ISO14001 5 10.2 Nonconformity And Corrective Action c) implement any action needed; d) review the effectiveness of any corrective action taken; e)make changes to the EMS, if necessary. Corrective action shall be appropriate to the significance of the effects of the nonconformities encountered, including environmental impacts Retain documented information as evidence of:  the nature of the nonconformities and any subsequent actions taken;  the results of any corrective action Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 30
  • 31.
    Overview of ISO14001 5 10.3 Continual Improvement The organisation shall continually improve the suitability, adequacy and effectiveness of the environmental management system to enhance environmental performance. Issue : Feb 2019 MMC/INTAS- EMS 14001:2015 Internal Auditor TrainingCourse 31