This document summarizes a research paper that proposes a new scheduling algorithm called Strategic Oscillation Ant Colony System (SOACS) for grid computing resource management. SOACS enhances the exploitation and exploration mechanisms in ant colony system by implementing a concept of strategic oscillation between the two. The algorithm was tested on a job scheduling problem and evaluated based on makespan and flowtime metrics. Results showed SOACS outperformed other metaheuristics algorithms on both metrics. Future work is suggested to implement strategic oscillation at the ant level and apply SOACS to other combinatorial problems.