Introduction to
Un-Bonded Post-Tensioned System
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
What is Pre-stressing…
A complete Solution package in Un-Bonded PT
• It means that the structural member is
stressed internally before it is subjected to
design loads.
• The Pre-stressing is done by applying an
external force using a steel cable assembly,
placed in the body of the structural member.
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Pre-stressing
The design concept is to put a
management of various stresses at every
cross section of the structure. This can be
done by a careful placement of
cables/tendons, through which an external
force can be applied to the structure
resulting in the final stresses in structure at
or below the desired level
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Pre-stressed concrete Terminology
Main differences
Stress sequence
Pre - Before concrete has reached to desired strength
Post - After concrete has reached to desired strength
Transfer of force
Bonded - Through bond between concrete and the cable
Un-bonded - Mechanically using special anchor plates
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Types of Post-Tensioning System
Bonded - Where the Pre-stressing steel strand is bonded to
the concrete after it is tensioned by injecting cement grout
inside of a duct in which the tendon is placed.
Unbonded - Where the Pre-stressing steel strand is
prevented from bonding to the concrete and thus free to
move relative to the concrete. The force is transferred to
the concrete by the MECHANICAL ASSEMBLY only
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Advantages of Post-Tensioned
•Allows larger column spacing
•Reduces Structural Depth of members
•Results in larger floor to ceiling height
•Greater Deflection Control
•Reduces Structural Costs
•Un-cracked section at all times
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
HOW PT WORKS…
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Un-bonded Tendon Applications
•Parking Structures
•Hotels
•High-rise Apartments & Condos
•Office Buildings
•Ground Supported Foundations
•Typically where large bays or spans are desired
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Essential Elements of PT
The cable or Tendon
Fpu = 250 ksi, 270 ksi and 300 ksi (1
ksi = 6.89 Mpa)
Seven wire strand
Low relaxation
The cable or tendon come in various
diameters
3/8 Inch, 1/2 Inch, 0.6 Inch
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
COMPONENTS & FIXTURES
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Anchor Plates
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Friction Wedges
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Friction Wedges- Locking Arrangement
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Friction Wedges, Anchor Plate & Tendon – Locking Arrangement
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
CONSTRUCTION SEQUENCE
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Cables Prepared at the workshop for a particular project
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Cables Delivered to the Jobsite
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Fixing of the Pocket formers
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Installing Anchorages
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
PT Cables are planned and prepared with
identity markings at workshop before it is
transported to the site for installation.
Our system offers the technology with
excellent quality assurance at all the
stages
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Tendon Identification Code for Quick and Precise Installation
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Tendon Laying
We care for the safety of our equipped
persons for the installation of PT System.
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Inspecting the Tendon Profile
A complete supervision and onsite inspections that
leads to desired quality control.
www.ptspakistan.us
www.segoc.com
POST TENSIONING DETAILS
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Tendon Layout with a Wide Panel
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Tendon Layout around Column
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Tendon Layout around Column
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Tendon Anchorage Zone - Re-bar Details
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Tendon Anchorage Zone - Re-bar Details
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Tendon Anchorage Zone - Re-bar Details
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Tendon live ends kept for stressing after pouring
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Tendon Profile – Typical view
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Tendon Layout with nominal reinforcement – Typical view
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Tendon Layout with nominal reinforcement – Typical view
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Regent High Street Mall- Flat Plate with Cut out, Surat, India
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Deep Beam - PMT Workshop Building, Pune, India
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Tendon Layout with Electrical Ducting - Commercial Complex, Baroda
www.ptspakistan.us
www.segoc.com
Add Tendon Anchorages – Preparation & Placing
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Tendons with Reinforcement as per Seismic detailing
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Tendons with Reinforcement as per Seismic detailing
www.ptspakistan.us
www.segoc.com
Tendons with Reinforcement as per ductile detailing
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
PT Beam with conventional Slab
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Intersecting Beams without Columns
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Cables kept at construction joint
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Cables for stressing at construction joint
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Cables for stressing at construction joint
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Post Tensioning in Parking Garage
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Post Tensioning in Parking Garage
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Parking Garage, Denver - Colorado
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Thin Plate Parking Garage
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Thin Plate Parking Garage
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
36 ft Garage Span on each way
www.ptspakistan.us
www.segoc.com
36 ft Garage Span on each way
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
36 ft Garage Span on each way
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Parking Garage Slab with a Ramp
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Openings/Cutouts for other trades
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Block Out for other trades
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
STRESSING OF TENDONS
www.ptspakistan.us
www.segoc.com
Stressing Jack
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Pump Set
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Stressing of Tendons
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Stressing of Tendons
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
Islamabad Club
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Islamabad Club
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
International Textile
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
International Textile
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Prime Flour Mill
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Korangi Factory
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Nazeer Dying
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Anis Apparel
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
70 Riviera
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
70 Riviera
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
A complete Solution package in Un-Bonded PT
Saint Mary, RWP
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
Saint Mary, RWP
www.ptspakistan.us
www.segoc.com
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
First Turn Key Project
A complete Solution package in Un-Bonded PT
www.ptspakistan.us
www.segoc.com
IFMCH Hospital Mirpur Sakro
FIRST TURN KEY PROJECT:
Name of Project: IFMCH Hospital Complex
Client Name: IFMCH
Estimated time of Completion: 36months
Total Covered area: 100,000 sq.ft.
Basement: 4900 sq.ft
Ground Floor: 26242.25 sq.ft
First Floor: 16915 sq.ft
Second Floor: 8364.45 sq.ft
Third Floor: 8364.45 sq.ft
Fourth Floor: 8364.45 sq.ft
Fifth Floor: 8364.45 sq.ft
Thank you..

More Related Content

What's hot

Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and Design
Umer Farooq
 
Precast structure
Precast structurePrecast structure
Precast structure
piyush9392
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and Steel
Rithika Ravishankar
 
Prestressed construction
Prestressed constructionPrestressed construction
Prestressed construction
Vishvendu pandey
 
Temporary Work in Building Construction
Temporary Work in Building ConstructionTemporary Work in Building Construction
Temporary Work in Building Construction
Er.Karan Chauhan
 
HOLLOW CORE SLABS
HOLLOW CORE SLABSHOLLOW CORE SLABS
HOLLOW CORE SLABS
MohdAbdulMujeeb5
 
PRESTRESSED CONCRETE STRUCTURES
PRESTRESSED CONCRETE STRUCTURESPRESTRESSED CONCRETE STRUCTURES
PRESTRESSED CONCRETE STRUCTURES
Tarun kumar
 
Practical Design of Balanced Cantilever Bridges - Piyush Santhalia
Practical Design of Balanced Cantilever Bridges - Piyush SanthaliaPractical Design of Balanced Cantilever Bridges - Piyush Santhalia
Practical Design of Balanced Cantilever Bridges - Piyush SanthaliaPiyush Kumar Santhalia
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridge
jupallipavan2911
 
Water tanks and what are they used for.
Water tanks and what are they used for.Water tanks and what are they used for.
Water tanks and what are they used for.
Md. Aminul Islam Khan
 
Steel reinforcement hand book
Steel reinforcement hand bookSteel reinforcement hand book
Steel reinforcement hand book
Dadan Yupi Andika
 
Special structure
Special structureSpecial structure
underwater-construction-5651f4bb8b92f.pptx
underwater-construction-5651f4bb8b92f.pptxunderwater-construction-5651f4bb8b92f.pptx
underwater-construction-5651f4bb8b92f.pptx
Jayachandran68
 
Precast Construction technology
Precast Construction technologyPrecast Construction technology
Precast Construction technology
GedalaJairam
 
Report on rigid frame structures
Report  on rigid frame structuresReport  on rigid frame structures
Report on rigid frame structures
Manisha Agarwal
 
Waffle slab
Waffle slabWaffle slab
Waffle slab
Kiruthika Selvi K J
 
Types roof trusses
Types roof trussesTypes roof trusses
Types roof trusses
AnsherinaDelMundo
 
Industrial building
Industrial buildingIndustrial building
Industrial building
tausif_k
 
4 storied building superstructure construction proposal
4 storied building superstructure construction proposal4 storied building superstructure construction proposal
4 storied building superstructure construction proposal
Mkh Nantu
 
EXPANSION JOINT TREATMENT: MATERIAL & TECHNIQUES
EXPANSION JOINT TREATMENT: MATERIAL & TECHNIQUESEXPANSION JOINT TREATMENT: MATERIAL & TECHNIQUES
EXPANSION JOINT TREATMENT: MATERIAL & TECHNIQUES
A Makwana
 

What's hot (20)

Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and Design
 
Precast structure
Precast structurePrecast structure
Precast structure
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and Steel
 
Prestressed construction
Prestressed constructionPrestressed construction
Prestressed construction
 
Temporary Work in Building Construction
Temporary Work in Building ConstructionTemporary Work in Building Construction
Temporary Work in Building Construction
 
HOLLOW CORE SLABS
HOLLOW CORE SLABSHOLLOW CORE SLABS
HOLLOW CORE SLABS
 
PRESTRESSED CONCRETE STRUCTURES
PRESTRESSED CONCRETE STRUCTURESPRESTRESSED CONCRETE STRUCTURES
PRESTRESSED CONCRETE STRUCTURES
 
Practical Design of Balanced Cantilever Bridges - Piyush Santhalia
Practical Design of Balanced Cantilever Bridges - Piyush SanthaliaPractical Design of Balanced Cantilever Bridges - Piyush Santhalia
Practical Design of Balanced Cantilever Bridges - Piyush Santhalia
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridge
 
Water tanks and what are they used for.
Water tanks and what are they used for.Water tanks and what are they used for.
Water tanks and what are they used for.
 
Steel reinforcement hand book
Steel reinforcement hand bookSteel reinforcement hand book
Steel reinforcement hand book
 
Special structure
Special structureSpecial structure
Special structure
 
underwater-construction-5651f4bb8b92f.pptx
underwater-construction-5651f4bb8b92f.pptxunderwater-construction-5651f4bb8b92f.pptx
underwater-construction-5651f4bb8b92f.pptx
 
Precast Construction technology
Precast Construction technologyPrecast Construction technology
Precast Construction technology
 
Report on rigid frame structures
Report  on rigid frame structuresReport  on rigid frame structures
Report on rigid frame structures
 
Waffle slab
Waffle slabWaffle slab
Waffle slab
 
Types roof trusses
Types roof trussesTypes roof trusses
Types roof trusses
 
Industrial building
Industrial buildingIndustrial building
Industrial building
 
4 storied building superstructure construction proposal
4 storied building superstructure construction proposal4 storied building superstructure construction proposal
4 storied building superstructure construction proposal
 
EXPANSION JOINT TREATMENT: MATERIAL & TECHNIQUES
EXPANSION JOINT TREATMENT: MATERIAL & TECHNIQUESEXPANSION JOINT TREATMENT: MATERIAL & TECHNIQUES
EXPANSION JOINT TREATMENT: MATERIAL & TECHNIQUES
 

Viewers also liked

Pt group presentation 2013
Pt group presentation 2013Pt group presentation 2013
Pt group presentation 2013Rabee Nassar
 
Project Design Report
Project Design ReportProject Design Report
Project Design ReportTaylor Wilson
 
Infrastructure and Unbonded Post Tensioning
Infrastructure and Unbonded Post TensioningInfrastructure and Unbonded Post Tensioning
Infrastructure and Unbonded Post TensioningAMSYSCO Inc.
 
Design ppt
Design pptDesign ppt
Design ppttishu001
 
Analysis of continuous prestressed concrete
Analysis of continuous prestressed concreteAnalysis of continuous prestressed concrete
Analysis of continuous prestressed concrete
SRAVANTHI mehar
 
What Is Post Tensioning
What Is Post TensioningWhat Is Post Tensioning
What Is Post Tensioning
AMSYSCO Inc.
 
Prestresses concrete
Prestresses concrete Prestresses concrete
Prestresses concrete
jaiveer singh
 
Mega prefab post tension catalog
Mega prefab post tension catalog Mega prefab post tension catalog
Mega prefab post tension catalog
bassamnakfour
 
ANALYSIS & DESIGN ASPECTS OF PRE-STRESSED MEMBERS USING F.R.P. TENDONS
ANALYSIS & DESIGN ASPECTS OF PRE-STRESSED MEMBERS USING F.R.P. TENDONSANALYSIS & DESIGN ASPECTS OF PRE-STRESSED MEMBERS USING F.R.P. TENDONS
ANALYSIS & DESIGN ASPECTS OF PRE-STRESSED MEMBERS USING F.R.P. TENDONS
Girish Singh
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRahul
 
Post Tension
Post TensionPost Tension
Post Tension
Sashi Kirran
 
FINITE ELEMENT ANALYSIS OF A PRESTRESSED CONCRETE BEAM USING FRP TENDON
FINITE ELEMENT ANALYSIS OF A PRESTRESSED CONCRETE BEAM USING FRP TENDONFINITE ELEMENT ANALYSIS OF A PRESTRESSED CONCRETE BEAM USING FRP TENDON
FINITE ELEMENT ANALYSIS OF A PRESTRESSED CONCRETE BEAM USING FRP TENDON
Girish Singh
 
PT STRUCTURES IN BUILDINGS
PT STRUCTURES IN BUILDINGSPT STRUCTURES IN BUILDINGS
PT STRUCTURES IN BUILDINGS
Francois Lepers
 
prestressed concrete
prestressed concreteprestressed concrete
prestressed concrete
Parag Pal
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
Ravi Savani
 

Viewers also liked (20)

presentation
presentationpresentation
presentation
 
FinalReport
FinalReportFinalReport
FinalReport
 
Pt group presentation 2013
Pt group presentation 2013Pt group presentation 2013
Pt group presentation 2013
 
Project Design Report
Project Design ReportProject Design Report
Project Design Report
 
Infrastructure and Unbonded Post Tensioning
Infrastructure and Unbonded Post TensioningInfrastructure and Unbonded Post Tensioning
Infrastructure and Unbonded Post Tensioning
 
Design ppt
Design pptDesign ppt
Design ppt
 
Analysis of continuous prestressed concrete
Analysis of continuous prestressed concreteAnalysis of continuous prestressed concrete
Analysis of continuous prestressed concrete
 
What Is Post Tensioning
What Is Post TensioningWhat Is Post Tensioning
What Is Post Tensioning
 
Prestresses concrete
Prestresses concrete Prestresses concrete
Prestresses concrete
 
Mega prefab post tension catalog
Mega prefab post tension catalog Mega prefab post tension catalog
Mega prefab post tension catalog
 
Ppt
PptPpt
Ppt
 
ANALYSIS & DESIGN ASPECTS OF PRE-STRESSED MEMBERS USING F.R.P. TENDONS
ANALYSIS & DESIGN ASPECTS OF PRE-STRESSED MEMBERS USING F.R.P. TENDONSANALYSIS & DESIGN ASPECTS OF PRE-STRESSED MEMBERS USING F.R.P. TENDONS
ANALYSIS & DESIGN ASPECTS OF PRE-STRESSED MEMBERS USING F.R.P. TENDONS
 
Final Report (Group 5)
Final Report (Group 5)Final Report (Group 5)
Final Report (Group 5)
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Post Tension
Post TensionPost Tension
Post Tension
 
FINITE ELEMENT ANALYSIS OF A PRESTRESSED CONCRETE BEAM USING FRP TENDON
FINITE ELEMENT ANALYSIS OF A PRESTRESSED CONCRETE BEAM USING FRP TENDONFINITE ELEMENT ANALYSIS OF A PRESTRESSED CONCRETE BEAM USING FRP TENDON
FINITE ELEMENT ANALYSIS OF A PRESTRESSED CONCRETE BEAM USING FRP TENDON
 
PT STRUCTURES IN BUILDINGS
PT STRUCTURES IN BUILDINGSPT STRUCTURES IN BUILDINGS
PT STRUCTURES IN BUILDINGS
 
prestressed concrete
prestressed concreteprestressed concrete
prestressed concrete
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 

More from Aamir Sharif

PT ADVANTAGES
PT ADVANTAGESPT ADVANTAGES
PT ADVANTAGES
Aamir Sharif
 
PT FOR PARKING SOLUTIONS
PT FOR PARKING SOLUTIONSPT FOR PARKING SOLUTIONS
PT FOR PARKING SOLUTIONS
Aamir Sharif
 
PT FOR PARKING PLAZAS
PT FOR PARKING PLAZASPT FOR PARKING PLAZAS
PT FOR PARKING PLAZAS
Aamir Sharif
 
PT ADVANTAGES
PT ADVANTAGESPT ADVANTAGES
PT ADVANTAGES
Aamir Sharif
 
APPLICATIONS
APPLICATIONSAPPLICATIONS
APPLICATIONS
Aamir Sharif
 
Sterling PT pvt.ltd.
Sterling PT pvt.ltd.Sterling PT pvt.ltd.
Sterling PT pvt.ltd.
Aamir Sharif
 

More from Aamir Sharif (7)

PT ADVANTAGES
PT ADVANTAGESPT ADVANTAGES
PT ADVANTAGES
 
PT FOR PARKING SOLUTIONS
PT FOR PARKING SOLUTIONSPT FOR PARKING SOLUTIONS
PT FOR PARKING SOLUTIONS
 
PT FOR PARKING PLAZAS
PT FOR PARKING PLAZASPT FOR PARKING PLAZAS
PT FOR PARKING PLAZAS
 
PT ADVANTAGES
PT ADVANTAGESPT ADVANTAGES
PT ADVANTAGES
 
APPLICATIONS
APPLICATIONSAPPLICATIONS
APPLICATIONS
 
Sterling PT pvt.ltd.
Sterling PT pvt.ltd.Sterling PT pvt.ltd.
Sterling PT pvt.ltd.
 
STERLING PT
STERLING PTSTERLING PT
STERLING PT
 

Recently uploaded

Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdfThe Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
Nettur Technical Training Foundation
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 

Recently uploaded (20)

Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdfThe Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 

Sterling PT Pvt. Ltd. (PAKISTAN)

  • 1. Najeeb Centre Level 2, 172-B Block 2 PECHS Karachi Pakistan
  • 2. Introduction to Un-Bonded Post-Tensioned System A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com
  • 3. What is Pre-stressing… A complete Solution package in Un-Bonded PT • It means that the structural member is stressed internally before it is subjected to design loads. • The Pre-stressing is done by applying an external force using a steel cable assembly, placed in the body of the structural member. www.ptspakistan.us www.segoc.com
  • 4. A complete Solution package in Un-Bonded PT Pre-stressing The design concept is to put a management of various stresses at every cross section of the structure. This can be done by a careful placement of cables/tendons, through which an external force can be applied to the structure resulting in the final stresses in structure at or below the desired level www.ptspakistan.us www.segoc.com
  • 5. A complete Solution package in Un-Bonded PT Pre-stressed concrete Terminology Main differences Stress sequence Pre - Before concrete has reached to desired strength Post - After concrete has reached to desired strength Transfer of force Bonded - Through bond between concrete and the cable Un-bonded - Mechanically using special anchor plates www.ptspakistan.us www.segoc.com
  • 6. A complete Solution package in Un-Bonded PT Types of Post-Tensioning System Bonded - Where the Pre-stressing steel strand is bonded to the concrete after it is tensioned by injecting cement grout inside of a duct in which the tendon is placed. Unbonded - Where the Pre-stressing steel strand is prevented from bonding to the concrete and thus free to move relative to the concrete. The force is transferred to the concrete by the MECHANICAL ASSEMBLY only www.ptspakistan.us www.segoc.com
  • 7. A complete Solution package in Un-Bonded PT Advantages of Post-Tensioned •Allows larger column spacing •Reduces Structural Depth of members •Results in larger floor to ceiling height •Greater Deflection Control •Reduces Structural Costs •Un-cracked section at all times www.ptspakistan.us www.segoc.com
  • 8. A complete Solution package in Un-Bonded PT HOW PT WORKS… www.ptspakistan.us www.segoc.com
  • 9. A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com
  • 10. A complete Solution package in Un-Bonded PT Un-bonded Tendon Applications •Parking Structures •Hotels •High-rise Apartments & Condos •Office Buildings •Ground Supported Foundations •Typically where large bays or spans are desired www.ptspakistan.us www.segoc.com
  • 11. A complete Solution package in Un-Bonded PT Essential Elements of PT The cable or Tendon Fpu = 250 ksi, 270 ksi and 300 ksi (1 ksi = 6.89 Mpa) Seven wire strand Low relaxation The cable or tendon come in various diameters 3/8 Inch, 1/2 Inch, 0.6 Inch www.ptspakistan.us www.segoc.com
  • 12. A complete Solution package in Un-Bonded PT COMPONENTS & FIXTURES www.ptspakistan.us www.segoc.com
  • 13. A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com
  • 14. A complete Solution package in Un-Bonded PT Anchor Plates www.ptspakistan.us www.segoc.com
  • 15. A complete Solution package in Un-Bonded PT Friction Wedges www.ptspakistan.us www.segoc.com
  • 16. A complete Solution package in Un-Bonded PT Friction Wedges- Locking Arrangement www.ptspakistan.us www.segoc.com
  • 17. A complete Solution package in Un-Bonded PT Friction Wedges, Anchor Plate & Tendon – Locking Arrangement www.ptspakistan.us www.segoc.com
  • 18. A complete Solution package in Un-Bonded PT CONSTRUCTION SEQUENCE www.ptspakistan.us www.segoc.com
  • 19. A complete Solution package in Un-Bonded PT Cables Prepared at the workshop for a particular project www.ptspakistan.us www.segoc.com
  • 20. A complete Solution package in Un-Bonded PT Cables Delivered to the Jobsite www.ptspakistan.us www.segoc.com
  • 21. A complete Solution package in Un-Bonded PT Fixing of the Pocket formers www.ptspakistan.us www.segoc.com
  • 22. A complete Solution package in Un-Bonded PT Installing Anchorages www.ptspakistan.us www.segoc.com
  • 23. A complete Solution package in Un-Bonded PT PT Cables are planned and prepared with identity markings at workshop before it is transported to the site for installation. Our system offers the technology with excellent quality assurance at all the stages www.ptspakistan.us www.segoc.com
  • 24. A complete Solution package in Un-Bonded PT Tendon Identification Code for Quick and Precise Installation www.ptspakistan.us www.segoc.com
  • 25. A complete Solution package in Un-Bonded PT Tendon Laying We care for the safety of our equipped persons for the installation of PT System. www.ptspakistan.us www.segoc.com
  • 26. A complete Solution package in Un-Bonded PT Inspecting the Tendon Profile A complete supervision and onsite inspections that leads to desired quality control. www.ptspakistan.us www.segoc.com
  • 27. POST TENSIONING DETAILS A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com
  • 28. A complete Solution package in Un-Bonded PT Tendon Layout with a Wide Panel www.ptspakistan.us www.segoc.com
  • 29. A complete Solution package in Un-Bonded PT Tendon Layout around Column www.ptspakistan.us www.segoc.com
  • 30. A complete Solution package in Un-Bonded PT Tendon Layout around Column www.ptspakistan.us www.segoc.com
  • 31. A complete Solution package in Un-Bonded PT Tendon Anchorage Zone - Re-bar Details www.ptspakistan.us www.segoc.com
  • 32. A complete Solution package in Un-Bonded PT Tendon Anchorage Zone - Re-bar Details www.ptspakistan.us www.segoc.com
  • 33. A complete Solution package in Un-Bonded PT Tendon Anchorage Zone - Re-bar Details www.ptspakistan.us www.segoc.com
  • 34. A complete Solution package in Un-Bonded PT Tendon live ends kept for stressing after pouring www.ptspakistan.us www.segoc.com
  • 35. A complete Solution package in Un-Bonded PT Tendon Profile – Typical view www.ptspakistan.us www.segoc.com
  • 36. A complete Solution package in Un-Bonded PT Tendon Layout with nominal reinforcement – Typical view www.ptspakistan.us www.segoc.com
  • 37. A complete Solution package in Un-Bonded PT Tendon Layout with nominal reinforcement – Typical view www.ptspakistan.us www.segoc.com
  • 38. A complete Solution package in Un-Bonded PT Regent High Street Mall- Flat Plate with Cut out, Surat, India www.ptspakistan.us www.segoc.com
  • 39. A complete Solution package in Un-Bonded PT Deep Beam - PMT Workshop Building, Pune, India www.ptspakistan.us www.segoc.com
  • 40. A complete Solution package in Un-Bonded PT Tendon Layout with Electrical Ducting - Commercial Complex, Baroda www.ptspakistan.us www.segoc.com
  • 41. Add Tendon Anchorages – Preparation & Placing A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com
  • 42. A complete Solution package in Un-Bonded PT Tendons with Reinforcement as per Seismic detailing www.ptspakistan.us www.segoc.com
  • 43. A complete Solution package in Un-Bonded PT Tendons with Reinforcement as per Seismic detailing www.ptspakistan.us www.segoc.com
  • 44. Tendons with Reinforcement as per ductile detailing A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com
  • 45. A complete Solution package in Un-Bonded PT PT Beam with conventional Slab www.ptspakistan.us www.segoc.com
  • 46. A complete Solution package in Un-Bonded PT Intersecting Beams without Columns www.ptspakistan.us www.segoc.com
  • 47. A complete Solution package in Un-Bonded PT Cables kept at construction joint www.ptspakistan.us www.segoc.com
  • 48. A complete Solution package in Un-Bonded PT Cables for stressing at construction joint www.ptspakistan.us www.segoc.com
  • 49. A complete Solution package in Un-Bonded PT Cables for stressing at construction joint www.ptspakistan.us www.segoc.com
  • 50. A complete Solution package in Un-Bonded PT Post Tensioning in Parking Garage www.ptspakistan.us www.segoc.com
  • 51. A complete Solution package in Un-Bonded PT Post Tensioning in Parking Garage www.ptspakistan.us www.segoc.com
  • 52. A complete Solution package in Un-Bonded PT Parking Garage, Denver - Colorado www.ptspakistan.us www.segoc.com
  • 53. A complete Solution package in Un-Bonded PT Thin Plate Parking Garage www.ptspakistan.us www.segoc.com
  • 54. A complete Solution package in Un-Bonded PT Thin Plate Parking Garage www.ptspakistan.us www.segoc.com
  • 55. A complete Solution package in Un-Bonded PT 36 ft Garage Span on each way www.ptspakistan.us www.segoc.com
  • 56. 36 ft Garage Span on each way A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com
  • 57. A complete Solution package in Un-Bonded PT 36 ft Garage Span on each way www.ptspakistan.us www.segoc.com
  • 58. A complete Solution package in Un-Bonded PT Parking Garage Slab with a Ramp www.ptspakistan.us www.segoc.com
  • 59. A complete Solution package in Un-Bonded PT Openings/Cutouts for other trades www.ptspakistan.us www.segoc.com
  • 60. A complete Solution package in Un-Bonded PT Block Out for other trades www.ptspakistan.us www.segoc.com
  • 61. A complete Solution package in Un-Bonded PT STRESSING OF TENDONS www.ptspakistan.us www.segoc.com
  • 62. Stressing Jack A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com
  • 63. A complete Solution package in Un-Bonded PT Pump Set www.ptspakistan.us www.segoc.com
  • 64. A complete Solution package in Un-Bonded PT Stressing of Tendons www.ptspakistan.us www.segoc.com
  • 65. A complete Solution package in Un-Bonded PT Stressing of Tendons www.ptspakistan.us www.segoc.com
  • 66. A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com
  • 67. A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com
  • 68. A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com
  • 69. A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com
  • 70. A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com
  • 71. A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com
  • 72. A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com
  • 73. A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com
  • 78. Prime Flour Mill www.ptspakistan.us www.segoc.com A complete Solution package in Un-Bonded PT
  • 82. 70 Riviera www.ptspakistan.us www.segoc.com A complete Solution package in Un-Bonded PT
  • 83. 70 Riviera www.ptspakistan.us www.segoc.com A complete Solution package in Un-Bonded PT
  • 84. A complete Solution package in Un-Bonded PT Saint Mary, RWP www.ptspakistan.us www.segoc.com
  • 85. A complete Solution package in Un-Bonded PT Saint Mary, RWP www.ptspakistan.us www.segoc.com
  • 86. A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com First Turn Key Project
  • 87. A complete Solution package in Un-Bonded PT www.ptspakistan.us www.segoc.com IFMCH Hospital Mirpur Sakro FIRST TURN KEY PROJECT: Name of Project: IFMCH Hospital Complex Client Name: IFMCH Estimated time of Completion: 36months Total Covered area: 100,000 sq.ft. Basement: 4900 sq.ft Ground Floor: 26242.25 sq.ft First Floor: 16915 sq.ft Second Floor: 8364.45 sq.ft Third Floor: 8364.45 sq.ft Fourth Floor: 8364.45 sq.ft Fifth Floor: 8364.45 sq.ft