This document outlines a term paper assignment where students are asked to propose an Agile project management approach for implementing a complex marketing campaign system. The system has multiple components and the organization wants it completed within 12-14 months while seeing early results. Students must submit a 10-15 page written project plan and a separate MS Project plan that outlines the tasks, timeline, resources and phases of the project using Agile methods. The written plan should address challenges like retiring legacy systems, controlling scope, developing architecture, managing teams and conflicts, expectations, and documentation.
There are many myth and misunderstanding around what program management is - this is a deck not only captures what I define for the PGM team as the head of program management for multiple startups, it's also an interview presentation I made to my hiring committee (CEO, CTO, CPO, CFO, CMO, CHRO etc).
The principles have been incorporated into a product we built - dragonboat.io
Questions and comments - twitter: @beckyflintsf
20210113 Lean In Government Harrisburg Conf Agile Governance at Scale Craeg S...Craeg Strong
Traditional duties of IT governance and oversight include auditing timely completion of milestones and phase gates and tracking progress versus spend. They place heavy emphasis on correctness and completeness of documentation, managing risks and tracking metrics such as earned value and escaped defect counts. With the adoption of agile methods comes the need to adjust governance and oversight accordingly. But what does agile governance look like? How does it differ from traditional governance? Given the lack of detailed plans up-front, the reduced emphasis on documentation, and the eschewing of traditional metrics such as earned value, one might assume that governance and oversight is more challenging in the agile space. Looking at governance and oversight through a traditional lens reveals relatively few effective tools and the necessity of relying upon vaguely defined metrics such as “story points.” However, we will show that, in fact, agile methods offer governance and oversight a wealth of new tools and capabilities, enabling a more proactive and collaborative approach—which could ultimately lead to improved outcomes.
Portfolio Analysis is the gist of portfolio management. To maximize the portfolio value, the configuration and project selection need mindful consideration.
There are many myth and misunderstanding around what program management is - this is a deck not only captures what I define for the PGM team as the head of program management for multiple startups, it's also an interview presentation I made to my hiring committee (CEO, CTO, CPO, CFO, CMO, CHRO etc).
The principles have been incorporated into a product we built - dragonboat.io
Questions and comments - twitter: @beckyflintsf
20210113 Lean In Government Harrisburg Conf Agile Governance at Scale Craeg S...Craeg Strong
Traditional duties of IT governance and oversight include auditing timely completion of milestones and phase gates and tracking progress versus spend. They place heavy emphasis on correctness and completeness of documentation, managing risks and tracking metrics such as earned value and escaped defect counts. With the adoption of agile methods comes the need to adjust governance and oversight accordingly. But what does agile governance look like? How does it differ from traditional governance? Given the lack of detailed plans up-front, the reduced emphasis on documentation, and the eschewing of traditional metrics such as earned value, one might assume that governance and oversight is more challenging in the agile space. Looking at governance and oversight through a traditional lens reveals relatively few effective tools and the necessity of relying upon vaguely defined metrics such as “story points.” However, we will show that, in fact, agile methods offer governance and oversight a wealth of new tools and capabilities, enabling a more proactive and collaborative approach—which could ultimately lead to improved outcomes.
Portfolio Analysis is the gist of portfolio management. To maximize the portfolio value, the configuration and project selection need mindful consideration.
This presentation has been compiled using material available in public domain. Copyrights of the owners and sources of the material used has been duly acknowledged.
Agile Project Management - An introduction to Agile and the new PMI-ACPDimitri Ponomareff
The PMI-ACP recognizes knowledge of agile principles, practices and tools and techniques across agile methodologies. If you use agile practices in your projects, or your organization is adopting agile approaches to project management, then this PDM will provide a full overview about this new PMI certification while exploring key agile principles, practices and techniques. If you always wanted to learn more about agile, this presenter is a certified Agile practitioner, trainer and coach so you will receive up to date information about the state of Agile and how it can most help you in your organization or your career.
This presentation provides 5 easy to apply tips for the design of professional PMO and project templates. Practical and pragmatic ideas and concepts that can be applied to all project and PMO templates.
20210618 PMI XC 2021 Conf Business Agility: What Got You Here Won't Get You T...Craeg Strong
The results are in, and the conclusion is clear: Agile methods produce better results for knowledge work. Corporations have initiated large-scale Agile transformations in order to achieve these benefits across the entire organization. These transformations often involve retraining, retooling, re-organizing into “squads” and hiring dozens or hundreds of Scrum Masters and Agile coaches. Sadly, these efforts are rarely successful. Why?
Simply put, team agility does not produce business agility. By focusing exclusively on the team level, the organization fails to solve three main problems: no Agile interactions between teams, no end-to-end management of the value streams, and no Agile strategic portfolio management. In addition, the organization has failed to realize that the Agile team structure does not have to match the reporting structure. While it may ultimately make sense to reorganize reporting relationships, that should be done last, not first.
In this talk, I will introduce the Flight Levels model and the Kanban Maturity Model. The Flight Level framework recognizes that there are three different levels on which work should be visualized and coordinated: the strategy/portfolio level, the coordination/value-stream level, and the operational/team level. The Kanban Maturity Model helps us understand the current level of organizational maturity and choose practices that take us to the learning zone and avoid the “panic” zone of emotional resistance. Working with Agile teams who may be using Kanban, Scrum, SAFe, LeSS, or Disciplined Agile, we will explore how this model dramatically simplifies the problem and show how it has enabled real business agility.
Discover the right tools for your Project Management Office (PMO)Hussain Bandukwala
No matter what the domain, having the right tools at our disposal can make a significant difference.
In relevance to the PMO, it dictates the shift in our focus from management to administration.
Project/Program Managers often find themselves scrambling around to collect pertinent and accurate information to update their statuses, while Resource Managers may have to connect with several people to determine if they efficiently staffed their resources and have sufficient bench to staff upcoming initiatives.
These are some of the reasons to compel PMOs to surround themselves with the right tools. But what are the right tools? How did we end up with the not-so-right-tools? Why are the right tools so important?
Learn all this (and more) in "Discover the right tools for your Project Management Office (PMO)"
This is a basic overview on some of the aspects of Lean PMO during the every day agile practice world
The author writes regularly at www.madhavanwrites.blogspot.com
How to build outcome driven product - Connecting OKRs with Agile teamsBecky Flint
How to best connect product vision, business objectives and myriad of feature requests when building agile roadmaps? Use the Responsive PPM method.
This deck accomplish a webinar with the same tile. It covers
- the difference in the top down and bottoms up product planning approaches
- how to create OKRs that work for the unique needs of the product and engineering organization
- why you should take a portfolio approach for your product roadmaps
For more information, check out dragonboat.io/blog and responsivePPM.org
Product Management is Not Enough for ScaleUp CPOs - Introducing Responsive PPMBecky Flint
You’ve reached product-market fit, your engineering teams are growing, your product teams are growing. Congrats! Now what? How do you manage autonomous, empowered teams that each have different goals to be measured against?
Dragonboat CEO & Founder, Becky Flint, shares how to bring effective portfolio management to your fast-growing companies to scale teams, deliver results, expand to new markets and innovate quickly.
From high-level strategic frameworks to real-world examples and tangible best practices for applying a portfolio management approach, attendees will walk away with a clear understanding of how to create an outcome-focused product organization that delivers results.
This presentation will cover:
- When portfolio management becomes essential to running your product
- Portfolio management in the context of autonomous teams and “big rocks"
- How to transform your product organization from “feature focused” to “outcome-focused”
Learn more at https://dragonboat.io/
The reality is that a paradigm shift is needed to enable the Agile PMO to deliver the correct support and provide an acceptable level of guidance for project managers in a collaborative and co-operative approach.
This will result in the ability to work with the project and business teams to fast track projects through to delivery while ensuring that the components of the triple constraints evolves into a managed agile enterprise project and programme environment.
If you think "we only have 1 product line. So we don't have a portfolio", you'll be surprised to learn that the world has changed.
While you may not be managing a portfolio of products, leaders today need to manage a portfolio of objectives, and a portfolio of customer/ market segments, and perhaps a portfolio of investment types. And their investment? People - talents with different skills and preference.
Decades ago, within traditional industries/ companies, there were IT professionals, business analysts, and project managers.
With digitalization, we have seen the transformation from IT to engineering, from Business Analyst to product management. Project management has also been transforming to portfolio program management. It is just not well known yet, until now.
Learn and apply Responsive PPM and become an effective and strategic leader in any function.
responsivePPM.org
https://www.youtube.com/watch?v=sBbishV2GO8&t=79s
Using agile for business process design and development oct 19, 2010 ottawaAdaptiveOrg Inc.
Is Agile Scrum just for software development or can it also be used to achieve great business process design and development as well?
Presented to the Ottawa IIBA Chapter on October 19, 2010
Project management methodologies change over time but one element of all projects always remains important - Project Charter. Here I am sharing a template for a medium to large implementation project type of project, for example SAP system implementation.
STAYER CIS 443 Week 10 Term Paper: Using Agile Project Management to Implement a Complex Marketing Campaign System NEW
Check this A+ tutorial guideline at
http://www.assignmentcloud.com/cis-443-stayer/cis-443-week-10-term-paper-using-agile-project-management-to-implement-a-complex-marketing-campaign-system-new
For more classes visit
http://www.assignmentcloud.com
Term Paper: Using Agile Project Management to Implement a Complex Marketing Campaign System
Due Week 10 and worth 200 points
This assignment consists of two (2) sections: a written project plan, and a project plan that is created through the use of MS Project.You must submit the two (2) sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for.
This presentation has been compiled using material available in public domain. Copyrights of the owners and sources of the material used has been duly acknowledged.
Agile Project Management - An introduction to Agile and the new PMI-ACPDimitri Ponomareff
The PMI-ACP recognizes knowledge of agile principles, practices and tools and techniques across agile methodologies. If you use agile practices in your projects, or your organization is adopting agile approaches to project management, then this PDM will provide a full overview about this new PMI certification while exploring key agile principles, practices and techniques. If you always wanted to learn more about agile, this presenter is a certified Agile practitioner, trainer and coach so you will receive up to date information about the state of Agile and how it can most help you in your organization or your career.
This presentation provides 5 easy to apply tips for the design of professional PMO and project templates. Practical and pragmatic ideas and concepts that can be applied to all project and PMO templates.
20210618 PMI XC 2021 Conf Business Agility: What Got You Here Won't Get You T...Craeg Strong
The results are in, and the conclusion is clear: Agile methods produce better results for knowledge work. Corporations have initiated large-scale Agile transformations in order to achieve these benefits across the entire organization. These transformations often involve retraining, retooling, re-organizing into “squads” and hiring dozens or hundreds of Scrum Masters and Agile coaches. Sadly, these efforts are rarely successful. Why?
Simply put, team agility does not produce business agility. By focusing exclusively on the team level, the organization fails to solve three main problems: no Agile interactions between teams, no end-to-end management of the value streams, and no Agile strategic portfolio management. In addition, the organization has failed to realize that the Agile team structure does not have to match the reporting structure. While it may ultimately make sense to reorganize reporting relationships, that should be done last, not first.
In this talk, I will introduce the Flight Levels model and the Kanban Maturity Model. The Flight Level framework recognizes that there are three different levels on which work should be visualized and coordinated: the strategy/portfolio level, the coordination/value-stream level, and the operational/team level. The Kanban Maturity Model helps us understand the current level of organizational maturity and choose practices that take us to the learning zone and avoid the “panic” zone of emotional resistance. Working with Agile teams who may be using Kanban, Scrum, SAFe, LeSS, or Disciplined Agile, we will explore how this model dramatically simplifies the problem and show how it has enabled real business agility.
Discover the right tools for your Project Management Office (PMO)Hussain Bandukwala
No matter what the domain, having the right tools at our disposal can make a significant difference.
In relevance to the PMO, it dictates the shift in our focus from management to administration.
Project/Program Managers often find themselves scrambling around to collect pertinent and accurate information to update their statuses, while Resource Managers may have to connect with several people to determine if they efficiently staffed their resources and have sufficient bench to staff upcoming initiatives.
These are some of the reasons to compel PMOs to surround themselves with the right tools. But what are the right tools? How did we end up with the not-so-right-tools? Why are the right tools so important?
Learn all this (and more) in "Discover the right tools for your Project Management Office (PMO)"
This is a basic overview on some of the aspects of Lean PMO during the every day agile practice world
The author writes regularly at www.madhavanwrites.blogspot.com
How to build outcome driven product - Connecting OKRs with Agile teamsBecky Flint
How to best connect product vision, business objectives and myriad of feature requests when building agile roadmaps? Use the Responsive PPM method.
This deck accomplish a webinar with the same tile. It covers
- the difference in the top down and bottoms up product planning approaches
- how to create OKRs that work for the unique needs of the product and engineering organization
- why you should take a portfolio approach for your product roadmaps
For more information, check out dragonboat.io/blog and responsivePPM.org
Product Management is Not Enough for ScaleUp CPOs - Introducing Responsive PPMBecky Flint
You’ve reached product-market fit, your engineering teams are growing, your product teams are growing. Congrats! Now what? How do you manage autonomous, empowered teams that each have different goals to be measured against?
Dragonboat CEO & Founder, Becky Flint, shares how to bring effective portfolio management to your fast-growing companies to scale teams, deliver results, expand to new markets and innovate quickly.
From high-level strategic frameworks to real-world examples and tangible best practices for applying a portfolio management approach, attendees will walk away with a clear understanding of how to create an outcome-focused product organization that delivers results.
This presentation will cover:
- When portfolio management becomes essential to running your product
- Portfolio management in the context of autonomous teams and “big rocks"
- How to transform your product organization from “feature focused” to “outcome-focused”
Learn more at https://dragonboat.io/
The reality is that a paradigm shift is needed to enable the Agile PMO to deliver the correct support and provide an acceptable level of guidance for project managers in a collaborative and co-operative approach.
This will result in the ability to work with the project and business teams to fast track projects through to delivery while ensuring that the components of the triple constraints evolves into a managed agile enterprise project and programme environment.
If you think "we only have 1 product line. So we don't have a portfolio", you'll be surprised to learn that the world has changed.
While you may not be managing a portfolio of products, leaders today need to manage a portfolio of objectives, and a portfolio of customer/ market segments, and perhaps a portfolio of investment types. And their investment? People - talents with different skills and preference.
Decades ago, within traditional industries/ companies, there were IT professionals, business analysts, and project managers.
With digitalization, we have seen the transformation from IT to engineering, from Business Analyst to product management. Project management has also been transforming to portfolio program management. It is just not well known yet, until now.
Learn and apply Responsive PPM and become an effective and strategic leader in any function.
responsivePPM.org
https://www.youtube.com/watch?v=sBbishV2GO8&t=79s
Using agile for business process design and development oct 19, 2010 ottawaAdaptiveOrg Inc.
Is Agile Scrum just for software development or can it also be used to achieve great business process design and development as well?
Presented to the Ottawa IIBA Chapter on October 19, 2010
Project management methodologies change over time but one element of all projects always remains important - Project Charter. Here I am sharing a template for a medium to large implementation project type of project, for example SAP system implementation.
STAYER CIS 443 Week 10 Term Paper: Using Agile Project Management to Implement a Complex Marketing Campaign System NEW
Check this A+ tutorial guideline at
http://www.assignmentcloud.com/cis-443-stayer/cis-443-week-10-term-paper-using-agile-project-management-to-implement-a-complex-marketing-campaign-system-new
For more classes visit
http://www.assignmentcloud.com
Term Paper: Using Agile Project Management to Implement a Complex Marketing Campaign System
Due Week 10 and worth 200 points
This assignment consists of two (2) sections: a written project plan, and a project plan that is created through the use of MS Project.You must submit the two (2) sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for.
STAYER CIS 443 Week 8 Assignment 4: How to Become a Leader in Agile Projects NEW
Check this A+ tutorial guideline at
http://www.assignmentcloud.com/cis-443-stayer/cis-443-week-8-assignment-4-how-to-become-a-leader-in-agile-projects-new
For more classes visit
http://www.assignmentcloud.com
Assignment 3: Release Planning
Due Week 7 and worth 100 points
With the Agile project framework in place for your home improvement store’s e-Commerce Website you started in assignment two (2), now you must consider long-term planning as well as short-term planning for your project.
#1 Assignment ObjectivesManaging a Project Schedule400 words.docxmayank272369
#1 Assignment Objectives
Managing a Project Schedule
400 words
For this Discussion Board assignment, complete the following:
•Critique 3 ideas, concepts, or topics from this course, and reflect on how they relate to the course objectives and your career aspirations.
Be substantive and clear, and use examples to reinforce your ideas
#2 Assignment Objectives
Managing a Project Schedule
Describe project management principles as they are currently applied to both governmental and non-governmental acquisition projects.
Use effective communication techniques. Word document with 10 total pages, including empty sections
700 words
Assignment
Your first task in this process will be to select a project to use as the basis of your Key Assignment. You will also create the shell document for the final project Key Assignment document deliverable that you will be working on throughout the course. As you proceed through each project phase, you will add content to each section of the final document to progressively complete the final project delivery, which is the Acquisition Project Scheduling and Cost Management Plan.
The project deliverables are the following:
•Submit your project proposal to your instructor for approval.
•Acquisition Project Scheduling and Cost Management Plan document shell ◦Use Word
◦Title page ◾Course number and name
◾Project name
◾Your name
◾Date
◦Table of Contents (TOC) ◾Use an autogenerated TOC.
◾This should be on a separate page.
◾This should be a maximum of 3 levels deep.
◾Be sure to update the fields of the TOC so that it is up-to-date before submitting your project.
◦Section headings (create each heading on a new page with "TBD" as the content, except for sections listed under "New Content" below) ◾Project Outline
◾Cost, Schedule, and Technical Performance Management
◾Management of Small Projects
◾Acquisition Project Guidelines
◾Costing Methods and Tools
◾Earned Value Management System
◾Overall Cost and Schedule Performance
•New content to be inserted in document shell ◦Project Outline ◾Give a brief description of the project.
◾Discuss the overall project deliverable.
◾The material can be taken from approved proposal submitted to instructor, and this will serve as the draft for the proposal.
◾Be sure this project is approved by the instructor.
◦Cost, Schedule, and Technical Performance ◾Discuss cost techniques both in determining initial estimates and in monitoring and controlling them throughout the life of the project.
◾Determine the project schedule for the acquisition component of the overall project and include a copy of it.
◾Develop the program evaluation and review technique (PERT) and critical path method (CPM) for this Key Assignment acquisition project, and include copies of those charts in this section.
◾Describe all of the key schedule influencers that can impact a schedule positively or negatively and how you would handle them.
#3 Assignment Objectives
Management of Small Project ...
Strayer cis 348 week 3 assignment 2 business caseshyaminfo30
STRAYER CIS 348 Week 3 Assignment 2 Business Case (2 Papers) NEW
Check this A+ tutorial guideline at
http://www.assignmentcloud.com/cis-348-strayer/cis-348-week-3-assignment-2-business-case-new
For more classes visit
http://www.assignmentcloud.com/
This Tutorial contains 2 Papers
CIS 348 Week 3 Assignment 2: Business Case
Due Week 3 and worth 85 points
Imagine that you work as a project manager for a company that buys and sells used textbooks. The main sales channel is a Web application.
This course requires use of the Microsoft Project 2010 (or later.docxchristalgrieg
This course requires use of the Microsoft Project 2010 (or later) software application. The 2010 version and those released later are similar and suitable for the assignments. Please note the software is not compatible with Mac computers.
Even if you have a well-planned and controlled project, there is still 1 important but sometimes overlooked area that can impact the success of a project. This very important area is quality management and assurance. There are many quality systems that exist today thanks to the work of pioneers such as Dr. William Edward Deming. You will be evaluating different quality systems such as ISO 9000, Six Sigma, Plan-Do-Check-Act or Plan-Do-Study-Act, capability maturity model integration (CMMI), organizational project management maturity model (OPM3), and Malcolm Baldrige for their potential application to a project you will be selecting in the Individual Project for this week.
1 # Assignment Objectives
Explore and discuss definitions, concepts, principles and major contributors to the quality field.
Use effective communication techniques
write 350–500 words that respond to the following questions with your thoughts, ideas, and comments. This will be the foundation for future discussions by your classmates. Be substantive and clear, and use examples to reinforce your ideas.
Research at least 2 sources (which may include your textbook) to support your response, and discuss the following:
•Compare and contrast 3 of what you consider the most appropriate types of quality systems for the project that you will use in your Key Assignment.
•In your opinion, which is the best type of quality system? Why?
•Which is the easiest to implement? Why?
Write 2 more paragraphs that are an introduction and conclusion to this topic. Be sure to include your references, and format your submission in APA format.
#2 Assignment Objectives
Explore and discuss definitions, concepts, principles and major contributors to the quality field.
Use effective communication techniques.
Word document of 10 pages (including empty sections), 600–900 words
Weekly tasks or assignments (Individual or Group Projects) will be due by Monday, and late submissions will be assigned a late penalty in accordance with the late penalty policy found in the syllabus. NOTE: All submission posting times are based on midnight Central Time.
Overview
As you have already learned in your Discussion Board this week, quality assurance in any project might be the most important but overlooked aspect of a project. Lack of quality management, however, can cause an entire project to fail if the final project deliverables do not meet customer expectations and standards. Implementing quality assurance throughout the project improves overall performance of tasks and minimizes the risk of nonacceptance at the end of the project. In this course, you are asked to develop a Quality Management Integration Plan that allows you to select and integrate quality management tool ...
“Selecting and implementing a new asset finance system? In the second of three articles, we go back to basics to take a look at what you need to consider at the start of your project to give yourself the best chance of success.”
This has necessarily been a brief look at Project Initiation. We welcome comments and would be happy to help you get your project off to a good start.
Looking to keep your website development costs in check? Check out our latest blog post for expert tips and strategies to control expenses. https://techonefive.com/saving-money-on-website-development-expert-insights/
Asset finance system project initiation 101. “Selecting and implementing a new asset finance system? In the second of three articles, we go back to basics to take a look at what you need to consider at the start of your project to give yourself the best chance of success.” This has necessarily been a brief look at Project Initiation. We welcome comments and would be happy to help you get your project off to a good start.
BUSN350Week 3 Business Problem and RequirementsBusiness.docxhumphrieskalyn
BUSN350
Week 3: Business Problem and Requirements
Business Analysis
The basic idea of business analysis is simple. It is the practice of identifying and clarifying a problem or issue within a company, then working with the various stakeholders to define and implement an acceptable solution. However, actually conducting a business analysis can be quite complex and time-consuming.
Starting Point
The first step in the process is to identify a problem, an issue, or some other business need. Let's say that you are the owner of a small motorcycle dealership. In addition to selling bikes, your store does repairs and maintenance, sells riding gear, and custom orders parts for your customers. You have received numerous complaints from the staff and customers about the accuracy of your inventory system. The problem is the inventory system often shows parts and merchandise as being in stock, when none are actually available. This often means that a repair job is not finished on schedule, which really irritates your customers.
Milestone 1 Assignment Requirements
In a 5-8 page paper using APA format, please describe the following:
1. Introduction– Briefly describe the organization and business process to provide contextfor your project.
2. Business problem– Identify and describe a business problem for your project.
a. Create a flowchart of the current business process using Visio.
b. If you do not have Visio installed on your computer, you can access this application via the iLab tab in the Course Home unit.
3. Identify stakeholders– Provide a stakeholder tracking matrix based on eachstakeholder’s position and responsibilities, the level of their involvement and their importance to the project.
Example of a stakeholder matrix:
Role
Responsibilities
Level of Involvement
Importance
Project Manager
(Business)
Project Manager
(Implementation partner)
Business Analyst
Page 1 of 4
BUSN350
Role
Responsibilities
Level of Involvement
Importance
Department Manager
Work Group Supervisor
External Business Partner
SME 1
SME 2
SME 3
Level of Involvement – What level of involvement and how much time will be expected of each stakeholder?
Importance – How important is the stakeholder in the requirements elicitation process? Are they required in order to document all of the critical project requirements, or are they optional in that they can add clarity to processes that may further refine requirements?
4. Conduct elicitationusing one of the methods listed and provide the documented resultsfrom your activity in the Appendix of your paper:
Surveys – develop a set of 5-8 multiple choice questions pertaining to the business problem that will enable you to document a list of requirements for your project, administer the survey to elicit responses from 10 participants
Interviews – develop a set of 5-8 open-ended questions pertaining to the ...
Business RequirementsReference number Document ControlTawnaDelatorrejs
Business Requirements
Reference number:
Document Control
Change Record
Date
Author
Version
Change Reference
Reviewers
Name
Position
Table of Contents
2Document Control
1
Business Requirements
4
1.1
Project Overview
4
1.2
Background including current process
4
1.3
Scope
4
1.3.1
Scope of Project
4
1.3.2
Constraints and Assumptions
5
1.3.3
Risks
5
1.3.4
Scope Control
5
1.3.5
Relationship to Other Systems/Projects
5
1.3.6
Definition of Terms (if applicable)
5
1 Business Requirements
1.1 Project Overview
Provide a short, yet complete, overview of the project.
1.2 Background including current process
Describe the background to the project, (same section may be reused in the Quality Plan) include:
This project is
The project goal is to
The IT role for this project is
1.3 Scope
1.3.1 Scope of Project
The scope of this project includes a number of areas. For each area, there should be a corresponding strategy for incorporating these areas into the overall project.
Applications
In order to meet the target production date, only these applications will be implemented:
Sites
These sites are considered part of the implementation:
Process Re-engineering
Re-engineering will
Customization
Customizations will be limited to
Interfaces
the interfaces included are:
Architecture
Application and Technical Architecture will
Conversion
Only the following data and volume will be considered for conversion:
Testing
Testing will include only
Funding
Project funding is limited to
Training
Training will be
Education
Education will include
1.3.2 Constraints and Assumptions
The following constraints have been identified:
The following assumptions have been made in defining the scope, objectives and approach:
1.3.3 Risks
The following risks have been identified as possibly affecting the project during its progression:
1.3.4 Scope Control
The control of changes to the scope identified in this document will be managed through the Change Control, with business owner representative approval for any changes that affect cost or timeline for the project.
1.3.5 Relationship to Other Systems/Projects
It is the responsibility of the business unit to inform IT of other business initiatives that may impact the project. The following are known business initiatives:
1.3.6 Definition of Terms (if applicable)
List any definitions that will be used throughout the duration of the project.
5
Project Deliverable 1: Project Plan Inception
Overview
This assignment consists of two sections: a project introduction and a project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and/or assume all necessary assumptions needed for the completion of this assignment.
You are currently the Chief Information Officer (CIO) for an innovative Internet-based compa ...
PROJ 587 Creative and Effective/newtonhelp.commyblue101
For more course tutorials visit
www.newtonhelp.com
Course Project: Portfolio Management Plan
Your Professor will determine whether the Course Project is an individual or team assignment. If the project is completed as a team, your professor will assign teams promptly.
For more course tutorials visit
www.newtonhelp.com
Course Project: Portfolio Management Plan
Your Professor will determine whether the Course Project is an individual or team assignment. If the project is completed as a team,
Uop hsa 530 week 10 assignment 3 human resources planning and employee relationsBartholomee
hsa 530 week 10 assignment 3 human resources planning and employee relations new,hsa 530 week 10 discussion consultants to support hrm and the future of hrm in health care new,strayer hsa 530,hsa 530,strayer hsa 530 week 10 tutorial,hsa 530 week 10 assignment,strayer hsa 530 week 10 help
fin 486 week 2 learning team assignment department budgets new,fin 486 week 2 team assignment new,fin 486 week 2 video summary new,uop fin 486,fin 486,uop fin 486 week 2 tutorial,fin 486 week 2 assignment,uop fin 486 week 2 help
Uop fin 486 week 2 individual assignment newBartholomee
fin 486 week 2 learning team assignment department budgets new,fin 486 week 2 team assignment new,fin 486 week 2 video summary new,uop fin 486,fin 486,uop fin 486 week 2 tutorial,fin 486 week 2 assignment,uop fin 486 week 2 help
Ash eng 225 week 5 film critique final paper newBartholomee
uop eng 225 new week 5 dq 1,uop eng 225 new week 5 dq 2,uop eng 225 new week 5 film critique final paper new,uop eng 225 new week 5,uop eng 225 new week 5,uop eng 225 new,uop eng 225 new week 5 tutorial,uop eng 225 new week 5 assignment,uop eng 225 new week 5 help
Jacksonville state university em 565 finance strategy for renewable energy newBartholomee
em 565,jacksonville state university em 565,em 565 entire course new,em 565 finance strategy for renewable energy new,em 565 renewable energy new,jacksonville state university em 565 tutorials,jacksonville state university em 565 assignments,em 565 help
Ashford edu 692 week 6 final project creative teaching designing culturally r...Bartholomee
ash edu 692 week 6 discussion creativity innovation and culture,edu 692 week 6 final project creative teaching designing culturally relevant instruction,ash edu 692 week 6,edu 692 week 6,ash edu 692 discussion,edu 692 final project,ash edu 692 week 6 tutorial,ash edu 692 week 6 assignment,ash edu 692 week 6 help
Ashford edu 692 week 6 discussion creativityBartholomee
ash edu 692 week 6 discussion creativity innovation and culture,edu 692 week 6 final project creative teaching designing culturally relevant instruction,ash edu 692 week 6,edu 692 week 6,ash edu 692 discussion,edu 692 final project,ash edu 692 week 6 tutorial,ash edu 692 week 6 assignment,ash edu 692 week 6 help
Ashford edu 692 week 5 discussion 1 decisionsBartholomee
ash edu 692 week 5 assignment a case for problem based learning,edu 692 week 5 discussion 1 decisions,edu 692 week 5 discussion 1 decisions,ash edu 692 week 5,edu 692 week 5,edu 692 week 5 final paper,ash edu 692 week 5 tutorial,ash edu 692 week 5 assignment,ash edu 692 week 5 help
Ashford edu 692 week 5 assignment a case for problemBartholomee
ash edu 692 week 5 assignment a case for problem based learning,edu 692 week 5 discussion 1 decisions,edu 692 week 5 discussion 1 decisions,ash edu 692 week 5,edu 692 week 5,edu 692 week 5 final paper,ash edu 692 week 5 tutorial,ash edu 692 week 5 assignment,ash edu 692 week 5 help
eco 372 week 2 knowledge check new,eco 372 week 2 team weekly reflection economic forecasting paper new,eco 372 week 2 individual assignment product purchases and the economy new,eco 372 week 2 assignment the real economy in the long run new,eco 372 week 2 principles of economics and the data of macroeconomics new,uop eco 372,eco 372,uop eco 372 week 2 tutorial,eco 372 week 2 assignment,uop eco 372 week 2 help
The French Revolution, which began in 1789, was a period of radical social and political upheaval in France. It marked the decline of absolute monarchies, the rise of secular and democratic republics, and the eventual rise of Napoleon Bonaparte. This revolutionary period is crucial in understanding the transition from feudalism to modernity in Europe.
For more information, visit-www.vavaclasses.com
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.
Instructions for Submissions thorugh G- Classroom.pptxJheel Barad
This presentation provides a briefing on how to upload submissions and documents in Google Classroom. It was prepared as part of an orientation for new Sainik School in-service teacher trainees. As a training officer, my goal is to ensure that you are comfortable and proficient with this essential tool for managing assignments and fostering student engagement.
Synthetic Fiber Construction in lab .pptxPavel ( NSTU)
Synthetic fiber production is a fascinating and complex field that blends chemistry, engineering, and environmental science. By understanding these aspects, students can gain a comprehensive view of synthetic fiber production, its impact on society and the environment, and the potential for future innovations. Synthetic fibers play a crucial role in modern society, impacting various aspects of daily life, industry, and the environment. ynthetic fibers are integral to modern life, offering a range of benefits from cost-effectiveness and versatility to innovative applications and performance characteristics. While they pose environmental challenges, ongoing research and development aim to create more sustainable and eco-friendly alternatives. Understanding the importance of synthetic fibers helps in appreciating their role in the economy, industry, and daily life, while also emphasizing the need for sustainable practices and innovation.
The Art Pastor's Guide to Sabbath | Steve ThomasonSteve Thomason
What is the purpose of the Sabbath Law in the Torah. It is interesting to compare how the context of the law shifts from Exodus to Deuteronomy. Who gets to rest, and why?
How to Split Bills in the Odoo 17 POS ModuleCeline George
Bills have a main role in point of sale procedure. It will help to track sales, handling payments and giving receipts to customers. Bill splitting also has an important role in POS. For example, If some friends come together for dinner and if they want to divide the bill then it is possible by POS bill splitting. This slide will show how to split bills in odoo 17 POS.
Read| The latest issue of The Challenger is here! We are thrilled to announce that our school paper has qualified for the NATIONAL SCHOOLS PRESS CONFERENCE (NSPC) 2024. Thank you for your unwavering support and trust. Dive into the stories that made us stand out!
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
Stayer cis 443 week 10 term paper
1. STRAYER CIS 443 Week 10 Term Paper: Using Agile Project
Management to Implement a Complex Marketing Campaign
System NEW
Check this A+ tutorial guideline at
http://www.homeworkrank.com/cis-443-strayer/cis-443-
week-10-term-paper-using-agile-project-management-to-
implement-a-complex-marketing-campaign-system-
updated
For more classes visit
http://www.homeworkrank.com/
Term Paper: Using Agile Project Management to Implement a
Complex Marketing Campaign System
Due Week 10 and worth 200 points
This assignment consists of two (2) sections: a written project
plan, and a project plan that is created through the use of MS
Project.You must submit the two (2) sections as separate files
for the completion of this assignment. Label each file name
according to the section of the assignment it is written for.
Additionally, you may create and / or assume all necessary
assumptions needed for the completion of this assignment.
Imagine you are the project manager for a critical project for an
organization. The organization wants to implement a state of
the art real-time marketing campaign system. This system has
many components.
First, it has to get data from its front-end systems via the
middle-ware component.
Second, it has its own database system that stores the shopping
2. history, credit information, billing address and shipping
address, and so on.
Third, it has a marketing rules engine that needs to be
customized for various campaigns.
Finally, it has an analytical platform that leverages data
warehouse and analytics tools, such as SAS to test marketing
strategies and assess campaign effectiveness.
In addition, your company already has some stand-alone
applications supporting marketing campaigns and analytics.
Due to this project, your executives want IT to retire the legacy
applications as part of the project. Although your executives
plan to have this new system in production in twelve (12) to
fourteen (14) months, they want to see the results as soon as
possible, so they can enable more business capabilities, such as
real-time decisions for up-selling and cross-selling. The
executives also want to save costs by using offshore resources
even though your organization does not currently have
experience with this. Other troubles with the organization
include problems controlling the scope of projects and
inexperience to initiatives of this size. To further complicate
the situation, you are aware that some of the business
executives have had bad experiences with IT delivery in the
past and you heard numerous complains about IT projects
being late without meeting project expectations.
Section 1: Written Project Plan
Write a ten to fifteen (10-15) page paper in which you:
Suggest an Agile project management framework to the
sponsors and justify why the framework you suggested is best
suited for this project.
Develop a release plan through the use of graphical tools in
Microsoft Word or Visio, or an open source alternative such as
Dia. Note: The graphically depicted solution is not included in
the required page length.
3. Explain how to use Agile methods to scale the release plan you
developed for retiring the legacy applications.
Explain how to use Agile methods to establish the scope for the
project and determine the methods to control the scope to
ensure the business values will be delivered.
Choose at least two (2) Agile techniques to monitor this project
and explain the reasons why you chose those two (2)
techniques.
Suggest Agile strategies to develop product vision and product
architecture.
Create a diagram to show the overall systems architecture
through the use of graphical tools in Microsoft Word or Visio, or
an open source alternative such as Dia. Note: The graphically
depicted solution is not included in the required page length.
Determine the roles of the Agile project team in this project and
determine the coaching methods to build a high-performance
team.
Determine the Agile techniques to manage conflicts and
facilitate collaboration throughout the project. Provide
examples to support your response.
Explain how to set the right expectation with the business.
Take a position on whether or not offshore resources should be
used in this project and explain why or why not.
Speculate on the ethical challenges in this project and explain
how to resolve them.
Identify the key differences and speculate on the consequences
if managing / governing the same project with a traditional
waterfall project management approach instead of using Agile
strategies.
Suggest the Agile methods to control the quality of work among
the project team.
Explain how to encourage more innovative ways to accomplish
this project.
Explain how to use Agile methods to handle the documentation
4. in this project that would satisfy both short-term project needs
and long-term maintenance needs.
Use at least five (5) quality resources in this assignment. Note:
Wikipedia and similar Websites do not qualify as quality
resources.
Section 1 of your assignment must follow these formatting
requirements:
Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and
references must follow APA or school-specific format. Check
with your professor for any additional instructions.
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the
date. The cover page and the reference page are not included in
the required assignment page length.
Include charts or diagrams created in Visio or Dia. The
completed diagrams / charts must be imported into the Word
document before the paper is submitted.
Section 2: Project Plan
Use Microsoft project to:
Develop the project plan. The project plan should:
Record all tasks, subtasks, resources, and time related to the
project.
Outline the planning, analysis, design, and implementation
phases.
The specific course learning outcomes associated with this
assignment are:
Describe Agile project management methods and phases.
Describe Agile governance methods for organizational use.
Explain the leadership values in Agile environments.
Compare and contrast Agile methods with traditional project
5. management techniques.
Summarize the iterative qualities for Agile project success.
Explain the challenges and opportunities of an Agile project
leader.
Explain the role of teams in Agile settings.
Analyze the phases of the Agile Delivery Framework.
Discuss release planning attributes in Agile environments.
Discuss methods of measuring the performance and quality of
Agile projects.
Develop an Agile deployment plan that addresses and solves a
proposed business problem.
Evaluate the ethical concerns inherent in Agile project
management techniques.
Use technology and information resources to research issues in
Agile project management.
Write clearly and concisely about Agile project management
topics using proper writing mechanics and technical style
conventions.
6. management techniques.
Summarize the iterative qualities for Agile project success.
Explain the challenges and opportunities of an Agile project
leader.
Explain the role of teams in Agile settings.
Analyze the phases of the Agile Delivery Framework.
Discuss release planning attributes in Agile environments.
Discuss methods of measuring the performance and quality of
Agile projects.
Develop an Agile deployment plan that addresses and solves a
proposed business problem.
Evaluate the ethical concerns inherent in Agile project
management techniques.
Use technology and information resources to research issues in
Agile project management.
Write clearly and concisely about Agile project management
topics using proper writing mechanics and technical style
conventions.