SlideShare a Scribd company logo
Statutory
Requirements
for
Energizing
Substation
MLIP CL-XII
Why all the statutory rules to be
followed?????
– Electricity Generation, Supply and Consumption comes under the Indian Penal
Category. Hence, to generate, transmit and distribute the electrical energy
different license is required.
– Moreover, all electrical installations need to be checked by the different
government appointed authorities before its energization. This is a statutory
requirement.
– All our installation are being inspected Electrical Inspector and there officers.
Qualification for being Electrical
Inspector
– He possesses a degree in electrical engineering or its equivalent from
recognised University or Institution; and
– He has been regularly engaged for a period of at least eight years in the practice
of electrical engineering of which not less than two years have been spent in an
electrical or mechanical engineering workshop or,
– in generation or transmission or distribution of electricity, or in the
administration of the Act and these rules, in a position of responsibility.
Qualification for Officers to
assist the Electrical Inspector
– (i) He possesses a Degree in Electrical Engineering or its equivalent from a
recognized University or Institution; and (ii) He has been regularly engaged for a
period of at least three years in the practice of electrical engineering, of which not
less than one year has been spent in an electrical or mechanical engineering
workshop or in generation or transmission or distribution of electricity, or in the
administration of the Act and these rules, in a position of responsibility; Provided
that the appropriate Government may relax the requirements of experience in case
of officers otherwise well qualified.] Or
– (i) He possesses a diploma in electrical engineering or its equivalent from a
recognized institution; and (ii) He has been regularly engaged for a period of at least
six years in the practice of electrical engineering, of which not less than two years
have been spent in an electrical or mechanical engineering workshop or in
generation or transmission or distribution of electricity or in the administration of
the Act and these rules, in a position of responsibility
Vetting of Drawings and Details
– Before construction of any Substation, it is always recommended to get all the
major drawings of substation approved by Electrical Inspector viz. Equipment
Layout, Earthing Drawings, Lighting Drawings etc.
– These drawings should be submitted to EI after paying the requisite Inspection
Fees. In our case it is Rs. 400 per drawing.
– Electrical Inspector will approve these drawings with reference to Central
Electricity Authority, 2010.
– Any deviation as noted by him, will be corresponded through letter. Same shall
be incorporated in the drawing by EDRC.
Design Criteria for Selection of
Substation Land
Offering Inspection of Electrical
Installation in Sub-station
– Once the Installation is complete in all respect, it will be offered for Inspection to Electrical
Inspector.
– Following Documents need to be submitted to Electrical Inspector for offering the Inspection:
a. Job Completion Certificate duly signed by Licensed Contractor and its Supervisor.
b. Layout of Transmission Line with Pole Numbering.
c. Equipment List with requisite Inspection fees.
d. Print Out of Inspection Fees Challan.
e. Routine Test Report of all Electrical Equipment.
f. Power Supply Permission from concerned DISCOM.
Offering Inspection of Electrical
Installation in Sub-station
– Based upon submission of above docs, the Inspector will give one probable date
for Inspection of Electrical Installations.
– We have to ensure all Routine Testing Kit, Approve Drawings and Power Supply
Permission is available at site with us at the time of Inspection.
– Temporary Power supply should also be kept ready for scheme check, if EI asks.
What Electrical Inspector will
check?????
Mainly, electrical inspector will check the installations from electrical safety point of
view. During his inspection he will cover the following points mainly in
– Whether Job has been executed as per the approved drawings or, not?
– Whether all electrical clearances has been maintained as pee the IE rules or, not for
transmission line and outdoor Equipment?
– Whether transmission line are laid properly or, not using standard material as per
approved drawings and standards.
– Whether IR value of transmission line is OK, or not?
– All safety equipment are in place or, not for Transmission line viz. Danger Board, Anti
Climbing Device, Guarding in case of Road & Line crossing, Earthing etc.
What Electrical Inspector will
check?????
– As the transformer is the major equipment in SS, PI test is being recommended by EI
almost each time. Apart from this, they may ask for other routine tests of
transformer also.
– Earthing and Lightning protection will also be checked.
– In control room, EI will check for side clearance, back clearance and front clearance
of all installed panels.
– Whether proper nomenclature of panels are done or, not.
– Apart from these all safety equipment should be available at site which must include
Shock Treatment Chart, Fire Extinguisher at strategic locations, Rubber Mat, Single
Line Diagram, First Aid Kit, Insulated Hand Gloves, Equipment Layout properly
displayed at site.
Post Inspection Formalities
– After Inspection of the all installations, Electrical Inspector will give a report
about the identified observations.
– These observations need to be complied and a compliance report should be
submitted to Electrical Inspector within the scheduled time.
– Once we get the report from EI, Power supply agreement is done with DISCOM.
– Now, we have to recheck our Installations before energizing. Once it’s healthy
we can Energize the Substation.
Thank You

More Related Content

What's hot

New Electrical Safety Present2009
New Electrical Safety Present2009New Electrical Safety Present2009
New Electrical Safety Present2009Nestor Fraga
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
abbas taheri
 
Work at Height | Safety during work at hight
Work at Height | Safety during work at hightWork at Height | Safety during work at hight
Work at Height | Safety during work at hight
Gaurav Singh Rajput
 
2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards
Bryan Johnson
 
Arc flash analysis and electrical hazards
Arc flash analysis and electrical hazardsArc flash analysis and electrical hazards
Arc flash analysis and electrical hazards
VB Engineering
 
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTHLIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
Bimal Chandra Das
 
Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]
Azmeel Contracting Company
 
Electrical Safety
Electrical SafetyElectrical Safety
Electrical Safety
fairchildequipment
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
Karnav Rana
 
Basic Scaffolding Awareness
Basic Scaffolding AwarenessBasic Scaffolding Awareness
Basic Scaffolding Awareness
edale07
 
High Voltage Electrical Compliance and Safety Operating Procedures
High Voltage Electrical Compliance and Safety Operating ProceduresHigh Voltage Electrical Compliance and Safety Operating Procedures
High Voltage Electrical Compliance and Safety Operating Procedures
Living Online
 
Qualifi level 7 international diploma in occupational health and safety manag...
Qualifi level 7 international diploma in occupational health and safety manag...Qualifi level 7 international diploma in occupational health and safety manag...
Qualifi level 7 international diploma in occupational health and safety manag...
SELVAKUMARBALU1
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
Dabbroto Binoy Bhadra
 
Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design Shahab Khan
 
Electrical Hazards.pptx
Electrical Hazards.pptxElectrical Hazards.pptx
Electrical Hazards.pptx
waqasawan56
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam Atif
Wessam Atif
 
Nfpa 70 E
Nfpa 70 ENfpa 70 E
Nfpa 70 E
jboullemet
 
Safety commitee meeting
Safety commitee meetingSafety commitee meeting
Safety commitee meetingsssaravana
 
Electrical Commissioning and Arc-Flash Safety presentation
Electrical Commissioning and Arc-Flash Safety presentationElectrical Commissioning and Arc-Flash Safety presentation
Electrical Commissioning and Arc-Flash Safety presentation
Michael Luffred
 
Loto presentation
Loto presentationLoto presentation
Loto presentation
LalitSharma508
 

What's hot (20)

New Electrical Safety Present2009
New Electrical Safety Present2009New Electrical Safety Present2009
New Electrical Safety Present2009
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Work at Height | Safety during work at hight
Work at Height | Safety during work at hightWork at Height | Safety during work at hight
Work at Height | Safety during work at hight
 
2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards
 
Arc flash analysis and electrical hazards
Arc flash analysis and electrical hazardsArc flash analysis and electrical hazards
Arc flash analysis and electrical hazards
 
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTHLIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
 
Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]
 
Electrical Safety
Electrical SafetyElectrical Safety
Electrical Safety
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
Basic Scaffolding Awareness
Basic Scaffolding AwarenessBasic Scaffolding Awareness
Basic Scaffolding Awareness
 
High Voltage Electrical Compliance and Safety Operating Procedures
High Voltage Electrical Compliance and Safety Operating ProceduresHigh Voltage Electrical Compliance and Safety Operating Procedures
High Voltage Electrical Compliance and Safety Operating Procedures
 
Qualifi level 7 international diploma in occupational health and safety manag...
Qualifi level 7 international diploma in occupational health and safety manag...Qualifi level 7 international diploma in occupational health and safety manag...
Qualifi level 7 international diploma in occupational health and safety manag...
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design
 
Electrical Hazards.pptx
Electrical Hazards.pptxElectrical Hazards.pptx
Electrical Hazards.pptx
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam Atif
 
Nfpa 70 E
Nfpa 70 ENfpa 70 E
Nfpa 70 E
 
Safety commitee meeting
Safety commitee meetingSafety commitee meeting
Safety commitee meeting
 
Electrical Commissioning and Arc-Flash Safety presentation
Electrical Commissioning and Arc-Flash Safety presentationElectrical Commissioning and Arc-Flash Safety presentation
Electrical Commissioning and Arc-Flash Safety presentation
 
Loto presentation
Loto presentationLoto presentation
Loto presentation
 

Similar to Statutory requirement of charging of substation

a presenattion of PHILIPPINE ELECTRICAL CODE.pptx
a presenattion of PHILIPPINE ELECTRICAL CODE.pptxa presenattion of PHILIPPINE ELECTRICAL CODE.pptx
a presenattion of PHILIPPINE ELECTRICAL CODE.pptx
RousellAndrada
 
EICR Inspection Guide for Landlords and Tenants
EICR Inspection Guide for Landlords and TenantsEICR Inspection Guide for Landlords and Tenants
EICR Inspection Guide for Landlords and Tenants
Electric Works London
 
Final_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptx
Final_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptxFinal_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptx
Final_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptx
ssuser4bcf3b
 
Karthikeyan. ex insp cv
Karthikeyan.  ex insp cvKarthikeyan.  ex insp cv
Karthikeyan. ex insp cv
Karthi keyan
 
Commission resume
Commission resumeCommission resume
Commission resume
Manos Thangaraja
 
Understanding The Basics of EICR Testing Report and Its Codes
Understanding The Basics of EICR Testing Report and Its CodesUnderstanding The Basics of EICR Testing Report and Its Codes
Understanding The Basics of EICR Testing Report and Its Codes
Electric Works London
 
151223 CV BEN AMOR Z-Ing English .
151223 CV BEN AMOR Z-Ing English .151223 CV BEN AMOR Z-Ing English .
151223 CV BEN AMOR Z-Ing English .Zouhaier Ben Amor
 
Deputy Manager Electrical
Deputy Manager ElectricalDeputy Manager Electrical
Deputy Manager Electrical
S.Silambu Selva Siddharthan
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
Abdul Hakkim
 
Nec and oesc-8
Nec and oesc-8Nec and oesc-8
Nec and oesc-8
grantlerc
 
USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2usman ahmed
 
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
Anonymouscj7JdRbDb
 
Sespl Profile for Energy Auditing
Sespl Profile for Energy AuditingSespl Profile for Energy Auditing
Sespl Profile for Energy Auditing
Maxpromotion
 

Similar to Statutory requirement of charging of substation (20)

a presenattion of PHILIPPINE ELECTRICAL CODE.pptx
a presenattion of PHILIPPINE ELECTRICAL CODE.pptxa presenattion of PHILIPPINE ELECTRICAL CODE.pptx
a presenattion of PHILIPPINE ELECTRICAL CODE.pptx
 
EICR Inspection Guide for Landlords and Tenants
EICR Inspection Guide for Landlords and TenantsEICR Inspection Guide for Landlords and Tenants
EICR Inspection Guide for Landlords and Tenants
 
Final_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptx
Final_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptxFinal_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptx
Final_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptx
 
Irfan - Elec Engr
Irfan - Elec EngrIrfan - Elec Engr
Irfan - Elec Engr
 
Karthikeyan. ex insp cv
Karthikeyan.  ex insp cvKarthikeyan.  ex insp cv
Karthikeyan. ex insp cv
 
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
 
Commission resume
Commission resumeCommission resume
Commission resume
 
Understanding The Basics of EICR Testing Report and Its Codes
Understanding The Basics of EICR Testing Report and Its CodesUnderstanding The Basics of EICR Testing Report and Its Codes
Understanding The Basics of EICR Testing Report and Its Codes
 
CV Electrical Technician
CV Electrical TechnicianCV Electrical Technician
CV Electrical Technician
 
151223 CV BEN AMOR Z-Ing English .
151223 CV BEN AMOR Z-Ing English .151223 CV BEN AMOR Z-Ing English .
151223 CV BEN AMOR Z-Ing English .
 
Alaa QA-QC last Applicant CV-2
Alaa QA-QC  last Applicant CV-2Alaa QA-QC  last Applicant CV-2
Alaa QA-QC last Applicant CV-2
 
Deputy Manager Electrical
Deputy Manager ElectricalDeputy Manager Electrical
Deputy Manager Electrical
 
RESUME - Copy
RESUME - CopyRESUME - Copy
RESUME - Copy
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
 
R Venkatesan
R VenkatesanR Venkatesan
R Venkatesan
 
Eng Kamran zfp
Eng Kamran zfpEng Kamran zfp
Eng Kamran zfp
 
Nec and oesc-8
Nec and oesc-8Nec and oesc-8
Nec and oesc-8
 
USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2
 
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
 
Sespl Profile for Energy Auditing
Sespl Profile for Energy AuditingSespl Profile for Energy Auditing
Sespl Profile for Energy Auditing
 

Recently uploaded

The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Product School
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
Quantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIsQuantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIs
Vlad Stirbu
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
DianaGray10
 
Welocme to ViralQR, your best QR code generator.
Welocme to ViralQR, your best QR code generator.Welocme to ViralQR, your best QR code generator.
Welocme to ViralQR, your best QR code generator.
ViralQR
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
Product School
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
ControlCase
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
mikeeftimakis1
 
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptxSecstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
nkrafacyberclub
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
OnBoard
 
Free Complete Python - A step towards Data Science
Free Complete Python - A step towards Data ScienceFree Complete Python - A step towards Data Science
Free Complete Python - A step towards Data Science
RinaMondal9
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
Dorra BARTAGUIZ
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
UiPathCommunity
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 

Recently uploaded (20)

The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
Quantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIsQuantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIs
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
Welocme to ViralQR, your best QR code generator.
Welocme to ViralQR, your best QR code generator.Welocme to ViralQR, your best QR code generator.
Welocme to ViralQR, your best QR code generator.
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
 
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptxSecstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
 
Free Complete Python - A step towards Data Science
Free Complete Python - A step towards Data ScienceFree Complete Python - A step towards Data Science
Free Complete Python - A step towards Data Science
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 

Statutory requirement of charging of substation

  • 2. Why all the statutory rules to be followed????? – Electricity Generation, Supply and Consumption comes under the Indian Penal Category. Hence, to generate, transmit and distribute the electrical energy different license is required. – Moreover, all electrical installations need to be checked by the different government appointed authorities before its energization. This is a statutory requirement. – All our installation are being inspected Electrical Inspector and there officers.
  • 3. Qualification for being Electrical Inspector – He possesses a degree in electrical engineering or its equivalent from recognised University or Institution; and – He has been regularly engaged for a period of at least eight years in the practice of electrical engineering of which not less than two years have been spent in an electrical or mechanical engineering workshop or, – in generation or transmission or distribution of electricity, or in the administration of the Act and these rules, in a position of responsibility.
  • 4. Qualification for Officers to assist the Electrical Inspector – (i) He possesses a Degree in Electrical Engineering or its equivalent from a recognized University or Institution; and (ii) He has been regularly engaged for a period of at least three years in the practice of electrical engineering, of which not less than one year has been spent in an electrical or mechanical engineering workshop or in generation or transmission or distribution of electricity, or in the administration of the Act and these rules, in a position of responsibility; Provided that the appropriate Government may relax the requirements of experience in case of officers otherwise well qualified.] Or – (i) He possesses a diploma in electrical engineering or its equivalent from a recognized institution; and (ii) He has been regularly engaged for a period of at least six years in the practice of electrical engineering, of which not less than two years have been spent in an electrical or mechanical engineering workshop or in generation or transmission or distribution of electricity or in the administration of the Act and these rules, in a position of responsibility
  • 5. Vetting of Drawings and Details – Before construction of any Substation, it is always recommended to get all the major drawings of substation approved by Electrical Inspector viz. Equipment Layout, Earthing Drawings, Lighting Drawings etc. – These drawings should be submitted to EI after paying the requisite Inspection Fees. In our case it is Rs. 400 per drawing. – Electrical Inspector will approve these drawings with reference to Central Electricity Authority, 2010. – Any deviation as noted by him, will be corresponded through letter. Same shall be incorporated in the drawing by EDRC.
  • 6. Design Criteria for Selection of Substation Land
  • 7. Offering Inspection of Electrical Installation in Sub-station – Once the Installation is complete in all respect, it will be offered for Inspection to Electrical Inspector. – Following Documents need to be submitted to Electrical Inspector for offering the Inspection: a. Job Completion Certificate duly signed by Licensed Contractor and its Supervisor. b. Layout of Transmission Line with Pole Numbering. c. Equipment List with requisite Inspection fees. d. Print Out of Inspection Fees Challan. e. Routine Test Report of all Electrical Equipment. f. Power Supply Permission from concerned DISCOM.
  • 8. Offering Inspection of Electrical Installation in Sub-station – Based upon submission of above docs, the Inspector will give one probable date for Inspection of Electrical Installations. – We have to ensure all Routine Testing Kit, Approve Drawings and Power Supply Permission is available at site with us at the time of Inspection. – Temporary Power supply should also be kept ready for scheme check, if EI asks.
  • 9. What Electrical Inspector will check????? Mainly, electrical inspector will check the installations from electrical safety point of view. During his inspection he will cover the following points mainly in – Whether Job has been executed as per the approved drawings or, not? – Whether all electrical clearances has been maintained as pee the IE rules or, not for transmission line and outdoor Equipment? – Whether transmission line are laid properly or, not using standard material as per approved drawings and standards. – Whether IR value of transmission line is OK, or not? – All safety equipment are in place or, not for Transmission line viz. Danger Board, Anti Climbing Device, Guarding in case of Road & Line crossing, Earthing etc.
  • 10. What Electrical Inspector will check????? – As the transformer is the major equipment in SS, PI test is being recommended by EI almost each time. Apart from this, they may ask for other routine tests of transformer also. – Earthing and Lightning protection will also be checked. – In control room, EI will check for side clearance, back clearance and front clearance of all installed panels. – Whether proper nomenclature of panels are done or, not. – Apart from these all safety equipment should be available at site which must include Shock Treatment Chart, Fire Extinguisher at strategic locations, Rubber Mat, Single Line Diagram, First Aid Kit, Insulated Hand Gloves, Equipment Layout properly displayed at site.
  • 11. Post Inspection Formalities – After Inspection of the all installations, Electrical Inspector will give a report about the identified observations. – These observations need to be complied and a compliance report should be submitted to Electrical Inspector within the scheduled time. – Once we get the report from EI, Power supply agreement is done with DISCOM. – Now, we have to recheck our Installations before energizing. Once it’s healthy we can Energize the Substation.