The document contains 15 sheets of architectural drawings measuring and documenting the State Chinese Penang Association building. It includes floor plans, elevations, sections and schedules for the ground, first, and roof levels. Dimensioned plans show room layouts, wall configurations, doors, and other building elements. Elevations depict the building exterior from multiple views and angles. Sections cut through the building to reveal structural and material details.
A planar truss is the one whose all members lies in a single plane. If a plane truss does not change its shape when loaded then it is known as Rigid Planar Truss. Copy the link given below and paste it in new browser window to get more information on Planar Truss:- http://www.transtutors.com/homework-help/civil-engineering/planar-truss/
Unitech Karma Lakelands is a residential project from Unitech and located on Sector 80 Gurgaon. To know more Call +91 8470930121 ABC Buildcon PVT LTD
Project Site: http://www.abcbuildcon.in/projects/unitech-karma-lakelands
A planar truss is the one whose all members lies in a single plane. If a plane truss does not change its shape when loaded then it is known as Rigid Planar Truss. Copy the link given below and paste it in new browser window to get more information on Planar Truss:- http://www.transtutors.com/homework-help/civil-engineering/planar-truss/
Unitech Karma Lakelands is a residential project from Unitech and located on Sector 80 Gurgaon. To know more Call +91 8470930121 ABC Buildcon PVT LTD
Project Site: http://www.abcbuildcon.in/projects/unitech-karma-lakelands
Architectural design, designing university libraryVaishnavi R
In my Sem 7 design portfolio, I present a vision for university libraries that transcends mere functionality, aiming instead to create vibrant spaces that resonate with students. I embarked on this project with the ambition of transforming traditional library environments into dynamic hubs of collaboration and inspiration. Throughout the design process, I grappled with the challenge of modernizing these spaces to meet the diverse needs of today's learners. By strategically integrating collaborative zones, quiet study areas, cutting-edge technology, and adaptable spaces, I sought to prioritize student well-being and flexibility. This portfolio encapsulates the culmination of my efforts, reflecting a deeply personal commitment to revitalizing university libraries as centers of learning and community. Join me on this journey of innovation and reimagination, where every element is carefully crafted to inspire curiosity and lifelong discovery.
Resort design , architectural projects, Hand drawnKrushnaDhokale
This is my Second yr. hand drawn architectural design project bit incomplete but quite interesting also....there is Golden ratio(Fibonacci Spiral) concept for Resort design project at Trimbakeshwar, Nashik.✌️
and...Thanks to my project guides.
Total site area : 6500 sq.m
#S.B.Patil college of Architecture and Design,Pune
#Krushna B. Dhokale
#SBPCOAD
@sbpcoad
@sbpatilarchitecture
#sbpatilarchitecture
Safalta Digital marketing institute in Noida, provide complete applications that encompass a huge range of virtual advertising and marketing additives, which includes search engine optimization, virtual communication advertising, pay-per-click on marketing, content material advertising, internet analytics, and greater. These university courses are designed for students who possess a comprehensive understanding of virtual marketing strategies and attributes.Safalta Digital Marketing Institute in Noida is a first choice for young individuals or students who are looking to start their careers in the field of digital advertising. The institute gives specialized courses designed and certification.
for beginners, providing thorough training in areas such as SEO, digital communication marketing, and PPC training in Noida. After finishing the program, students receive the certifications recognised by top different universitie, setting a strong foundation for a successful career in digital marketing.
Introduction to AI for Nonprofits with Tapp NetworkTechSoup
Dive into the world of AI! Experts Jon Hill and Tareq Monaur will guide you through AI's role in enhancing nonprofit websites and basic marketing strategies, making it easy to understand and apply.
A Strategic Approach: GenAI in EducationPeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
Normal Labour/ Stages of Labour/ Mechanism of LabourWasim Ak
Normal labor is also termed spontaneous labor, defined as the natural physiological process through which the fetus, placenta, and membranes are expelled from the uterus through the birth canal at term (37 to 42 weeks
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
Francesca Gottschalk - How can education support child empowerment.pptxEduSkills OECD
Francesca Gottschalk from the OECD’s Centre for Educational Research and Innovation presents at the Ask an Expert Webinar: How can education support child empowerment?
Biological screening of herbal drugs: Introduction and Need for
Phyto-Pharmacological Screening, New Strategies for evaluating
Natural Products, In vitro evaluation techniques for Antioxidants, Antimicrobial and Anticancer drugs. In vivo evaluation techniques
for Anti-inflammatory, Antiulcer, Anticancer, Wound healing, Antidiabetic, Hepatoprotective, Cardio protective, Diuretics and
Antifertility, Toxicity studies as per OECD guidelines
How to Make a Field invisible in Odoo 17Celine George
It is possible to hide or invisible some fields in odoo. Commonly using “invisible” attribute in the field definition to invisible the fields. This slide will show how to make a field invisible in odoo 17.
State Chinese Penang Association - Measured Drawings
1. DP380
UP
102313141516171819202122
132456798
1112
DRYKITCHEN
(DAPUH)
GROUND FLOOR PLAN
SCALE 1 : 50
33
9
1 : 50
CALVIN SUAH, EUNICE CHAN
GROUND FLOOR PLAN
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
WITH TILES FINISH
PARQUET MOSAICMOSAIC
CLAY TILES
0 52.5
METERS
0.5 1 1.5 2
3. 1A 3A 4A 5A 6A 6B 7A 7B1B
B
C
D
E
F
A
G
H
I
J
K
L
E
D
C
F
E'
A
F'
C'
D'
B
A' B'
1 42 3 6 7 8
ROOF FRAMING PLAN
SCALE 1 : 100
33
11
1 : 100
LANCELOT TING
ROOF FRAMING PLAN
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
0 5 101 2 3 4
METERS
4. GROUND LINE
CEILING LEVEL
GROUND FLOOR FINISH
BOUNDARY WALL
RIDGE
GRILLE OF PATIO
WET KITCHENDRY KITCHEN
RESTAURANT
RIDGE
DIAMOND SHAPED AIR VENT
FIRST FLOOR FINISH
ROOF LEVEL
B.L
PATIO
RESTAURANT CANOPY
V-SHAPED TILESTIMBER LOUVERSPEDIMENT
346437063599
1234678 5
MAIN BUILDING EXTENSION
FRONT ELEVATION
SCALE 1 : 75
33
12
1 : 75
JIA HUI SIM
FRONT ELEVATION
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
0 7.5
METERS
3.75
5. BACK DOOR
BOUNDARY WALL
STORAGE AIR VENTPASSAGE TO THE FRONT YARD
VOID
380
GROUND LINE
3464
CEILING LEVEL
3620
GROUND FLOOR FINISH
FIRST FLOOR FINISH
ROOF LEVEL
3599
B.L
1A 3A 4A 5A 6A 6B 7A 7B1B
EXTENSION MAIN BUILDING
BACK ELEVATION
SCALE 1 : 75
33
13
1 : 75
JIA HUI SIM
BACK ELEVATION
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
0 7.5
METERS
3.75
6. C D E FA G H I
PEDIMENT RIDGE
FLORA PATTERN AIR VENT
V-SHAPED TILES
CEILING LEVEL
3464
GROUND LINE
3620
ROOF LEVEL
380
GROUND FLOOR FINISH
FIRST FLOOR FINISH
3599
METAL FASCIA
JKLB
DAPUH
(DRY KITCHEN)
MAIN BUILDING EXTENSION
LEFT ELEVATION
SCALE 1 : 75
33
14
1 : 75
JIA HUI SIM
LEFT ELEVATION
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
0 7.5
METERS
3.75
7. BCDEF AGHI
RIDGE V-SHAPED TILES
FLORA PATTERN AIR VENTDIAMOND SHAPED AIR VENTINTER COURTYARD
PEDIMENT
CURVE WALL
3599
GROUND LINE
34643620
ROUND TRANSOM
METAL FASCIA
CEILING LEVEL
GROUND FLOOR FINISH
ROOF LEVEL
FIRST FLOOR FINISH
J K L
MAIN BUILDING
RIGHT ELEVATION
SCALE 1 : 75
33
15
1 : 75
JIA HUI SIM
RIGHT ELEVATION
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
0 7.5
METERS
3.75
8. SECTION A - A'
33
16
SCALE 1 : 75
1 : 75
PEI KEI TANG
SECTION DRAWINGS
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
SECTION A - A'
0 7.5
METERS
3.75
9. 33
17
1 : 75
PEI KEI TANG
SECTION DRAWINGS
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
SECTION B - B'
0 7.5
METERS
3.75
SECTION B - B'
SCALE 1 : 75
10. (TIA)
MAIN HALL
(TIA)
MAIN HALL
LIBRARY MEETING ROOM
CORRIDOR
380
346437063599
1234678 5
VERANDAH VERANDAH
CHIWAN
(WC) CHIWAN
(WC)
CEILING LEVEL
GROUND FLOOR FINISH
FIRST FLOOR FINISH
ROOF LEVEL
COLLAR TIE
GYPSUM CEILING PANELS
KING POST
TILE BATTEN
ROOF FLASHING
UNDER PURLIN
RAFTER
GROUND LINE
SECTION C - C'
33
18
SCALE 1 : 75
1 : 75
PEI KEI TANG
SECTION DRAWINGS
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
SECTION C - C'
0 7.5
METERS
3.75
11. COLLAR TIE
GYPSUM CEILING PANELS
KING POST
TILE BATTEN
380
346437063599
8765321 4
ROOF FLASHING
UNDER PURLIN
RAFTER
ANCESTOR ALTAR
CEILING LEVEL
GROUND FLOOR FINISH
FIRST FLOOR FINISH
ROOF LEVEL
GROUND LINE
VERANDAH
MAIN HALL
CORRIDOR
CHI WAN
MEETING ROOM
LIBRARY
CHI WAN
VERANDAH
SECTION D - D'
33
19
SCALE 1 : 75
1 : 75
PEI KEI TANG
SECTION DRAWINGS
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
SECTION D - D'
0 7.5
METERS
3.75
12. 380346437063599
1234678 5
COLLAR TIE
GYPSUM CEILING PANELS
KING POST
TILE BATTEN
ROOF FLASHING
UNDER PURLIN
RAFTER
CEILING LEVEL
GROUND FLOOR FINISH
FIRST FLOOR FINISH
ROOF LEVEL
GROUND LINE
CORRIDORVERANDAH
CORRIDORSECRETARY ROOM
33
20
1 : 75
PEI KEI TANG, KHAI JHUNG LOH
SECTION DRAWINGS
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
SECTION E - E'
0 7.5
METERS
3.75
SECTION E - E'
SCALE 1 : 75
13. RIDGE
PATIO
ACTIVITY ROOM
INTERIOR COURTYARD
338436173599
3A 4A 5A 6A 6B 7A 7B
TIMBER LOUVERS
TOP PLATES
TILE BATTEN
DOUBLE HOWE TRUSS
GYPSUM CEILING PANELS
CEILING LEVEL
GROUND FLOOR FINISH
FIRST FLOOR FINISH
ROOF LEVEL
GROUND LINE
(CHIM CHAE)
SECTION F - F'
33
21
SCALE 1 : 75
1 : 75
PEI KEI TANG
SECTION DRAWINGS
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
SECTION F - F'
0 7.5
METERS
3.75
14. D9
GLASS
BLOCK
W2
W2
WASHROOM INTERIOR ELEVATION
SCALE 1 : 25
BALCONY INTERIOR ELEVATION
SCALE 1 : 25
ACTIVITY ROOM INTERIOR ELEVATION
SCALE 1 : 25
33
22
1 : 25
KHAI JHUNG LOH, NICHOLAS LEE, EUNICE CHAN
INTERIOR ELEVATION
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
0 2.5
METERS
1.25
16. 3273
877
877
767
3273
877
200617901220620
1065
950
2860
950
1065
1065
2860
11804300
611
1131
STATED IN GROUND FLOOR PLAN
1292
1292
611
8401345
3565
2770
2770
2630
2770
3565
33
24
1 : 50
CALVIN SUAH, CHI MUN LAI, EUNICE CHAN
DOORS SCHEDULE
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
DOOR 9
SCALE 1 : 50
DOOR 6
SCALE 1 : 50
DOOR 10
SCALE 1 : 50
DOOR 3
SCALE 1 : 50
D
9
D
D
3
D
D
10
D
0 5
METERS
2.51.50.5 1 2
D
6
D
17. 3040
3037
3037
2847
3037
3040
1540
340
340
340
2790
2820
2720
2450
2720
2820
2820
2450
500
500
500
9601520
2420
3270
STATED IN GROUND FLOOR PLAN
548861861
383
STATED IN GROUND FLOOR PLAN
2075
1020
1020
2075
2306
1533
2306
1533
33
25
1 : 50
CALVIN SUAH, CHI MUN LAI, EUNICE CHAN
DOORS SCHEDULE
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
DOOR 7
SCALE 1 : 50
DOOR 8
SCALE 1 : 50
GRILLE 1
SCALE 1 : 50
GRILLE 2
SCALE 1 : 50
D
7
D
D
8 0 5
METERS
2.51.50.5 1 2
19. IRONY CARVING
2770
3565
3565
2770
DOOR HEAD JAMB
WHEEL
ALUMINUM TRACK
PIVOT
OVERALL
WALL
THICKNESS
TRACK MOUNTING
TRIM
BOTTOM PIVOT
FLOOR
FINISH
DOOR THICKNESS
SCALE 1:20
SCALE 1:20
3273
877
HEAD JAMB
PANEL
MIDDLE RAIL
DOOR KNOBS
3273
2250
1247
40
50
154
SHANK
KNOB
ROSE
15
64" DIAMETER MOUNTING HOLES
64.5
35
877
ADJUSTMENT SET SCREW
FACES UP FOR TOP HINGE,
DOWN FOR BOTTOM HINGE
TRIM
STOP
FRAME
DOOR 7
DOOR 7 DETAILSDOOR 4 DETAILS
DOOR 4
1 : 40
CALVIN SUAH, CHI MUN LAI, JIA HUI SIM
DETAILED DRAWINGS
( DOORS )
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
33
27
SCALE 1 : 40
SCALE 1 : 40
SCALE 1 : 40
SCALE 1 : 40
D
7
D
4
D
7
D
4
0 4
METERS
2
SCALE 1 : 1
SCALE 1 : 1
SCALE 1 : 1
SCALE 1 : 1
20. 1215
1904
1215
FRAME
FACING BOARD
LINTEL
INTERIOR SILL
PLASTER BOARD
GLASS DIVIDER
GLASS
1904
GLASS PATTERN
4090
2030
4090
2030
COVER SLEEVES
LOUVERS
DIVIDER
BOLT
GLASS WINDOW
WINDOW 5
WINDOW 5 DETAILSWINDOW 3 DETAILS
WINDOW 3
33
28
1 : 40
CALVIN SUAH, CHI MUN LAI, EUNICE CHAN
DETAILED DRAWINGS
( WINDOWS )
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
SCALE 1 : 40
SCALE 1 : 40SCALE 1 : 40
SCALE 1 : 40
0 4
METERS
2
21. 500
2551
7507
430
194
526383
57
1385
269
33
29
AS STATED
JIA HUI SIM, JIA YI LAI
DETAILED DRAWINGS
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
( PEDIMENT )
PEDIMENT SECTIONPEDIMENT ELEVATION
SCALE 1 : 20SCALE 1 : 20
PEDIMENT PLAN
SCALE 1 : 20
CORNICE
FRIEZE
ARCHITRAVE
CAPITAL
CORNICE
FLORA AIR VENT
PEDIMENT AXONOMETRIC
SCALE 1 : 30
0 2
METERS
10 3
METERS
1.5
22. 200
200
200
200
200
200
200
200
157
158
53
53
157
158
33
30
AS STATED
LOH KHAI JHUNG, EUNICE CHAN
DETAILED DRAWINGS
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
( TILES AND GLASS )
SCALE 1 : 5
SCALE 1 : 5
SCALE 1 : 1
SCALE 1 : 5
SCALE 1 : 5
SCALE 1 : 5
CORRIDOR FLOOR TILES
CHIWAN WALL TILES
WINDOWS' GLASS PATTERN
0 0.5
METERS
0.25
23. TREAD
STRINGER
RISER
NEWEL
SMALL COLUMNS
TREAD
STORAGE
LANDING
JOISTS
FIRST FLOOR SLAB
GRILLE WORK
SECURITY DOOR
3795
13312464
14142365
3587
2468
11101108
STRINGER
WEDGE
RISER
TREAD
195180460240
STAIRCASE SECTION
SCALE 1 : 20
NEWEL DETAILS
SCALE 1 : 10
33
31
AS STATED
KHAI JHUNG LOH, CHI MUN LAI
CONSTRUCTION DETAILS
( STAIRCASE )
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
STAIRCASE PLAN
SCALE 1 : 20
STAIRCASE DETAIL
SCALE 1 : 10
0 1
METERS
0.50 2
METERS
1
24. FLASHING
PURLINS
RIDGE BOARD
ROOF TILES
RAFTER
FLASHING
WOODEN PURLINS
ROOF TILES
WOODEN RAFTER
RIDGE BOARD
COLLAR TIE
UNDER PURLINS
HANGER
UNDER PURLINS
KING POST
COLLAR TIE
HANGER
STRUT
EXTERNAL WALL PANEL
PURLINS
RAFTER
WALL PLATE
STUD
SILL PLATE
BRICK WALL
NOGGIN
EXTERNAL WALL PANEL
STUD
WOODEN WALL PLATE
WOODEN PURLINS
WOODEN RAFTER
WOODEN SILL PLATE
BRICK WALL
CEILING JOIST
ROOF STRUCTURES
WALLS TO ROOF CONNECTIONS
33
32
1 : 20
KHAI JHUNG LOH, FARAH AKMAL
CONSTRUCTION DETAILS
( ROOF )
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
SCALE 1 : 20
SCALE 1 : 20
0 2
METERS
1
25. 33
33
1 : 150
LAI JIA YI , LAI CHI MUNDRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERSAXONOMETRIC DRAWING
AXONOMETRIC DRAWING
SCALE 1 : 150
26. KAMPUNG
MAKAM
TAMAN
JESSELTON
HEIGHT
TAMAN
LUMBA
KUDA
TAMAN
RAMPAS
TAMAN
BERJAYA
GEORGE
TOWN
JELUTONG KAMPUNG
RAWA
TAMAN
LALULINTAS
LITTLE
INDIA
GURNEY SEA
PROPOSED SITE
ISLAND HOSPITAL
PUSAT KECEMERLANGAN
SUKAN WESTLAND
CHINESE RECREATION
CLUB PENANG
KOAY TENG HAI
SERVICE CENTRE
MEDICAL CENTER
CRC FIELD
PROPOSED SITE
CHINESERECREA
JALAN PERAK
PARKING
PATIO
PARKING
SITE PLAN
33
1
SCALE 1 : 150
LOCATION PLAN
SCALE 1 : 2500
KEY PLAN
SCALE 1 : 20000
AS STATED
LOH KHAI JHUNG
KEY PLAN, LOCATION PLAN,
SITE PLAN
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
27. G.L.
33
2
1 : 100
JIA HUI SIM
SITE ELEVATION
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
0 5 101 2 3 4
METERS
SITE ELEVATION
SCALE 1 : 100
28. C D E FA G H I
FENGSHUI BAMBOOS
J KL
PORTE COCHERE
(PORCH)
BALCONY KAKI LIMA
(CORRIDOR)
(MAIN HALL)
TIA (WC)
CHI WAN BOUNDRY WALL
(INTERIOR COURTYARD)
CHIM CHAE
B
33
3
1 : 100
JIA HUI SIM
SITE SECTION
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
0 5 101 2 3 4
METERS
SITE SECTION
SCALE 1 : 100
29. VERANDAH
A
C
D
E
G
F
H
1 2 3 4 6 7 85
B
A' B'
C
D
E E'
F F'
CH
DP 380
DP 380
DP 380
SFL = +0.15
C'
D'
FFL = +0.38
-TF
3205mm
132 sqm
MF -
3205mmCH
5.3 sqm
FFL = +0.38
VERANDAH
-
REST
ROOM
CH 3205mm
MF
6.1 sqm
FFL = +0.38
SFL = +0.15
-
STAIR
UP
10
GL = +0.065GL = +0.065
23 13141516171819202122
1 32 4 5 6 7 98
1112
FFL = +0.38
SFL = +0.15
CH
MF -
27.4 sqm
3205mm
D
1
D
D
5
D
1
D
5
D
1
D
4
RESTAURANT
(WET KITCHEN)
D
12
TIA
GL = +0.075
PORTE COCHERE
(MAIN HALL)
(CORRIDOR)
KAKI LIMA
D
10
A
B
DP 380
DP 380
DP 380 DP 380
DP 380 DP 380
DP 380
CH
SFL = +0.15
FFL = +0.38
-CF
3205mm
31.2 sqm
CHI WANCHI WAN
D
2
D
2
I
J
K
L
78 sqm
CF -
3560mmCH
GL = +0.055
-
PATIO
DP 50 DP 50
THIA GELAP
(ACTIVITY ROOM)
CH
SFL = +0.15
FFL = +0.38
-MZ
3205mm
66.2 sqm
RESTRICTED
AREA
(DAPUH)
CHIM CHAE
FFL = -0.015
CFMF
CH 3074mm
58.4 sqm
-
(COURTYARD)
1A 3A 4A 5A 6A 6B 7A 7B1B
(WC) (WC)
(PORCH)
DP 380
D
1
D
1
D
2
D
2
D
2
D
2
D
2
D
2
D
2
D
2
D
3
D
3
DAPUH
(DRY KITCHEN)
DAPUH
GL = +0.0
GROUND FLOOR PLAN
SCALE 1 : 100
33
4
1 : 100
LANCELOT TING
GROUND FLOOR PLAN
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
0 5 101 2 3 4
METERS
30. 1 2 3 4 6 7 8
OFFICE
DP
1223
A B
A' B'
C
D
E E'
F
C'
D'
TF -
3120 mmCH
30 sqm
FFL = +3.38
SFL = +0.15
MF -
3120 mmCH
FFL = +3.38
6.2 sqm
-
LIBRARY
(WC)
TF -
3120 mmCH
FFL = +3.38
SFL = +0.15
44.4 sqm
MF -
3120 mmCH
FFL = +3.38
6.2 sqm
-
TF -
3120 mmCH
FFL = +3.38
-
OFFICE
28.5 sqm
TF -
3120 mmCH
FFL = +3.38
12 sqm
SFL = +0.15
13141516171819202122 10
987654321
STAIR
MF -
3120 mmCH
FFL = +3.38
6.2 sqm
-
MF -
3120 mmCH
FFL = +3.38
6.2 sqm
-
D
9
D
9
D
9
WC
B
C
D
E
F
A
(CHI WAN)
WC
(CHI WAN)
D
11
G
H
MEETING ROOM
TF -
3120 mmCH
FFL = +3.38
55 sqm
SFL = +0.15
BALCONY
MF -
3621mmCH
26.7 sqm
FFL = +3.38
SFL = +0.15
D
9
I
J
K
L
1A 3A 4A 5A 6A 6B 7A 7B1B
CHI WAN
(WC)
CHI WAN
D
6
D
6
D
6 D
7
D
6
D
6
D
7
D
8
DP 50
DP 50 DP 50
DP 50
(CORRIDOR)
KAKI LIMA
F
DP 20
DP 20
DP 20
DP 20
33
5
1 : 100
LANCELOT TING
FIRST FLOOR PLAN
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
0 5 101 2 3 4
METERS
FIRST FLOOR PLAN
SCALE 1 : 100
31. 1 42 3 6 7 8
B
C
D
E
F
A
C'
J
H
G
E
C
F'
E'
A
D'D
F
B
I
L
K
A' B'
1A 3A 4A 5A 6A 6B 7A 7B1B
ROOF PLAN
SCALE 1 : 100
33
6
1 : 100
LANCELOT TING
ROOF PLAN
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
0 5 101 2 3 4
METERS
32. 1 2 3 4 6 7 8
A B
C
D
E E'
F F'
C'
D'
B
C
D
E
F
A
G
H
I
J
K
L
2' X 4' FLUORESCENT LIGHT FIXTURES
1' X 4' FLUORESCENT LIGHT FIXTURES
CEILING FAN
DISCO BALL
MOUNTED INCANDESCENT FIXTURES
CEILING PLAN LEGEND
EMERGENCY CEILING LIGHT
A' B'
1A 4A 5A 6A 6B 7A 7B FIRST FLOOR CEILING PLAN
SCALE 1 : 100
33
8
1 : 100
PEI KEI TANG
FIRST FLOOR
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
CEILING PLAN
0 5 101 2 3 4
METERS
33. A
C
D
E
G
F
H
1 2 3 4 6 7 85
B
A' B'
C
D
E E'
F F'
C'
D'
A
B
I
J
K
L
NO PERMISSION GRANTED
TO ACCESS THE INTERIOR
SPACE
2' X 4' FLUORESCENT LIGHT FIXTURES
1' X 4' FLUORESCENT LIGHT FIXTURES
CEILING FAN
DISCO BALL
MOUNTED INCANDESCENT FIXTURES
CEILING PLAN LEGEND
EMERGENCY CEILING LIGHT
1A 3A 4A 5A 6A 6B 7A 7B1B GROUND FLOOR CEILING PLAN
SCALE 1 : 100
33
7
1 : 100
PEI KEI TANG
GROUND FLOOR
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
CEILING PLAN
0 5 101 2 3 4
METERS