This document contains a list of 40 drawings related to the documentation and measured drawings of Lian Huat Company located at 140 Lebuh Carnarvon in Georgetown, Penang. The drawings include key plans, site plans, floor plans, elevations, sections, schedules, and details. Each drawing is given a reference number and title to identify the content and viewpoint depicted. A legend at the bottom of some sheets provides further information about materials, scales, and other notes.
Touraride Penang Downinig Street to London.Iran Turkey & GreeceTimothy Wooi
IT WAS a dream accomplished on a road least travelled, using motorbikes least thought off, with the least budget and crossing terrain least desirable.
Touraride Penang Downinig Street to London covering Iran Turkey & Greece
That is how three Penangites who straddled humble 125cc motorcycles described their journey from Downing Street in George Town to Downing Street in London.
They announced on their Facebook page that they arrived yesterday at 1.45am Malaysian time (6.45pm in London) after travelling four months, 11 days, eight hours and 45 minutes.
Touraride Downing Street Penang to Downing Street London on Honda Wave 125Timothy Wooi
The idea to ride from Downing Street Penang to Downing Street London started when Mr Lim Bak Kau (former Penang BMW Motorad Manager) wanted to full fill his dream by riding to the UK. He gathered few of his Biker friends at Touratech Rangoon Street and invited me to attend the meeting where he shared his dream. A group of only 5 friends were present and Mr Lim shared why a small capacity Motorbike, the Honda Wave 125cc was decided as the Bike to cover about 45,000 kilometers trotting over 14 countries.2 weeks later after the meeting, Mr Ding & his wife Wong shown interest to do the trip and we started to plan where Mr Ding did all the route & logistic planning. We became serious a month after that and responsibilities were assaigned to individual Riders and the team grew to eight.
Here is the almost final route prepared by our logistic Specialist,Mr Ding Bee Sin.
Touraride Penang Downing St. to London.Malaysia,Thailand & India. 9thMay2015Timothy Wooi
A brief Pictorial record of our epic Bike trip from Downing Street Penang to Downing Street London covering 24 Countries,18,290 KM, 4Mth 11days & 6 3/4 hrs
IT WAS a dream accomplished on a road least travelled, using motorbikes least thought off, with the least budget and crossing terrain least desirable.
That is how three Penangites who straddled humble 125cc motorcycles described their journey from Downing Street in George Town to Downing Street in London.
They announced on their Facebook page that they arrived yesterday at 1.45am Malaysian time (6.45pm in London) after travelling four months, 11 days, eight hours and 45 minutes.
“Total land distance rolled over was 18,290km, burning 365.8 litres of petrol ranging from RON80 to RON96 with a total fuel cost of RM1,825,” the team’s tech man Timothy Wooi added on their facebook page. https://www.facebook.com/Touraride-Downing-St-Penang-to-Downing-St-London-392640874248837/
An interior designing thesis on -Sustainable Interior with recyclable materialsAmrutaVaishampayan1
Hello there, this is my final year thesis while I was studying in Rachana Sansad- Academy of Architecture. Please leave a comment if you find this useful. Thank you.
Touraride Penang Downinig Street to London.Iran Turkey & GreeceTimothy Wooi
IT WAS a dream accomplished on a road least travelled, using motorbikes least thought off, with the least budget and crossing terrain least desirable.
Touraride Penang Downinig Street to London covering Iran Turkey & Greece
That is how three Penangites who straddled humble 125cc motorcycles described their journey from Downing Street in George Town to Downing Street in London.
They announced on their Facebook page that they arrived yesterday at 1.45am Malaysian time (6.45pm in London) after travelling four months, 11 days, eight hours and 45 minutes.
Touraride Downing Street Penang to Downing Street London on Honda Wave 125Timothy Wooi
The idea to ride from Downing Street Penang to Downing Street London started when Mr Lim Bak Kau (former Penang BMW Motorad Manager) wanted to full fill his dream by riding to the UK. He gathered few of his Biker friends at Touratech Rangoon Street and invited me to attend the meeting where he shared his dream. A group of only 5 friends were present and Mr Lim shared why a small capacity Motorbike, the Honda Wave 125cc was decided as the Bike to cover about 45,000 kilometers trotting over 14 countries.2 weeks later after the meeting, Mr Ding & his wife Wong shown interest to do the trip and we started to plan where Mr Ding did all the route & logistic planning. We became serious a month after that and responsibilities were assaigned to individual Riders and the team grew to eight.
Here is the almost final route prepared by our logistic Specialist,Mr Ding Bee Sin.
Touraride Penang Downing St. to London.Malaysia,Thailand & India. 9thMay2015Timothy Wooi
A brief Pictorial record of our epic Bike trip from Downing Street Penang to Downing Street London covering 24 Countries,18,290 KM, 4Mth 11days & 6 3/4 hrs
IT WAS a dream accomplished on a road least travelled, using motorbikes least thought off, with the least budget and crossing terrain least desirable.
That is how three Penangites who straddled humble 125cc motorcycles described their journey from Downing Street in George Town to Downing Street in London.
They announced on their Facebook page that they arrived yesterday at 1.45am Malaysian time (6.45pm in London) after travelling four months, 11 days, eight hours and 45 minutes.
“Total land distance rolled over was 18,290km, burning 365.8 litres of petrol ranging from RON80 to RON96 with a total fuel cost of RM1,825,” the team’s tech man Timothy Wooi added on their facebook page. https://www.facebook.com/Touraride-Downing-St-Penang-to-Downing-St-London-392640874248837/
An interior designing thesis on -Sustainable Interior with recyclable materialsAmrutaVaishampayan1
Hello there, this is my final year thesis while I was studying in Rachana Sansad- Academy of Architecture. Please leave a comment if you find this useful. Thank you.
BUILDING SCIENCE II: ACOUSTICS AND LIGHTING ANALYSIS OF DONUTES CAFE, SS15JoyeeLee0131
BUILDING SCIENCE II: ACOUSTICS AND LIGHTING ANALYSIS OF DONUTES CAFE, SS15
as part of the projects by architectural students in Taylor's Univeristy Lakeside Campus
Reaction Papers toward Theories of Architecture & UrbanismJoyeeLee0131
Reaction papers for
1.Jan Gehl, “Life Between Buildings Using Public / Jane Jacobs, “The death and Life of Great American Cities” (1961)
2. Charles Jencks, “Semiology and Architecture”, (1969) / Diana Agrest and Maria Gandelsonas, “Semiotics and Architecture: Ideological Consumption or Theoretical Work”(1973)
3. Juhani Pallasma, “The Eyes of the Skin: Architecture and the Senses”, (2007), pp40 – 46 / Juhani Pallasma, The Geometry of Feeling A Look at Phenomenology of Architecture.
4.Kenneth Frampton, “Towards a Critical Regionalism: Six Points for an Architecture of Resistance, No 3 & 4”/ Kenneth Frampton, “Towards a Critical Regionalism: Six Points for an Architecture of Resistance, No 5 & 6”
Building Service Project 2 Case Study ReportJoyeeLee0131
A case study on Jaya Shopping Centre located at Petaling Jaya, Selangor of the building services such as ACMV system, Fire Protection System and Mechanical Transportation system.
A Strategic Approach: GenAI in EducationPeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
Introduction to AI for Nonprofits with Tapp NetworkTechSoup
Dive into the world of AI! Experts Jon Hill and Tareq Monaur will guide you through AI's role in enhancing nonprofit websites and basic marketing strategies, making it easy to understand and apply.
Safalta Digital marketing institute in Noida, provide complete applications that encompass a huge range of virtual advertising and marketing additives, which includes search engine optimization, virtual communication advertising, pay-per-click on marketing, content material advertising, internet analytics, and greater. These university courses are designed for students who possess a comprehensive understanding of virtual marketing strategies and attributes.Safalta Digital Marketing Institute in Noida is a first choice for young individuals or students who are looking to start their careers in the field of digital advertising. The institute gives specialized courses designed and certification.
for beginners, providing thorough training in areas such as SEO, digital communication marketing, and PPC training in Noida. After finishing the program, students receive the certifications recognised by top different universitie, setting a strong foundation for a successful career in digital marketing.
How to Build a Module in Odoo 17 Using the Scaffold MethodCeline George
Odoo provides an option for creating a module by using a single line command. By using this command the user can make a whole structure of a module. It is very easy for a beginner to make a module. There is no need to make each file manually. This slide will show how to create a module using the scaffold method.
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Dr. Vinod Kumar Kanvaria
Exploiting Artificial Intelligence for Empowering Researchers and Faculty,
International FDP on Fundamentals of Research in Social Sciences
at Integral University, Lucknow, 06.06.2024
By Dr. Vinod Kumar Kanvaria
Acetabularia Information For Class 9 .docxvaibhavrinwa19
Acetabularia acetabulum is a single-celled green alga that in its vegetative state is morphologically differentiated into a basal rhizoid and an axially elongated stalk, which bears whorls of branching hairs. The single diploid nucleus resides in the rhizoid.
it describes the bony anatomy including the femoral head , acetabulum, labrum . also discusses the capsule , ligaments . muscle that act on the hip joint and the range of motion are outlined. factors affecting hip joint stability and weight transmission through the joint are summarized.
This slide is special for master students (MIBS & MIFB) in UUM. Also useful for readers who are interested in the topic of contemporary Islamic banking.
Thinking of getting a dog? Be aware that breeds like Pit Bulls, Rottweilers, and German Shepherds can be loyal and dangerous. Proper training and socialization are crucial to preventing aggressive behaviors. Ensure safety by understanding their needs and always supervising interactions. Stay safe, and enjoy your furry friends!
A review of the growth of the Israel Genealogy Research Association Database Collection for the last 12 months. Our collection is now passed the 3 million mark and still growing. See which archives have contributed the most. See the different types of records we have, and which years have had records added. You can also see what we have for the future.
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
Measure Drawings Penang Lian Huat Company JAN 2015
1. METHODS OF DOCUMENTATION AND MEASURED DRAWING
LIAN HUAT COMPANY,
140 LEBUH CARNARVON,
GEORGETOWN PENANG
LIST OF MEMBERS
LIST OF MEMBERSNO
NAME OF MEMBERS
1
2
3
4
7
8
9
5
6
10
11
12
13
14
15
16
17
18
19
20
STUDENT ID.
21
22
23
24
NO
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
KOH JING HAO
SANJEH KUMAR RAMAN
TUTORS
LIST OF MEMBERS STUDENT ID.
NG WEI YING ( SABRINA ) 0313366
TEH GIE ENG ( IVANKA )
AUGUSTINE CHEN KEEN HOE
AZRIN BIN FAUZI
BENARD CHIN TZE YONG
BENNY TAN SHIOWEE
BIBI AMEERAH PEERUN
CARMEN CHEE CHA YI
CHEONG SIEW YING
CHEW WOAN CHYIN
CHIA WEI PINK
CHIANG KAH WAI
DANIEL ZAIN BIN MAZALAN
DIPTI GYA
ERIC LAI YIEW HOW
ESTHER LIM QIU QIU
LEE YAUE SHEN ( JASON )
LIEW CHUNG HOOI ( GABRIEL )
LINDA
0316179
0314175
0317770
0313355
0315447
0313939
0313893
0314618
0310797
0316971
0311397
0313329
0311390
0313843
0314322
0316929
0319306
0317986
0313675
0314880
TAN MING LONG
TEOH HUI YU
WONG VOON YIN
YAP WEI TYNG
YUAN KHAI SHIEN
0315381
0314126
0316925
0313855
0313679
0309421
0308714
0320832
0315746
0313611
0314572
0318890
0314130
0311069
0313701
0315151
0314058
0314818
LEE CHAER SHEAN
KOAY HUI MAY
KIMBERLY ANN NGIENG PEI SING
LING HUI SIM
LOW YONG GING
LUCAS WONG KOK HOE
LYDIA AMALINA BINTI FARIDAN
MEGAT KHAIRUR RASYAD
NAREAN A/L PUNITHARAJAH
NICOLE HOOI YI TIEN
SEH YIH YIING
HOW PEI NGOH
LEE JO YEE
PHUA JING SERN
SOO XIAO WEN
2. METHODS OF DOCUMENTATION AND MEASURED DRAWING
LIAN HUAT COMPANY,
140 LEBUH CARNARVON,
GEORGETOWN PENANG
prepared by
LIST OF DRAWING
LIST OF DRAWINGNO
MAIN DRAWING
1
2
3
4
7
8
9
KEY PLAN, LOCATION PLAN, SITE PLAN, STREET ELEVATION
SITE SECTION
GROUND FLOOR PLAN
FIRST FLOOR PLAN
FIRST FLOOR REFLECTED CEILING PLAN
FRONT ELEVATION
SECTION Y1 - Y1
5 ROOF PLAN
GROUND FLOOR REFLECTED CEILING PLAN6
10
11
12
13
14
15
16
17
18
19
20
SECTION Y2 - Y2
SECTION X1 - X1, SECTION X2 - X2, SECTION X3 - X3
EXPLODED ISOMETRIC
DOOR SCHEDULE D1, DOOR SCHEDULE D2
SECTION X4 - X4, SECTION X5 - X5, SECTION X6 - X6
SECTION X7 - X7, SECTION X8 - X8, SECTION X9 - X9
SECTION X10 - X10, SECTION X11 - X11
DOOR SCHEDULE D3, DOOR SCHEDULE D4
DOOR SCHEDULE D5, DOOR SCHEDULE D6
DOOR SCHEDULE D7, DOOR SCHEDULE D8
DOOR SCHEDULE D9, DOOR SCHEDULE D10
DRAWING NO.
21
22
23
24
LIST OF DRAWINGNO
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
DRAWING NO.
DOOR SCHEDULE D11, DOOR SCHEDULE D12
DOOR SCHEDULE D13, DOOR SCHEDULE D14
DOOR SCHEDULE D15, DOOR SCHEDULE D16
DOOR SCHEDULE D17
WINDOW SCHEDULE W1
WINDOW SCHEDULE W2, WINDOW SCHEDULE W3
WINDOW SCHEDULE W4
WINDOW SCHEDULE W5
WINDOW SCHEDULE AV1, WINDOW SCHEDULE AV2
WINDOW SCHEDULE LW1, WINDOW SCHEDULE LW2
WINDOW SCHEDULE LW3, WINDOW SCHEDULE LW4
WINDOW SCHEDULE LW5, WINDOW SCHEDULE LW6
WINDOW SCHEDULE FG1
STAIRCASE DETAILS SC
JACK ROOF DETAILS R1
ARCH DETAILS AD1, ARCH DETAILS AD2
COLUMN DETAILS C1, C2, CERAMIC VENT BLOCK DETAILS VB
LATTICE SCREEN DETAILS GD 1 , GD 2
LATTICE SCREEN DETAILS GD 3 , GD 4, GD 5
TILE DETAILS 1, TILE DETAILS 2, TILE DETAILS 3
LHCO.001
LHCO.002
LHCO.003
LHCO.004
LHCO.005
LHCO.006
LHCO.007
LHCO.008
LHCO.009
LHCO.010
LHCO.011
LHCO.012
LHCO.013
LHCO.014
LHCO.015
LHCO.016
LHCO.017
LHCO.018
LHCO.019
LHCO.020
LHCO.021
LHCO.022
LHCO.023
LHCO.024
LHCO.025
LHCO.026
LHCO.027
LHCO.028
LHCO.029
LHCO.030
LHCO.031
LHCO.032
LHCO.033
LHCO.034
LHCO.035
LHCO.036
LHCO.037
LHCO.038
LHCO.039
LHCO.040
TEAM LIAN HUAT
( PENANG GROUP )
3. Timur Laut
Barat Daya
George
Town
Tanjong
Bungah
Batu
Feringgi
Teluk
Bahang
Balik Pulau
Air Itam
Bayan
Lepas
Batu
Maung
Pulau
Pinang
Seberang Perai
Timur Laut
Barat Daya
George
Town
Tanjong
Bungah
Batu
Feringgi
Teluk
Bahang
Balik Pulau
Air Itam
Bayan
Lepas
Batu
Maung
Pulau
Pinang
Seberang Perai
LEBUHNGAHAHBOO
LEBUH
KIMBERLEY
PESARA CLAIMANT
LEBUH CAMPBELL
JALAN
PINTAL
TALI
LEBUH
CARNARVON
LEBUH
M
ELAYU
LORONG
CARNARVONLO
RO
NG
TO
H
AKA
LORONG
TOH
LEBU
H
AC
H
EH
LEBUH
ARMENIAN
LEBU
H
AC
H
EH
ARM
ENIAN
LEBUH
CANNON
LORONG
SOO
HONG
LEBU
H
AH
Q
U
EE
LEBUH
CHULIA
LEBUH
CHULIA
LEBUH
CHULIA
LEBUH
PENANG
LEBUH
PASAR
LORONG
PASAR
LEBUH
CHINA
LEBUH
QUEEN
JALAN
MASJID
KAPITAN
KELING
LEBUH
ARM
LORONG
PIT
JALAN
DR.LIM
CH
JALAN
CHEONG
FATT
TZE
LEBUH
CINTRA
JALAN
SUNGAI
JALAN BUCKINGHAM
LEBUHCINTRA
U
JO
N
G
LEBUH
CARNARVO
N
AKA
LEBUH
GAT
LEBUH
KING
LEBUH
CARNARVO
N
LEBUHNGAHAHBOO
LEBUH KIMBERLEY
PESARA CLAIMANT
LEBUH
ACHEH
Lian Huat and CO
GROUND FLOOR LEVEL : 0.000
ROAD LEVEL : -0.152
0 1 2 4M
100 20 40M
40 8 12KM
KEY PLAN
LOCATION PLAN
SITE PLAN
STREET ELEVATION
02-03-2015
AS SHOWN
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 001
1
40
KEY PLAN
SCALE N.T.S
LOCATION PLAN
SCALE 1 : 4000
SITE PLAN
SCALE 1 : 1200
STREET ELEVATION
SCALE 1 : 75
N
N
N
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
4. 1 3 42
ROAD LEVEL ROAD LEVEL GROUND LEVEL
LEBUH
CARNARVO
N
LEBUHNGAHAHBOO
LEBUH KIMBERLEY
PESARA CLAIMANT
LEBUH
ACHEH
100 20 40M
0 2 4 6 10M
02-03-2015
AS SHOWN
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 002
2
40
SITE SECTION
SCALE 1 : 200
SITE SECTION
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANYLIAN HUAT COMPANY
SITE PLAN
SCALE 1 : 1200
N
LEGENDS :
1 LIAN HUAT COMPANY
2 LEBUH CARNARVON
3 LEBUH CARNARVON
4 NEIGHBOURING BUILDING
5. GROUND FLOOR PLAN
02-03-2015
1 : 100
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 003
3
40
LEGENDS :
1 PAVEMENT
2 FIVE FOOT WALKWAY
3 HALL 1
4 AIR WELL 1
5 HALL 2
6 AIR WELL 2
7 TOILET 1
8 HALL 3
9 HALL 4
10 AIR WELL 3
11 INACCESSIBLE STAIRCASE
12 UTILITIES ROOM
13 STOREROOM
14 TOILET 2
15 INACCESSIBLE ROOM
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
A1
1
1
FFL : 0.000
SPACE NO.
FINISH FLOOR LEVEL
TIMBER
DRAWING SHEET NO.
DRAWING NAME
TILES FINISHING
TD1
40
6. FIRST FLOOR PLAN
02-03-2015
1 : 100
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
PENANG GROUP
DRAWING TITLE
LHCO. 004
4
40LIAN HUAT COMPANY
LEGENDS :
1 PAVEMENT
2 ROOM 1
3 ROOM 2
4 CORRIDOR 1
5 ROOM 3
6 CORRIDOR 2
7 ROOM 4
8 CORRIDOR 3
9 ROOM 5
10 ROOM 6
11 INACCESSIBLE STAIRCASE
12 CORRIDOR 4
13 KITCHEN
14 TERRACE
15 CHIMNEY
16 BATHROOM
17 TOILET 2
A1
1
1
FFL : 0.000
SPACE NO.
FINISH FLOOR LEVEL
TIMBER
DRAWING SHEET NO.
DRAWING NAME
TILES FINISHING
7. ROOF PLAN
02-03-2015
1 : 100
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 005
5
40
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
A1
1 DRAWING SHEET NO.
DRAWING NAME
LEGENDS :
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
8. GROUND FLOOR
REFLECTED CEILING PLAN
02-03-2015
1 : 100
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
PENANG GROUP
DRAWING TITLE
LHCO. 006
6
40LIAN HUAT COMPANY
LEGENDS :
1 FIVE FOOT WALKWAY
2 HALL 1
3 AIR WELL 1
4 HALL 2
5 STAIRCASE
6 AIR WELL 2
7 HALL 3
8 INACCESSIBLE
9 AIR WELL 3
10 ROOM 6
11 UTILITIES ROOM
12 TOILET 2
13 STOREROOM
14 INACCESSIBLE
A1
1
1 SPACE NO.
TIMBER
DRAWING SHEET NO.
DRAWING NAME
MATERIAL
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
9. FIRST FLOOR
REFLECTED CEILING PLAN
02-03-2015
1 : 100
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
PENANG GROUP
DRAWING TITLE
LHCO. 007
7
40LIAN HUAT COMPANY
LEGENDS :
1 ROOM 1
2 ROOM 2
3 AIR WELL 1
4 ROOM 3
5 AIR WELL 2
6 CORRIDOR 3
7 ROOM 4
8 ROOM 5
9 ROOM 6
10 INACCESSIBLE
11 AIR WELL 3
12 KITCHEN
13 TERRACE
14 W.C
15 CHIMNEY
A1
1
1 SPACE NO.
TIMBER
DRAWING SHEET NO.
DRAWING NAME
MATERIAL
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
10. 12859
1 2
169638317333
FIRST FLOOR LEVEL : +3.831
FIRST ROOF LEVEL : +11.164
SECOND ROOF LEVEL : +12.859
GROUND FLOOR LEVEL : 0.000
5800
0 1 2 4M
FRONT ELEVATION
02-03-2015
AS SHOWN
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 008
08
40
FRONT ELEVATION
SCALE 1 : 50
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
11. SECTION Y1 - Y1
02-03-2015
1 : 100
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
DRAWING TITLE
LHCO. 009
9
40
LEGENDS :
1 FIVE FOOT WALKWAY
2 HALL 1
3 AIR WELL 1
4 HALL 2
5 TO LOT 138
6 HALL 3
7 HALL 4
8 INACCESSIBLE STAIRCASE
9 UTILITIES ROOM
10 INACCESSBLE ROOM
11 ROOM 1
12 ROOM 2
13 CORRIDOR 1
14 ROOM 3
15 TO LOT 138
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
16 CORRIDOR 2
17 ROOM 4
18 ROOM 5
19 ROOM 6
20 CORRIDOR 4
21 KITCHEN
22 W.C
PENANG GROUP
A1
1
1
FFL : 0.000
SPACE NO.
FINISH FLOOR LEVEL
TIMBER
DRAWING SHEET NO.
DRAWING NAME
TILES FINISHING
12. SECTION Y2 - Y2
02-03-2015
1 : 100
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
DRAWING TITLE
LHCO. 010
10
40
LEGENDS :
1 FIVE FOOT WALKWAY
2 HALL 1
3 AIR WELL 1
4 HALL 2
5 BASIN
6 TOILET
7 HALL 3
8 AIR WELL 3
9 HALL 4
10 UTILITIES ROOM
11 INACCESSIBLE ROOM
12 ROOM 1
13 ROOM 2
14 ROOM 3
15 AIR WELL 2
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
16 ROOM 4
17 INACCESSIBLE SPACE
18 ROOM 5
19 ROOM 6
20 KITCHEN
21 TERRACE
PENANG GROUP
A1
1
1
FFL : 0.000
SPACE NO.
FINISH FLOOR LEVEL
TIMBER
DRAWING SHEET NO.
DRAWING NAME
TILES FINISHING
13. 02-03-2015
1 : 50
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 011
11
40
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
SECTION X1 - X1
SCALE 1 : 50
SECTION X1 - X1
SECTION X2 - X2
SECTION X3 - X3
SECTION X2 - X2
SCALE 1 : 50
SECTION X3 - X3
SCALE 1 : 50
KEY PLAN
SCALE 1 : 500
14. 02-03-2015
1 : 50
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 012
12
40
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
SECTION X4 - X4
SCALE 1 : 50
SECTION X4 - X4
SECTION X5 - X5
SECTION X6 - X6
SECTION X5 - X5
SCALE 1 : 50
SECTION X6 - X6
SCALE 1 : 50
KEY PLAN
SCALE 1 : 500
15. 02-03-2015
1 : 50
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 013
13
40
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
SECTION X7 - X7
SCALE 1 : 50
SECTION X7 - X7
SECTION X8 - X8
SECTION X9 - X9
SECTION X8 - X8
SCALE 1 : 50
SECTION X9 - X9
SCALE 1 : 50
KEY PLAN
SCALE 1 : 500
16. 02-03-2015
1 : 50
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 014
14
40
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
SECTION X10 - X10
SCALE 1 : 50
SECTION X10 - X10
SECTION X11 - X11
SECTION X11 - X11
SCALE 1 : 50
KEY PLAN
SCALE 1 : 500
17. EXPLODED ISOMETRIC
02-03-2015
AS SHOWN
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
DRAWING TITLE
LHCO. 015
15
40
LEGENDS :
1 FIVE FOOT WALKWAY
2 HALL 1
3 AIR WELL 1
4 HALL 2
5 TOILET
6 STAIRCASE
7 HALL 3
8 HALL 4
9 INACCESSIBLE STAIRCASE
10 UTILITIES ROOM
11 INACCESSIBLE ROOM
14 CORRIDOR 1
15 ROOM 3
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
16 CORRIDOR 2
17 ROOM 4
18 CORRIDOR 3
19 ROOM 5
20 ROOM 6
21 CORRIDOR 4
22 KITCHEN
PENANG GROUP
EXPLODED ISOMETRIC
N.T.S
12 ROOM 1
23 W.C
24 TERRACE
13 ROOM 2
25 INACCESSIBLE SPACE
18. 2630
2480
1193
597
1327
1193
597
2630
2480
252
02-03-2015
1 : 25
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 016
16
40
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
HALL 1
1
3
HINGES, DOOR HANDLES
DOUBLE PANEL DOOR
INTACT
ALUMINIUM, GLASS
CLEAR COATING
HALL 2
1
0
HINGES, METAL TOWER BOLTS, WOODEN HANDLES
DOUBLE PANEL DOOR
INTACT
TIMBER
BEIGE PAINT
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
PLAN
SCALE 1 : 25
ELEVATION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
SECTION
SCALE 1 : 25
SECTION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
PLAN
SCALE 1 : 25
FRONT AND BACK ELEVATION
SCALE 1 : 25
DOUBLE PANEL GLASS DOORD1 DOUBLE PANEL DOORD2
DOOR SCHEDULE D1
DOOR SCHEDULE D2
19. 2040
2005
123
720
650
720
650
2040
2005
02-03-2015
1 : 25
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
DRAWING TITLE
LHCO. 017
17
40
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
TOILET 1
1
0
HINGES
SINGLE PANEL DOOR
DEFECTED
TIMBER
PAINTED BLUE
UTILITIES ROOM
1
0
DOOR HANDLE, HINGES
SINGLE PANEL DOOR
INTACT
TIMBER
PAINTED TURQUOISE
PLAN
SCALE 1 : 25
FRONT AND BACK ELEVATION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
SECTION
SCALE 1 : 25
SINGLE PANEL DOORD3
PENANG GROUP
PLAN
SCALE 1 : 25
ELEVATION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
SECTION
SCALE 1 : 25
SINGLE PANEL DOORD4
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
DOOR SCHEDULE D3
DOOR SCHEDULE D4
20. 2320
2240
145
1530
1219
1290
1219
606
2320
2240
02-03-2015
1 : 25
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
DRAWING TITLE
LHCO. 018
18
40
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
UTILITIES ROOM
1
0
DOOR HANDLE, HINGES
SINGLE PANEL DOOR
INTACT
TIMBER
PAINTED TURQUOISE
UTILITIES ROOM
1
0
HINGES, METAL DOOR BOLTS, METAL BARREL BOLT LATCH, WOODEN HANDLES
DOUBLE PANEL DOOR
INTACT
TIMBER
PAINTED TURQUOISE
EXPLODED ISOMETRIC
SCALE 1 : 25
SECTION
SCALE 1 : 25
SINGLE PANEL DOORD5 DOUBLE PANEL DOORD6
PLAN
SCALE 1 : 25
ELEVATION
SCALE 1 : 25
PENANG GROUP
EXPLODED ISOMETRIC
SCALE 1 : 25
SECTION
SCALE 1 : 25
PLAN
SCALE 1 : 25
ELEVATION
SCALE 1 : 25
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
DOOR SCHEDULE D5
DOOR SCHEDULE D6
21. 1986
557
2200
45
1036
450 450
1036
2200
1986
557
296
02-03-2015
1 : 25
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAHMAN
PENANG GROUP
DRAWING TITLE
LHCO. 019
19
40
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
ROOM 1
1
0
HINGES, METAL TOWER BOLTS
DOUBLE PANEL DOOR
INTACT
TIMBER
PAINTED BEIGE
CORRIDOR 2
1
0
HINGES, METAL LEVER HANDLE LOCK
DOUBLE PANEL DOOR
INTACT
TIMBER
PAINTED BEIGE
PENANG GROUP
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
EXPLODED ISOMETRIC
SCALE 1 : 25
SECTION
SCALE 1 : 25
PLAN
SCALE 1 : 25
FRONT AND BACK ELEVATION
SCALE 1 : 25
FRONT AND BACK ELEVATION
SCALE 1 : 25
PLAN
SCALE 1 : 25
SECTION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
DOUBLE PANEL DOORD7 DOUBLE PANEL DOORD8
DOOR SCHEDULE D7
DOOR SCHEDULE D8
22. 1986
557
2200
1036
450
296
450
2200
1986
557
02-03-2015
1 : 25
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 020
20
40
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
CORRIDOR 3
1
0
HINGES, METAL BARREL BOLTS LATCH
DOUBLE LATTICE GRILL DOOR
INTACT
TIMBER, METAL
PAINTED BEIGE
ROOM 4
1
0
HINGES, METAL TOWER BOLTS, METAL LEVER HANDLE LOCK
DOUBLE PANEL DOOR
INTACT
TIMBER
PAINTED BEIGE
EXPLODED ISOMETRIC
SCALE 1 : 25
SECTION
SCALE 1 : 25
ELEVATION
SCALE 1 : 25
PLAN
SCALE 1 : 25
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
DOUBLE LATTICE GRILL DOORD9
DOUBLE PANEL DOORD10
EXPLODED ISOMETRIC
SCALE 1 : 25
SECTION
SCALE 1 : 25
FRONT AND BACK ELEVATION
SCALE 1 : 25
PLAN
SCALE 1 : 25
DOOR SCHEDULE D9
DOOR SCHEDULE D10
23. 2305
2155
605
1384
586 586
402
2305
2154
605
02-03-2015
1 : 25
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
DRAWING TITLE
LHCO. 021
21
40
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
CORRIDOR 3, ROOM 5
2
0
HINGES, METAL TOWER BOLTS
DOUBLE PANEL DOOR
INTACT
TIMBER
PAINTED BEIGE
ROOM 6
2
0
HINGES, METAL TOWER BOLTS, METAL LEVER HANDLE LOCK
DOUBLE PANEL DOOR
INTACT
TIMBER
PAINTED BEIGE
PENANG GROUP
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
FRONT AND BACK ELEVATION
SCALE 1 : 25
FRONT AND BACK ELEVATION
SCALE 1 : 25
SECTION
SCALE 1 : 25
SECTION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
PLAN
SCALE 1 : 25
PLAN
SCALE 1 : 25
DOUBLE PANEL DOORD11 DOUBLE PANEL DOORD12
DOOR SCHEDULE D11
DOOR SCHEDULE D12
24. 2390
2602057
1930
130
966
853
966
853
760
2390
2602057
1930
DRAWING NO. SHEET NO.PROJECT TITLE DRAWING TITLE
LHCO. 022
22
40
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
KITCHEN
1
0
HINGES, WOODEN PANELS, METAL DOOR KNOB
SINGLE PANEL DOOR
INTACT
TIMBER, METAL
VARNISH COATING
TERRACE
1
0
LOUVERED DOOR VENT, LOUVERED GLASS, HINGES
SINGLE PANEL DOOR
DEFECTED
TIMBER, GLASS
VARNISH COATING
EXPLODED ISOMETRIC
SCALE 1 : 25
SECTION
SCALE 1 : 25
ELEVATION
SCALE 1 : 25
PLAN
SCALE 1 : 25
SINGLE PANEL DOORD14
EXPLODED ISOMETRIC
SCALE 1 : 25
SECTION
SCALE 1 : 25
FRONT AND BACK ELEVATION
SCALE 1 : 25
PLAN
SCALE 1 : 25
02-03-2015
1 : 25
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
SINGLE PANEL DOORD13
DOOR SCHEDULE D13
DOOR SCHEDULE D14
25. 2420
2732028
143
760
656
760
656
2420
2732028
DRAWING NO. SHEET NO.PROJECT TITLE DRAWING TITLE
LHCO. 023
23
40
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
KITCHEN
1
0
LOUVERED DOOR VENT, HINGES
SINGLE PANEL DOOR
DEFECTED
TIMBER
-
BATHROOM
1
0
HINGES, AIR VENT
SINGLE PANEL DOOR
INTACT
METAL
VARNISH COATING
02-03-2015
1 : 25
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
LIAN HUAT COMPANY
ELEVATION
SCALE 1 : 25
PLAN
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
SECTION
SCALE 1 : 25
SECTION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
ELEVATION
SCALE 1 : 25
PLAN
SCALE 1 : 25
SINGLE PANEL DOORD15 SINGLE PANEL DOORD16
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
DOOR SCHEDULE D15
DOOR SCHEDULE D16
26. 02-03-2015
1 : 25
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
DRAWING TITLE
LHCO. 024
24
40
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
TOILET 2
1
0
HINGES
SINGLE PANEL DOOR
INTACT
METAL
VARNISH COATING
ELEVATION
SCALE 1 : 25
PLAN
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
SECTION
SCALE 1 : 25
SINGLE PANEL DOORD17
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
PENANG GROUP
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DOOR SCHEDULE D17
27. LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
HALL 1
ALUMINUIM, GLASS
POWDER COATING
4
-
FIX WINDOWS
INTACT
1
02-03-2015
1 : 25
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 025
25
40
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
W1 ADJUSTABLE LOUVRE WINDOW
ELEVATION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
PLAN
SCALE 1 : 25
SECTION
SCALE 1 : 25
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
WINDOW SCHEDULE W1
28. 1655
313340
1655
313340
120
988
128
988
128
120
810
810
GROUND LEVEL
GROUND LEVEL
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
1 : 25
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 026
26
40
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
HALL 2
1
TIMBER AND GLASS
PAINTED WHITE
5
-
DOUBLE LEAF CASEMENT WINDOW
DEFECTED : MISSING LEAF
HALL 3
2
TIMBER AND GLASS
PAINTED TURQUOISE
17
HINGES
DOUBLE LEAF CASEMENT WINDOW
INTACT
W2 DOUBLE LEAF CASEMENT WINDOW W3 DOUBLE LEAF CASEMENT WINDOW
ELEVATION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
ELEVATION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
PLAN
SCALE 1 : 25
SECTION
SCALE 1 : 25
PLAN
SCALE 1 : 25
SECTION
SCALE 1 : 25
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
02-03-2015WINDOW SCHEDULE W2
WINDOW SCHEDULE W3
29. LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
AS SHOWN
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 027
27
40
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
ROOM 1
1
METAL, GLASS
-
70
HINGES, HANDLE LOCKS
DOUBLE LEAF CASEMENT WINDOW, AWNING WINDOW ON TOP
INTACT BUT RUSTED FRAME
W4 DOUBLE LEAF CASEMENT WINDOW AWNING WINDOW
PLAN
SCALE 1 : 25
ELEVATION
SCALE 1 : 25
SECTION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
02-03-2015
30. LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
1 : 25
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 028
28
40
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
ROOM 4
1
TIMBER, GLASS, METAL
PAINTED BEIGE
26
HINGES, HANDLE LOCKS
DOUBLE LEAF CASEMENT WINDOW
INTACT
SECTION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
PLAN
SCALE 1 : 25
ELEVATION
SCALE 1 : 25
W5 DOUBLE LEAF CASEMENT WINDOW & AWNING WINDOW
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
02-03-2015
WINDOW SCHEDULE W5
31. 447
447
1334
1142
110
1334
1142
1104494
4494
GROUND LEVELGROUND LEVEL
DRAWING NO. SHEET NO.
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
1 : 25
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 029
29
40
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
HALL 3
1
TIMBER, METAL
PAINTED GREEN
-
METAL BARS
METAL BARS AIR VENT
INTACT
ROOM 5
5
TIMBER
PAINTED BEIGE
-
ORNAMENT
ORNAMENTAL AIR VENT
INTACT
EXPLODED ISOMETRIC
SCALE 1 : 25
ELEVATION
SCALE 1 : 25
SECTION
SCALE 1 : 25
PLAN
SCALE 1 : 25
AV1 METAL BARS AIR VENT
EXPLODED ISOMETRIC
SCALE 1 : 25
ELEVATION
SCALE 1 : 25
SECTION
SCALE 1 : 25
PLAN
SCALE 1 : 25
AV2 WOODEN AIR VENT
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
02-03-2015WINDOW SCHEDULE AV1
WINDOW SCHEDULE AV2
32. 1036
135
1036
140
92
825
730
825
730
92
1410
1410
GROUND LEVEL
GROUND LEVEL
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
02-03-2015
1 : 25
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 030
30
40
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
ROOM 4
1
TIMBER, GLASS
PAINTED BEIGE
6
-
FIX LOUVRED WINDOWS, FIX GLASSES
INTACT
ROOM 5
1
TIMBER, ALUMINIUM
PAINTED WHITE
7
ADJUSTING TAB, BLADE HOLDER
ADJUSTABLE LOUVRED WINDOW
INTACT
LW1 FIXED LOUVRED WINDOWS WITH GLASS PANELS LW2 ADJUSTABLE LOUVRED WINDOW
ELEVATION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
ELEVATION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
PLAN
SCALE 1 : 25
SECTION
SCALE 1 : 25
PLAN
SCALE 1 : 25
SECTION
SCALE 1 : 25
WINDOW SCHEDULE LW1
WINDOW SCHEDULE LW2
33. 1015
1015
880
90
100
2774
2774
342
2596
2596
388365
388365342
100
GROUND LEVEL
GROUND LEVEL
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
1 : 25
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 031
31
40
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
ROOM 6
1
TIMBER, ALUMINIUM
PAINTED BEIGE
-
ADJUSTING TAB, BLADE HOLDER
ADJUSTABLE LOUVRED WINDOWS
DEFECTED : MISSING BLADES
ROOM 6
1
TIMBER
PAINTED BEIGE
-
-
FIXED LOUVRED WINDOWS
INTACT
LW3 ADJUSTABLE LOUVRED WINDOW
EXPLODED ISOMETRIC
SCALE 1 : 25
SECTION
SCALE 1 : 25
ELEVATION
SCALE 1 : 25
PLAN
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
ELEVATION
SCALE 1 : 25
PLAN
SCALE 1 : 25
SECTION
SCALE 1 : 25
LW4 FIXED LOUVRED WINDOW
02-03-2015
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
WINDOW SCHEDULE LW3
WINDOW SCHEDULE LW4
34. 460
390
460
390
245
1070
483
245
1070
483
2020
2020
GROUND LEVEL
GROUND LEVEL
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
1 : 25
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 032
32
40
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
KITCHEN
1
TIMBER, GLASS, ALUMINIUM
PAINTED BEIGE
24
ADJUSTING TAB, BLADE HOLDER
ADJUSTABLE LOUVRED WINDOWS, FIXED GLASSES
INTACT
TOILET 2
1
TIMBER, GLASS
PAINTED WHITE
10
-
FIXED LOUVERED WINDOWS
INTACT
LW5 ADJUSTABLE LOUVRED WINDOWS WITH FIXED GLASSES LW6 FIXED LOUVRE WINDOW
ELEVATION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
PLAN
SCALE 1 : 25
SECTION
SCALE 1 : 25
ELEVATION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
PLAN
SCALE 1 : 25
SECTION
SCALE 1 : 25
02-03-2015
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
WINDOW SCHEDULE LW5
WINDOW SCHEDULE LW6
35. DRAWING NO. SHEET NO.
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
1 : 25
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 033
33
40
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
ROOM 5
1
TIMBER, GLASS
SHELLACKED
26
-
FIXED GLASSES WINDOWS
INTACT
FG1 FIXED GLASSES WINDOWS
PLAN
SCALE 1 : 25
ELEVATION
SCALE 1 : 25
SECTION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
02-03-2015
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
WINDOW SCHEDULE FG1
36. STORE
OPEN STRING
697
79
925
110
165240
MORTISE
TENON
JOINT
705
BALUSTER
CARVING DETAIL
STRING TREAD
RISER
BOARD
CONCRETE SLAB
LANDING
NEWEL
185
480
FIRST FLOOR
GROUND FLOOR
GROUND FLOOR
GROUND FLOOR
7095
1300
02-03-2015
AS SHOWN
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
PENANG GROUP
DRAWING TITLE
LHCO. 034
34
40
UsersericlaiDesktopimgres.jpg
SCALE 1 : 30
SIDE ELEVATION
SCALE 1 : 30
FRONT AND REAR ELEVATION
SCALE 1 : 30
PLAN
N . T . S
TIMBER STAIRCASE AND CARVING DETAILS
LIAN HUAT COMPANY
STAIRCASE DETAIL
SC
37. 8MM THK
ASBESTOS
ROOFING SHEET
40MM X 40MM
TIMBER BATTEN
GALVANIZED
ROOFING NAIL
TIMBER BATTEN
TIMBER PURLIN
8MM THK
ASBESTOS
ROOFING SHEET
TIMBER LOUVER
SKYLIGHT TIMBER
LOUVER FRAME
GABLE WALL
104MM X 50MM
TIMBER PURLIN
02-03-2015
AS SHOWN
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
PENANG GROUP
DRAWING TITLE
LHCO. 035
35
40
UsersericlaiDesktopimgres.jpg
SCALE 1 : 25
PLAN
SCALE 1 : 25
JACK TRUSS FRONT ELEVATION
SCALE 1 : 25
JACK TRUSS REAR ELEVATION
SCALE 1 : 25
JACK TRUSS SIDE ELEVATION
N . T . S
JACK ROOF EXPLODED ISOMETRIC
LIAN HUAT COMPANY
JACK ROOF DETAILS
SCALE 1 : 25
JACK ROOF DETAILR1
38. 5457
10482288
5457
401
22881449
14492288
521
5418 5414
5982393
580
736
23931334
23931334
ARCH DETAIL AD1
ARCH DETAIL AD2
02-03-2015
1:40
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
PENANG GROUP
DRAWING TITLE
LHCO. 036
36
40
UsersericlaiDesktopimgres.jpg
ARCH DETAIL 1AD1
ARCH DETAIL 2AD2
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
LIAN HUAT COMPANY
SECTION
SCALE 1 : 40
ISOMETRIC
SCALE 1 : 40
ISOMETRIC
SCALE 1 : 40
SECTION
SCALE 1 : 40
FRONT ELEVATION
SCALE 1 : 40
REAR ELEVATION
SCALE 1 : 40
FRONT ELEVATION
SCALE 1 : 40
REAR ELEVATION
SCALE 1 : 40
39. 320
320
02-03-2015
AS SHOWN
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
PENANG GROUP
DRAWING TITLE
40LIAN HUAT COMPANY
COLUMN DETAIL 1 , COLUMN DETAIL 2 VENT BLOCK DETAIL
FRONT ELEVATION
SCALE 1 : 25
PLAN
SCALE 1 : 25
SIDE ELEVATION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 10
ISOMETRIC
SCALE 1 : 5
FRONT ELEVATION
SCALE 1 : 5
REAR ELEVATION
SCALE 1 : 5
COLUMN DETAIL C1
COLUMN DETAIL C2
VENT BLOCK DETAIL VB
LHCO. 037
37
C VB
40. 1113
1006
2441
2242
719
620
4206
4071
02-03-2015
1 : 15
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
PENANG GROUP
DRAWING TITLE
40LIAN HUAT COMPANY
FRONT ELEVATION
SCALE 1 : 15
ISOMETRIC
SCALE 1 : 15
EXPLODED ISOMETRIC
SCALE 1 : 15
LATTICE 1 DETAILGD1
LHCO. 038
38
LATTICE SCREEN DETAIL GD1
LATTICE SCREEN DETAIL GD2
FRONT ELEVATION
SCALE 1 : 15
ISOMETRIC
SCALE 1 : 15
EXPLODED ISOMETRIC
SCALE 1 : 15
LATTICE 2 DETAILGD2
41. 735
530
1334
1012
660
530
2864
2734
551
422
2342
2248
02-03-2015
1 : 15
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
PENANG GROUP
DRAWING TITLE
40LIAN HUAT COMPANY.
FRONT ELEVATION
SCALE 1 : 15
ISOMETRIC
SCALE 1 : 15
EXPLODED ISOMETRIC
SCALE 1 : 15
FRONT ELEVATION
SCALE 1 : 15
FRONT ELEVATION
SCALE 1 : 15
ISOMETRIC
SCALE 1 : 15
EXPLODED ISOMETRIC
SCALE 1 : 15
EXPLODED ISOMETRIC
SCALE 1 : 15
ISOMETRIC
SCALE 1 : 15
LATTICE 5 DETAILGD5LATTICE 4 DETAILGD4LATTICE 3 DETAILGD3
LHCO. 039
39
LATTICE SCREEN DETAIL GD3
LATTICE SCREEN DETAIL GD4
LATTICE SCREEN DETAIL GD5
42. 200
200
200
200
200
200
200
200
02-03-2015
1 : 5
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
PENANG GROUP
DRAWING TITLE
40
40
DT2
6
SCALE 1 : 5
TYPE A ( OLIVE GREEN & IVORY )
SCALE 1 : 5DT1
5
SCALE 1 : 5 DT3
7
SCALE 1 : 5
1
DT1
DT1
4
SCALE 1 : 5
CLAY TILES ARRANGEMENT 1
DT2
2
SCALE 1 : 5
CLAY TILES ARRANGEMENT 2
DT3
3
SCALE 1 : 5
CLAY TILES ARRANGEMENT 3
TYPE B ( OLIVE GREEN & IVORY ) TYPE C ( OLIVE GREEN & IVORY ) TYPE D( OLIVE GREEN & IVORY )
TILES DETAIL 1
TILES DETAIL 2
TILES DETAIL 3
UsersericlaiDesktopimgres.jpg
LHCO. 040
LIAN HUAT COMPANY