The document discusses trends in drilling and completions in the Montney formation, including an increase in the number of frac stages, fluid pumped, completed length, and total proppant placed from 2010 to 2016. It also notes a shift to slickwater completions. Current completion systems are outlined and their limitations discussed. The innovation presented is the Stage Completions system, which uses a collet-activated fracturing sleeve to enable unlimited stages, higher pumping rates, and improved water management compared to plug-and-perf, sliding sleeve, and ball-drop systems. Successful field testing and initial deployment in Montney wells is also summarized.
Need a proven solution to remove surface runoff? Contech's Slotted Drain™ has over 100-years of proven in the ground performance and can remove over 50% more surface runoff than alternative inlet solutions.
Need a proven solution to remove surface runoff? Contech's Slotted Drain™ has over 100-years of proven in the ground performance and can remove over 50% more surface runoff than alternative inlet solutions.
ELECTRÓNICA FUNDAMENTAL 6 Desde la válvula de vacío hasta el circuito integradoGabriel Araceli
Año 1980
TEORÍA: Circuitos integrados digitales y analógicos. El microprocesador. Hardware y Software del microprocesador 8085.
PRÁCTICA: Montajes y experimentación con circuitos integrados analógicos y digitales. Programación del microprocesador 8085.
Jay R. Smith Mfg. Co. offers a full line of trench drain products covering a broad scope of manufacturing, processing, commercial, industrial and residential applications. The Enviro-Flo® Trench Drain Series, Figure Numbers 9930 and 9931, is made from 100% polypropylene, making it light weight, durable and easy to install. The Enviro-Flo® system can consist of 15 sloped and 15 neutral channels for any configuration. The Smith/ACO Trench Drain Series, Figure Numbers 9810 through 9860, is made from precast polymer concrete and fiberglass. The Smith/ACO system is sloped with a radiused bottom. The smooth, uniform interior of these channels offers maximum hydraulic performance. Jay R. Smith Mfg. Co. Drainage Systems includes a wide variety of grate types and materials to meet all installation requirements.
For more information, please visit www.jrsmith.com
"This brand new Powerpoint Presentation details the types, benefits, and applications of the Smith Drainage Systems Trench Drains. This overview of the product line is an excellent resource tool for anyone interested in our trench drains."
Jingbo Petroleum Machinery Co.,Ltd., founded in 1986, is committed to providing quality oilfield hoses worldwide.
we can provided rubber rotary drilling hose,Cementing Hose,Choke & Kill Hose,BOP Hose,Hammer Union etc.
Discover the secret to a lower coefficient of friction while permitting translational motion or movement with the supporting element. Learn about the different types of slide plates and pipe rollers used for various applications. View the design, load capabilities, and installation and maintenance guidelines for both slide plates and pipe rollers. See numerous photos featuring combinations with other critical pipe supports in order to allow for movement or a low coefficient of friction.
Artificial Lift Products from Evolution Oil ToolsGeoffrey Brennan
In the US, 96 percent of oil and gas wells require artificial lift when they are established. Worldwide only about 5% of today’s wells have enough natural lift to be profitable. Artificial lift refers to the process by which internal pressure of an oil reservoir is raised in order to drive oil to the surface. This system increases the productivity of the well.
Evolution Oil Tools has a complete selection of Artificial Lift Tools and accessories to meet your needs.
Get to know U.S. Bellows from introducing our team and manufacturing capabilities to exploring design details in technical drawings for large-scale projects. View case studies that lead to the creation of new standards and designs. Learn about cost saving measures for expansion joint failures and how to prevent future problems.
Show how different projects were constructed, generally the construction methods, sequence and plant are included. The information is presented in a way that is easily understood and explained.
Started to create milestones, we, Perfect Prime Piping & Agritech Private Limited marked our presence in the year 2011 and operate in the manufacturing/servicing of Water Irrigation Systems, Dust Suppression Systems since 3 years. Our quality services products have been always appreciated by our clients. Our spontaneous attitude and confident approach in offering an excellent range of Water Irrigation Systems, Dust Suppression Systems, Water Supply Network Designs, HDPE Pipe Couplings, HDPE Pipes has deepened our roots in the market. We, Prime Piping & Agritech Private Limited breathe with the aim of fully satisfying our clients with our high-quality products services. We are a unit of highly experienced professionals, all of them contributing at the best of their potentials to offer the highest degree of efficiency and client satisfaction.
Company Valuation webinar series - Tuesday, 4 June 2024FelixPerez547899
This session provided an update as to the latest valuation data in the UK and then delved into a discussion on the upcoming election and the impacts on valuation. We finished, as always with a Q&A
What is the TDS Return Filing Due Date for FY 2024-25.pdfseoforlegalpillers
It is crucial for the taxpayers to understand about the TDS Return Filing Due Date, so that they can fulfill your TDS obligations efficiently. Taxpayers can avoid penalties by sticking to the deadlines and by accurate filing of TDS. Timely filing of TDS will make sure about the availability of tax credits. You can also seek the professional guidance of experts like Legal Pillers for timely filing of the TDS Return.
Recruiting in the Digital Age: A Social Media MasterclassLuanWise
In this masterclass, presented at the Global HR Summit on 5th June 2024, Luan Wise explored the essential features of social media platforms that support talent acquisition, including LinkedIn, Facebook, Instagram, X (formerly Twitter) and TikTok.
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
The key differences between the MDR and IVDR in the EUAllensmith572606
In the European Union (EU), two significant regulations have been introduced to enhance the safety and effectiveness of medical devices – the In Vitro Diagnostic Regulation (IVDR) and the Medical Device Regulation (MDR).
https://mavenprofserv.com/comparison-and-highlighting-of-the-key-differences-between-the-mdr-and-ivdr-in-the-eu/
VAT Registration Outlined In UAE: Benefits and Requirementsuae taxgpt
Vat Registration is a legal obligation for businesses meeting the threshold requirement, helping companies avoid fines and ramifications. Contact now!
https://viralsocialtrends.com/vat-registration-outlined-in-uae/
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
3. Drilling and Completion Trends in the Montney
Increased Frac Stages
2010: Average 10 stages
2016: Average 26 Stages
Increased Fluid Pumped
2010: ~2,500 cubic meters
2016: ~15,000 cubic meters
3
Source: Raymond James, Jeremy McCrea
4. Drilling and Completion Trends in the Montney
Increased Completed Length
2010: ~1,250 meters
2016: >2,000 meters
Increased Total Proppant Placed
2010: ~750 tonnes
2016: ~2,500 tonnes
4
Source: Raymond James, Jeremy McCrea
5. Drilling and Completion Trends in the Montney
Movement to Slickwater
2010: 20% of wells using
Slickwater
2016: >70% of wells using
Slickwater
5
Source: Raymond James, Jeremy McCrea
6. The Drivers Behind the Changing Trends
6
The Goal
The Requirements
The Solution
Superior Capital Efficiencies
Higher Productivity and EUR’s
Increased Stimulated Rock Volume
Longer Laterals Tighter Spacing
Higher Pump
Rates
Slickwater
Pinpoint
Fracturing
8. Water Management and Social Impact
8
Water Management Issues
o Slickwater becoming dominate completion
o Water to inflate coil tubing
o Potable water requirement for certain
completion styles
o Ability to access adequate water for
completion
Social Impact Issues
o Time on surface
o Noise
o Impact to residents in rural / urban corridors
o Traffic
o Pad size
o Perception of completions (high vs. low
impact)
9. Current Systems Not Meeting all Design-Change Demands
9
Based on 4.5-in (114.3-mm) Casing Plug & Perf
(Clustered Stages)
Sliding Sleeve
(Coil Tubing)
Ball-Drop
Unlimited stages Yes Yes No
Reduced pumping friction pressure Yes No No
Can use high fluid rates and sand concentration Yes No No*
Individual frac Isolation No Yes Yes
Wellbore unrestricted by ball seats or coil tubing
while fracturing
Yes No No
Reduces pumping time on surface No No Yes
Water and chemicals conservation No No Yes
Re-closable sleeve for re-fracturing or shutoff No Yes No
Extended reach capability Yes No No
Production-ready wellbore No Yes Yes
Constant ID heel to toe Yes Yes No
Open hole or Cased hole application No Yes No
Cemented annulus Yes Yes No
Completed without coiled tubing Yes No Yes
* Restricted at the toe
10. 10
Risks and Limitations of Current Systems
Plug and PerfSliding Sleeve with Coil Ball-Drop
Significant time required to place
plugs and perforate while frac
equipment is waiting
Controlling frac placement in cluster
applications and ensuring all intervals
are stimulated
Perforating gun misfire and associated
time to round trip tool string
Plug failures from skidding and pre
sets from cast iron slips
Debris and fluids from drillouts
causing damage to the formation
Difficulty drilling plugs in extended
reach applications
Additional fluid usage to place plugs
and perforating guns
Sanding off with coil in the wellbore
(Higher risk of being stuck in the
wellbore with coil)
Extra costs of friction reducers and
potential inability to the toe of the
wellbore
Setting tool packer failure (limited
number of sets per packer)
Fishing charges if tool becomes stuck
or disconnected
Equipment failures such as coil tubing
breakdowns
Pump rate limitations due to friction
pressure
Limited stage count
Limit on horizontal length due to
decreasing ball seat size
Pump rate limitations, particularly at
the toe
Decreasing seat sizes restrict flow back
Risk of ball extrusion
Screenouts can potentially lead to
partial or complete loss of wellbore
12. Stage Completions Inc.
12
Stage Completions Inc. is a downhole technology company
focused on providing innovative completion solutions
90% privately held, 10% to be acquired by Blackbird Energy Inc. (TSX-V: BBI)
Three main product lines that are fully patented:
SC Bowhead II: Collet-activated fracturing sleeve system designed for cased
hole and open hole applications
SC Bowhead: Wireline deployed Baffle isolation fracturing system designed
for cased and open hole applications
Cemented Ball Drop: ball activated fracturing sleeve designed for
multiple frac stages in a well bore
All systems designed from 2 7/8” (71mm) right through to 5 ½” (139.7 mm) casing
13. 13
Production and Operational Advantages
Pinpoint fracturing
Longer Laterals
and Increased
Stages
Higher Rates and
Tonnages
Asset in the
Wellbore
o 216 stages currently available (>700 available in near term)
o Pump down collet (elimination of coil tubing) allows for industry leading lateral
length
o Only system that can frac beyond current coil / wireline lengths
o Constant ID allows for higher pump rate and higher sand concentrations,
particularly at the toe
o Elimination of coil and ball seats leads to reduced friction
o Optimize every fracture treatment / Accurately place every fracture treatment
o Maximize stimulated reservoir volume
o Constant ID allows for maximum flowback recovery without intervention
o Collets are retrievable and sleeves can be open / closed throughout life of
wellbore
o Refrac available with re-pump down of existing collets and balls
14. Stage’s Advantages
14
Reduced Risk
o Large bore access allows clean outs from heel to toe with no restrictions
in coil or tubing size
o Collets can be removed at any point in time allowing full drift of liner
o Without retrieval, Stage system has largest flowback ID
o Ability to close specific sleeves for production challenges
o Elimination of ball extrusion
o Reduced risk of breached casing
o Sleeve and collet rated for 15k pressure limits
Reduced Cost
o Increased speed of completions – 20 -40 min vs. 1 hr 40 min or higher
reduced direct and indirect costs (continuous pumping operations)
o Reduced fluids into formation and the associated cost
o No milling and drilling out of balls and seats
o Elimination of Coil Tubing
o Dissolvable ball allows for full wellbore access during flow back and
production operations
o Reduction in pressure pumping and associated costs
16. The Cost and Savings Discussion
16
Compared to Ball Drop
o Costs comparable to ball drop but with significant operational advantages
Compared to Plug and Perf
o No coil tubing unit to drill out plugs, no drill bits and accessories
o Reduction in treating and stimulation
o No stand by on frac equipment while having to set bridge plugs / perforate
o Fluid hauling is drastically reduced (reduction in fluid volume for pumping down wireline to set
bridge plugs / perf)
Compared to Sliding Sleeve with Coil
o No coil tubing unit to open and fracture each sleeve
o No coil tubing packer and accessories
o Elimination of fresh water circulating costs to maintain coil integrity
o Fresh water disposal
o Reduction in treating and stimulation
18. Quality Assurance
18
Ability to land collets at between
1 m3/min and 5 m3/min
Continuous completion
Over 100 surface tests
Varied pressures,
temperatures and rates
100% success
Two wells successfully completed
using Stage
Third well installed – testing in
next two weeks
Blackbird 06-14-70-7W6M Pump Down
20. Blackbird’s 02/2-20 Montney Well
20
Blackbird is implementing the
largest sliding sleeve
completion in the Elmworth /
Pipestone Corridor
71-76 Stage sleeves
4,000 tonnes of proppant (~2.0
tonnes per linear meter)
~2,150 meter lateral
Slickwater
Pumpers: Step Energy Services
Estimated completion:
November 8, 2016
21. Roll Out Achievement
21
The Eagle Ford
The Cardium
The Uinta
The Bakken
The Montney
The Permian
China Successfully Being Deployed in Cased and Open Hole Applications
23. Stage Checks All The Boxes
23
Based on 4.5-in (114.3-mm)
Casing
SC Bowhead II Plug & Perf (five
clusters/stage)
Sliding Sleeve
(Coil Tubing)
Ball-Drop
Unlimited stages Yes Yes Yes No
Reduced pumping friction pressure Yes Yes No No
Can use high fluid rates and sand
concentration
Yes Yes No No*
Individual frac Isolation Yes No Yes Yes
Wellbore unrestricted by ball seats or
coil tubing while fracturing
Yes Yes No No
Reduces pumping time on surface Yes No No Yes
Water and chemicals conservation Yes No No Yes
Re-closable sleeve for re-fracturing or
shutoff
Yes No Yes No
Extended reach capability Yes Yes No No
Production-ready wellbore Yes No Yes Yes
Constant ID heel to toe Yes Yes Yes No
Open hole or Cased hole application Yes No Yes No
Cemented annulus Yes Yes Yes No
Completed without coiled tubing Yes No No Yes
* Restricted at the toe
24. Disruptive Completions Technology
24
Higher Tonnages
Higher Rates
Longer laterals
More Stages
Stage’s Bowhead
II Increased EUR’s
High Utility of
Capital
Improved Water
Management