April 9, 2018
Springfield Community Business Center
Commuter Parking Garage
Slugging Community Meeting
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
Building Design and Construction Division
Introduction
Welcome
– Introductions
– Project Overview
• Scope
• Status
– Revised Ground Floor Plan and Slug Line Space
– Transit Center
– Slug Line and Parking Relocation During Construction
– Questions and Answers
2
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
Building Design and Construction Division
Introduction
• Implementing Agencies
– Department of Transportation
– Department of Public Works and Environmental
Services
• Partnering Agencies
– Office of Community Revitalization
– Fairfax County Park Authority
3
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
Site Location
4Building Design and Construction Division
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
Background – Purpose and Need
• Fairfax County Comprehensive Plan
5Building Design and Construction Division
- Commuter parking facility
- Preserve slugging*
- Meet long term parking and
park-and-ride needs
- Multimodal center (provide
more choices to commuters)
- Include community-serving uses
that can utilize parking on
evenings and weekends
* The Comprehensive Plan specifically mentions slugging as
a form of carpooling that should be preserved at the garage
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
Background – Purpose and Need
- Provide additional commuter parking capacity to meet the
high demand in the Springfield area
- Secure parking in County-owned facility for slugging and
carpooling
- Provide bicycle and pedestrian facilities and access
- Provide a connection point for multiple transit routes to
improve service and access to transit
- Provide flexible, community event spaces for evening and
weekend use
6Building Design and Construction Division
• Project Goals
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
Background – Purpose and Need
• Permanently secure and consolidate commuter parking at one
location
7Building Design and Construction Division
- Existing County-owned surface
parking (278 spaces)
- Springfield Plaza (240 spaces either
leased or under agreement with
owner)
- American Legion (100 spaces
leased)
- Springfield United Methodist
Church (54 spaces leased)
- 672 total spaces with 394*
under leases or agreements
* County to continue leasing these spaces after the garage opens
as long as there is sufficient demand and owner willingness
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
Project Overview
• Design Features
– 6-level garage with over 1000 parking spaces
• Adding over 700 County-owned spaces at the lot
– Two commuter slug line loading zones
• Line A: 18-car loading zone with extra 4-car queueing capacity
• Line B: 15-car loading zone with extra 4-car queueing capacity
– Shared slug lines and kiss-and-ride space
– Carpool waiting/short-term parking area provided on ramp
• 10 spaces initially
• Can be expanded
8Building Design and Construction Division
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
Project Overview
• Design Features
– Pedestrian bridge over Old Keene Mill Road
• Provides access to bus stops on westbound Old Keene Mill Road
• Connects Springfield Plaza to the parking garage
– Bus transit center with 7 bus bays
– Bicycle storage, passenger waiting areas, and transit system
information
– Community event spaces on ground and top levels
9Building Design and Construction Division
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
Perspective
10Building Design and Construction Division
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
Roof Top View
11Building Design and Construction Division
VIEW FROM NORTHWEST
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
Project Status
• Status
– Finalizing design plans
– Land acquisition initiated
– Construction anticipated to begin in late 2019*
– Garage operation anticipated to begin in spring 2022
* County will provide alternate space and parking for slug
lines and commuters during construction
12Building Design and Construction Division
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
First Floor Plan (Ground Level) - PREVIOUS
13
7 Bus Bays
Short Term Parking Area
Pedestrian Bridge (200 LF)
Carpool (Slug) Area with
Pick-up/Drop-off Zones
Building Design and Construction Division
Bicycle Storage
Passenger Waiting Areas
(Bus Shelters) and
Transit Information Displays
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
First Floor Plan (Ground Level) - PREVIOUS
14Building Design and Construction Division
Slug area expanded from 2
lines of 6 cars each to 18
cars in Line A and 15 cars in
Line B
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
First Floor Plan (Ground Level) - REVISED
15
7 Bus Bays
Carpool Waiting Area/
Short Term Parking Area
Slug Line A Loading Area
Capacity 18 cars
Kiss & Ride during non-rush
Building Design and Construction Division
Slug Line B Loading Area
Capacity 15 cars
Kiss & Ride during non-rush Overflow of 4 cars per line
Sunoco Gas Station
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
First Floor Plan (Ground Level) - REVISED
16Building Design and Construction Division
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
First Floor Plan (Ground Level) - REVISED
• Revised Plan Benefits to Slug Lines
– Expanded space on ground floor for slug lines
– Increased loading zone capacities
• Line A: from 6 cars to 18 cars
• Line B: from 6 cars to 15 cars
– Increased queuing capacities
• Line A: up to 22 cars (includes loading zone)
• Line B: up to 19 cars (includes loading zone)
• Entrance width allows queueing for both lines
– Carpool waiting/short-term parking
separated from slug lines
• Area can now be expanded if required
– Adding over 700 spaces at the lot
• More parking on site for sluggers seeking rides
17Building Design and Construction Division
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
Multimodal Facility
• Transit Center Benefits
– Enhance transfers between Fairfax Connector and Metrobus
routes
• Existing Connector routes will be able to use this center
• Allows transfers to Metrobus Routes 18G, H, J and P
– Create more efficient service
• Location allows rerouting of bus routes to more efficient travel paths
– Faster service
– Less operating expenses
– Location complements other facilities in the area
• Location better serves commuters west of I-95 and I-395
• Location accessible to I-95, I-395, and I-495
18Building Design and Construction Division
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
Multimodal Facility
• Transit Center Benefits
– Create transportation hub in Community Business Center
• Pentagon
• Rolling Valley Mall Park & Ride
• Keene Mill Heights neighborhood
• Franconia-Springfield Metrorail Station
• Huntington Metrorail Station
• Van Dorn Street Metrorail Station
• Shirley Industrial Park
• Mark Center
• George Mason University*
• Fairfax County Judicial Center*
• Fairfax County Government Center*
• Centreville*
* Indicates possible future destinations
19Building Design and Construction Division
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
Multimodal Facility
• Transit Planning
– Shared facility
• Commuter parking is primary use
• A lot of the transit service is local versus commuter
oriented
– Lower parking demand
– Opportunity to bus and slug
• Transit routes and frequency reassessed based on
demand
– Routes adjusted, added, or removed
– 5 bays required at opening
• 11 routes generating 30 bus trips per hour
– 7 bays needed for future expansion of transit
service
• 14 routes generating 45 bus trips per hour by 2035
20Building Design and Construction Division
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
Temporary Slug Line and Parking Relocation
• Temporary Slug Line and Parking Relocation
21Building Design and Construction Division
– Existing lot will be closed
during construction
– County will provide
alternate locations
– May need different
locations for the two slug
lines
– Seeking input
We want your help!
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
Temporary Slug Line and Parking Relocation
• Suggestions and Ideas
22Building Design and Construction Division
– Springfield Plaza
– Springfield Town Center
– Backlick North Park-and-
Ride
– Rolling Valley Park-and-
Ride
– Tower Center
– Lorton VRE Station
– Saratoga Park-and-Ride
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
Questions and Answers
23
Questions and Answers
Building Design and Construction Division
Department of Transportation
Springfield Community Business Center Commuter Parking Garage
24
Thank You
Building Design and Construction Division
Comments
• Comment Forms
• Submit Comments on Project Website:
https://www.fairfaxcounty.gov/transportation/projects/springfield-garage
Department of Transportation
www.fairfaxcounty.gov/fcdot (703) 877-5600 TTY: 711
Department of Public Works and Environmental Services
www.fairfaxcounty.gov/dpwes (703) 324-5800 TTY: 711

More Related Content

What's hot

Master plan of NID Shrikant
Master plan of NID ShrikantMaster plan of NID Shrikant
Master plan of NID Shrikant
ShriKant49
 
Critical Analysis of the Planning scenario in Hyderabad City
Critical Analysis of the Planning scenario in Hyderabad CityCritical Analysis of the Planning scenario in Hyderabad City
Critical Analysis of the Planning scenario in Hyderabad City
Maitreyi Yellapragada
 
Express avenue mall architectural case study,chennai
Express avenue mall architectural case study,chennaiExpress avenue mall architectural case study,chennai
Express avenue mall architectural case study,chennai
AIN UL HAQ PUNEKAR
 
Abu safwan thesis report
Abu safwan thesis reportAbu safwan thesis report
Abu safwan thesis report
Abu Safwan
 
Sabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agraSabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agra
deeksha sharma
 
NATIONAL PARLIAMENT DHAKA BY LOUIS I. KHAN Modern architecture
NATIONAL PARLIAMENT DHAKA BY LOUIS I. KHAN Modern architectureNATIONAL PARLIAMENT DHAKA BY LOUIS I. KHAN Modern architecture
NATIONAL PARLIAMENT DHAKA BY LOUIS I. KHAN Modern architecture
SAYANTAN PAUL
 
architecture internship portfolio
architecture internship portfolioarchitecture internship portfolio
architecture internship portfolio
rakesh kumar
 
MIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICSMIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICS
JayashreeIyer14
 
MARINA BAY SINGAPORE - URBAN CASE STUDY
MARINA BAY SINGAPORE - URBAN CASE STUDYMARINA BAY SINGAPORE - URBAN CASE STUDY
MARINA BAY SINGAPORE - URBAN CASE STUDY
LAr. Siti Aishah Khairuddin
 
Folded plates case study (theory of structures)
Folded plates case study (theory of structures)Folded plates case study (theory of structures)
Folded plates case study (theory of structures)
NIKITA SHARMA
 
Lakefront development at kanelav lake
Lakefront development at kanelav lakeLakefront development at kanelav lake
Lakefront development at kanelav lake
harshilshah546931
 
High Density and Large Scale Mixed Use
High Density and Large Scale Mixed UseHigh Density and Large Scale Mixed Use
High Density and Large Scale Mixed Use
Rajesh Kolli
 
Architectural Design Project Design Report
Architectural Design Project Design ReportArchitectural Design Project Design Report
Architectural Design Project Design Report
KohSungJie
 
Architectural case study of chandigarh by louis i khan
Architectural case study of chandigarh by louis i khanArchitectural case study of chandigarh by louis i khan
Architectural case study of chandigarh by louis i khan
Rajat Katarne
 
Bharat Bhavan, Bhopal
Bharat Bhavan, BhopalBharat Bhavan, Bhopal
Bharat Bhavan, Bhopal
Divya Suresh
 
Uttarayan art foundation
Uttarayan art foundationUttarayan art foundation
Uttarayan art foundation
Juhi Kumari
 
urban studies NASHIK by GB
urban studies NASHIK by GBurban studies NASHIK by GB
urban studies NASHIK by GB
GajananBhamare
 
Pondicherry tourism
Pondicherry tourismPondicherry tourism
Pondicherry tourism
michellesahay
 
BIM case study
BIM case studyBIM case study
BIM case study
NeelkumarBairwa1
 
Gip
GipGip

What's hot (20)

Master plan of NID Shrikant
Master plan of NID ShrikantMaster plan of NID Shrikant
Master plan of NID Shrikant
 
Critical Analysis of the Planning scenario in Hyderabad City
Critical Analysis of the Planning scenario in Hyderabad CityCritical Analysis of the Planning scenario in Hyderabad City
Critical Analysis of the Planning scenario in Hyderabad City
 
Express avenue mall architectural case study,chennai
Express avenue mall architectural case study,chennaiExpress avenue mall architectural case study,chennai
Express avenue mall architectural case study,chennai
 
Abu safwan thesis report
Abu safwan thesis reportAbu safwan thesis report
Abu safwan thesis report
 
Sabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agraSabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agra
 
NATIONAL PARLIAMENT DHAKA BY LOUIS I. KHAN Modern architecture
NATIONAL PARLIAMENT DHAKA BY LOUIS I. KHAN Modern architectureNATIONAL PARLIAMENT DHAKA BY LOUIS I. KHAN Modern architecture
NATIONAL PARLIAMENT DHAKA BY LOUIS I. KHAN Modern architecture
 
architecture internship portfolio
architecture internship portfolioarchitecture internship portfolio
architecture internship portfolio
 
MIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICSMIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICS
 
MARINA BAY SINGAPORE - URBAN CASE STUDY
MARINA BAY SINGAPORE - URBAN CASE STUDYMARINA BAY SINGAPORE - URBAN CASE STUDY
MARINA BAY SINGAPORE - URBAN CASE STUDY
 
Folded plates case study (theory of structures)
Folded plates case study (theory of structures)Folded plates case study (theory of structures)
Folded plates case study (theory of structures)
 
Lakefront development at kanelav lake
Lakefront development at kanelav lakeLakefront development at kanelav lake
Lakefront development at kanelav lake
 
High Density and Large Scale Mixed Use
High Density and Large Scale Mixed UseHigh Density and Large Scale Mixed Use
High Density and Large Scale Mixed Use
 
Architectural Design Project Design Report
Architectural Design Project Design ReportArchitectural Design Project Design Report
Architectural Design Project Design Report
 
Architectural case study of chandigarh by louis i khan
Architectural case study of chandigarh by louis i khanArchitectural case study of chandigarh by louis i khan
Architectural case study of chandigarh by louis i khan
 
Bharat Bhavan, Bhopal
Bharat Bhavan, BhopalBharat Bhavan, Bhopal
Bharat Bhavan, Bhopal
 
Uttarayan art foundation
Uttarayan art foundationUttarayan art foundation
Uttarayan art foundation
 
urban studies NASHIK by GB
urban studies NASHIK by GBurban studies NASHIK by GB
urban studies NASHIK by GB
 
Pondicherry tourism
Pondicherry tourismPondicherry tourism
Pondicherry tourism
 
BIM case study
BIM case studyBIM case study
BIM case study
 
Gip
GipGip
Gip
 

Similar to Springfield Community Business Center Commuter Parking Garage Slugging Community Meeting

Springfield Community Business Center Commuter Parking Garage
Springfield Community Business Center Commuter Parking GarageSpringfield Community Business Center Commuter Parking Garage
Springfield Community Business Center Commuter Parking Garage
Fairfax County
 
Springfield Community Business Center Commuter Parking Garage: Design Public ...
Springfield Community Business Center Commuter Parking Garage: Design Public ...Springfield Community Business Center Commuter Parking Garage: Design Public ...
Springfield Community Business Center Commuter Parking Garage: Design Public ...
Fairfax County
 
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Fairfax County
 
Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17
Adina Levin
 
Capitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open HouseCapitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open House
jseattle
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
Toronto Public Consultation Unit
 
2520-20measure20presentation (1).ppt
2520-20measure20presentation (1).ppt2520-20measure20presentation (1).ppt
2520-20measure20presentation (1).ppt
Richie890303
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2
StittsvilleCentral.ca
 
2013-03-15_BalanceMHub&Parking_final
2013-03-15_BalanceMHub&Parking_final2013-03-15_BalanceMHub&Parking_final
2013-03-15_BalanceMHub&Parking_final
Joshua Engel-Yan
 
CMAX Cleveland Avenue BRT Public Meeting - October 14, 2014
CMAX Cleveland Avenue BRT Public Meeting - October 14, 2014CMAX Cleveland Avenue BRT Public Meeting - October 14, 2014
CMAX Cleveland Avenue BRT Public Meeting - October 14, 2014
COTA BUS
 
Geometric design
Geometric designGeometric design
Geometric design
Taamrat kuhilen
 
8 7-14 electric multiple unit procurement update
8 7-14 electric multiple unit procurement update8 7-14 electric multiple unit procurement update
8 7-14 electric multiple unit procurement update
Adina Levin
 
VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014
SCVTA
 
South Lakes Drive Sidewalk
South Lakes Drive Sidewalk South Lakes Drive Sidewalk
South Lakes Drive Sidewalk
Fairfax County
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
Toronto Public Consultation Unit
 
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventBirmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
Design South East
 
Caltrain emu procurement sept 2014
Caltrain emu procurement sept 2014Caltrain emu procurement sept 2014
Caltrain emu procurement sept 2014
Adina Levin
 
Richmond Highway Transit Center Feasibility Study: Public Information Meeting
Richmond Highway Transit Center Feasibility Study: Public Information MeetingRichmond Highway Transit Center Feasibility Study: Public Information Meeting
Richmond Highway Transit Center Feasibility Study: Public Information Meeting
Fairfax County
 
Isbt kashmere gate 2
Isbt kashmere gate 2Isbt kashmere gate 2
Isbt kashmere gate 2
Kishmish Sethi
 
VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21
SCVTA
 

Similar to Springfield Community Business Center Commuter Parking Garage Slugging Community Meeting (20)

Springfield Community Business Center Commuter Parking Garage
Springfield Community Business Center Commuter Parking GarageSpringfield Community Business Center Commuter Parking Garage
Springfield Community Business Center Commuter Parking Garage
 
Springfield Community Business Center Commuter Parking Garage: Design Public ...
Springfield Community Business Center Commuter Parking Garage: Design Public ...Springfield Community Business Center Commuter Parking Garage: Design Public ...
Springfield Community Business Center Commuter Parking Garage: Design Public ...
 
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
 
Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17
 
Capitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open HouseCapitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open House
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
 
2520-20measure20presentation (1).ppt
2520-20measure20presentation (1).ppt2520-20measure20presentation (1).ppt
2520-20measure20presentation (1).ppt
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2
 
2013-03-15_BalanceMHub&Parking_final
2013-03-15_BalanceMHub&Parking_final2013-03-15_BalanceMHub&Parking_final
2013-03-15_BalanceMHub&Parking_final
 
CMAX Cleveland Avenue BRT Public Meeting - October 14, 2014
CMAX Cleveland Avenue BRT Public Meeting - October 14, 2014CMAX Cleveland Avenue BRT Public Meeting - October 14, 2014
CMAX Cleveland Avenue BRT Public Meeting - October 14, 2014
 
Geometric design
Geometric designGeometric design
Geometric design
 
8 7-14 electric multiple unit procurement update
8 7-14 electric multiple unit procurement update8 7-14 electric multiple unit procurement update
8 7-14 electric multiple unit procurement update
 
VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014
 
South Lakes Drive Sidewalk
South Lakes Drive Sidewalk South Lakes Drive Sidewalk
South Lakes Drive Sidewalk
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
 
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventBirmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
 
Caltrain emu procurement sept 2014
Caltrain emu procurement sept 2014Caltrain emu procurement sept 2014
Caltrain emu procurement sept 2014
 
Richmond Highway Transit Center Feasibility Study: Public Information Meeting
Richmond Highway Transit Center Feasibility Study: Public Information MeetingRichmond Highway Transit Center Feasibility Study: Public Information Meeting
Richmond Highway Transit Center Feasibility Study: Public Information Meeting
 
Isbt kashmere gate 2
Isbt kashmere gate 2Isbt kashmere gate 2
Isbt kashmere gate 2
 
VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21
 

More from Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
Fairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Fairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Fairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
Fairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Fairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
Fairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
Fairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
Fairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Fairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
Fairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
Fairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
Fairfax County
 

More from Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Recently uploaded

Markakis-Schlee-Young-2021-The-nation-state.pdf
Markakis-Schlee-Young-2021-The-nation-state.pdfMarkakis-Schlee-Young-2021-The-nation-state.pdf
Markakis-Schlee-Young-2021-The-nation-state.pdf
Abraham Lebeza
 
12062024_First India Newspaper Jaipur.pdf
12062024_First India Newspaper Jaipur.pdf12062024_First India Newspaper Jaipur.pdf
12062024_First India Newspaper Jaipur.pdf
FIRST INDIA
 
The Rise of Christian Persecution In Islamic Countries
The Rise of Christian Persecution In Islamic CountriesThe Rise of Christian Persecution In Islamic Countries
The Rise of Christian Persecution In Islamic Countries
ECSPE - Saving the Persecuted and Enslaved
 
The Rise of Christian Persecution In Islamic Countries (1).pdf
The Rise of Christian Persecution In Islamic Countries (1).pdfThe Rise of Christian Persecution In Islamic Countries (1).pdf
The Rise of Christian Persecution In Islamic Countries (1).pdf
ECSPE - Saving the Persecuted and Enslaved
 
15062024_First India Newspaper Jaipur.pdf
15062024_First India Newspaper Jaipur.pdf15062024_First India Newspaper Jaipur.pdf
15062024_First India Newspaper Jaipur.pdf
FIRST INDIA
 
13062024_First India Newspaper Jaipur.pdf
13062024_First India Newspaper Jaipur.pdf13062024_First India Newspaper Jaipur.pdf
13062024_First India Newspaper Jaipur.pdf
FIRST INDIA
 
#WenguiGuo#WashingtonFarm Guo Wengui Wolf son ambition exposed to open a far...
#WenguiGuo#WashingtonFarm  Guo Wengui Wolf son ambition exposed to open a far...#WenguiGuo#WashingtonFarm  Guo Wengui Wolf son ambition exposed to open a far...
#WenguiGuo#WashingtonFarm Guo Wengui Wolf son ambition exposed to open a far...
rittaajmal71
 
Reuters Institute Digital News Report 2024
Reuters Institute Digital News Report 2024Reuters Institute Digital News Report 2024
Reuters Institute Digital News Report 2024
Reuters Institute for the Study of Journalism, Oxford University
 
Howard Fineman, Veteran Political Journalist and TV Pundit, Dies at 75
Howard Fineman, Veteran Political Journalist and TV Pundit, Dies at 75Howard Fineman, Veteran Political Journalist and TV Pundit, Dies at 75
Howard Fineman, Veteran Political Journalist and TV Pundit, Dies at 75
LUMINATIVE MEDIA/PROJECT COUNSEL MEDIA GROUP
 
Organisations.pdf k[poikdip-jhhohuhejhnjhn
Organisations.pdf k[poikdip-jhhohuhejhnjhnOrganisations.pdf k[poikdip-jhhohuhejhnjhn
Organisations.pdf k[poikdip-jhhohuhejhnjhn
bhavenpr
 
18062024_First India Newspaper Jaipur.pdf
18062024_First India Newspaper Jaipur.pdf18062024_First India Newspaper Jaipur.pdf
18062024_First India Newspaper Jaipur.pdf
FIRST INDIA
 
On the Wrong Track | Recent Increasing Train Accidents in India | News
On the Wrong Track | Recent Increasing Train Accidents in India | NewsOn the Wrong Track | Recent Increasing Train Accidents in India | News
On the Wrong Track | Recent Increasing Train Accidents in India | News
Harsh Kumar
 
Federal Authorities Urge Vigilance Amid Bird Flu Outbreak | The Lifesciences ...
Federal Authorities Urge Vigilance Amid Bird Flu Outbreak | The Lifesciences ...Federal Authorities Urge Vigilance Amid Bird Flu Outbreak | The Lifesciences ...
Federal Authorities Urge Vigilance Amid Bird Flu Outbreak | The Lifesciences ...
The Lifesciences Magazine
 
Snigdha-Sreenath-Minor-v-Travancore-Devaswom-Board-WPCNO-39847-OF-2023-2024-L...
Snigdha-Sreenath-Minor-v-Travancore-Devaswom-Board-WPCNO-39847-OF-2023-2024-L...Snigdha-Sreenath-Minor-v-Travancore-Devaswom-Board-WPCNO-39847-OF-2023-2024-L...
Snigdha-Sreenath-Minor-v-Travancore-Devaswom-Board-WPCNO-39847-OF-2023-2024-L...
bhavenpr
 
projet de traité négocié à Istanbul (anglais).pdf
projet de traité négocié à Istanbul (anglais).pdfprojet de traité négocié à Istanbul (anglais).pdf
projet de traité négocié à Istanbul (anglais).pdf
EdouardHusson
 
Shark Tank Jargon | Operational Profitability
Shark Tank Jargon | Operational ProfitabilityShark Tank Jargon | Operational Profitability
Shark Tank Jargon | Operational Profitability
TheUnitedIndian
 
A draft Ukraine-Russia treaty from April 2022
A draft Ukraine-Russia treaty from April 2022A draft Ukraine-Russia treaty from April 2022
A draft Ukraine-Russia treaty from April 2022
dynamo777
 
17062024_First India Newspaper Jaipur.pdf
17062024_First India Newspaper Jaipur.pdf17062024_First India Newspaper Jaipur.pdf
17062024_First India Newspaper Jaipur.pdf
FIRST INDIA
 
在线办理(latrobe毕业证书)拉筹伯大学毕业证Offer一模一样
在线办理(latrobe毕业证书)拉筹伯大学毕业证Offer一模一样在线办理(latrobe毕业证书)拉筹伯大学毕业证Offer一模一样
在线办理(latrobe毕业证书)拉筹伯大学毕业证Offer一模一样
ckn2izdm
 
The Impact of Imperial Mode of Living on Migration.pdf
The Impact of Imperial Mode of Living on Migration.pdfThe Impact of Imperial Mode of Living on Migration.pdf
The Impact of Imperial Mode of Living on Migration.pdf
blueshagoo1
 

Recently uploaded (20)

Markakis-Schlee-Young-2021-The-nation-state.pdf
Markakis-Schlee-Young-2021-The-nation-state.pdfMarkakis-Schlee-Young-2021-The-nation-state.pdf
Markakis-Schlee-Young-2021-The-nation-state.pdf
 
12062024_First India Newspaper Jaipur.pdf
12062024_First India Newspaper Jaipur.pdf12062024_First India Newspaper Jaipur.pdf
12062024_First India Newspaper Jaipur.pdf
 
The Rise of Christian Persecution In Islamic Countries
The Rise of Christian Persecution In Islamic CountriesThe Rise of Christian Persecution In Islamic Countries
The Rise of Christian Persecution In Islamic Countries
 
The Rise of Christian Persecution In Islamic Countries (1).pdf
The Rise of Christian Persecution In Islamic Countries (1).pdfThe Rise of Christian Persecution In Islamic Countries (1).pdf
The Rise of Christian Persecution In Islamic Countries (1).pdf
 
15062024_First India Newspaper Jaipur.pdf
15062024_First India Newspaper Jaipur.pdf15062024_First India Newspaper Jaipur.pdf
15062024_First India Newspaper Jaipur.pdf
 
13062024_First India Newspaper Jaipur.pdf
13062024_First India Newspaper Jaipur.pdf13062024_First India Newspaper Jaipur.pdf
13062024_First India Newspaper Jaipur.pdf
 
#WenguiGuo#WashingtonFarm Guo Wengui Wolf son ambition exposed to open a far...
#WenguiGuo#WashingtonFarm  Guo Wengui Wolf son ambition exposed to open a far...#WenguiGuo#WashingtonFarm  Guo Wengui Wolf son ambition exposed to open a far...
#WenguiGuo#WashingtonFarm Guo Wengui Wolf son ambition exposed to open a far...
 
Reuters Institute Digital News Report 2024
Reuters Institute Digital News Report 2024Reuters Institute Digital News Report 2024
Reuters Institute Digital News Report 2024
 
Howard Fineman, Veteran Political Journalist and TV Pundit, Dies at 75
Howard Fineman, Veteran Political Journalist and TV Pundit, Dies at 75Howard Fineman, Veteran Political Journalist and TV Pundit, Dies at 75
Howard Fineman, Veteran Political Journalist and TV Pundit, Dies at 75
 
Organisations.pdf k[poikdip-jhhohuhejhnjhn
Organisations.pdf k[poikdip-jhhohuhejhnjhnOrganisations.pdf k[poikdip-jhhohuhejhnjhn
Organisations.pdf k[poikdip-jhhohuhejhnjhn
 
18062024_First India Newspaper Jaipur.pdf
18062024_First India Newspaper Jaipur.pdf18062024_First India Newspaper Jaipur.pdf
18062024_First India Newspaper Jaipur.pdf
 
On the Wrong Track | Recent Increasing Train Accidents in India | News
On the Wrong Track | Recent Increasing Train Accidents in India | NewsOn the Wrong Track | Recent Increasing Train Accidents in India | News
On the Wrong Track | Recent Increasing Train Accidents in India | News
 
Federal Authorities Urge Vigilance Amid Bird Flu Outbreak | The Lifesciences ...
Federal Authorities Urge Vigilance Amid Bird Flu Outbreak | The Lifesciences ...Federal Authorities Urge Vigilance Amid Bird Flu Outbreak | The Lifesciences ...
Federal Authorities Urge Vigilance Amid Bird Flu Outbreak | The Lifesciences ...
 
Snigdha-Sreenath-Minor-v-Travancore-Devaswom-Board-WPCNO-39847-OF-2023-2024-L...
Snigdha-Sreenath-Minor-v-Travancore-Devaswom-Board-WPCNO-39847-OF-2023-2024-L...Snigdha-Sreenath-Minor-v-Travancore-Devaswom-Board-WPCNO-39847-OF-2023-2024-L...
Snigdha-Sreenath-Minor-v-Travancore-Devaswom-Board-WPCNO-39847-OF-2023-2024-L...
 
projet de traité négocié à Istanbul (anglais).pdf
projet de traité négocié à Istanbul (anglais).pdfprojet de traité négocié à Istanbul (anglais).pdf
projet de traité négocié à Istanbul (anglais).pdf
 
Shark Tank Jargon | Operational Profitability
Shark Tank Jargon | Operational ProfitabilityShark Tank Jargon | Operational Profitability
Shark Tank Jargon | Operational Profitability
 
A draft Ukraine-Russia treaty from April 2022
A draft Ukraine-Russia treaty from April 2022A draft Ukraine-Russia treaty from April 2022
A draft Ukraine-Russia treaty from April 2022
 
17062024_First India Newspaper Jaipur.pdf
17062024_First India Newspaper Jaipur.pdf17062024_First India Newspaper Jaipur.pdf
17062024_First India Newspaper Jaipur.pdf
 
在线办理(latrobe毕业证书)拉筹伯大学毕业证Offer一模一样
在线办理(latrobe毕业证书)拉筹伯大学毕业证Offer一模一样在线办理(latrobe毕业证书)拉筹伯大学毕业证Offer一模一样
在线办理(latrobe毕业证书)拉筹伯大学毕业证Offer一模一样
 
The Impact of Imperial Mode of Living on Migration.pdf
The Impact of Imperial Mode of Living on Migration.pdfThe Impact of Imperial Mode of Living on Migration.pdf
The Impact of Imperial Mode of Living on Migration.pdf
 

Springfield Community Business Center Commuter Parking Garage Slugging Community Meeting

  • 1. Building Design and Construction DivisionDepartment of Transportation April 9, 2018 Springfield Community Business Center Commuter Parking Garage Slugging Community Meeting
  • 2. Department of Transportation Springfield Community Business Center Commuter Parking Garage Building Design and Construction Division Introduction Welcome – Introductions – Project Overview • Scope • Status – Revised Ground Floor Plan and Slug Line Space – Transit Center – Slug Line and Parking Relocation During Construction – Questions and Answers 2
  • 3. Department of Transportation Springfield Community Business Center Commuter Parking Garage Building Design and Construction Division Introduction • Implementing Agencies – Department of Transportation – Department of Public Works and Environmental Services • Partnering Agencies – Office of Community Revitalization – Fairfax County Park Authority 3
  • 4. Department of Transportation Springfield Community Business Center Commuter Parking Garage Site Location 4Building Design and Construction Division
  • 5. Department of Transportation Springfield Community Business Center Commuter Parking Garage Background – Purpose and Need • Fairfax County Comprehensive Plan 5Building Design and Construction Division - Commuter parking facility - Preserve slugging* - Meet long term parking and park-and-ride needs - Multimodal center (provide more choices to commuters) - Include community-serving uses that can utilize parking on evenings and weekends * The Comprehensive Plan specifically mentions slugging as a form of carpooling that should be preserved at the garage
  • 6. Department of Transportation Springfield Community Business Center Commuter Parking Garage Background – Purpose and Need - Provide additional commuter parking capacity to meet the high demand in the Springfield area - Secure parking in County-owned facility for slugging and carpooling - Provide bicycle and pedestrian facilities and access - Provide a connection point for multiple transit routes to improve service and access to transit - Provide flexible, community event spaces for evening and weekend use 6Building Design and Construction Division • Project Goals
  • 7. Department of Transportation Springfield Community Business Center Commuter Parking Garage Background – Purpose and Need • Permanently secure and consolidate commuter parking at one location 7Building Design and Construction Division - Existing County-owned surface parking (278 spaces) - Springfield Plaza (240 spaces either leased or under agreement with owner) - American Legion (100 spaces leased) - Springfield United Methodist Church (54 spaces leased) - 672 total spaces with 394* under leases or agreements * County to continue leasing these spaces after the garage opens as long as there is sufficient demand and owner willingness
  • 8. Department of Transportation Springfield Community Business Center Commuter Parking Garage Project Overview • Design Features – 6-level garage with over 1000 parking spaces • Adding over 700 County-owned spaces at the lot – Two commuter slug line loading zones • Line A: 18-car loading zone with extra 4-car queueing capacity • Line B: 15-car loading zone with extra 4-car queueing capacity – Shared slug lines and kiss-and-ride space – Carpool waiting/short-term parking area provided on ramp • 10 spaces initially • Can be expanded 8Building Design and Construction Division
  • 9. Department of Transportation Springfield Community Business Center Commuter Parking Garage Project Overview • Design Features – Pedestrian bridge over Old Keene Mill Road • Provides access to bus stops on westbound Old Keene Mill Road • Connects Springfield Plaza to the parking garage – Bus transit center with 7 bus bays – Bicycle storage, passenger waiting areas, and transit system information – Community event spaces on ground and top levels 9Building Design and Construction Division
  • 10. Department of Transportation Springfield Community Business Center Commuter Parking Garage Perspective 10Building Design and Construction Division
  • 11. Department of Transportation Springfield Community Business Center Commuter Parking Garage Roof Top View 11Building Design and Construction Division VIEW FROM NORTHWEST
  • 12. Department of Transportation Springfield Community Business Center Commuter Parking Garage Project Status • Status – Finalizing design plans – Land acquisition initiated – Construction anticipated to begin in late 2019* – Garage operation anticipated to begin in spring 2022 * County will provide alternate space and parking for slug lines and commuters during construction 12Building Design and Construction Division
  • 13. Department of Transportation Springfield Community Business Center Commuter Parking Garage First Floor Plan (Ground Level) - PREVIOUS 13 7 Bus Bays Short Term Parking Area Pedestrian Bridge (200 LF) Carpool (Slug) Area with Pick-up/Drop-off Zones Building Design and Construction Division Bicycle Storage Passenger Waiting Areas (Bus Shelters) and Transit Information Displays
  • 14. Department of Transportation Springfield Community Business Center Commuter Parking Garage First Floor Plan (Ground Level) - PREVIOUS 14Building Design and Construction Division Slug area expanded from 2 lines of 6 cars each to 18 cars in Line A and 15 cars in Line B
  • 15. Department of Transportation Springfield Community Business Center Commuter Parking Garage First Floor Plan (Ground Level) - REVISED 15 7 Bus Bays Carpool Waiting Area/ Short Term Parking Area Slug Line A Loading Area Capacity 18 cars Kiss & Ride during non-rush Building Design and Construction Division Slug Line B Loading Area Capacity 15 cars Kiss & Ride during non-rush Overflow of 4 cars per line Sunoco Gas Station
  • 16. Department of Transportation Springfield Community Business Center Commuter Parking Garage First Floor Plan (Ground Level) - REVISED 16Building Design and Construction Division
  • 17. Department of Transportation Springfield Community Business Center Commuter Parking Garage First Floor Plan (Ground Level) - REVISED • Revised Plan Benefits to Slug Lines – Expanded space on ground floor for slug lines – Increased loading zone capacities • Line A: from 6 cars to 18 cars • Line B: from 6 cars to 15 cars – Increased queuing capacities • Line A: up to 22 cars (includes loading zone) • Line B: up to 19 cars (includes loading zone) • Entrance width allows queueing for both lines – Carpool waiting/short-term parking separated from slug lines • Area can now be expanded if required – Adding over 700 spaces at the lot • More parking on site for sluggers seeking rides 17Building Design and Construction Division
  • 18. Department of Transportation Springfield Community Business Center Commuter Parking Garage Multimodal Facility • Transit Center Benefits – Enhance transfers between Fairfax Connector and Metrobus routes • Existing Connector routes will be able to use this center • Allows transfers to Metrobus Routes 18G, H, J and P – Create more efficient service • Location allows rerouting of bus routes to more efficient travel paths – Faster service – Less operating expenses – Location complements other facilities in the area • Location better serves commuters west of I-95 and I-395 • Location accessible to I-95, I-395, and I-495 18Building Design and Construction Division
  • 19. Department of Transportation Springfield Community Business Center Commuter Parking Garage Multimodal Facility • Transit Center Benefits – Create transportation hub in Community Business Center • Pentagon • Rolling Valley Mall Park & Ride • Keene Mill Heights neighborhood • Franconia-Springfield Metrorail Station • Huntington Metrorail Station • Van Dorn Street Metrorail Station • Shirley Industrial Park • Mark Center • George Mason University* • Fairfax County Judicial Center* • Fairfax County Government Center* • Centreville* * Indicates possible future destinations 19Building Design and Construction Division
  • 20. Department of Transportation Springfield Community Business Center Commuter Parking Garage Multimodal Facility • Transit Planning – Shared facility • Commuter parking is primary use • A lot of the transit service is local versus commuter oriented – Lower parking demand – Opportunity to bus and slug • Transit routes and frequency reassessed based on demand – Routes adjusted, added, or removed – 5 bays required at opening • 11 routes generating 30 bus trips per hour – 7 bays needed for future expansion of transit service • 14 routes generating 45 bus trips per hour by 2035 20Building Design and Construction Division
  • 21. Department of Transportation Springfield Community Business Center Commuter Parking Garage Temporary Slug Line and Parking Relocation • Temporary Slug Line and Parking Relocation 21Building Design and Construction Division – Existing lot will be closed during construction – County will provide alternate locations – May need different locations for the two slug lines – Seeking input We want your help!
  • 22. Department of Transportation Springfield Community Business Center Commuter Parking Garage Temporary Slug Line and Parking Relocation • Suggestions and Ideas 22Building Design and Construction Division – Springfield Plaza – Springfield Town Center – Backlick North Park-and- Ride – Rolling Valley Park-and- Ride – Tower Center – Lorton VRE Station – Saratoga Park-and-Ride
  • 23. Department of Transportation Springfield Community Business Center Commuter Parking Garage Questions and Answers 23 Questions and Answers Building Design and Construction Division
  • 24. Department of Transportation Springfield Community Business Center Commuter Parking Garage 24 Thank You Building Design and Construction Division Comments • Comment Forms • Submit Comments on Project Website: https://www.fairfaxcounty.gov/transportation/projects/springfield-garage Department of Transportation www.fairfaxcounty.gov/fcdot (703) 877-5600 TTY: 711 Department of Public Works and Environmental Services www.fairfaxcounty.gov/dpwes (703) 324-5800 TTY: 711