EMBEDDED SOLAR PV GENERATION
IN SOUTH AFRICA
Having received many enquiries from
clients wishing to connect their embedded
generation systems to utilities, we
identified the need to prepare a summary
whereby persons could understand the
principles in a nutshell.
It should be noted that this document
refers to both grid-tied and grid-
integrated systems (whenever there is
some form of connecting to the utility).
Off-grid systems are not pertinently part
of this discussion.
At present legislation and regulations regarding
embedded generation is open for interpretation. This
results in uncertainty pertaining to compliance.
One example is the interpretation of the “Own Use”
principle as contained in Item 2 of Schedule II of the
Electricity Regulation Act 4 of 2006 (“ERA”). Some
utilities interpret this as meaning that a specific user
is a net consumer of electricity over a certain period,
say one year. Other stakeholders interpret it as
meaning that no reverse flow of electricity through a
meter occurs – the latter which is also referred to as
“Self Consumption”.
There are also perceptions in the market about what
systems require licensing.
In order to clarify the position, NERSA commenced a
process whereby the Small Scale Embedded
Generation (“SSEG”) Rules would have been issued.
This process was commenced early in 2015 and
would have been issued by Q3 2015. By November
2015 the DOE however took charge of this process
and also intimated that a change to the ERA is
considered.
Both these processes are intended to get finality
regarding to interpretation and processes to follow.
At present these amendments / clarifications are
expected to be issued by Q3 2016.
• SANS10142-3 is currently being developed and
would soon regulate the DC (Direct Current)
aspects of wiring.
The two regulations currently in place are:
• The NRS097-2 regulations are applied regarding
the connection of embedded generators. This
currently prescribes the principles of connection
and procedures for shut down of systems.
• SANS10142-1 regulates the electrical wiring of
premises. This applies to the AC (Alternating
Current) aspects of wiring.
All of these principles have safety in mind and are
not intended to create unnecessary burdensome
procedures.
Connection and Synchronization of Embedded Generation –
The Current Status
Whether a System can be connected to a utility:
When an embedded generation system (Solar PV, Diesel, Biogas, Wind etc.) is considered, the first question
asked should be: Which utility provides the connection?
Utilities in South Africa are generally Eskom and Municipal Networks, both of whom have their own rules,
principles, by-laws and/or guidelines (or lack thereof) on how these system need to connect.
Current Regulatory position:
www.solareff.co.za info@solareff.co.za +27 011 675 1114
• Eskom does not allow any synchronization of
embedded generation to its LV network. An LV
network is connections up to 1000V, this is due
to a safety concern for technicians working on
the LV network.
• It is of utmost importance to understand the
principle of “synchronization”. This is the use by
the Solar PV system of the frequency supplied
by the utility and does not imply reverse flow of
power at all.
• The simple answer is therefore that Eskom does
not allow embedded generators to be installed at
its clients’ premises when on an LV connection.
• Eskom does have a process whereby clients
may convert from an LV to an MV connection.
This conversion is however so costly that it often
adds too much to the costs of the system to
remain financially viable.
• An easy way to determine whether a certain site
is on LV or MV is where the meter resides. If the
meter is a 380-400V meter, the connection is an
LV one (generally smaller connections between
15KVA – 1MVA). If the meter is a 11KV or 22KV
meter, it will be an MV connection (generally
larger connections >350KVA). As is evident, an
overlap exists in the size of the LV and MV
connections, therefore each site has to be
considered on its own merits.
Municipalities
• Various municipalities allow the connection of
embedded generation on an LV level. Many
other municipalities do not as yet allow any
connections of this nature and should a client
connect such a system in disregard to the
municipality’s principles, that client risks being
completely disconnected from their electrical
supply.
• In instances where municipalities do allow
connections:
• Each municipality has its own rules,
by-laws and processes to follow.
• Generally the large Metropolitan
municipalities have processes in place
whereby embedded generation can
be connected.
• In most instances municipalities
consider, witness and inspect these
installations before allowing it to be
“hot commissioned”.
• Most municipalities do not accept
excess generation back onto their
networks.
• Some municipalities do accept excess
generation, with or without
compensation to the client.
Principles of Design:
Prospective clients should start by asking their service provider about the legality of connecting to the utility. If
the service provider appears allusive in any respect, caution should be exercised. Many clients have paid
excessive school fees for systems that were not compliant which resulted in the client being completely
disconnected from their electrical supply.
When a service provider blindly refers to “turning the meter backwards” without explaining that a specialised
four-quadrant meter would be installed, additional caution should be exercised. Municipalities only accept
reverse flow when done through a properly approved bi-directional meter. The older mechanical-type meters
could be spun in reverse, however they are not calibrated for reverse flow which results in inaccurate
readings and are in any event not an approved method.
In each instance the service provider should provide a detail design whereby the risk of excess generation and
the possible curtailment thereof during off-peak periods are mitigated.
Clients should ask prospective service providers as many questions
as possible. When answers to questions of a regulatory nature are
avoided or when regulatory aspects are made out as non-issues,
caution should be exercised. You are most welcome to address
any questions of this nature to us.

More Related Content

What's hot

Lvdc
LvdcLvdc
Power Distribution Overview
Power Distribution OverviewPower Distribution Overview
Power Distribution Overview
HIMADRI BANERJI
 
Topology review and derivation methodology of single phase transformerless ph...
Topology review and derivation methodology of single phase transformerless ph...Topology review and derivation methodology of single phase transformerless ph...
Topology review and derivation methodology of single phase transformerless ph...
LeMeniz Infotech
 
Power grid operation in India
Power grid operation in IndiaPower grid operation in India
Power grid operation in India
Mahim Srivastava
 
IRJET- Power Loss Reduction in Radial Network using Flower Pollination Approach
IRJET- Power Loss Reduction in Radial Network using Flower Pollination ApproachIRJET- Power Loss Reduction in Radial Network using Flower Pollination Approach
IRJET- Power Loss Reduction in Radial Network using Flower Pollination Approach
IRJET Journal
 
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion SystemIRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET Journal
 
IRJET- Power Theft and Fault Detection using IoT Technology
IRJET-  	  Power Theft and Fault Detection using IoT TechnologyIRJET-  	  Power Theft and Fault Detection using IoT Technology
IRJET- Power Theft and Fault Detection using IoT Technology
IRJET Journal
 
What's short circuit level
What's short circuit levelWhat's short circuit level
What's short circuit level
Power System Operation
 
Short and long interruptions- UNIT-II-POWER QUALITY
Short and long interruptions- UNIT-II-POWER QUALITYShort and long interruptions- UNIT-II-POWER QUALITY
Short and long interruptions- UNIT-II-POWER QUALITY
ST. MARTIN'S ENGINEERING COLLEGE
 
Building management system from link vue system
Building management system  from link vue systemBuilding management system  from link vue system
Building management system from link vue system
Mahesh Chandra Manav
 
Standards of Power Quality (medium and low voltage electrical power grid )
Standards of Power Quality (medium and low voltage electrical power grid )Standards of Power Quality (medium and low voltage electrical power grid )
Standards of Power Quality (medium and low voltage electrical power grid )
jebrilbassem
 
Solar power and our application (2)
Solar power and our application (2)Solar power and our application (2)
Solar power and our application (2)
Mahesh Chandra Manav
 
Solid State Fault Current Limiter for Improvement of Smart Grid Performance
Solid State Fault Current Limiter for Improvement of Smart Grid PerformanceSolid State Fault Current Limiter for Improvement of Smart Grid Performance
Solid State Fault Current Limiter for Improvement of Smart Grid Performance
IRJET Journal
 
2. power system losses evaluation
2. power system losses evaluation2. power system losses evaluation
2. power system losses evaluation
Yusuf A. KHALIL
 
A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021
Mahesh Chandra Manav
 
Link vue system offer safety for human and assets (alert 24 x7)
Link vue system offer safety for human  and  assets (alert 24 x7)Link vue system offer safety for human  and  assets (alert 24 x7)
Link vue system offer safety for human and assets (alert 24 x7)
Mahesh Chandra Manav
 
PLS 2019: EV infrastructure requirements
PLS 2019: EV infrastructure requirementsPLS 2019: EV infrastructure requirements
PLS 2019: EV infrastructure requirements
Institution of Lighting Professionals
 
THINK GCCIA
THINK GCCIA THINK GCCIA
Licensing for ASPCA cabling system for sale
Licensing for ASPCA cabling system for saleLicensing for ASPCA cabling system for sale
Licensing for ASPCA cabling system for sale
clivemclean
 

What's hot (20)

Lvdc
LvdcLvdc
Lvdc
 
Power Distribution Overview
Power Distribution OverviewPower Distribution Overview
Power Distribution Overview
 
Topology review and derivation methodology of single phase transformerless ph...
Topology review and derivation methodology of single phase transformerless ph...Topology review and derivation methodology of single phase transformerless ph...
Topology review and derivation methodology of single phase transformerless ph...
 
Power grid operation in India
Power grid operation in IndiaPower grid operation in India
Power grid operation in India
 
IRJET- Power Loss Reduction in Radial Network using Flower Pollination Approach
IRJET- Power Loss Reduction in Radial Network using Flower Pollination ApproachIRJET- Power Loss Reduction in Radial Network using Flower Pollination Approach
IRJET- Power Loss Reduction in Radial Network using Flower Pollination Approach
 
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion SystemIRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
 
IRJET- Power Theft and Fault Detection using IoT Technology
IRJET-  	  Power Theft and Fault Detection using IoT TechnologyIRJET-  	  Power Theft and Fault Detection using IoT Technology
IRJET- Power Theft and Fault Detection using IoT Technology
 
What's short circuit level
What's short circuit levelWhat's short circuit level
What's short circuit level
 
Short and long interruptions- UNIT-II-POWER QUALITY
Short and long interruptions- UNIT-II-POWER QUALITYShort and long interruptions- UNIT-II-POWER QUALITY
Short and long interruptions- UNIT-II-POWER QUALITY
 
Building management system from link vue system
Building management system  from link vue systemBuilding management system  from link vue system
Building management system from link vue system
 
Standards of Power Quality (medium and low voltage electrical power grid )
Standards of Power Quality (medium and low voltage electrical power grid )Standards of Power Quality (medium and low voltage electrical power grid )
Standards of Power Quality (medium and low voltage electrical power grid )
 
Solar power and our application (2)
Solar power and our application (2)Solar power and our application (2)
Solar power and our application (2)
 
Solid State Fault Current Limiter for Improvement of Smart Grid Performance
Solid State Fault Current Limiter for Improvement of Smart Grid PerformanceSolid State Fault Current Limiter for Improvement of Smart Grid Performance
Solid State Fault Current Limiter for Improvement of Smart Grid Performance
 
2. power system losses evaluation
2. power system losses evaluation2. power system losses evaluation
2. power system losses evaluation
 
A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021
 
Poster[1]
Poster[1]Poster[1]
Poster[1]
 
Link vue system offer safety for human and assets (alert 24 x7)
Link vue system offer safety for human  and  assets (alert 24 x7)Link vue system offer safety for human  and  assets (alert 24 x7)
Link vue system offer safety for human and assets (alert 24 x7)
 
PLS 2019: EV infrastructure requirements
PLS 2019: EV infrastructure requirementsPLS 2019: EV infrastructure requirements
PLS 2019: EV infrastructure requirements
 
THINK GCCIA
THINK GCCIA THINK GCCIA
THINK GCCIA
 
Licensing for ASPCA cabling system for sale
Licensing for ASPCA cabling system for saleLicensing for ASPCA cabling system for sale
Licensing for ASPCA cabling system for sale
 

Similar to Solareff Information Brochure - Current Regulatory Position July 2016

Presentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringPresentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringAnil Kumar Bohra
 
Integration of Renewable Energy In Grid
Integration of Renewable Energy In GridIntegration of Renewable Energy In Grid
Integration of Renewable Energy In GridTejaswi Shukla
 
IRJET- Advanced Metering Infrastructure Tripping System
IRJET-  	  Advanced Metering Infrastructure Tripping SystemIRJET-  	  Advanced Metering Infrastructure Tripping System
IRJET- Advanced Metering Infrastructure Tripping System
IRJET Journal
 
IRJET-Electrical Power Robbery Detection and Transformer Fault Detection
IRJET-Electrical Power Robbery Detection and Transformer Fault Detection  IRJET-Electrical Power Robbery Detection and Transformer Fault Detection
IRJET-Electrical Power Robbery Detection and Transformer Fault Detection
IRJET Journal
 
Improving Distribution System Performance in Deregulated Electricity Industry...
Improving Distribution System Performance in Deregulated Electricity Industry...Improving Distribution System Performance in Deregulated Electricity Industry...
Improving Distribution System Performance in Deregulated Electricity Industry...
IOSRJEEE
 
IRJET- Sanctioned Load Monitoring & Controlling by using PLC
IRJET- Sanctioned Load Monitoring & Controlling by using PLCIRJET- Sanctioned Load Monitoring & Controlling by using PLC
IRJET- Sanctioned Load Monitoring & Controlling by using PLC
IRJET Journal
 
NARUC Joins the Debate on DERs
NARUC Joins the Debate on DERsNARUC Joins the Debate on DERs
NARUC Joins the Debate on DERs
ScottMadden, Inc.
 
Legislative Staff Briefing: Update on the Texas Electric Industry
Legislative Staff Briefing: Update on the Texas Electric IndustryLegislative Staff Briefing: Update on the Texas Electric Industry
Legislative Staff Briefing: Update on the Texas Electric Industry
aectnet
 
Smart Grid July 09
Smart Grid July 09Smart Grid July 09
Smart Grid July 09
Glenn Klith Andersen
 
Mantenimiento en los sistemas Eléctricos de distribución
Mantenimiento en los sistemas Eléctricos de distribución Mantenimiento en los sistemas Eléctricos de distribución
Mantenimiento en los sistemas Eléctricos de distribución
JOe Torres Palomino
 
EE Reports Submetering 102 Guide
EE Reports Submetering 102 GuideEE Reports Submetering 102 Guide
EE Reports Submetering 102 Guide
EEReports.com
 
Wirelesspowertheftmonitoringoriginalbyrupalipatra 121126043543-phpapp02
Wirelesspowertheftmonitoringoriginalbyrupalipatra 121126043543-phpapp02Wirelesspowertheftmonitoringoriginalbyrupalipatra 121126043543-phpapp02
Wirelesspowertheftmonitoringoriginalbyrupalipatra 121126043543-phpapp02ratnmani mukesh
 
IRJET- Wireless Charging of Electric Vehicles
IRJET- Wireless Charging of Electric VehiclesIRJET- Wireless Charging of Electric Vehicles
IRJET- Wireless Charging of Electric Vehicles
IRJET Journal
 
Fundamentals of Transformer-Rated Field Meter Testing and Site Verification
Fundamentals of Transformer-Rated Field Meter Testing and Site VerificationFundamentals of Transformer-Rated Field Meter Testing and Site Verification
Fundamentals of Transformer-Rated Field Meter Testing and Site Verification
TESCO - The Eastern Specialty Company
 
Issues faced by developer for net metering
Issues faced by developer for net meteringIssues faced by developer for net metering
Issues faced by developer for net metering
Ankur Tyagi
 
Issues in Interconnections
Issues in InterconnectionsIssues in Interconnections
Issues in Interconnections
Ridwanul Hoque
 
Availing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reformsAvailing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reforms
Abdul Haseeb
 
Site Verification for Newer Employees
Site Verification for Newer EmployeesSite Verification for Newer Employees
Site Verification for Newer Employees
TESCO - The Eastern Specialty Company
 
Circuit Break Connect Monitoring to 5G Mobile Application
Circuit Break Connect Monitoring to 5G Mobile ApplicationCircuit Break Connect Monitoring to 5G Mobile Application
Circuit Break Connect Monitoring to 5G Mobile Application
AIRCC Publishing Corporation
 

Similar to Solareff Information Brochure - Current Regulatory Position July 2016 (20)

Presentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringPresentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
 
Integration of Renewable Energy In Grid
Integration of Renewable Energy In GridIntegration of Renewable Energy In Grid
Integration of Renewable Energy In Grid
 
IRJET- Advanced Metering Infrastructure Tripping System
IRJET-  	  Advanced Metering Infrastructure Tripping SystemIRJET-  	  Advanced Metering Infrastructure Tripping System
IRJET- Advanced Metering Infrastructure Tripping System
 
IRJET-Electrical Power Robbery Detection and Transformer Fault Detection
IRJET-Electrical Power Robbery Detection and Transformer Fault Detection  IRJET-Electrical Power Robbery Detection and Transformer Fault Detection
IRJET-Electrical Power Robbery Detection and Transformer Fault Detection
 
Improving Distribution System Performance in Deregulated Electricity Industry...
Improving Distribution System Performance in Deregulated Electricity Industry...Improving Distribution System Performance in Deregulated Electricity Industry...
Improving Distribution System Performance in Deregulated Electricity Industry...
 
GI11-Paper_McLellan
GI11-Paper_McLellanGI11-Paper_McLellan
GI11-Paper_McLellan
 
IRJET- Sanctioned Load Monitoring & Controlling by using PLC
IRJET- Sanctioned Load Monitoring & Controlling by using PLCIRJET- Sanctioned Load Monitoring & Controlling by using PLC
IRJET- Sanctioned Load Monitoring & Controlling by using PLC
 
NARUC Joins the Debate on DERs
NARUC Joins the Debate on DERsNARUC Joins the Debate on DERs
NARUC Joins the Debate on DERs
 
Legislative Staff Briefing: Update on the Texas Electric Industry
Legislative Staff Briefing: Update on the Texas Electric IndustryLegislative Staff Briefing: Update on the Texas Electric Industry
Legislative Staff Briefing: Update on the Texas Electric Industry
 
Smart Grid July 09
Smart Grid July 09Smart Grid July 09
Smart Grid July 09
 
Mantenimiento en los sistemas Eléctricos de distribución
Mantenimiento en los sistemas Eléctricos de distribución Mantenimiento en los sistemas Eléctricos de distribución
Mantenimiento en los sistemas Eléctricos de distribución
 
EE Reports Submetering 102 Guide
EE Reports Submetering 102 GuideEE Reports Submetering 102 Guide
EE Reports Submetering 102 Guide
 
Wirelesspowertheftmonitoringoriginalbyrupalipatra 121126043543-phpapp02
Wirelesspowertheftmonitoringoriginalbyrupalipatra 121126043543-phpapp02Wirelesspowertheftmonitoringoriginalbyrupalipatra 121126043543-phpapp02
Wirelesspowertheftmonitoringoriginalbyrupalipatra 121126043543-phpapp02
 
IRJET- Wireless Charging of Electric Vehicles
IRJET- Wireless Charging of Electric VehiclesIRJET- Wireless Charging of Electric Vehicles
IRJET- Wireless Charging of Electric Vehicles
 
Fundamentals of Transformer-Rated Field Meter Testing and Site Verification
Fundamentals of Transformer-Rated Field Meter Testing and Site VerificationFundamentals of Transformer-Rated Field Meter Testing and Site Verification
Fundamentals of Transformer-Rated Field Meter Testing and Site Verification
 
Issues faced by developer for net metering
Issues faced by developer for net meteringIssues faced by developer for net metering
Issues faced by developer for net metering
 
Issues in Interconnections
Issues in InterconnectionsIssues in Interconnections
Issues in Interconnections
 
Availing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reformsAvailing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reforms
 
Site Verification for Newer Employees
Site Verification for Newer EmployeesSite Verification for Newer Employees
Site Verification for Newer Employees
 
Circuit Break Connect Monitoring to 5G Mobile Application
Circuit Break Connect Monitoring to 5G Mobile ApplicationCircuit Break Connect Monitoring to 5G Mobile Application
Circuit Break Connect Monitoring to 5G Mobile Application
 

Recently uploaded

Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 

Recently uploaded (20)

Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 

Solareff Information Brochure - Current Regulatory Position July 2016

  • 1. EMBEDDED SOLAR PV GENERATION IN SOUTH AFRICA Having received many enquiries from clients wishing to connect their embedded generation systems to utilities, we identified the need to prepare a summary whereby persons could understand the principles in a nutshell. It should be noted that this document refers to both grid-tied and grid- integrated systems (whenever there is some form of connecting to the utility). Off-grid systems are not pertinently part of this discussion. At present legislation and regulations regarding embedded generation is open for interpretation. This results in uncertainty pertaining to compliance. One example is the interpretation of the “Own Use” principle as contained in Item 2 of Schedule II of the Electricity Regulation Act 4 of 2006 (“ERA”). Some utilities interpret this as meaning that a specific user is a net consumer of electricity over a certain period, say one year. Other stakeholders interpret it as meaning that no reverse flow of electricity through a meter occurs – the latter which is also referred to as “Self Consumption”. There are also perceptions in the market about what systems require licensing. In order to clarify the position, NERSA commenced a process whereby the Small Scale Embedded Generation (“SSEG”) Rules would have been issued. This process was commenced early in 2015 and would have been issued by Q3 2015. By November 2015 the DOE however took charge of this process and also intimated that a change to the ERA is considered. Both these processes are intended to get finality regarding to interpretation and processes to follow. At present these amendments / clarifications are expected to be issued by Q3 2016. • SANS10142-3 is currently being developed and would soon regulate the DC (Direct Current) aspects of wiring. The two regulations currently in place are: • The NRS097-2 regulations are applied regarding the connection of embedded generators. This currently prescribes the principles of connection and procedures for shut down of systems. • SANS10142-1 regulates the electrical wiring of premises. This applies to the AC (Alternating Current) aspects of wiring. All of these principles have safety in mind and are not intended to create unnecessary burdensome procedures. Connection and Synchronization of Embedded Generation – The Current Status Whether a System can be connected to a utility: When an embedded generation system (Solar PV, Diesel, Biogas, Wind etc.) is considered, the first question asked should be: Which utility provides the connection? Utilities in South Africa are generally Eskom and Municipal Networks, both of whom have their own rules, principles, by-laws and/or guidelines (or lack thereof) on how these system need to connect. Current Regulatory position:
  • 2. www.solareff.co.za info@solareff.co.za +27 011 675 1114 • Eskom does not allow any synchronization of embedded generation to its LV network. An LV network is connections up to 1000V, this is due to a safety concern for technicians working on the LV network. • It is of utmost importance to understand the principle of “synchronization”. This is the use by the Solar PV system of the frequency supplied by the utility and does not imply reverse flow of power at all. • The simple answer is therefore that Eskom does not allow embedded generators to be installed at its clients’ premises when on an LV connection. • Eskom does have a process whereby clients may convert from an LV to an MV connection. This conversion is however so costly that it often adds too much to the costs of the system to remain financially viable. • An easy way to determine whether a certain site is on LV or MV is where the meter resides. If the meter is a 380-400V meter, the connection is an LV one (generally smaller connections between 15KVA – 1MVA). If the meter is a 11KV or 22KV meter, it will be an MV connection (generally larger connections >350KVA). As is evident, an overlap exists in the size of the LV and MV connections, therefore each site has to be considered on its own merits. Municipalities • Various municipalities allow the connection of embedded generation on an LV level. Many other municipalities do not as yet allow any connections of this nature and should a client connect such a system in disregard to the municipality’s principles, that client risks being completely disconnected from their electrical supply. • In instances where municipalities do allow connections: • Each municipality has its own rules, by-laws and processes to follow. • Generally the large Metropolitan municipalities have processes in place whereby embedded generation can be connected. • In most instances municipalities consider, witness and inspect these installations before allowing it to be “hot commissioned”. • Most municipalities do not accept excess generation back onto their networks. • Some municipalities do accept excess generation, with or without compensation to the client. Principles of Design: Prospective clients should start by asking their service provider about the legality of connecting to the utility. If the service provider appears allusive in any respect, caution should be exercised. Many clients have paid excessive school fees for systems that were not compliant which resulted in the client being completely disconnected from their electrical supply. When a service provider blindly refers to “turning the meter backwards” without explaining that a specialised four-quadrant meter would be installed, additional caution should be exercised. Municipalities only accept reverse flow when done through a properly approved bi-directional meter. The older mechanical-type meters could be spun in reverse, however they are not calibrated for reverse flow which results in inaccurate readings and are in any event not an approved method. In each instance the service provider should provide a detail design whereby the risk of excess generation and the possible curtailment thereof during off-peak periods are mitigated. Clients should ask prospective service providers as many questions as possible. When answers to questions of a regulatory nature are avoided or when regulatory aspects are made out as non-issues, caution should be exercised. You are most welcome to address any questions of this nature to us.