Embedded solar PV generation in South Africa has unclear regulations, leading to uncertainty for clients. The Small Scale Embedded Generation Rules process began in 2015 to clarify the position but was taken over by the Department of Energy and may be issued by mid-2016. Currently, Eskom does not allow synchronization of embedded generation to its low voltage network for safety reasons. Municipalities have various rules for connections but many do not allow it. Prospective clients should carefully check the legality and design with their service provider.