The document summarizes the reforms made by the Board of Investment (BOI) to promote small-scale renewable energy generation in Pakistan through net metering. The two key reforms were: 1) Eliminating the requirement for a three-phase grid connection, and 2) Eliminating the need for a generation license from NEPRA for systems under 25 kW. The reforms reduced administrative burdens and costs for consumers. Analysis found the reforms reduced processing time by 23 days and sludge by 25%, and lowered recurring administrative costs by over 350 million rupees annually. However, some transparency and oversight issues between DISCOs and NEPRA were also reported.
Introduction to Virtual Power Purchase Agreement instruments.pptxmsounak95
Virtual Power Purchase Agreements are increasingly becoming a popular instrument to execute electricity market transactions. They enable both parties to hedge their risks of fluctuating markets and execute transactions.
EEI Strategic Issues Forum - Integration of DER: California and New YorkScottMadden, Inc.
Cristin Lyons, partner and grid transformation practice leader at ScottMadden, recently presented, "Integration of DER: California and New York," at the EEI Strategic Issues Form.
California and New York are leading the country in integrating Distributed Energy Resources (DER); however, their approaches are different. It’s worth understanding some of the nuances of their respective proceedings and to clarify what they are (and are not) trying to accomplish. Each will provide unique lessons to both utilities and regulators that are attempting to integrate ever-increasing amounts of DER.
For more information, please visit www.scottmadden.com.
Development of a web-based single-phase load monitoring and auditing systemIJECEIAES
In a developing nation like Nigeria, the conventional load monitoring and billing system has proved to be tedious, time-consuming, expensive, and prone to human error over the years. Therefore, this creates the need for an efficient system that can assist the Utility to monitor the energy consumption trend of the customers remotely. This work developed a web-based singlephase load monitoring and auditing system using NodeMCU (ESP8266) microcontroller, PZEM-004T sensor, and liquid crystal display (LCD) module for the hardware unit and Blynk internet of things (IoT) platform for the software unit. The system design was implemented around the ESP8266 microcontroller with relevant design models, and standard power and energy equations programmed into the microcontroller in the Arduino integrated development environment. The developed system was load tested to examine its performance and determine its reading error. The hardware and software units of the system operated satisfactorily when tested. The reading accuracy for current and voltage measured by the device were ±0.2% and ±0.4%, respectively, giving a reading error of ±0.8% for power measurement. The developed system is suitable for residential, commercial, and similar applications where the energy usage trend of some small loads is required for management purposes.
Presentation given in the final meeting of the project "Energy Efficiency Policies: a Worldwide Panorama", which was conducted under the guidance of the Energy Efficiency Policies & Technologies Knowledge Network. Date: 27-28 May 2013 in cooperation with WEC, CFE & ADEME.
Case study on innovation smart billing for household consumers and its main findings
Introduction to Virtual Power Purchase Agreement instruments.pptxmsounak95
Virtual Power Purchase Agreements are increasingly becoming a popular instrument to execute electricity market transactions. They enable both parties to hedge their risks of fluctuating markets and execute transactions.
EEI Strategic Issues Forum - Integration of DER: California and New YorkScottMadden, Inc.
Cristin Lyons, partner and grid transformation practice leader at ScottMadden, recently presented, "Integration of DER: California and New York," at the EEI Strategic Issues Form.
California and New York are leading the country in integrating Distributed Energy Resources (DER); however, their approaches are different. It’s worth understanding some of the nuances of their respective proceedings and to clarify what they are (and are not) trying to accomplish. Each will provide unique lessons to both utilities and regulators that are attempting to integrate ever-increasing amounts of DER.
For more information, please visit www.scottmadden.com.
Development of a web-based single-phase load monitoring and auditing systemIJECEIAES
In a developing nation like Nigeria, the conventional load monitoring and billing system has proved to be tedious, time-consuming, expensive, and prone to human error over the years. Therefore, this creates the need for an efficient system that can assist the Utility to monitor the energy consumption trend of the customers remotely. This work developed a web-based singlephase load monitoring and auditing system using NodeMCU (ESP8266) microcontroller, PZEM-004T sensor, and liquid crystal display (LCD) module for the hardware unit and Blynk internet of things (IoT) platform for the software unit. The system design was implemented around the ESP8266 microcontroller with relevant design models, and standard power and energy equations programmed into the microcontroller in the Arduino integrated development environment. The developed system was load tested to examine its performance and determine its reading error. The hardware and software units of the system operated satisfactorily when tested. The reading accuracy for current and voltage measured by the device were ±0.2% and ±0.4%, respectively, giving a reading error of ±0.8% for power measurement. The developed system is suitable for residential, commercial, and similar applications where the energy usage trend of some small loads is required for management purposes.
Presentation given in the final meeting of the project "Energy Efficiency Policies: a Worldwide Panorama", which was conducted under the guidance of the Energy Efficiency Policies & Technologies Knowledge Network. Date: 27-28 May 2013 in cooperation with WEC, CFE & ADEME.
Case study on innovation smart billing for household consumers and its main findings
Hosting Capacity Analysis for Photovoltaic Rooftop in IndonesiaSyamsirAbduh2
The commitment to reduce emission in all over
the world can be depicted in the Paris Agreement. As one of the
countries involved, Indonesia made a target to increase the
share of renewable energy by 23% in 2030. Furthermore, the
incentive given by the government for the photovoltaic (PV)
rooftop might attract more people and increase the awareness
of renewable energy. However, the rising number of integrated
PV rooftop might have an impact on the grid and the overall
system. So, in order to make sure the reliability of the system,
the hosting capacity is needed. It is a maximum limit of how
much PV rooftop can be integrated into the distribution system
without disturbing the performance of the system. By
implementing the hosting capacity, is expected to avoid an
unnecessary problem like overloading, overvoltage, protection
failure or power quality problem. This paper discusses general
information of technical and economic policy of PV rooftop in
Indonesia and also a case to obtained hosting capacity. A radial
system which consists of three transformers (A, B, and C) is
observed. By using the active power method, the hosting
capacity in each point of load and also along the feeder can be
obtained. Next, the load is projected to increase by 10%, 20%,
30%, and up to 100% of installed capacity. Then, the hosting
capacity and transformer ratio is calculated and analyzed. The
result indicated that the PV limit from the government rules
affects the hosting capacity calculation where the PV projection
is equal as load projection. Finally, this paper is expected to be
used as guidance or source of information for the electricity
company before accepting more PV rooftop on the grid
Keywords—hosting capacity, distributed generation,
Formulation of Net Metering Policy for Odisha to boost rooftop Solar ProjectsBikash Kumar Mallick
Formulation of Net Metering Policy for Odisha to boost Rooftop Solar Projects
Original Link: http://www.iroaf.indianrailways.gov.in/iroaf/uploads/files/1456814619659-Odisha%20Draft%20Net%20Metering%20Policy.pdf
Distributed energy resources (DERs) can provide net benefits to the electric system (e.g., congestion relief) and broader society (e.g., emission reductions). However, despite these advantages, the deployment of high penetrations of DER has proved challenging. Against this backdrop, the electric utility is often singled out as a fundamental barrier to deployment of DER assets. To overcome the perceived electric utility shortcomings, many stakeholders conclude that a completely new model is needed for the electric industry.
ScottMadden disagrees with this assessment and instead believes electric utilities maintain natural advantages that can be leveraged to deploy renewables and DER assets as well or better than some models being offered. In our 51st Phase II Roadmap, ScottMadden proposes leveraging the natural advantages of the electric utility in order to accelerate the deployment and penetration of DER assets.
Distributed energy resources (DERs) can provide net benefits to the electric system (e.g., congestion relief) and broader society (e.g., emission reductions). However, despite these advantages, the deployment of high penetrations of DER has proved challenging. Against this backdrop, the electric utility is often singled out as a fundamental barrier to deployment of DER assets. To overcome the perceived electric utility shortcomings, many stakeholders conclude that a completely new model is needed for the electric industry.
ScottMadden disagrees with this assessment and instead believes electric utilities maintain natural advantages that can be leveraged to deploy renewables and DER assets as well or better than some models being offered. In our 51st Phase II Roadmap, ScottMadden proposes leveraging the natural advantages of the electric utility in order to accelerate the deployment and penetration of DER assets.
For more information, please visit www.scottmadden.com.
CIS Transformation: Unlocking the Value of Utilities' Customer Information Sy...Cognizant
The customer information system (CIS) is a vital part of the meter-to-cash value chain for electric companies and other industries that provide critical commodities like water and natural gas. Yet the complex nature of CIS initiatives has left many utilities saddled with failed or underperforming CIS systems. To overcome these roadblocks, utilities must craft an approach that mitigates the risks and challenges inherent in CIS projects, delivers an exceptional customer experience, and fuels growth to support true business transformation.
The European project PV LEGAL has set itself the target of identifying and reducing administrative hurdles to the planning and installation of PV systems. Here are key recommendations.
Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...OECD Environment
Presentation by Mylene Capongol, Department of Energy - OECD Focus Group Discussion: Investment models for scaling up renewable energy deployment in Indonesia's eastern islands, 21 October 2020
If you are looking for a pi coin investor. Then look no further because I have the right one he is a pi vendor (he buy and resell to whales in China). I met him on a crypto conference and ever since I and my friends have sold more than 10k pi coins to him And he bought all and still want more. I will drop his telegram handle below just send him a message.
@Pi_vendor_247
What price will pi network be listed on exchangesDOT TECH
The rate at which pi will be listed is practically unknown. But due to speculations surrounding it the predicted rate is tends to be from 30$ — 50$.
So if you are interested in selling your pi network coins at a high rate tho. Or you can't wait till the mainnet launch in 2026. You can easily trade your pi coins with a merchant.
A merchant is someone who buys pi coins from miners and resell them to Investors looking forward to hold massive quantities till mainnet launch.
I will leave the telegram contact of my personal pi vendor to trade with.
@Pi_vendor_247
More Related Content
Similar to Availing the Net metering facility: impact of BOI's reforms
Hosting Capacity Analysis for Photovoltaic Rooftop in IndonesiaSyamsirAbduh2
The commitment to reduce emission in all over
the world can be depicted in the Paris Agreement. As one of the
countries involved, Indonesia made a target to increase the
share of renewable energy by 23% in 2030. Furthermore, the
incentive given by the government for the photovoltaic (PV)
rooftop might attract more people and increase the awareness
of renewable energy. However, the rising number of integrated
PV rooftop might have an impact on the grid and the overall
system. So, in order to make sure the reliability of the system,
the hosting capacity is needed. It is a maximum limit of how
much PV rooftop can be integrated into the distribution system
without disturbing the performance of the system. By
implementing the hosting capacity, is expected to avoid an
unnecessary problem like overloading, overvoltage, protection
failure or power quality problem. This paper discusses general
information of technical and economic policy of PV rooftop in
Indonesia and also a case to obtained hosting capacity. A radial
system which consists of three transformers (A, B, and C) is
observed. By using the active power method, the hosting
capacity in each point of load and also along the feeder can be
obtained. Next, the load is projected to increase by 10%, 20%,
30%, and up to 100% of installed capacity. Then, the hosting
capacity and transformer ratio is calculated and analyzed. The
result indicated that the PV limit from the government rules
affects the hosting capacity calculation where the PV projection
is equal as load projection. Finally, this paper is expected to be
used as guidance or source of information for the electricity
company before accepting more PV rooftop on the grid
Keywords—hosting capacity, distributed generation,
Formulation of Net Metering Policy for Odisha to boost rooftop Solar ProjectsBikash Kumar Mallick
Formulation of Net Metering Policy for Odisha to boost Rooftop Solar Projects
Original Link: http://www.iroaf.indianrailways.gov.in/iroaf/uploads/files/1456814619659-Odisha%20Draft%20Net%20Metering%20Policy.pdf
Distributed energy resources (DERs) can provide net benefits to the electric system (e.g., congestion relief) and broader society (e.g., emission reductions). However, despite these advantages, the deployment of high penetrations of DER has proved challenging. Against this backdrop, the electric utility is often singled out as a fundamental barrier to deployment of DER assets. To overcome the perceived electric utility shortcomings, many stakeholders conclude that a completely new model is needed for the electric industry.
ScottMadden disagrees with this assessment and instead believes electric utilities maintain natural advantages that can be leveraged to deploy renewables and DER assets as well or better than some models being offered. In our 51st Phase II Roadmap, ScottMadden proposes leveraging the natural advantages of the electric utility in order to accelerate the deployment and penetration of DER assets.
Distributed energy resources (DERs) can provide net benefits to the electric system (e.g., congestion relief) and broader society (e.g., emission reductions). However, despite these advantages, the deployment of high penetrations of DER has proved challenging. Against this backdrop, the electric utility is often singled out as a fundamental barrier to deployment of DER assets. To overcome the perceived electric utility shortcomings, many stakeholders conclude that a completely new model is needed for the electric industry.
ScottMadden disagrees with this assessment and instead believes electric utilities maintain natural advantages that can be leveraged to deploy renewables and DER assets as well or better than some models being offered. In our 51st Phase II Roadmap, ScottMadden proposes leveraging the natural advantages of the electric utility in order to accelerate the deployment and penetration of DER assets.
For more information, please visit www.scottmadden.com.
CIS Transformation: Unlocking the Value of Utilities' Customer Information Sy...Cognizant
The customer information system (CIS) is a vital part of the meter-to-cash value chain for electric companies and other industries that provide critical commodities like water and natural gas. Yet the complex nature of CIS initiatives has left many utilities saddled with failed or underperforming CIS systems. To overcome these roadblocks, utilities must craft an approach that mitigates the risks and challenges inherent in CIS projects, delivers an exceptional customer experience, and fuels growth to support true business transformation.
The European project PV LEGAL has set itself the target of identifying and reducing administrative hurdles to the planning and installation of PV systems. Here are key recommendations.
Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...OECD Environment
Presentation by Mylene Capongol, Department of Energy - OECD Focus Group Discussion: Investment models for scaling up renewable energy deployment in Indonesia's eastern islands, 21 October 2020
If you are looking for a pi coin investor. Then look no further because I have the right one he is a pi vendor (he buy and resell to whales in China). I met him on a crypto conference and ever since I and my friends have sold more than 10k pi coins to him And he bought all and still want more. I will drop his telegram handle below just send him a message.
@Pi_vendor_247
What price will pi network be listed on exchangesDOT TECH
The rate at which pi will be listed is practically unknown. But due to speculations surrounding it the predicted rate is tends to be from 30$ — 50$.
So if you are interested in selling your pi network coins at a high rate tho. Or you can't wait till the mainnet launch in 2026. You can easily trade your pi coins with a merchant.
A merchant is someone who buys pi coins from miners and resell them to Investors looking forward to hold massive quantities till mainnet launch.
I will leave the telegram contact of my personal pi vendor to trade with.
@Pi_vendor_247
where can I find a legit pi merchant onlineDOT TECH
Yes. This is very easy what you need is a recommendation from someone who has successfully traded pi coins before with a merchant.
Who is a pi merchant?
A pi merchant is someone who buys pi network coins and resell them to Investors looking forward to hold thousands of pi coins before the open mainnet.
I will leave the telegram contact of my personal pi merchant to trade with
@Pi_vendor_247
USDA Loans in California: A Comprehensive Overview.pptxmarketing367770
USDA Loans in California: A Comprehensive Overview
If you're dreaming of owning a home in California's rural or suburban areas, a USDA loan might be the perfect solution. The U.S. Department of Agriculture (USDA) offers these loans to help low-to-moderate-income individuals and families achieve homeownership.
Key Features of USDA Loans:
Zero Down Payment: USDA loans require no down payment, making homeownership more accessible.
Competitive Interest Rates: These loans often come with lower interest rates compared to conventional loans.
Flexible Credit Requirements: USDA loans have more lenient credit score requirements, helping those with less-than-perfect credit.
Guaranteed Loan Program: The USDA guarantees a portion of the loan, reducing risk for lenders and expanding borrowing options.
Eligibility Criteria:
Location: The property must be located in a USDA-designated rural or suburban area. Many areas in California qualify.
Income Limits: Applicants must meet income guidelines, which vary by region and household size.
Primary Residence: The home must be used as the borrower's primary residence.
Application Process:
Find a USDA-Approved Lender: Not all lenders offer USDA loans, so it's essential to choose one approved by the USDA.
Pre-Qualification: Determine your eligibility and the amount you can borrow.
Property Search: Look for properties in eligible rural or suburban areas.
Loan Application: Submit your application, including financial and personal information.
Processing and Approval: The lender and USDA will review your application. If approved, you can proceed to closing.
USDA loans are an excellent option for those looking to buy a home in California's rural and suburban areas. With no down payment and flexible requirements, these loans make homeownership more attainable for many families. Explore your eligibility today and take the first step toward owning your dream home.
how can i use my minded pi coins I need some funds.DOT TECH
If you are interested in selling your pi coins, i have a verified pi merchant, who buys pi coins and resell them to exchanges looking forward to hold till mainnet launch.
Because the core team has announced that pi network will not be doing any pre-sale. The only way exchanges like huobi, bitmart and hotbit can get pi is by buying from miners.
Now a merchant stands in between these exchanges and the miners. As a link to make transactions smooth. Because right now in the enclosed mainnet you can't sell pi coins your self. You need the help of a merchant,
i will leave the telegram contact of my personal pi merchant below. 👇 I and my friends has traded more than 3000pi coins with him successfully.
@Pi_vendor_247
how to sell pi coins on Bitmart crypto exchangeDOT TECH
Yes. Pi network coins can be exchanged but not on bitmart exchange. Because pi network is still in the enclosed mainnet. The only way pioneers are able to trade pi coins is by reselling the pi coins to pi verified merchants.
A verified merchant is someone who buys pi network coins and resell it to exchanges looking forward to hold till mainnet launch.
I will leave the telegram contact of my personal pi merchant to trade with.
@Pi_vendor_247
how to sell pi coins effectively (from 50 - 100k pi)DOT TECH
Anywhere in the world, including Africa, America, and Europe, you can sell Pi Network Coins online and receive cash through online payment options.
Pi has not yet been launched on any exchange because we are currently using the confined Mainnet. The planned launch date for Pi is June 28, 2026.
Reselling to investors who want to hold until the mainnet launch in 2026 is currently the sole way to sell.
Consequently, right now. All you need to do is select the right pi network provider.
Who is a pi merchant?
An individual who buys coins from miners on the pi network and resells them to investors hoping to hang onto them until the mainnet is launched is known as a pi merchant.
debuts.
I'll provide you the Telegram username
@Pi_vendor_247
Turin Startup Ecosystem 2024 - Ricerca sulle Startup e il Sistema dell'Innov...Quotidiano Piemontese
Turin Startup Ecosystem 2024
Una ricerca de il Club degli Investitori, in collaborazione con ToTeM Torino Tech Map e con il supporto della ESCP Business School e di Growth Capital
Currently pi network is not tradable on binance or any other exchange because we are still in the enclosed mainnet.
Right now the only way to sell pi coins is by trading with a verified merchant.
What is a pi merchant?
A pi merchant is someone verified by pi network team and allowed to barter pi coins for goods and services.
Since pi network is not doing any pre-sale The only way exchanges like binance/huobi or crypto whales can get pi is by buying from miners. And a merchant stands in between the exchanges and the miners.
I will leave the telegram contact of my personal pi merchant. I and my friends has traded more than 6000pi coins successfully
Tele-gram
@Pi_vendor_247
Poonawalla Fincorp and IndusInd Bank Introduce New Co-Branded Credit Cardnickysharmasucks
The unveiling of the IndusInd Bank Poonawalla Fincorp eLITE RuPay Platinum Credit Card marks a notable milestone in the Indian financial landscape, showcasing a successful partnership between two leading institutions, Poonawalla Fincorp and IndusInd Bank. This co-branded credit card not only offers users a plethora of benefits but also reflects a commitment to innovation and adaptation. With a focus on providing value-driven and customer-centric solutions, this launch represents more than just a new product—it signifies a step towards redefining the banking experience for millions. Promising convenience, rewards, and a touch of luxury in everyday financial transactions, this collaboration aims to cater to the evolving needs of customers and set new standards in the industry.
when will pi network coin be available on crypto exchange.DOT TECH
There is no set date for when Pi coins will enter the market.
However, the developers are working hard to get them released as soon as possible.
Once they are available, users will be able to exchange other cryptocurrencies for Pi coins on designated exchanges.
But for now the only way to sell your pi coins is through verified pi vendor.
Here is the telegram contact of my personal pi vendor
@Pi_vendor_247
when will pi network coin be available on crypto exchange.
Availing the Net metering facility: impact of BOI's reforms
1. AVAILING OF THE NET-METERING FACILITY:
IMPACT OF BOI’S REFORMS
Abdul Haseeb & Ahmed Waqar Qasim
Pakistan Institute of Development Economics, Islamabad.
The world is now transiting from fossil fuels to clean and environment-friendly energy generation. Societies are shift-
ing toward renewable energy sources, such as Photovoltaic (PV) and wind power generation, to meet their energy
demands. The government of Pakistan is also taking drastic measures to improve the energy mix in order to cope with
the environmental and climate challenges. Among these initiatives, one involves the promotion of the generation of
small-scale distributed renewable energy. Accordingly, the concept of net-metering was formally announced in 2015
which allows the consumer to set up a renewable energy capacity like a PV system (commonly known as a solar
system) to produce and sell the electricity.
This report provides an overview of the process of installation of a PV system that is grid-connected and has a capacity
of up to 25 kilowatts (kW). The objectives of the report are twofold: firstly, to walk the reader through different stages,
processes, and administrative hurdles/burdens that one has to experience during the installation of the PV system.
Secondly, to evaluate the impact of recent reforms that have been implemented by the efforts of the Board of
Investment (BOI) in availing the net-metering facility.
PIDE ANALYTICS
PIDE ANALYTICS 03
1
2. The formal mechanism of the net metering has been elaborated in the Development of Renewable Energy for Power
Generation Policy, 2006. The policy promulgates that power Distribution Companies (DISCO) shall enter into a
net-metering agreement with qualified end-users upon the request of the end-user without any discrimination
(section-8.4).The end-user under this agreement is allowed to produce electricity from a PV system for his/her own use
and supply the excess produce to the national grid, which will be compensated by the consumption during peak hours
or at the time of low own production. The consumer will pay or get paid according to the adjusted bill that is based on
the net unit either exported or consumed.
The National Electric Power Regulatory Authority (NEPRA) announced net-metering regulations in 2015 under which
any customer of the national grid (having a three-phase connection) can avail of the net-metering facility on a small
scale. As per the guide issued by the Alternative Energy Development Board (AEDB) on net-metering, the installation
of a net-meter takes around 3 months1
. The diagram below summarizes the process of net-metering as per the AEDB’s
guide.
2
1. Net-metering: The Process
SUBMIT APPLICATION APPLICATION REVIEW
TECHNICAL FEASIBILITY
IN THE INITIAL REVIEW
AGREEMENT APPLICATION MOVE
TO NEPRA
FOR A GRANT
OF LICENSE
Application form
along with document
Takes around 27 days to
complete the initial review
Takes 10 working days
Takes 7 working days
ESTIMATE CONNECTION
CHARGES
Takes 5 working days
PAYMENT OF CHARGES INSTALLATION OF THE
INTERCONNECTION FACILITY
Within 20 days of issuance Within 30 working
days of payment
Takes 3 working days
The AEDB’s guide can be accessed at: https://www.aedb.org/images/NetmeteringGuidlinesforConsumers.pdf.
3. 3
High level
meetings
Meetings
with Donors
Total
8-10
8-14
2-3
2-3
0
1-2
0
0
However, when we reached out to customers who are availing of the net-metering facility, their experience show that
the actual process may take more than 4 months. The table below elaborates on the process of net-metering
installation as per the end-user’s recollection.
Since there are two government bodies involved, the DISCO and NEPRA, therefore, the administrative burden is
enormous in availing the net-metering facility. Once the initial assessment and agreement are furnished by DISCO then
the application moves to NEPRA. The table below describes the application processing at NEPRA.
The Process of net-metering: A consumer’s perspective
Steps
Search for the vendor
Request for installation
Visit from the vendor
Report by the vendor
Consumer’s confirmation
Payment confirmation
Equipment production
Apply for net metering
Documents Requirement
Application
processing at IESCO
Application to NEPRA
IESCO survey 1
IESCO survey 2
IESCO survey 3
Local visits or websites
Personal Visit to vendor
Visit of a technical person
Voltage load calculation
for house
Space Checkup
Internal processing
Confirmation of installation
50% advance payments
Internal processing
Internal processing
The vendor will apply on
behalf of the consumer
CNIC, Bills, Affidavit, etc.
Review, technical
feasibility, agreement
Application forwarded
by DISCO
for safety measurements
of consumer
Meter installation
Description Time
1-3 days
1-3 days
1-2 weeks
2-3 days
1-3 days
1-3 days
2 weeks for 25 KW
1.5 months for 100KW
1 week
2-3 months
1.5-2 months
1-3 weeks
4. To promote investment in the renewable energy generation at a small-scale level, BOI proposes and is also able to
implement two reforms:
1. Condition of a three-phase connection with the national grid to avail net-metering facility has been
eliminated (Reform ID: F006).
2. The requirement of a generation license from NEPRA for net-metering up to 25 kW has been eliminated
(Reform ID: F086).
We have evaluated the impact of these reforms based on how much administrative and financial burdens have been
reduced, and what increase is expected to happen in the usage of renewable energy generation. To evaluate the
impact of reforms implemented with the efforts of BOI, we obtained data from NEPRA for the period 2017-2021.
In the post-reform scenario, DISCOs can install a bi-directional meter (also known as a green meter) even if the
customer does not have a three-phase connection. This intervention has not only saved the processing time but also
lowers the cost of availing net-metering facility for the individual end-user by around Rs. 15,0002
. Our key findings are:
• Previously only 3% of consumers were eligible to avail net-metering facility. Now almost 100% of consumers
with the national grid connection can avail this facility.
• Based on the average number of applications for net-metering from 2017 to 2021, this reform will
reduce the annual recurring cost by Rs. 180 million, which the society has to bear in the absence of this reform3
.
• The reform has reduced the processing time by eliminating the three-phase connection requirement and
can reduce sludge by 8%.
4
2. Reforms proposed and implemented by the
Board of Investment (BOI)
2.1. Impact assessment of eliminatingthree-phase connection requirement
2This includes the cost of a three-phase meter that has to be installed before the installation of the net-meter.
3There is a 200% increase in the number of applicants each year from 2017-to 2021. Based on this trend, the expected number of applications during
2022 would be around 12,000. The reform would also induce more consumers to avail of this facility, however, we have ignored this impact in
calculating the reduction of monetary cost. Therefore, the estimates presented above are understated in that respect.
Application Processing at NEPRA
Steps
Application received Licensing department
Document verification
1 day
1-3 days
1-7 days
1-7 days
1-7 days
Description Time
Member Authorization
Authorization
Notification
Member of the NEPRA will
sign the application, and the
time it takes depends on the
availability
The competent authority will
sign the document
Aﬞer authorization member
will notify and will issue the
license
5. Now the small-scale consumers can avail net-metering facility and interconnect their solar or wind power generation
up to 25 kW without getting a license as well as paying any fee to NEPRA. Our findings under this reform are:
• Based on the average number of applications for net-metering from 2017 to 2021, this reform will reduce
the aggregate monetary cost by Rs. 170 million, which the society has to bear in the absence of this reform4
.
• The reform has reduced the processing time by 18 days and is also able to reduce sludge by 22%.
• The reform has eliminated one procedure (obtaining a license from NEPRA) directly and 6 indirect steps
(the processing of application within NEPRA).
• 80% to 90% of consumers are of capacity less than 25kW.
• 10% to 15% increase in the number of applications for net-metering is expected due to the reforms.
• Overall reforms have reduced the processing time by 23 days and eliminated the sludge by 25%.
• More than Rs. 350 million annual recurring administrative costs have been reduced.
• NEPRA has raised transparency concerns. Since DISCOs entertain the net-metering application below 25 kW
without notifying the authority.
• The reforms have empowered DISCOs, and instances of misuse of power have also been reported by the
respondents.
• Members’availability in NEPRA could cause a delay of around 15 – 20 days.
• Consumers can only apply for the net-metering through certified vendors of the AEDB.
5
3. Important Findings and Observations
2.2. Impact assessment of eliminatingthree-phase connection requirement
4Data reveals that there is a 15% annual increase in the applicants for net-metering below 25kW connections. DISCOs on average entertain around
10,000 applicants below 25 kW and the fee charged by NEPRA is Rs. 1,000 per kW. The expected number of applicants below 25 kW during 2022 is
around 80% of total applications.
6. • Online integration of NEPRA and DISCOs can address the concerns of NEPRA related to the contractual
validations between DISCOs and vendors.
• Automation of application processing with a trace and track facility that is accessible to the vendor as well
as the consumer may bring some transparency to the process.
• For connection above 25 kW, the authorization by the member may also be received online.
• To curtail the misuse of power by DISCOs, NEPRA should specify the timelines starting from the day of
application submission till the day consumer receive the first adjusted bill. In the event of prolonged delays,
a forum and a mechanism of complaint registration should also be initiated by NEPRA.
4. Way Forward
PAKISTAN INSTITUTE OF DEVELOPMENT ECONOMICS
QAU Campus, P.O. Box 1091, Islamabad 44000, Pakistan.
Tel: 051-9248094
www.pide.org.pk 6