The world is now transiting from fossil fuels to clean and environment-friendly energy generation. Societies are shift-
ing toward renewable energy sources, such as Photovoltaic (PV) and wind power generation, to meet their energy
demands. The government of Pakistan is also taking drastic measures to improve the energy mix in order to cope with
the environmental and climate challenges. Among these initiatives, one involves the promotion of the generation of
small-scale distributed renewable energy. Accordingly, the concept of net-metering was formally announced in 2015
which allows the consumer to set up a renewable energy capacity like a PV system (commonly known as a solar
system) to produce and sell the electricity.
This report provides an overview of the process of installation of a PV system that is grid-connected and has a capacity
of up to 25 kilowatts (kW). The objectives of the report are twofold: firstly, to walk the reader through different stages,
processes, and administrative hurdles/burdens that one has to experience during the installation of the PV system.
Secondly, to evaluate the impact of recent reforms that have been implemented by the efforts of the Board of
Investment (BOI) in availing the net-metering facility.
PIDE ANALYTICS
PIDE ANALYTICS 03
1
The formal mechanism of the net metering has been elaborated in the Development of Renewable Energy for Power
Generation Policy, 2006. The policy promulgates that power Distribution Companies (DISCO) shall enter into a
net-metering agreement with qualified end-users upon the request of the end-user without any discrimination
(section-8.4).The end-user under this agreement is allowed to produce electricity from a PV system for his/her own use
and supply the excess produce to the national grid, which will be compensated by the consumption during peak hours
or at the time of low own production. The consumer will pay or get paid according to the adjusted bill that is based on
the net unit either exported or consumed.
The National Electric Power Regulatory Authority (NEPRA) announced net-metering regulations in 2015 under which
any customer of the national grid (having a three-phase connection) can avail of the net-metering facility on a small
scale. As per the guide issued by the Alternative Energy Development Board (AEDB) on net-metering, the installation
of a net-meter takes around 3 months1
. The diagram below summarizes the process of net-metering as per the AEDB’s
guide.
2
1. Net-metering: The Process
SUBMIT APPLICATION APPLICATION REVIEW
TECHNICAL FEASIBILITY
IN THE INITIAL REVIEW
AGREEMENT APPLICATION MOVE
TO NEPRA
FOR A GRANT
OF LICENSE
Application form
along with document
Takes around 27 days to
complete the initial review
Takes 10 working days
Takes 7 working days
ESTIMATE CONNECTION
CHARGES
Takes 5 working days
PAYMENT OF CHARGES INSTALLATION OF THE
INTERCONNECTION FACILITY
Within 20 days of issuance Within 30 working
days of payment
Takes 3 working days
The AEDB’s guide can be accessed at: https://www.aedb.org/images/NetmeteringGuidlinesforConsumers.pdf.
3
High level
meetings
Meetings
with Donors
Total
8-10
8-14
2-3
2-3
0
1-2
0
0
However, when we reached out to customers who are availing of the net-metering facility, their experience show that
the actual process may take more than 4 months. The table below elaborates on the process of net-metering
installation as per the end-user’s recollection.
Since there are two government bodies involved, the DISCO and NEPRA, therefore, the administrative burden is
enormous in availing the net-metering facility. Once the initial assessment and agreement are furnished by DISCO then
the application moves to NEPRA. The table below describes the application processing at NEPRA.
The Process of net-metering: A consumer’s perspective
Steps
Search for the vendor
Request for installation
Visit from the vendor
Report by the vendor
Consumer’s confirmation
Payment confirmation
Equipment production
Apply for net metering
Documents Requirement
Application
processing at IESCO
Application to NEPRA
IESCO survey 1
IESCO survey 2
IESCO survey 3
Local visits or websites
Personal Visit to vendor
Visit of a technical person
Voltage load calculation
for house
Space Checkup
Internal processing
Confirmation of installation
50% advance payments
Internal processing
Internal processing
The vendor will apply on
behalf of the consumer
CNIC, Bills, Affidavit, etc.
Review, technical
feasibility, agreement
Application forwarded
by DISCO
for safety measurements
of consumer
Meter installation
Description Time
1-3 days
1-3 days
1-2 weeks
2-3 days
1-3 days
1-3 days
2 weeks for 25 KW
1.5 months for 100KW
1 week
2-3 months
1.5-2 months
1-3 weeks
To promote investment in the renewable energy generation at a small-scale level, BOI proposes and is also able to
implement two reforms:
1. Condition of a three-phase connection with the national grid to avail net-metering facility has been
eliminated (Reform ID: F006).
2. The requirement of a generation license from NEPRA for net-metering up to 25 kW has been eliminated
(Reform ID: F086).
We have evaluated the impact of these reforms based on how much administrative and financial burdens have been
reduced, and what increase is expected to happen in the usage of renewable energy generation. To evaluate the
impact of reforms implemented with the efforts of BOI, we obtained data from NEPRA for the period 2017-2021.
In the post-reform scenario, DISCOs can install a bi-directional meter (also known as a green meter) even if the
customer does not have a three-phase connection. This intervention has not only saved the processing time but also
lowers the cost of availing net-metering facility for the individual end-user by around Rs. 15,0002
. Our key findings are:
• Previously only 3% of consumers were eligible to avail net-metering facility. Now almost 100% of consumers
with the national grid connection can avail this facility.
• Based on the average number of applications for net-metering from 2017 to 2021, this reform will
reduce the annual recurring cost by Rs. 180 million, which the society has to bear in the absence of this reform3
.
• The reform has reduced the processing time by eliminating the three-phase connection requirement and
can reduce sludge by 8%.
4
2. Reforms proposed and implemented by the
Board of Investment (BOI)
2.1. Impact assessment of eliminatingthree-phase connection requirement
2This includes the cost of a three-phase meter that has to be installed before the installation of the net-meter.
3There is a 200% increase in the number of applicants each year from 2017-to 2021. Based on this trend, the expected number of applications during
2022 would be around 12,000. The reform would also induce more consumers to avail of this facility, however, we have ignored this impact in
calculating the reduction of monetary cost. Therefore, the estimates presented above are understated in that respect.
Application Processing at NEPRA
Steps
Application received Licensing department
Document verification
1 day
1-3 days
1-7 days
1-7 days
1-7 days
Description Time
Member Authorization
Authorization
Notification
Member of the NEPRA will
sign the application, and the
time it takes depends on the
availability
The competent authority will
sign the document
Aﬞer authorization member
will notify and will issue the
license
Now the small-scale consumers can avail net-metering facility and interconnect their solar or wind power generation
up to 25 kW without getting a license as well as paying any fee to NEPRA. Our findings under this reform are:
• Based on the average number of applications for net-metering from 2017 to 2021, this reform will reduce
the aggregate monetary cost by Rs. 170 million, which the society has to bear in the absence of this reform4
.
• The reform has reduced the processing time by 18 days and is also able to reduce sludge by 22%.
• The reform has eliminated one procedure (obtaining a license from NEPRA) directly and 6 indirect steps
(the processing of application within NEPRA).
• 80% to 90% of consumers are of capacity less than 25kW.
• 10% to 15% increase in the number of applications for net-metering is expected due to the reforms.
• Overall reforms have reduced the processing time by 23 days and eliminated the sludge by 25%.
• More than Rs. 350 million annual recurring administrative costs have been reduced.
• NEPRA has raised transparency concerns. Since DISCOs entertain the net-metering application below 25 kW
without notifying the authority.
• The reforms have empowered DISCOs, and instances of misuse of power have also been reported by the
respondents.
• Members’availability in NEPRA could cause a delay of around 15 – 20 days.
• Consumers can only apply for the net-metering through certified vendors of the AEDB.
5
3. Important Findings and Observations
2.2. Impact assessment of eliminatingthree-phase connection requirement
4Data reveals that there is a 15% annual increase in the applicants for net-metering below 25kW connections. DISCOs on average entertain around
10,000 applicants below 25 kW and the fee charged by NEPRA is Rs. 1,000 per kW. The expected number of applicants below 25 kW during 2022 is
around 80% of total applications.
• Online integration of NEPRA and DISCOs can address the concerns of NEPRA related to the contractual
validations between DISCOs and vendors.
• Automation of application processing with a trace and track facility that is accessible to the vendor as well
as the consumer may bring some transparency to the process.
• For connection above 25 kW, the authorization by the member may also be received online.
• To curtail the misuse of power by DISCOs, NEPRA should specify the timelines starting from the day of
application submission till the day consumer receive the first adjusted bill. In the event of prolonged delays,
a forum and a mechanism of complaint registration should also be initiated by NEPRA.
4. Way Forward
PAKISTAN INSTITUTE OF DEVELOPMENT ECONOMICS
QAU Campus, P.O. Box 1091, Islamabad 44000, Pakistan.
Tel: 051-9248094
www.pide.org.pk 6

More Related Content

Similar to Availing the Net metering facility: impact of BOI's reforms

IRJET - Energy Audit and Electrical Power Consumption of ADIT College
IRJET - Energy Audit and Electrical Power Consumption of ADIT CollegeIRJET - Energy Audit and Electrical Power Consumption of ADIT College
IRJET - Energy Audit and Electrical Power Consumption of ADIT College
IRJET Journal
 
VENTURES_NPTI-EE_ACT_ESCO&DSM.ppt presentation
VENTURES_NPTI-EE_ACT_ESCO&DSM.ppt presentationVENTURES_NPTI-EE_ACT_ESCO&DSM.ppt presentation
VENTURES_NPTI-EE_ACT_ESCO&DSM.ppt presentation
nijamnveloor
 
Edison International Business Update - February 2018
Edison International Business Update - February 2018Edison International Business Update - February 2018
Edison International Business Update - February 2018
EdisonInternational
 
Hosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
Hosting Capacity Analysis for Photovoltaic Rooftop in IndonesiaHosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
Hosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
SyamsirAbduh2
 
Edison International October 2017 Business Update
Edison International October 2017 Business UpdateEdison International October 2017 Business Update
Edison International October 2017 Business Update
EdisonInternational
 
Energy Manager_MRV article pdf
Energy Manager_MRV article pdfEnergy Manager_MRV article pdf
Energy Manager_MRV article pdfAvijit Choudhury
 
062514NetMetering_Overview.ppt_062514NetMetering_Overview.pptx
062514NetMetering_Overview.ppt_062514NetMetering_Overview.pptx062514NetMetering_Overview.ppt_062514NetMetering_Overview.pptx
062514NetMetering_Overview.ppt_062514NetMetering_Overview.pptx
KasnilawazaidiAbdulk
 
Formulation of Net Metering Policy for Odisha to boost rooftop Solar Projects
Formulation of Net Metering Policy for Odisha to boost rooftop Solar ProjectsFormulation of Net Metering Policy for Odisha to boost rooftop Solar Projects
Formulation of Net Metering Policy for Odisha to boost rooftop Solar Projects
Bikash Kumar Mallick
 
Sgcp14guzeleva
Sgcp14guzelevaSgcp14guzeleva
Sgcp14guzeleva
Justin Hayward
 
2015 Connecticut Legislative Session Presentation (2)
2015 Connecticut Legislative Session Presentation (2)2015 Connecticut Legislative Session Presentation (2)
2015 Connecticut Legislative Session Presentation (2)Nicholas Cicale
 
2009 Sdge It Virtualization Presentation
2009 Sdge It Virtualization Presentation2009 Sdge It Virtualization Presentation
2009 Sdge It Virtualization Presentation
fowlk9
 
Pay-As-You-Go Energy Meter with GSM Module
Pay-As-You-Go Energy Meter with GSM ModulePay-As-You-Go Energy Meter with GSM Module
Pay-As-You-Go Energy Meter with GSM Module
IRJET Journal
 
EV Charging - Business Opportunity for NTPC
EV Charging - Business Opportunity for NTPCEV Charging - Business Opportunity for NTPC
EV Charging - Business Opportunity for NTPC
Shiva Prashanth Kasina
 
coned-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdfconed-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdf
Jose Morales
 
The 51st State Initiative
The 51st State InitiativeThe 51st State Initiative
The 51st State Initiative
ScottMadden, Inc.
 
ScottMadden's 51st State Roadmap
ScottMadden's 51st State RoadmapScottMadden's 51st State Roadmap
ScottMadden's 51st State Roadmap
ScottMadden, Inc.
 
CIS Transformation: Unlocking the Value of Utilities' Customer Information Sy...
CIS Transformation: Unlocking the Value of Utilities' Customer Information Sy...CIS Transformation: Unlocking the Value of Utilities' Customer Information Sy...
CIS Transformation: Unlocking the Value of Utilities' Customer Information Sy...
Cognizant
 
PV LEGAL: Key recommendations
PV LEGAL: Key recommendationsPV LEGAL: Key recommendations
PV LEGAL: Key recommendations
BISOL Solar Company
 
Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...
Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...
Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...
OECD Environment
 
Edison International Business Update - May 2018
Edison International Business Update - May 2018Edison International Business Update - May 2018
Edison International Business Update - May 2018
EdisonInternational
 

Similar to Availing the Net metering facility: impact of BOI's reforms (20)

IRJET - Energy Audit and Electrical Power Consumption of ADIT College
IRJET - Energy Audit and Electrical Power Consumption of ADIT CollegeIRJET - Energy Audit and Electrical Power Consumption of ADIT College
IRJET - Energy Audit and Electrical Power Consumption of ADIT College
 
VENTURES_NPTI-EE_ACT_ESCO&DSM.ppt presentation
VENTURES_NPTI-EE_ACT_ESCO&DSM.ppt presentationVENTURES_NPTI-EE_ACT_ESCO&DSM.ppt presentation
VENTURES_NPTI-EE_ACT_ESCO&DSM.ppt presentation
 
Edison International Business Update - February 2018
Edison International Business Update - February 2018Edison International Business Update - February 2018
Edison International Business Update - February 2018
 
Hosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
Hosting Capacity Analysis for Photovoltaic Rooftop in IndonesiaHosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
Hosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
 
Edison International October 2017 Business Update
Edison International October 2017 Business UpdateEdison International October 2017 Business Update
Edison International October 2017 Business Update
 
Energy Manager_MRV article pdf
Energy Manager_MRV article pdfEnergy Manager_MRV article pdf
Energy Manager_MRV article pdf
 
062514NetMetering_Overview.ppt_062514NetMetering_Overview.pptx
062514NetMetering_Overview.ppt_062514NetMetering_Overview.pptx062514NetMetering_Overview.ppt_062514NetMetering_Overview.pptx
062514NetMetering_Overview.ppt_062514NetMetering_Overview.pptx
 
Formulation of Net Metering Policy for Odisha to boost rooftop Solar Projects
Formulation of Net Metering Policy for Odisha to boost rooftop Solar ProjectsFormulation of Net Metering Policy for Odisha to boost rooftop Solar Projects
Formulation of Net Metering Policy for Odisha to boost rooftop Solar Projects
 
Sgcp14guzeleva
Sgcp14guzelevaSgcp14guzeleva
Sgcp14guzeleva
 
2015 Connecticut Legislative Session Presentation (2)
2015 Connecticut Legislative Session Presentation (2)2015 Connecticut Legislative Session Presentation (2)
2015 Connecticut Legislative Session Presentation (2)
 
2009 Sdge It Virtualization Presentation
2009 Sdge It Virtualization Presentation2009 Sdge It Virtualization Presentation
2009 Sdge It Virtualization Presentation
 
Pay-As-You-Go Energy Meter with GSM Module
Pay-As-You-Go Energy Meter with GSM ModulePay-As-You-Go Energy Meter with GSM Module
Pay-As-You-Go Energy Meter with GSM Module
 
EV Charging - Business Opportunity for NTPC
EV Charging - Business Opportunity for NTPCEV Charging - Business Opportunity for NTPC
EV Charging - Business Opportunity for NTPC
 
coned-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdfconed-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdf
 
The 51st State Initiative
The 51st State InitiativeThe 51st State Initiative
The 51st State Initiative
 
ScottMadden's 51st State Roadmap
ScottMadden's 51st State RoadmapScottMadden's 51st State Roadmap
ScottMadden's 51st State Roadmap
 
CIS Transformation: Unlocking the Value of Utilities' Customer Information Sy...
CIS Transformation: Unlocking the Value of Utilities' Customer Information Sy...CIS Transformation: Unlocking the Value of Utilities' Customer Information Sy...
CIS Transformation: Unlocking the Value of Utilities' Customer Information Sy...
 
PV LEGAL: Key recommendations
PV LEGAL: Key recommendationsPV LEGAL: Key recommendations
PV LEGAL: Key recommendations
 
Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...
Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...
Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...
 
Edison International Business Update - May 2018
Edison International Business Update - May 2018Edison International Business Update - May 2018
Edison International Business Update - May 2018
 

Recently uploaded

what is a pi whale and how to access one.
what is a pi whale and how to access one.what is a pi whale and how to access one.
what is a pi whale and how to access one.
DOT TECH
 
What price will pi network be listed on exchanges
What price will pi network be listed on exchangesWhat price will pi network be listed on exchanges
What price will pi network be listed on exchanges
DOT TECH
 
Chương 6. Ancol - phenol - ether (1).pdf
Chương 6. Ancol - phenol - ether (1).pdfChương 6. Ancol - phenol - ether (1).pdf
Chương 6. Ancol - phenol - ether (1).pdf
va2132004
 
Webinar Exploring DORA for Fintechs - Simont Braun
Webinar Exploring DORA for Fintechs - Simont BraunWebinar Exploring DORA for Fintechs - Simont Braun
Webinar Exploring DORA for Fintechs - Simont Braun
FinTech Belgium
 
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
ydubwyt
 
Summary of financial results for 1Q2024
Summary of financial  results for 1Q2024Summary of financial  results for 1Q2024
Summary of financial results for 1Q2024
InterCars
 
where can I find a legit pi merchant online
where can I find a legit pi merchant onlinewhere can I find a legit pi merchant online
where can I find a legit pi merchant online
DOT TECH
 
USDA Loans in California: A Comprehensive Overview.pptx
USDA Loans in California: A Comprehensive Overview.pptxUSDA Loans in California: A Comprehensive Overview.pptx
USDA Loans in California: A Comprehensive Overview.pptx
marketing367770
 
how can i use my minded pi coins I need some funds.
how can i use my minded pi coins I need some funds.how can i use my minded pi coins I need some funds.
how can i use my minded pi coins I need some funds.
DOT TECH
 
how to sell pi coins on Bitmart crypto exchange
how to sell pi coins on Bitmart crypto exchangehow to sell pi coins on Bitmart crypto exchange
how to sell pi coins on Bitmart crypto exchange
DOT TECH
 
Introduction to Value Added Tax System.ppt
Introduction to Value Added Tax System.pptIntroduction to Value Added Tax System.ppt
Introduction to Value Added Tax System.ppt
VishnuVenugopal84
 
This assessment plan proposal is to outline a structured approach to evaluati...
This assessment plan proposal is to outline a structured approach to evaluati...This assessment plan proposal is to outline a structured approach to evaluati...
This assessment plan proposal is to outline a structured approach to evaluati...
lamluanvan.net Viết thuê luận văn
 
APP I Lecture Notes to students 0f 4the year
APP I  Lecture Notes  to students 0f 4the yearAPP I  Lecture Notes  to students 0f 4the year
APP I Lecture Notes to students 0f 4the year
telilaalilemlem
 
Isios-2024-Professional-Independent-Trustee-Survey.pdf
Isios-2024-Professional-Independent-Trustee-Survey.pdfIsios-2024-Professional-Independent-Trustee-Survey.pdf
Isios-2024-Professional-Independent-Trustee-Survey.pdf
Henry Tapper
 
how to sell pi coins effectively (from 50 - 100k pi)
how to sell pi coins effectively (from 50 - 100k  pi)how to sell pi coins effectively (from 50 - 100k  pi)
how to sell pi coins effectively (from 50 - 100k pi)
DOT TECH
 
Turin Startup Ecosystem 2024 - Ricerca sulle Startup e il Sistema dell'Innov...
Turin Startup Ecosystem 2024  - Ricerca sulle Startup e il Sistema dell'Innov...Turin Startup Ecosystem 2024  - Ricerca sulle Startup e il Sistema dell'Innov...
Turin Startup Ecosystem 2024 - Ricerca sulle Startup e il Sistema dell'Innov...
Quotidiano Piemontese
 
how to sell pi coins on Binance exchange
how to sell pi coins on Binance exchangehow to sell pi coins on Binance exchange
how to sell pi coins on Binance exchange
DOT TECH
 
Poonawalla Fincorp and IndusInd Bank Introduce New Co-Branded Credit Card
Poonawalla Fincorp and IndusInd Bank Introduce New Co-Branded Credit CardPoonawalla Fincorp and IndusInd Bank Introduce New Co-Branded Credit Card
Poonawalla Fincorp and IndusInd Bank Introduce New Co-Branded Credit Card
nickysharmasucks
 
managementaccountingunitiv-230422140105-dd17d80b.ppt
managementaccountingunitiv-230422140105-dd17d80b.pptmanagementaccountingunitiv-230422140105-dd17d80b.ppt
managementaccountingunitiv-230422140105-dd17d80b.ppt
SuseelaPalanimuthu
 
when will pi network coin be available on crypto exchange.
when will pi network coin be available on crypto exchange.when will pi network coin be available on crypto exchange.
when will pi network coin be available on crypto exchange.
DOT TECH
 

Recently uploaded (20)

what is a pi whale and how to access one.
what is a pi whale and how to access one.what is a pi whale and how to access one.
what is a pi whale and how to access one.
 
What price will pi network be listed on exchanges
What price will pi network be listed on exchangesWhat price will pi network be listed on exchanges
What price will pi network be listed on exchanges
 
Chương 6. Ancol - phenol - ether (1).pdf
Chương 6. Ancol - phenol - ether (1).pdfChương 6. Ancol - phenol - ether (1).pdf
Chương 6. Ancol - phenol - ether (1).pdf
 
Webinar Exploring DORA for Fintechs - Simont Braun
Webinar Exploring DORA for Fintechs - Simont BraunWebinar Exploring DORA for Fintechs - Simont Braun
Webinar Exploring DORA for Fintechs - Simont Braun
 
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
 
Summary of financial results for 1Q2024
Summary of financial  results for 1Q2024Summary of financial  results for 1Q2024
Summary of financial results for 1Q2024
 
where can I find a legit pi merchant online
where can I find a legit pi merchant onlinewhere can I find a legit pi merchant online
where can I find a legit pi merchant online
 
USDA Loans in California: A Comprehensive Overview.pptx
USDA Loans in California: A Comprehensive Overview.pptxUSDA Loans in California: A Comprehensive Overview.pptx
USDA Loans in California: A Comprehensive Overview.pptx
 
how can i use my minded pi coins I need some funds.
how can i use my minded pi coins I need some funds.how can i use my minded pi coins I need some funds.
how can i use my minded pi coins I need some funds.
 
how to sell pi coins on Bitmart crypto exchange
how to sell pi coins on Bitmart crypto exchangehow to sell pi coins on Bitmart crypto exchange
how to sell pi coins on Bitmart crypto exchange
 
Introduction to Value Added Tax System.ppt
Introduction to Value Added Tax System.pptIntroduction to Value Added Tax System.ppt
Introduction to Value Added Tax System.ppt
 
This assessment plan proposal is to outline a structured approach to evaluati...
This assessment plan proposal is to outline a structured approach to evaluati...This assessment plan proposal is to outline a structured approach to evaluati...
This assessment plan proposal is to outline a structured approach to evaluati...
 
APP I Lecture Notes to students 0f 4the year
APP I  Lecture Notes  to students 0f 4the yearAPP I  Lecture Notes  to students 0f 4the year
APP I Lecture Notes to students 0f 4the year
 
Isios-2024-Professional-Independent-Trustee-Survey.pdf
Isios-2024-Professional-Independent-Trustee-Survey.pdfIsios-2024-Professional-Independent-Trustee-Survey.pdf
Isios-2024-Professional-Independent-Trustee-Survey.pdf
 
how to sell pi coins effectively (from 50 - 100k pi)
how to sell pi coins effectively (from 50 - 100k  pi)how to sell pi coins effectively (from 50 - 100k  pi)
how to sell pi coins effectively (from 50 - 100k pi)
 
Turin Startup Ecosystem 2024 - Ricerca sulle Startup e il Sistema dell'Innov...
Turin Startup Ecosystem 2024  - Ricerca sulle Startup e il Sistema dell'Innov...Turin Startup Ecosystem 2024  - Ricerca sulle Startup e il Sistema dell'Innov...
Turin Startup Ecosystem 2024 - Ricerca sulle Startup e il Sistema dell'Innov...
 
how to sell pi coins on Binance exchange
how to sell pi coins on Binance exchangehow to sell pi coins on Binance exchange
how to sell pi coins on Binance exchange
 
Poonawalla Fincorp and IndusInd Bank Introduce New Co-Branded Credit Card
Poonawalla Fincorp and IndusInd Bank Introduce New Co-Branded Credit CardPoonawalla Fincorp and IndusInd Bank Introduce New Co-Branded Credit Card
Poonawalla Fincorp and IndusInd Bank Introduce New Co-Branded Credit Card
 
managementaccountingunitiv-230422140105-dd17d80b.ppt
managementaccountingunitiv-230422140105-dd17d80b.pptmanagementaccountingunitiv-230422140105-dd17d80b.ppt
managementaccountingunitiv-230422140105-dd17d80b.ppt
 
when will pi network coin be available on crypto exchange.
when will pi network coin be available on crypto exchange.when will pi network coin be available on crypto exchange.
when will pi network coin be available on crypto exchange.
 

Availing the Net metering facility: impact of BOI's reforms

  • 1. AVAILING OF THE NET-METERING FACILITY: IMPACT OF BOI’S REFORMS Abdul Haseeb & Ahmed Waqar Qasim Pakistan Institute of Development Economics, Islamabad. The world is now transiting from fossil fuels to clean and environment-friendly energy generation. Societies are shift- ing toward renewable energy sources, such as Photovoltaic (PV) and wind power generation, to meet their energy demands. The government of Pakistan is also taking drastic measures to improve the energy mix in order to cope with the environmental and climate challenges. Among these initiatives, one involves the promotion of the generation of small-scale distributed renewable energy. Accordingly, the concept of net-metering was formally announced in 2015 which allows the consumer to set up a renewable energy capacity like a PV system (commonly known as a solar system) to produce and sell the electricity. This report provides an overview of the process of installation of a PV system that is grid-connected and has a capacity of up to 25 kilowatts (kW). The objectives of the report are twofold: firstly, to walk the reader through different stages, processes, and administrative hurdles/burdens that one has to experience during the installation of the PV system. Secondly, to evaluate the impact of recent reforms that have been implemented by the efforts of the Board of Investment (BOI) in availing the net-metering facility. PIDE ANALYTICS PIDE ANALYTICS 03 1
  • 2. The formal mechanism of the net metering has been elaborated in the Development of Renewable Energy for Power Generation Policy, 2006. The policy promulgates that power Distribution Companies (DISCO) shall enter into a net-metering agreement with qualified end-users upon the request of the end-user without any discrimination (section-8.4).The end-user under this agreement is allowed to produce electricity from a PV system for his/her own use and supply the excess produce to the national grid, which will be compensated by the consumption during peak hours or at the time of low own production. The consumer will pay or get paid according to the adjusted bill that is based on the net unit either exported or consumed. The National Electric Power Regulatory Authority (NEPRA) announced net-metering regulations in 2015 under which any customer of the national grid (having a three-phase connection) can avail of the net-metering facility on a small scale. As per the guide issued by the Alternative Energy Development Board (AEDB) on net-metering, the installation of a net-meter takes around 3 months1 . The diagram below summarizes the process of net-metering as per the AEDB’s guide. 2 1. Net-metering: The Process SUBMIT APPLICATION APPLICATION REVIEW TECHNICAL FEASIBILITY IN THE INITIAL REVIEW AGREEMENT APPLICATION MOVE TO NEPRA FOR A GRANT OF LICENSE Application form along with document Takes around 27 days to complete the initial review Takes 10 working days Takes 7 working days ESTIMATE CONNECTION CHARGES Takes 5 working days PAYMENT OF CHARGES INSTALLATION OF THE INTERCONNECTION FACILITY Within 20 days of issuance Within 30 working days of payment Takes 3 working days The AEDB’s guide can be accessed at: https://www.aedb.org/images/NetmeteringGuidlinesforConsumers.pdf.
  • 3. 3 High level meetings Meetings with Donors Total 8-10 8-14 2-3 2-3 0 1-2 0 0 However, when we reached out to customers who are availing of the net-metering facility, their experience show that the actual process may take more than 4 months. The table below elaborates on the process of net-metering installation as per the end-user’s recollection. Since there are two government bodies involved, the DISCO and NEPRA, therefore, the administrative burden is enormous in availing the net-metering facility. Once the initial assessment and agreement are furnished by DISCO then the application moves to NEPRA. The table below describes the application processing at NEPRA. The Process of net-metering: A consumer’s perspective Steps Search for the vendor Request for installation Visit from the vendor Report by the vendor Consumer’s confirmation Payment confirmation Equipment production Apply for net metering Documents Requirement Application processing at IESCO Application to NEPRA IESCO survey 1 IESCO survey 2 IESCO survey 3 Local visits or websites Personal Visit to vendor Visit of a technical person Voltage load calculation for house Space Checkup Internal processing Confirmation of installation 50% advance payments Internal processing Internal processing The vendor will apply on behalf of the consumer CNIC, Bills, Affidavit, etc. Review, technical feasibility, agreement Application forwarded by DISCO for safety measurements of consumer Meter installation Description Time 1-3 days 1-3 days 1-2 weeks 2-3 days 1-3 days 1-3 days 2 weeks for 25 KW 1.5 months for 100KW 1 week 2-3 months 1.5-2 months 1-3 weeks
  • 4. To promote investment in the renewable energy generation at a small-scale level, BOI proposes and is also able to implement two reforms: 1. Condition of a three-phase connection with the national grid to avail net-metering facility has been eliminated (Reform ID: F006). 2. The requirement of a generation license from NEPRA for net-metering up to 25 kW has been eliminated (Reform ID: F086). We have evaluated the impact of these reforms based on how much administrative and financial burdens have been reduced, and what increase is expected to happen in the usage of renewable energy generation. To evaluate the impact of reforms implemented with the efforts of BOI, we obtained data from NEPRA for the period 2017-2021. In the post-reform scenario, DISCOs can install a bi-directional meter (also known as a green meter) even if the customer does not have a three-phase connection. This intervention has not only saved the processing time but also lowers the cost of availing net-metering facility for the individual end-user by around Rs. 15,0002 . Our key findings are: • Previously only 3% of consumers were eligible to avail net-metering facility. Now almost 100% of consumers with the national grid connection can avail this facility. • Based on the average number of applications for net-metering from 2017 to 2021, this reform will reduce the annual recurring cost by Rs. 180 million, which the society has to bear in the absence of this reform3 . • The reform has reduced the processing time by eliminating the three-phase connection requirement and can reduce sludge by 8%. 4 2. Reforms proposed and implemented by the Board of Investment (BOI) 2.1. Impact assessment of eliminatingthree-phase connection requirement 2This includes the cost of a three-phase meter that has to be installed before the installation of the net-meter. 3There is a 200% increase in the number of applicants each year from 2017-to 2021. Based on this trend, the expected number of applications during 2022 would be around 12,000. The reform would also induce more consumers to avail of this facility, however, we have ignored this impact in calculating the reduction of monetary cost. Therefore, the estimates presented above are understated in that respect. Application Processing at NEPRA Steps Application received Licensing department Document verification 1 day 1-3 days 1-7 days 1-7 days 1-7 days Description Time Member Authorization Authorization Notification Member of the NEPRA will sign the application, and the time it takes depends on the availability The competent authority will sign the document Aﬞer authorization member will notify and will issue the license
  • 5. Now the small-scale consumers can avail net-metering facility and interconnect their solar or wind power generation up to 25 kW without getting a license as well as paying any fee to NEPRA. Our findings under this reform are: • Based on the average number of applications for net-metering from 2017 to 2021, this reform will reduce the aggregate monetary cost by Rs. 170 million, which the society has to bear in the absence of this reform4 . • The reform has reduced the processing time by 18 days and is also able to reduce sludge by 22%. • The reform has eliminated one procedure (obtaining a license from NEPRA) directly and 6 indirect steps (the processing of application within NEPRA). • 80% to 90% of consumers are of capacity less than 25kW. • 10% to 15% increase in the number of applications for net-metering is expected due to the reforms. • Overall reforms have reduced the processing time by 23 days and eliminated the sludge by 25%. • More than Rs. 350 million annual recurring administrative costs have been reduced. • NEPRA has raised transparency concerns. Since DISCOs entertain the net-metering application below 25 kW without notifying the authority. • The reforms have empowered DISCOs, and instances of misuse of power have also been reported by the respondents. • Members’availability in NEPRA could cause a delay of around 15 – 20 days. • Consumers can only apply for the net-metering through certified vendors of the AEDB. 5 3. Important Findings and Observations 2.2. Impact assessment of eliminatingthree-phase connection requirement 4Data reveals that there is a 15% annual increase in the applicants for net-metering below 25kW connections. DISCOs on average entertain around 10,000 applicants below 25 kW and the fee charged by NEPRA is Rs. 1,000 per kW. The expected number of applicants below 25 kW during 2022 is around 80% of total applications.
  • 6. • Online integration of NEPRA and DISCOs can address the concerns of NEPRA related to the contractual validations between DISCOs and vendors. • Automation of application processing with a trace and track facility that is accessible to the vendor as well as the consumer may bring some transparency to the process. • For connection above 25 kW, the authorization by the member may also be received online. • To curtail the misuse of power by DISCOs, NEPRA should specify the timelines starting from the day of application submission till the day consumer receive the first adjusted bill. In the event of prolonged delays, a forum and a mechanism of complaint registration should also be initiated by NEPRA. 4. Way Forward PAKISTAN INSTITUTE OF DEVELOPMENT ECONOMICS QAU Campus, P.O. Box 1091, Islamabad 44000, Pakistan. Tel: 051-9248094 www.pide.org.pk 6