I. INTRODUCTION
Social, economic and environmental concerns demand
highly efficient and more sustainable electrical power system.
However, power systems need to change from its traditional
conception to future power systems. New nonconventional
generators are distributed in the powers systems, which have
been developed and integrated to the electric grid.
Wind power is nowadays considered as one of the fastest
growing and future renewable energy resources in the world.
Wind power generation capacity in India has significantly
increased in recent years. As of 31 March 2019 the total
installed wind power capacity was 36.625 GW, the fourth
largest installed wind power capacity in the world. Wind
power capacity is mainly spread across the South, West, and
North and East regions
The increasing penetration of wind farms in the electric
grid will have a major impact on the operation and control of
the power system. Wind energy conversion systems (WECS)
are exposed to disturbances, faults and low grid voltages.
WECs are mostly designed to disconnect and remain offline
for a certain amount of time when there is a loss of grid
voltage. They are not designed to differentiate between a
complete loss of grid voltage and a temporary voltage dip.
Transient events cause a drop in voltage that causes the WECS
to turn off for 4-5 min. When the WECS turns off, net load on
the distribution feeder goes to a higher level, and feeder
experiences a quick drop in voltage. Drop in voltage causes
the flickering of lights, poor operation of electronic equipment
etc. With Low Voltage Ride Through technology integrated
into WECS, it continues to generate electricity immediately
after transient events. For prolonged faults, the LVRT feature
will ensure for safety reasons that the WECS will
automatically turn off for permanent fault condition.
A. Grid Code Requirements
Power system operators have implemented technical
standards known as grid codes that wind turbines must meet
when connecting to the grid. The typical grid codes main
requirements are as follows:
ο‚· Active Power: Wind power plants must have the
ability to regulate their active power output to ensure a
stable frequency in the system and to prevent lines
overloading.
ο‚· Reactive Power: Wind power plants should have the
capability to maintain the reactive power balance and
the power factor in the desired range (typically
between 0.9 (lag) to 0.98(lead)).
ο‚· Frequency Operating Range: Wind power plants are
required to run continuously within typical grid
frequency variations between 49.5 Hz and 50.5Hz.
ο‚· Low Voltage Ride-Through: During a voltage drop,
turbines are required to remain connected for specific
time duration before being allowed to disconnect. This
requirement is to ensure that there is no generation loss
for normally cleared faults. Disconnecting a wind
generator too quickly could have a negative impact on
the grid, particularly with large wind farms. Grid codes
require that large wind farms must withstand voltage
sags for a certain percentage of the nominal voltage
and for a specified duration.
B. LVRT Requirements
LVRT Standards differ from one country to another with
small changes in voltage drop magnitude, fault time, voltage
recovery time and final voltage magnitude. These standards
specify how distributed systems should respond to abnormal
grid voltages. Indian Wind Grid Code (IWGC) is similar to
the international grid code standards and the fault clearing
time is based on the Indian Electricity Grid Code (IEGC)[1].
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
Β© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2166
Abstractβ€” Increasing popularity of renewable energy has
led to increased penetration of wind farms in the power system.
Thus operation and control of power system is dependent on the
operation of wind farms particularly during faults. Whenever
there is a fault in the grid, the voltage at the point of common
coupling gets disturbed. As a result, the grid connected Wind
Electric Generator (WEG) gets disconnected from the grid, such
unintentional islanding causes a sudden loss of generation in the
power system. If the fault is cleared within a short duration, the
power system will face a huge generation load mismatch which
may even lead to blackouts. To prevent unintentional islanding,
the wind energy conversion system needs to satisfy the most
important grid code requirement known as the Low Voltage
Ride Through (LVRT) for it to be connected to the grid. In this
work, LVRT capability is provided by a Static Synchronous
Compensator (STATCOM). STATCOM is synchronized with
the grid using Synchronously Rotating Reference Frame Phase
Locked Loop (SRF-PLL) based grid synchronization algorithm.
The ability of STATCOM to provide LVRT capability is
analyzed through simulations in MATLAB/Simulink
environment. Behaviour of the system under normal and fault
conditions in the presence and absence of STATCOM is studied.
II. LITERATURE SURVEY
Fig. 1.LVRT Curve
The Fig. 1 shows the LVRT capability requirement for
wind farms to be connected within the shaded region and can
be disconnected otherwise. Vp f is the minimum voltage
mentioned by IWGC, which is 85% of the nominal system
voltage (Vnom) and Vf is 15% of the nominal system voltage.
TABLE I. LVRT REQUIREMENTS SPECIFIED IN INDIA
Nominal
System
voltage
(kV)
Fault
Clearing
Time(msec)
Vpf
(kV)
Vf
(kV)
400 100 360 60
220 160 200 33
132 16 120 19.8
110 160 96.25 16.5
66 300 60 9.9
C. Different LVRT Methodologies For Wecs
LVRT capability can be implemented by using different
methods. These methods can be classified as:
ο‚· Without energy storage based approach:Active
crowbar protection,Series Dynamic Braking Resistor
(SDBR) and Pitch angle control
ο‚· Energy storage based approach: Energy Storage
Systems (ESS) and STATCOM technology.
Detailed explanation of STATCOM technology is
presented in the next section as this is the method used in this
paper to provide LVRT requirement.
III. STATCOM TECHNOLOGY FOR LVRT
The basic diagram of STATCOM integrated to WECS
connected to grid is shown in the previous chapter. Flexible
AC transmission systems (FACTS) based power electronic
converters such as static synchronous compensator
(STATCOM) is used here to provide the LVRT
requirement[2]. STATCOM can provide this requirement by
injecting a reactive current which in-turn maintains the
voltage at the point of common coupling. The STATCOM is
a shunt-connected device using power electronics which can
regulate the voltage at its terminals by controlling the amount
of reactive power injected into or absorbed from the power
system. STATCOM consists of a coupling transformer,
voltage source converter and a dc capacitor. When the grid
voltage becomes low, the STATCOM generates the reactive
power for adjusting the system voltage. On the other hand,
when the power system voltage becomes high, it absorbs the
reactive power.
Fig. 2. Block Diagram Of LVRT Testing Scheme
Fig. 2 presents a schematic representation of a test setup to
create a voltage disturbance in the electric network. When S1
is open and S2 is closed, it is like a symmetric fault. It can be
seen that due to fault in the grid, the voltage available at WEG
system terminal drops.
A. Control Of STATCOM
The control system of the STATCOM consists of a unit
vector generation block, here since PLL technique is used, the
block is given the name PLL. The phase angle ΞΈ is the output
of the PLL system which is utilized to transform the three
phase abc currents and voltages to the dq-axis currents and
voltages. The error between the reference grid voltage and the
actual grid voltage is evaluated by a PI controller and the
output of PI controller is the reference q-axis reference
current.
Fig. 3. Control Of STATCOM
The error between the reference DC-link voltage and the
actual DC- link voltage is evaluated by a PI controller and the
PI controller generates the d-axis reference current. An inner
current controller loop produces the dq-axis reference voltage,
and then it is converted to the three phase voltage reference.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
Β© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2167
By using sinusoidal PWM, switching pulses are generated to
drive the VSC.
B. Unit Vector Generation
For the safe and efficient operation of STATCOM, proper
synchronization with grid is very essential. An accurate and
fast detection of the phase angle, amplitude and frequency of
the grid voltage is thus essential for determination of grid
condition. In order to control the flow of reactive current and
to turn on and off power devices, a set of unit sine and cosine
wave forms which are synchronized with the system are
required. Various grid synchronization algorithms or unit
vector generation methods include zero crossing detector
PLL, stationary reference frame PLL, SRF-PLL etc.
Zero crossing detector PLL gives slow response with high
sensitivity to frequency deviation and voltage unbalance and
the stationary reference frame PLL is not capable of tracking
un- balanced voltages properly. So among these SRF-PLL is
the most commonly used unit vector generation method/ grid
synchronization algorithm [3].
Unit vectors are two unity magnitude fundamental
sinusoidal quantities, which are displaced by 90β—¦ from each
other. One of the unit vector should be in phase with grid
voltage. These unit vectors must be free from harmonics.
Significance of unit vectors is that it helps to synchronize the
STATCOM voltage and grid voltage.
Fig. 4. Block Diagram Of SRF PLL
SRF PLL is the most commonly used PLL algorithm for unit
vector generation. The unit vectors generated are used for the
transformation of voltages and currents from Ξ±Ξ² to dq frame.
The unit vectors U1(Ο‰g) and U2(Ο‰g) are named as sinΞΈ and -
cosΞΈ respectively. To obtain phase angle, voltage vector is
synchronized with d or q axis. Basic block diagram of SRF
PLL is shown in figure. If Vq = 0 is ensured, then VR(Ο‰g) will
be synchronized with unit vector (U1(Ο‰g)). To ensure Vq = 0,
a simple PI controller is used.
[
𝑉𝑑
π‘‰π‘ž
]=[
sin πœ” 𝑔′𝑑 βˆ’cos πœ” 𝑔′𝑑
cos πœ” 𝑔′𝑑 sin πœ” 𝑔′𝑑
]= [
3
2
𝑉𝑔 cos(( πœ” 𝑔 βˆ’ πœ” 𝑔′)𝑑)
3
2
𝑉𝑔 sin(( πœ” 𝑔 βˆ’ πœ” 𝑔′)𝑑)
] (1)
If the phases are not locked i.e.Ο‰g β‰  Ο‰gβ€², then value of Vd and
Vq is as shown above.
[
𝑉𝑑
π‘‰π‘ž
] = [
sin πœ” 𝑔′𝑑 βˆ’cos πœ” 𝑔′𝑑
cos πœ” 𝑔′𝑑 sin πœ” 𝑔′𝑑
] [
3
2
𝑉𝑔 sin πœ” 𝑔 𝑑
βˆ’
3
2
𝑉𝑔 cos πœ” 𝑔 𝑑
] = [
3
2
𝑉𝑔
0
] (2)
If the phases are not locked i.e.Ο‰g = Ο‰gβ€², then value of
Vd and Vq is as shown above.
IV. DESIGN OF VOLTAGE SAG
A symmetrical fault is simulated at the PCC with help of fault
breaker in series with fault impedance as shown in Fig.3.1.
The value of the fault impedance has been programmed to
reduce the PCC voltage [4]. A dip in voltage can be created
using the equation given below.
π‘‰π‘ π‘Žπ‘” = π‘‰π‘Ÿπ‘Žπ‘‘π‘’π‘‘
𝑍2
𝑍1
(3)
V. SIMULATION AND RESULTS
The parameter values used for the simulation is given in
table II
TABLE II. PARAMETERS FOR SIMULATION
Sl.
No
Parameters Values
STATCOM Data
1 DC Link Capacitor (C)
5500Β΅F
2 Inductance (L)
326.85Β΅
H
3 Resistor (R) 100mH
4
Reference DC link capacitor
voltage (VDCref )
850V
5
Current controller time
constant (T1)
100Β΅s
6
Voltage controller time
constant (T2)
100ms
7 Grid frequency (f)
50Hz
8 Switching Frequency 10KHz
Wind Turbine Data
9 Power 600kW
10 No: of blades 3
11 Rated Wind Speed 9 m/s
Generator Data
12 Rated power 600kW
13 Rated voltage 690V
14 Rated frequency 50HZ
15 Stator Resistance 0.0092Ω
16 Stator Inductance 0.1686H
17 Rotor Resistance 0.0121Ω
18 Rotor Inductance 5.6863H
19 Moment of inertia coefficient 0.555
20 No: of pole pairs 2
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
Β© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2168
The Fig. 5 shows the Simulink model of WECS with
STATCOM connected to grid. In this model 66kV is stepped
down to 690kV and then fed to the wind electric generator.
Fault is introduced using an arrangement defined in the theory
part. The STATCOM model is simulated using the equations
mentioned above. In the control of STATCOM, SRF-PLL
algorithm is implemented. The WECS used in the simulation
takes the following values given in table II.
Fig. 6 shows the expanded STATCOM subsystem with
transformer at its terminal to step up the STATCOM voltage
generated.
Fig 6 Simulink model of STATCOM
Fig 7 Simulink model of voltage transformation in STATCOM control
Fig. 7 shows the voltage transformation in STATCOM control
implemented using SRF- PLL simulated in the previous
section. STATCOM rated 500kVA is connected in shunt with
grid at PCC through a transformer, 415V/690V, for supporting
reactive power requirement of WEG during fault condition. A
symmetrical fault is simulated at the PCC with help of fault
breaker in series with fault impedance.
Fig 8 Simulink model of current transformation in STATCOM control
Fig.8 shows the Simulink model of current transformation in
STATCOM using the unit vectors generated above.
Fig 9 Simulink model of voltage and current control in STATCOM control
Fig 5 Simulink model of WECS with STATCOM connected to grid
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
Β© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2169
Fig. 9 shows the generation of alpha and beta reference
voltages using the voltage and current controllers. The
switching pulses for the inverter are generated as shown in
Fig.10 Here sinusoidal pulse width modulation technique is
used.
Figure 5.10 Simulink model of pulse generation in STATCOM
Case I : The value of the fault impedance has been
programmed with Z1 = 0.02 + 0.1696 j and Z2 = 0.084 + 0.7169
j to reduce the PCC voltage to 76% of rated voltage at 40ms
and STATCOM is programmed to supply the reactive current
requirement of fault at 200ms.
Fig 11 Output of scope 2 with STATCOM programmed to supply reactive
current (a) at 200msec (b) as soon as fault occurs
TABLE III. CASE1:VOLTAGE AT PCC DURING FAULT AND
STATCOMON CONDITIONS
Normal Condition Fault Condition STATCOM On
690V 528V 630
690V 528V 630
690V 528V 630
From the above table III and waveforms in Fig.11 we can infer
that the RMS voltage at PCC is getting improved to 630V
from 528V when STATCOM is ON. This shows the
capability of STATCOM in providing LVRT requirement.
Fig 12 Output of scope 2 with STATCOM programmed to supply reactive
current (a) at 200msec (b) as soon as fault occurs
Case II : The value of the fault impedance has been
programmed with Z1 = 0.08 + 0.1696 j and Z2 = 1.5 + 0.9708
j to reduce the PCC voltage to 81% of rated voltage at 40ms
and STATCOM is programmed to supply the reactive current
requirement of fault at 200ms.
TABLE IV. CASE 2: VOLTAGE AT PCC DURING FAULT AND
STATCOM ON CONDITIONS
Line
Voltage
Normal
Condition
Fault
Condition
STATCOM
On
VRY 690V 565V 637
VY B 690V 565V 637
VBR 690V 565V 637
(a)
(b)
(a)
(b)
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
Β© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2170
From the above table and waveforms in Fig.12 we can infer
that the RMS voltage at PCC is getting improved to 637V
from 565V when STATCOM is ON. This shows the
capability of STATCOM in providing LVRT requirement.
VI. CONCLUSION
Grid code requirements imposed by transmission system
operators or grid operators are discussed. LVRT requirement
is explained in detail. STATCOM technology providing the
LVRT requirement is focused in this work. Simulations for
STATCOM providing LVRT for grid connected WECS are
carried out in MATLAB/Simulink environment. Hence it is
concluded that the STATCOM technology can mitigate the
voltage dip due to fault current by injecting capacitive reactive
current of appropriate magnitude as per the Indian Grid code
and it is a viable solution for effective integration of wind farm
to electrical distribution systems.
[1] Indian Wind Grid Code Draft.", 2009; pp.(15-18).
[2] Ramirez, Dionisio, et al, "Use of STATCOM in wind farms with fixed-
speed generators for grid code compliance" Renewable Energy, vol. 37,
no. 1, pp. 202-212, 2012.
[3] Andrews, Sajitha, TG Subhash Joshi, A. Saravana Kumar, A. S.Manju,
and A. K. Unnikr- ishnan, "Modified SRF-PLL to operate under
unbalance grid for grid synchronization of DVR", In 2014 IEEE
International Conference on Power Electronics, Drives andEnergy
Systems (PEDES), pp. 1-6. IEEE, 2014.
[4] Bollen, Math HJ, "IEEE tutorial on voltage sag analysis," IEEE Press,
1999.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
Β© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2171
REFERANCES

More Related Content

What's hot

Ppt of PGCIL by d.p.yadav( 91 8432379261)
Ppt of PGCIL by d.p.yadav( 91 8432379261)Ppt of PGCIL by d.p.yadav( 91 8432379261)
Ppt of PGCIL by d.p.yadav( 91 8432379261)Dharmpal Yadav
Β 
Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...
Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...
Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...Akbar Badusha
Β 
Overview lvrt capability of dfig techniques
Overview lvrt capability of dfig techniquesOverview lvrt capability of dfig techniques
Overview lvrt capability of dfig techniquesIAEME Publication
Β 
Wind farm grid issues
Wind farm grid issuesWind farm grid issues
Wind farm grid issuesRohil Kumar
Β 
Power quality improvement techniques
Power quality improvement techniquesPower quality improvement techniques
Power quality improvement techniquessahid raja khan
Β 
DG interconnection protection ieee 1547
DG interconnection protection ieee 1547DG interconnection protection ieee 1547
DG interconnection protection ieee 1547michaeljmack
Β 
Automated load shedding using microcontroller
Automated load shedding using microcontrollerAutomated load shedding using microcontroller
Automated load shedding using microcontrollerRajVerma175
Β 
Arc flash application guide
Arc flash application guideArc flash application guide
Arc flash application guideSouvik Dutta
Β 
Functions and performance requirements of excitation systems
Functions and performance requirements of excitation systemsFunctions and performance requirements of excitation systems
Functions and performance requirements of excitation systemsRajshekar Naregal
Β 
powergrid presentation
powergrid presentationpowergrid presentation
powergrid presentationAkriti Gupta
Β 
Solid State Fault Current Limiter for Improvement of Smart Grid Performance
Solid State Fault Current Limiter for Improvement of Smart Grid PerformanceSolid State Fault Current Limiter for Improvement of Smart Grid Performance
Solid State Fault Current Limiter for Improvement of Smart Grid PerformanceIRJET Journal
Β 
presentation on power grid system
presentation on power grid systempresentation on power grid system
presentation on power grid systemrahul123gupta
Β 
IRENA_The Role of Grid Codes v2
IRENA_The Role of Grid Codes v2IRENA_The Role of Grid Codes v2
IRENA_The Role of Grid Codes v2fboshell
Β 
C121738
C121738C121738
C121738irjes
Β 
EHVAC transmission line maintenance techniques
EHVAC transmission line maintenance techniquesEHVAC transmission line maintenance techniques
EHVAC transmission line maintenance techniquesYashwant Chaudhari
Β 
UPS Electrical Design and Installation
UPS Electrical Design and InstallationUPS Electrical Design and Installation
UPS Electrical Design and InstallationJason Koffler
Β 

What's hot (20)

Ppt of PGCIL by d.p.yadav( 91 8432379261)
Ppt of PGCIL by d.p.yadav( 91 8432379261)Ppt of PGCIL by d.p.yadav( 91 8432379261)
Ppt of PGCIL by d.p.yadav( 91 8432379261)
Β 
Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...
Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...
Intelligent Electric Power Management Using Zigbee with Advanced Metering Inf...
Β 
Overview lvrt capability of dfig techniques
Overview lvrt capability of dfig techniquesOverview lvrt capability of dfig techniques
Overview lvrt capability of dfig techniques
Β 
Class 16 load shedding
Class 16 load sheddingClass 16 load shedding
Class 16 load shedding
Β 
Wind farm grid issues
Wind farm grid issuesWind farm grid issues
Wind farm grid issues
Β 
Power quality improvement techniques
Power quality improvement techniquesPower quality improvement techniques
Power quality improvement techniques
Β 
DG interconnection protection ieee 1547
DG interconnection protection ieee 1547DG interconnection protection ieee 1547
DG interconnection protection ieee 1547
Β 
Power Electronics Application: HVDC
Power Electronics Application: HVDC Power Electronics Application: HVDC
Power Electronics Application: HVDC
Β 
Automated load shedding using microcontroller
Automated load shedding using microcontrollerAutomated load shedding using microcontroller
Automated load shedding using microcontroller
Β 
Arc flash application guide
Arc flash application guideArc flash application guide
Arc flash application guide
Β 
Functions and performance requirements of excitation systems
Functions and performance requirements of excitation systemsFunctions and performance requirements of excitation systems
Functions and performance requirements of excitation systems
Β 
powergrid presentation
powergrid presentationpowergrid presentation
powergrid presentation
Β 
Solid State Fault Current Limiter for Improvement of Smart Grid Performance
Solid State Fault Current Limiter for Improvement of Smart Grid PerformanceSolid State Fault Current Limiter for Improvement of Smart Grid Performance
Solid State Fault Current Limiter for Improvement of Smart Grid Performance
Β 
presentation on power grid system
presentation on power grid systempresentation on power grid system
presentation on power grid system
Β 
IRENA_The Role of Grid Codes v2
IRENA_The Role of Grid Codes v2IRENA_The Role of Grid Codes v2
IRENA_The Role of Grid Codes v2
Β 
What's short circuit level
What's short circuit levelWhat's short circuit level
What's short circuit level
Β 
C121738
C121738C121738
C121738
Β 
Wide area monitoring, protection and control in future smart grid
Wide area monitoring, protection and control in future smart gridWide area monitoring, protection and control in future smart grid
Wide area monitoring, protection and control in future smart grid
Β 
EHVAC transmission line maintenance techniques
EHVAC transmission line maintenance techniquesEHVAC transmission line maintenance techniques
EHVAC transmission line maintenance techniques
Β 
UPS Electrical Design and Installation
UPS Electrical Design and InstallationUPS Electrical Design and Installation
UPS Electrical Design and Installation
Β 

Similar to IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System

LOW VOLTAGE RIDE - THROUGH CAPABILITY OF WIND FARMS
LOW VOLTAGE RIDE - THROUGH CAPABILITY OF WIND FARMSLOW VOLTAGE RIDE - THROUGH CAPABILITY OF WIND FARMS
LOW VOLTAGE RIDE - THROUGH CAPABILITY OF WIND FARMSEditor IJMTER
Β 
IRJET- PI Controller based Shunt Connected Three Phase Active Power Filter
IRJET- PI Controller based Shunt Connected Three Phase Active Power FilterIRJET- PI Controller based Shunt Connected Three Phase Active Power Filter
IRJET- PI Controller based Shunt Connected Three Phase Active Power FilterIRJET Journal
Β 
IRJET- Grid Integrated Single Phase PV with Shunt Active Filter based Control...
IRJET- Grid Integrated Single Phase PV with Shunt Active Filter based Control...IRJET- Grid Integrated Single Phase PV with Shunt Active Filter based Control...
IRJET- Grid Integrated Single Phase PV with Shunt Active Filter based Control...IRJET Journal
Β 
IRJET- Solar H8 Inverter to Reduce Leakage Currents in Grid Connected Applic...
IRJET-	 Solar H8 Inverter to Reduce Leakage Currents in Grid Connected Applic...IRJET-	 Solar H8 Inverter to Reduce Leakage Currents in Grid Connected Applic...
IRJET- Solar H8 Inverter to Reduce Leakage Currents in Grid Connected Applic...IRJET Journal
Β 
IRJET - Introduction of STATCOM in PV Grid System
IRJET -  	  Introduction of STATCOM in PV Grid SystemIRJET -  	  Introduction of STATCOM in PV Grid System
IRJET - Introduction of STATCOM in PV Grid SystemIRJET Journal
Β 
IRJET - Power Quality Improvement using Statcom in PV Grid Connected System
IRJET - Power Quality Improvement using Statcom in PV Grid Connected SystemIRJET - Power Quality Improvement using Statcom in PV Grid Connected System
IRJET - Power Quality Improvement using Statcom in PV Grid Connected SystemIRJET Journal
Β 
Control Scheme for Solar PV System under Asymmetrical Fault Condition
Control Scheme for Solar PV System under Asymmetrical Fault ConditionControl Scheme for Solar PV System under Asymmetrical Fault Condition
Control Scheme for Solar PV System under Asymmetrical Fault ConditionIRJET Journal
Β 
Detection of Power Grid Synchronization Failure by Sensing Bad Voltage and Fr...
Detection of Power Grid Synchronization Failure by Sensing Bad Voltage and Fr...Detection of Power Grid Synchronization Failure by Sensing Bad Voltage and Fr...
Detection of Power Grid Synchronization Failure by Sensing Bad Voltage and Fr...IRJET Journal
Β 
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...IRJET Journal
Β 
Voltage Stability & Power Quality Assessment of Distributed Generation Based ...
Voltage Stability & Power Quality Assessment of Distributed Generation Based ...Voltage Stability & Power Quality Assessment of Distributed Generation Based ...
Voltage Stability & Power Quality Assessment of Distributed Generation Based ...ijsrd.com
Β 
IRJET- Comparative Analysis of Different Converter Topologies Employed for Tr...
IRJET- Comparative Analysis of Different Converter Topologies Employed for Tr...IRJET- Comparative Analysis of Different Converter Topologies Employed for Tr...
IRJET- Comparative Analysis of Different Converter Topologies Employed for Tr...IRJET Journal
Β 
IRJET- Voltage Stability Improvement and Reactive Power Compensation using ST...
IRJET- Voltage Stability Improvement and Reactive Power Compensation using ST...IRJET- Voltage Stability Improvement and Reactive Power Compensation using ST...
IRJET- Voltage Stability Improvement and Reactive Power Compensation using ST...IRJET Journal
Β 
Fault Ride-Through capability of DSTATCOM for Distributed Wind Generation System
Fault Ride-Through capability of DSTATCOM for Distributed Wind Generation SystemFault Ride-Through capability of DSTATCOM for Distributed Wind Generation System
Fault Ride-Through capability of DSTATCOM for Distributed Wind Generation SystemIJPEDS-IAES
Β 
IRJET- Modeling, Simulation and Implementation of D-STATCOM for Improveme...
IRJET-  	  Modeling, Simulation and Implementation of D-STATCOM for Improveme...IRJET-  	  Modeling, Simulation and Implementation of D-STATCOM for Improveme...
IRJET- Modeling, Simulation and Implementation of D-STATCOM for Improveme...IRJET Journal
Β 
Voltage stability improvement using static synchronous series compensator sss
Voltage stability improvement using static synchronous series compensator sssVoltage stability improvement using static synchronous series compensator sss
Voltage stability improvement using static synchronous series compensator sssIAEME Publication
Β 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
Β 
Paper id 41201606
Paper id 41201606Paper id 41201606
Paper id 41201606IJRAT
Β 
LOAD FREQUENCY CONTROL IN TWO AREA NETWORK INCLUDING DG
LOAD FREQUENCY CONTROL IN TWO AREA NETWORK INCLUDING DGLOAD FREQUENCY CONTROL IN TWO AREA NETWORK INCLUDING DG
LOAD FREQUENCY CONTROL IN TWO AREA NETWORK INCLUDING DGIAEME Publication
Β 
Design_and_Investigation_of_FRT_Schemes_for_Three-Phase_Grid-Tied_PV_System.pdf
Design_and_Investigation_of_FRT_Schemes_for_Three-Phase_Grid-Tied_PV_System.pdfDesign_and_Investigation_of_FRT_Schemes_for_Three-Phase_Grid-Tied_PV_System.pdf
Design_and_Investigation_of_FRT_Schemes_for_Three-Phase_Grid-Tied_PV_System.pdfEngnr Kami Zeb
Β 

Similar to IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System (20)

LOW VOLTAGE RIDE - THROUGH CAPABILITY OF WIND FARMS
LOW VOLTAGE RIDE - THROUGH CAPABILITY OF WIND FARMSLOW VOLTAGE RIDE - THROUGH CAPABILITY OF WIND FARMS
LOW VOLTAGE RIDE - THROUGH CAPABILITY OF WIND FARMS
Β 
IRJET- PI Controller based Shunt Connected Three Phase Active Power Filter
IRJET- PI Controller based Shunt Connected Three Phase Active Power FilterIRJET- PI Controller based Shunt Connected Three Phase Active Power Filter
IRJET- PI Controller based Shunt Connected Three Phase Active Power Filter
Β 
IRJET- Grid Integrated Single Phase PV with Shunt Active Filter based Control...
IRJET- Grid Integrated Single Phase PV with Shunt Active Filter based Control...IRJET- Grid Integrated Single Phase PV with Shunt Active Filter based Control...
IRJET- Grid Integrated Single Phase PV with Shunt Active Filter based Control...
Β 
IRJET- Solar H8 Inverter to Reduce Leakage Currents in Grid Connected Applic...
IRJET-	 Solar H8 Inverter to Reduce Leakage Currents in Grid Connected Applic...IRJET-	 Solar H8 Inverter to Reduce Leakage Currents in Grid Connected Applic...
IRJET- Solar H8 Inverter to Reduce Leakage Currents in Grid Connected Applic...
Β 
IRJET - Introduction of STATCOM in PV Grid System
IRJET -  	  Introduction of STATCOM in PV Grid SystemIRJET -  	  Introduction of STATCOM in PV Grid System
IRJET - Introduction of STATCOM in PV Grid System
Β 
IRJET - Power Quality Improvement using Statcom in PV Grid Connected System
IRJET - Power Quality Improvement using Statcom in PV Grid Connected SystemIRJET - Power Quality Improvement using Statcom in PV Grid Connected System
IRJET - Power Quality Improvement using Statcom in PV Grid Connected System
Β 
Control Scheme for Solar PV System under Asymmetrical Fault Condition
Control Scheme for Solar PV System under Asymmetrical Fault ConditionControl Scheme for Solar PV System under Asymmetrical Fault Condition
Control Scheme for Solar PV System under Asymmetrical Fault Condition
Β 
Detection of Power Grid Synchronization Failure by Sensing Bad Voltage and Fr...
Detection of Power Grid Synchronization Failure by Sensing Bad Voltage and Fr...Detection of Power Grid Synchronization Failure by Sensing Bad Voltage and Fr...
Detection of Power Grid Synchronization Failure by Sensing Bad Voltage and Fr...
Β 
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
Β 
Voltage Stability & Power Quality Assessment of Distributed Generation Based ...
Voltage Stability & Power Quality Assessment of Distributed Generation Based ...Voltage Stability & Power Quality Assessment of Distributed Generation Based ...
Voltage Stability & Power Quality Assessment of Distributed Generation Based ...
Β 
IRJET- Comparative Analysis of Different Converter Topologies Employed for Tr...
IRJET- Comparative Analysis of Different Converter Topologies Employed for Tr...IRJET- Comparative Analysis of Different Converter Topologies Employed for Tr...
IRJET- Comparative Analysis of Different Converter Topologies Employed for Tr...
Β 
IRJET- Voltage Stability Improvement and Reactive Power Compensation using ST...
IRJET- Voltage Stability Improvement and Reactive Power Compensation using ST...IRJET- Voltage Stability Improvement and Reactive Power Compensation using ST...
IRJET- Voltage Stability Improvement and Reactive Power Compensation using ST...
Β 
Fault Ride-Through capability of DSTATCOM for Distributed Wind Generation System
Fault Ride-Through capability of DSTATCOM for Distributed Wind Generation SystemFault Ride-Through capability of DSTATCOM for Distributed Wind Generation System
Fault Ride-Through capability of DSTATCOM for Distributed Wind Generation System
Β 
B0461015
B0461015B0461015
B0461015
Β 
IRJET- Modeling, Simulation and Implementation of D-STATCOM for Improveme...
IRJET-  	  Modeling, Simulation and Implementation of D-STATCOM for Improveme...IRJET-  	  Modeling, Simulation and Implementation of D-STATCOM for Improveme...
IRJET- Modeling, Simulation and Implementation of D-STATCOM for Improveme...
Β 
Voltage stability improvement using static synchronous series compensator sss
Voltage stability improvement using static synchronous series compensator sssVoltage stability improvement using static synchronous series compensator sss
Voltage stability improvement using static synchronous series compensator sss
Β 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
Β 
Paper id 41201606
Paper id 41201606Paper id 41201606
Paper id 41201606
Β 
LOAD FREQUENCY CONTROL IN TWO AREA NETWORK INCLUDING DG
LOAD FREQUENCY CONTROL IN TWO AREA NETWORK INCLUDING DGLOAD FREQUENCY CONTROL IN TWO AREA NETWORK INCLUDING DG
LOAD FREQUENCY CONTROL IN TWO AREA NETWORK INCLUDING DG
Β 
Design_and_Investigation_of_FRT_Schemes_for_Three-Phase_Grid-Tied_PV_System.pdf
Design_and_Investigation_of_FRT_Schemes_for_Three-Phase_Grid-Tied_PV_System.pdfDesign_and_Investigation_of_FRT_Schemes_for_Three-Phase_Grid-Tied_PV_System.pdf
Design_and_Investigation_of_FRT_Schemes_for_Three-Phase_Grid-Tied_PV_System.pdf
Β 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
Β 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
Β 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
Β 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
Β 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
Β 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
Β 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
Β 
A Review of β€œSeismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of β€œSeismic Response of RC Structures Having Plan and Vertical Irreg...A Review of β€œSeismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of β€œSeismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
Β 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
Β 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
Β 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
Β 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
Β 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
Β 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
Β 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
Β 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
Β 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
Β 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
Β 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
Β 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
Β 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
Β 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
Β 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
Β 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
Β 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
Β 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Β 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Β 
A Review of β€œSeismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of β€œSeismic Response of RC Structures Having Plan and Vertical Irreg...A Review of β€œSeismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of β€œSeismic Response of RC Structures Having Plan and Vertical Irreg...
Β 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
Β 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Β 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
Β 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
Β 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
Β 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
Β 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
Β 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
Β 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
Β 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Β 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Β 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Β 

Recently uploaded

CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
Β 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
Β 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
Β 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
Β 
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...9953056974 Low Rate Call Girls In Saket, Delhi NCR
Β 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
Β 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
Β 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
Β 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
Β 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
Β 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
Β 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
Β 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
Β 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
Β 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
Β 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
Β 

Recently uploaded (20)

CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
Β 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
Β 
young call girls in Rajiv ChowkπŸ” 9953056974 πŸ” Delhi escort Service
young call girls in Rajiv ChowkπŸ” 9953056974 πŸ” Delhi escort Serviceyoung call girls in Rajiv ChowkπŸ” 9953056974 πŸ” Delhi escort Service
young call girls in Rajiv ChowkπŸ” 9953056974 πŸ” Delhi escort Service
Β 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Β 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
Β 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
Β 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Β 
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
Β 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
Β 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
Β 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
Β 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
Β 
β˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
β˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCRβ˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
β˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
Β 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
Β 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
Β 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
Β 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
Β 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
Β 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
Β 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
Β 

IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System

  • 1. Keywords β€” LVRT; Wind electric generator; STATCOM; Grid synchronization; Phase Locked Loop. I. INTRODUCTION Social, economic and environmental concerns demand highly efficient and more sustainable electrical power system. However, power systems need to change from its traditional conception to future power systems. New nonconventional generators are distributed in the powers systems, which have been developed and integrated to the electric grid. Wind power is nowadays considered as one of the fastest growing and future renewable energy resources in the world. Wind power generation capacity in India has significantly increased in recent years. As of 31 March 2019 the total installed wind power capacity was 36.625 GW, the fourth largest installed wind power capacity in the world. Wind power capacity is mainly spread across the South, West, and North and East regions The increasing penetration of wind farms in the electric grid will have a major impact on the operation and control of the power system. Wind energy conversion systems (WECS) are exposed to disturbances, faults and low grid voltages. WECs are mostly designed to disconnect and remain offline for a certain amount of time when there is a loss of grid voltage. They are not designed to differentiate between a complete loss of grid voltage and a temporary voltage dip. Transient events cause a drop in voltage that causes the WECS to turn off for 4-5 min. When the WECS turns off, net load on the distribution feeder goes to a higher level, and feeder experiences a quick drop in voltage. Drop in voltage causes the flickering of lights, poor operation of electronic equipment etc. With Low Voltage Ride Through technology integrated into WECS, it continues to generate electricity immediately after transient events. For prolonged faults, the LVRT feature will ensure for safety reasons that the WECS will automatically turn off for permanent fault condition. A. Grid Code Requirements Power system operators have implemented technical standards known as grid codes that wind turbines must meet when connecting to the grid. The typical grid codes main requirements are as follows: ο‚· Active Power: Wind power plants must have the ability to regulate their active power output to ensure a stable frequency in the system and to prevent lines overloading. ο‚· Reactive Power: Wind power plants should have the capability to maintain the reactive power balance and the power factor in the desired range (typically between 0.9 (lag) to 0.98(lead)). ο‚· Frequency Operating Range: Wind power plants are required to run continuously within typical grid frequency variations between 49.5 Hz and 50.5Hz. ο‚· Low Voltage Ride-Through: During a voltage drop, turbines are required to remain connected for specific time duration before being allowed to disconnect. This requirement is to ensure that there is no generation loss for normally cleared faults. Disconnecting a wind generator too quickly could have a negative impact on the grid, particularly with large wind farms. Grid codes require that large wind farms must withstand voltage sags for a certain percentage of the nominal voltage and for a specified duration. B. LVRT Requirements LVRT Standards differ from one country to another with small changes in voltage drop magnitude, fault time, voltage recovery time and final voltage magnitude. These standards specify how distributed systems should respond to abnormal grid voltages. Indian Wind Grid Code (IWGC) is similar to the international grid code standards and the fault clearing time is based on the Indian Electricity Grid Code (IEGC)[1]. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 Β© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2166 Abstractβ€” Increasing popularity of renewable energy has led to increased penetration of wind farms in the power system. Thus operation and control of power system is dependent on the operation of wind farms particularly during faults. Whenever there is a fault in the grid, the voltage at the point of common coupling gets disturbed. As a result, the grid connected Wind Electric Generator (WEG) gets disconnected from the grid, such unintentional islanding causes a sudden loss of generation in the power system. If the fault is cleared within a short duration, the power system will face a huge generation load mismatch which may even lead to blackouts. To prevent unintentional islanding, the wind energy conversion system needs to satisfy the most important grid code requirement known as the Low Voltage Ride Through (LVRT) for it to be connected to the grid. In this work, LVRT capability is provided by a Static Synchronous Compensator (STATCOM). STATCOM is synchronized with the grid using Synchronously Rotating Reference Frame Phase Locked Loop (SRF-PLL) based grid synchronization algorithm. The ability of STATCOM to provide LVRT capability is analyzed through simulations in MATLAB/Simulink environment. Behaviour of the system under normal and fault conditions in the presence and absence of STATCOM is studied. II. LITERATURE SURVEY
  • 2. Fig. 1.LVRT Curve The Fig. 1 shows the LVRT capability requirement for wind farms to be connected within the shaded region and can be disconnected otherwise. Vp f is the minimum voltage mentioned by IWGC, which is 85% of the nominal system voltage (Vnom) and Vf is 15% of the nominal system voltage. TABLE I. LVRT REQUIREMENTS SPECIFIED IN INDIA Nominal System voltage (kV) Fault Clearing Time(msec) Vpf (kV) Vf (kV) 400 100 360 60 220 160 200 33 132 16 120 19.8 110 160 96.25 16.5 66 300 60 9.9 C. Different LVRT Methodologies For Wecs LVRT capability can be implemented by using different methods. These methods can be classified as: ο‚· Without energy storage based approach:Active crowbar protection,Series Dynamic Braking Resistor (SDBR) and Pitch angle control ο‚· Energy storage based approach: Energy Storage Systems (ESS) and STATCOM technology. Detailed explanation of STATCOM technology is presented in the next section as this is the method used in this paper to provide LVRT requirement. III. STATCOM TECHNOLOGY FOR LVRT The basic diagram of STATCOM integrated to WECS connected to grid is shown in the previous chapter. Flexible AC transmission systems (FACTS) based power electronic converters such as static synchronous compensator (STATCOM) is used here to provide the LVRT requirement[2]. STATCOM can provide this requirement by injecting a reactive current which in-turn maintains the voltage at the point of common coupling. The STATCOM is a shunt-connected device using power electronics which can regulate the voltage at its terminals by controlling the amount of reactive power injected into or absorbed from the power system. STATCOM consists of a coupling transformer, voltage source converter and a dc capacitor. When the grid voltage becomes low, the STATCOM generates the reactive power for adjusting the system voltage. On the other hand, when the power system voltage becomes high, it absorbs the reactive power. Fig. 2. Block Diagram Of LVRT Testing Scheme Fig. 2 presents a schematic representation of a test setup to create a voltage disturbance in the electric network. When S1 is open and S2 is closed, it is like a symmetric fault. It can be seen that due to fault in the grid, the voltage available at WEG system terminal drops. A. Control Of STATCOM The control system of the STATCOM consists of a unit vector generation block, here since PLL technique is used, the block is given the name PLL. The phase angle ΞΈ is the output of the PLL system which is utilized to transform the three phase abc currents and voltages to the dq-axis currents and voltages. The error between the reference grid voltage and the actual grid voltage is evaluated by a PI controller and the output of PI controller is the reference q-axis reference current. Fig. 3. Control Of STATCOM The error between the reference DC-link voltage and the actual DC- link voltage is evaluated by a PI controller and the PI controller generates the d-axis reference current. An inner current controller loop produces the dq-axis reference voltage, and then it is converted to the three phase voltage reference. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 Β© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2167
  • 3. By using sinusoidal PWM, switching pulses are generated to drive the VSC. B. Unit Vector Generation For the safe and efficient operation of STATCOM, proper synchronization with grid is very essential. An accurate and fast detection of the phase angle, amplitude and frequency of the grid voltage is thus essential for determination of grid condition. In order to control the flow of reactive current and to turn on and off power devices, a set of unit sine and cosine wave forms which are synchronized with the system are required. Various grid synchronization algorithms or unit vector generation methods include zero crossing detector PLL, stationary reference frame PLL, SRF-PLL etc. Zero crossing detector PLL gives slow response with high sensitivity to frequency deviation and voltage unbalance and the stationary reference frame PLL is not capable of tracking un- balanced voltages properly. So among these SRF-PLL is the most commonly used unit vector generation method/ grid synchronization algorithm [3]. Unit vectors are two unity magnitude fundamental sinusoidal quantities, which are displaced by 90β—¦ from each other. One of the unit vector should be in phase with grid voltage. These unit vectors must be free from harmonics. Significance of unit vectors is that it helps to synchronize the STATCOM voltage and grid voltage. Fig. 4. Block Diagram Of SRF PLL SRF PLL is the most commonly used PLL algorithm for unit vector generation. The unit vectors generated are used for the transformation of voltages and currents from Ξ±Ξ² to dq frame. The unit vectors U1(Ο‰g) and U2(Ο‰g) are named as sinΞΈ and - cosΞΈ respectively. To obtain phase angle, voltage vector is synchronized with d or q axis. Basic block diagram of SRF PLL is shown in figure. If Vq = 0 is ensured, then VR(Ο‰g) will be synchronized with unit vector (U1(Ο‰g)). To ensure Vq = 0, a simple PI controller is used. [ 𝑉𝑑 π‘‰π‘ž ]=[ sin πœ” 𝑔′𝑑 βˆ’cos πœ” 𝑔′𝑑 cos πœ” 𝑔′𝑑 sin πœ” 𝑔′𝑑 ]= [ 3 2 𝑉𝑔 cos(( πœ” 𝑔 βˆ’ πœ” 𝑔′)𝑑) 3 2 𝑉𝑔 sin(( πœ” 𝑔 βˆ’ πœ” 𝑔′)𝑑) ] (1) If the phases are not locked i.e.Ο‰g β‰  Ο‰gβ€², then value of Vd and Vq is as shown above. [ 𝑉𝑑 π‘‰π‘ž ] = [ sin πœ” 𝑔′𝑑 βˆ’cos πœ” 𝑔′𝑑 cos πœ” 𝑔′𝑑 sin πœ” 𝑔′𝑑 ] [ 3 2 𝑉𝑔 sin πœ” 𝑔 𝑑 βˆ’ 3 2 𝑉𝑔 cos πœ” 𝑔 𝑑 ] = [ 3 2 𝑉𝑔 0 ] (2) If the phases are not locked i.e.Ο‰g = Ο‰gβ€², then value of Vd and Vq is as shown above. IV. DESIGN OF VOLTAGE SAG A symmetrical fault is simulated at the PCC with help of fault breaker in series with fault impedance as shown in Fig.3.1. The value of the fault impedance has been programmed to reduce the PCC voltage [4]. A dip in voltage can be created using the equation given below. π‘‰π‘ π‘Žπ‘” = π‘‰π‘Ÿπ‘Žπ‘‘π‘’π‘‘ 𝑍2 𝑍1 (3) V. SIMULATION AND RESULTS The parameter values used for the simulation is given in table II TABLE II. PARAMETERS FOR SIMULATION Sl. No Parameters Values STATCOM Data 1 DC Link Capacitor (C) 5500Β΅F 2 Inductance (L) 326.85Β΅ H 3 Resistor (R) 100mH 4 Reference DC link capacitor voltage (VDCref ) 850V 5 Current controller time constant (T1) 100Β΅s 6 Voltage controller time constant (T2) 100ms 7 Grid frequency (f) 50Hz 8 Switching Frequency 10KHz Wind Turbine Data 9 Power 600kW 10 No: of blades 3 11 Rated Wind Speed 9 m/s Generator Data 12 Rated power 600kW 13 Rated voltage 690V 14 Rated frequency 50HZ 15 Stator Resistance 0.0092Ω 16 Stator Inductance 0.1686H 17 Rotor Resistance 0.0121Ω 18 Rotor Inductance 5.6863H 19 Moment of inertia coefficient 0.555 20 No: of pole pairs 2 International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 Β© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2168
  • 4. The Fig. 5 shows the Simulink model of WECS with STATCOM connected to grid. In this model 66kV is stepped down to 690kV and then fed to the wind electric generator. Fault is introduced using an arrangement defined in the theory part. The STATCOM model is simulated using the equations mentioned above. In the control of STATCOM, SRF-PLL algorithm is implemented. The WECS used in the simulation takes the following values given in table II. Fig. 6 shows the expanded STATCOM subsystem with transformer at its terminal to step up the STATCOM voltage generated. Fig 6 Simulink model of STATCOM Fig 7 Simulink model of voltage transformation in STATCOM control Fig. 7 shows the voltage transformation in STATCOM control implemented using SRF- PLL simulated in the previous section. STATCOM rated 500kVA is connected in shunt with grid at PCC through a transformer, 415V/690V, for supporting reactive power requirement of WEG during fault condition. A symmetrical fault is simulated at the PCC with help of fault breaker in series with fault impedance. Fig 8 Simulink model of current transformation in STATCOM control Fig.8 shows the Simulink model of current transformation in STATCOM using the unit vectors generated above. Fig 9 Simulink model of voltage and current control in STATCOM control Fig 5 Simulink model of WECS with STATCOM connected to grid International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 Β© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2169
  • 5. Fig. 9 shows the generation of alpha and beta reference voltages using the voltage and current controllers. The switching pulses for the inverter are generated as shown in Fig.10 Here sinusoidal pulse width modulation technique is used. Figure 5.10 Simulink model of pulse generation in STATCOM Case I : The value of the fault impedance has been programmed with Z1 = 0.02 + 0.1696 j and Z2 = 0.084 + 0.7169 j to reduce the PCC voltage to 76% of rated voltage at 40ms and STATCOM is programmed to supply the reactive current requirement of fault at 200ms. Fig 11 Output of scope 2 with STATCOM programmed to supply reactive current (a) at 200msec (b) as soon as fault occurs TABLE III. CASE1:VOLTAGE AT PCC DURING FAULT AND STATCOMON CONDITIONS Normal Condition Fault Condition STATCOM On 690V 528V 630 690V 528V 630 690V 528V 630 From the above table III and waveforms in Fig.11 we can infer that the RMS voltage at PCC is getting improved to 630V from 528V when STATCOM is ON. This shows the capability of STATCOM in providing LVRT requirement. Fig 12 Output of scope 2 with STATCOM programmed to supply reactive current (a) at 200msec (b) as soon as fault occurs Case II : The value of the fault impedance has been programmed with Z1 = 0.08 + 0.1696 j and Z2 = 1.5 + 0.9708 j to reduce the PCC voltage to 81% of rated voltage at 40ms and STATCOM is programmed to supply the reactive current requirement of fault at 200ms. TABLE IV. CASE 2: VOLTAGE AT PCC DURING FAULT AND STATCOM ON CONDITIONS Line Voltage Normal Condition Fault Condition STATCOM On VRY 690V 565V 637 VY B 690V 565V 637 VBR 690V 565V 637 (a) (b) (a) (b) International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 Β© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2170
  • 6. From the above table and waveforms in Fig.12 we can infer that the RMS voltage at PCC is getting improved to 637V from 565V when STATCOM is ON. This shows the capability of STATCOM in providing LVRT requirement. VI. CONCLUSION Grid code requirements imposed by transmission system operators or grid operators are discussed. LVRT requirement is explained in detail. STATCOM technology providing the LVRT requirement is focused in this work. Simulations for STATCOM providing LVRT for grid connected WECS are carried out in MATLAB/Simulink environment. Hence it is concluded that the STATCOM technology can mitigate the voltage dip due to fault current by injecting capacitive reactive current of appropriate magnitude as per the Indian Grid code and it is a viable solution for effective integration of wind farm to electrical distribution systems. [1] Indian Wind Grid Code Draft.", 2009; pp.(15-18). [2] Ramirez, Dionisio, et al, "Use of STATCOM in wind farms with fixed- speed generators for grid code compliance" Renewable Energy, vol. 37, no. 1, pp. 202-212, 2012. [3] Andrews, Sajitha, TG Subhash Joshi, A. Saravana Kumar, A. S.Manju, and A. K. Unnikr- ishnan, "Modified SRF-PLL to operate under unbalance grid for grid synchronization of DVR", In 2014 IEEE International Conference on Power Electronics, Drives andEnergy Systems (PEDES), pp. 1-6. IEEE, 2014. [4] Bollen, Math HJ, "IEEE tutorial on voltage sag analysis," IEEE Press, 1999. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 Β© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2171 REFERANCES